Inspection history · 61
18 February 2026
Deficiency Check · Periodic Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8312458
8 April 2025
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8108495
12 February 2024
Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7866316
10 January 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7847946
19 January 2023
COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7624125
1 September 2022
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7548609
28 September 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7066845
22 May 2019
Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6690504
21 February 2019
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6629861
8 December 2017
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6320560
19 July 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5946153
6 July 2016
Hull Examination · Internal Structural Exam · Administrative Inspection · Cargo Tank Internal · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5932900
9 September 2015
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5718733
5 November 2014
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5018470
27 August 2014
Administrative Inspection · Cargo Tank Internal · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4966081
3 April 2014
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4845611
4 October 2013
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4728510
5 June 2013
Type not recorded
No type recorded · Station Grand Isle · USCG Heartland District (CGD-H) · Activity 4612662
13 September 2012
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4438924
30 August 2011
Cargo Tank Internal · Annual Inspection · Hull Examination · Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4131126
7 September 2010
COI Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3844542
10 December 2009
DAPI Audit · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3644076
18 August 2009
Internal Structural Exam · Examination of Repairs · Hull Examination · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3568971
16 December 2008
Annual Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3381141
26 September 2007
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3066393
23 October 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2806558
29 September 2006
MTSA Verification · Re-Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2789698
15 September 2005
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2501191
6 September 2004
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2198376
16 August 2004
Hull Examination · Re-Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2167435
16 October 2003
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1929617
17 July 2003
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1849339
11 December 2002
Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1717478
5 October 2001
Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1462271
19 September 2000
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1446986
14 January 2000
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 101318
22 September 1999
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1450344
7 December 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 672183
5 November 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 47447
24 September 1998
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1454602
25 August 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1131873
3 July 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 766635
29 June 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 793097
26 May 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 101151
26 May 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 198558
2 January 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 783524
17 September 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1116573
30 January 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1102000
25 September 1996
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1398544
8 September 1995
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1187971
13 September 1994
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1428388
27 July 1994
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1178241
28 December 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1414227
10 September 1993
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1451887
1 October 1992
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1431165
7 May 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1260291
1 April 1992
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 957847
8 January 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 950212
24 December 1991
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1268655
5 November 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 943387
19 September 1991
Initial Construction-Excluding Oversight · Hull Examination · Initial Certification · Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1252352
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 February 2026
Resolved
Electric installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. The fuel transfer pump is energized by opening the electrical cabinet and manually pushing the motor’s electrical contact button. Repair to operate as designed by the manufacturer to the satisfaction of the attending marine Inspector.
46 CFR 111.01-1(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 25 February 2026
Resolution: Verified the fuel transfer pump control panel is operating as designed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 February 2026
Resolved
Table 1 to § 95.50-10(b) indicates the minimum required number and type of extinguisher for each space listed. Extinguishers with larger numerical ratings or multiple letter designations may be used if the extinguishers meet the requirements of the table. Internal combustion or gas turbine propelling machinery spaces 40-B; 1 for each 1,000-brake horsepower; not less than 2 but not more than 6. Vessel is 4,000 brake horsepower and only has two 40-B hand portable fire extinguishers. Provide two additional 40-B hand portable fire extinguishers to comply with the regulation. To the satisfaction of the attending Marine Inspector.
46 CFR 95.50-10(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 25 February 2026
Resolution: Verified adequate fire extinguishers were outfitted in the engine room.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 February 2026
Resolved
Electric installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. The five (5) Pro Nautic battery chargers are not installed in accordance with the manufacturer’s requirements due to missing overcurrent, creating an electrical hazard. Install the correct amperage overcurrent protection on the output side of the battery charger in as per the manufacturer to the satisfaction of the attending Marine Inspector.
46 CFR 111.01-1(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 25 February 2026
Resolution: Verified correct overcurent protection was installed in accordance with the manufactureres instructions.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 18 February 2026
Resolved
The transfer procedures required by § 155.720 must contain, either in the order listed or by use of a cross-reference index page: A description of each transfer system on the vessel including: A line diagram of the vessel's transfer piping, including the location of each valve, pump, control device, vent, and overflow. Missing the fuel manifold transfer system line diagram. Provide the fuel transfer line diagram to the satisfaction of the attending Marine Inspector.
33 CFR 155.750(a)(2)(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 25 February 2026
Resolution: Verified the fuel transfer system line diagram is posted at the fuel manifold.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 18 February 2026
Resolved
Gears, couplings, flywheels, and all rotating machinery capable of injuring personnel must be provided with adequate covers or guards. The starboard steering gear pump coupling protective cover is missing. Install protective cover to the satisfaction of the attending Marine Inspector.
46 CFR 58.01-20
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 25 February 2026
Resolution: Verified starboard stearing gear pump coupling protective cover was installed.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 18 February 2026
Resolved
Each forced draft fan induced draft fan, blower of an inert gas system, fuel oil transfer pump, fuel oil unit, fuel oil service pump, and any other fuel oil pumps must have a stop control that is outside of the space containing the pump or fan. Attending Marine Inspector could not witness the fuel pump emergency stop due to a faulty pump controller. Repair fuel transfer pump controller and test the emergency stop in the presence of the attending Marine Inspector.
46 CFR 111.103-9(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 25 February 2026
Resolution: Verified satisfactory operation of the fuel transfer pump emergency stop.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 8 April 2025
Resolved
(a) In General.-A vessel engaged in commercial service that does not carry passengers, shall maintain a video surveillance system.
(c) Placement of Video and Audio Surveillance Equipment.-
(1) In general.-The owner of a vessel to which this section applies shall install video and audio surveillance equipment aboard the vessel not later than 2 years after enactment of the [name withheld] Coast Guard Authorization Act of 2022, or during the next scheduled drydock, whichever is later.
(2) Locations.-Video and audio surveillance equipment shall be placed in passageways on to which doors from staterooms open. Such equipment shall be placed in a manner ensuring the visibility of every door in each such passageway. While reviewing the vessel’s SASH Policy, company removed mattresses to allow for only 09 crew on the vessel. The COI has total persons allowed at 24. Company must install video and audio surveillance equipment in passageways on to which door from staterooms open.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 May 2025
Resolved 2 May 2025
Resolution: Operator installed new surveillance equipment to meet SASH requirements.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 10 January 2024
Resolved
a) Fire detection, manual alarm, and supervised patrol systems are not required except in special cases; but if installed, the systems must meet the applicable requirements of 46 CFR, part 76 of subchapter H (Passenger Vessels) of this chapter.
(a) Detectors must be responsive to heat, smoke, or other products of combustion, flame, or any combination of these factors. Smoke detector located in the galley does not work.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2024
Resolved 13 January 2024
Resolution: Detector replace and tested satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 January 2024
Resolved
Each individual bilge suction shall be fitted with a suitable bilge strainer having an open area of not less than three times at of the suction pipe. In addition a mud box or basket strainer shall be fitted in an accessible position between the bilge suction manifold and the pump. There are no strainers for the bilge suction piping.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 February 2024
Resolved 22 January 2024
Resolution: RCVD pictures of new bilge strainers installed (See Documents Section under Deficiencies).
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 10 January 2024
Resolved
Clear instructions must be provided on the vessel that detail the actions each person on board should follow in the event of an emergency. Crew was unable to initially operate bilge suction during test. Need clear instructions for operation and valve alignment.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 January 2024
Resolved 13 January 2024
Resolution: Instructions implemented and posted.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 24 February 2023
Resolved
Each vessel must carry not less than 12 rocket parachute flares approved under approval series 160.136. Vessel outfitted with six hand red hand and six hand orange smoke flares. Vessel restricted from carrying persons other than crew until 12 rocket parachute flares approved under approval series 160.136 are provided. 46 CFR 199.60(c)
Action required: 705 - Other - as specified
Resolved 2 March 2023
Resolution: 12 rocket parachute flares were verified to be outfitted on the vessel to the satisfaction of the attending Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 24 February 2023
Resolved
Each life raft or group of life rafts must be arranged for float-free launching. The arrangement must ensure that the lifer aft or life rafts, when released and inflated, are not dragged under by the sinking vessel. Port side life raft mounted on the deck under the ladder leading to and from the main deck and 01 deck and the 01 deck overhanging superstructure. Relocate life raft to ensure the arrangement is float-free from any surrounding obstructions. 46 CFR 199.130(c)(7)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 March 2023
Resolved 2 March 2023
Resolution: The vessel's port life raft was relocated to a location just forward of its original location that facilitates the life raft installation's float free condition.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 February 2023
Resolved
All fire hose must be subjected to a test pressure equivalent to the maximum pressure to which they may be subjected in service, but not less than 100 psi. Fire main pressure was recorded to be 80 psi. Provide a test pressure of at least 100 psi to the satisfaction of the the attending MI conduct the fire hose inspection. 46 CFR 91.25-20(a)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 March 2023
Resolved 2 March 2023
Resolution: A satisfactory 100 PSI hydrostatic test was witnessed by the attending Marine Inspector.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 21 February 2019
Resolved
Vessel does not have updated notice of intent (NOI), vessel must submit and update NOI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2019
Resolved 26 February 2019
Resolution: Updated NOI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 February 2019
Resolved
Vessel has inacurate rudder angle indicator. Ensure rudder angle indicator operates properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2019
Resolved 26 February 2019
Resolution: Replaced both fwd and aft rudder angle indicators and tested.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 21 February 2019
Resolved
Lifefloat weak link was not the appropriate size vessel had 11-20 persons instead of 21 or more. Replace weak link with correct capacity.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2019
Resolved 26 February 2019
Resolution: Replaced weak link with 21+ capacity
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 21 February 2019
Resolved
EPIRB battery and hydrostatic release were both expired. Both need to be replaced.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2019
Resolved 26 February 2019
Resolution: Purchased new EPIRB with valid battery and registration
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 21 February 2019
Resolved
Vessel has multiple navigation lights in-operable. Replace any in-Op lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 March 2019
Resolved 26 February 2019
Resolution: All lights were replaced and tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 February 2019
Resolved
Multiple engine fuel filters are missing plugs. Replace all missing plugs in all fuel strainers.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2019
Resolved 26 February 2019
Resolution: All filter plugs were installed
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 8 December 2017
Resolved
Alcohol test strips onboard were expired. Obtain up to date test strips.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Recieved picture via text of new test strips.
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 8 December 2017
Resolved
Tachometer doesn't work when going ahead on port engine.
Action required: 705 - Other - as specified
Due 15 December 2017
Resolved 13 December 2017
Resolution: Recieved emailed video of properly working tachometers on bridge.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 8 December 2017
Resolved
Vessel had not conducted an abandon ship drill since 06/22/17. Provide proof of proper logging of conducted drills.
Due 8 December 2018
Resolved 26 February 2019
Resolution: All sat
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 8 December 2017
Resolved
Vessel only had 10 good lifejackets onboard. Restricted to 10 persons onboard until vsl obtains more lifejackets.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Recieved picture via text of 10 new lifejackets for a total of 20. Vessel obtained a new type of jacket and sent a picture of the new donning placard as well.
Engineering › Fuel Oil Service System › Filter
Issued 8 December 2017
Resolved
Fuel filters missing flame shield. Provide evidence of installed flame sheilds on filters.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Recieved picture via text of fuel filters with flame sheilds.
Engineering › Steering Gear System › Rudder
Issued 8 December 2017
Resolved
Shaft packing leaking in excess. Tighten shaft packing to prevent leaking.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Recieved emailed videos of both shaft packings not leaking for 2 min.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 8 December 2017
Resolved
Show proper operation of ground indicator on switchboard.
Action required: 705 - Other - as specified
Due 15 December 2017
Resolved 8 December 2017
Resolution: Recieved emailed video of ground detector working properly, ie. remaining on both when the button is pressed and when it is not.
Construction/Loadline › Structures › Door
Issued 8 December 2017
Resolved
Doors on back deck to engine room not weathertight. Tighten doors and proove weathertight.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2017
Resolution: Recieved video via text of sealed weathertight doors showing no light coming through.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 19 July 2016
Resolved
Crew could not prove to MI that they could retrieve somebody from the water, lack of experience and roles and responsibilities.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 July 2016
Resolved 20 July 2016
Resolution: [name withheld] attended vessel and witness a satisfactory MOB Drill
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 19 July 2016
Resolved
Lagging missing on exhaust.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 July 2016
Resolved 20 July 2016
Resolution: Lagging installed
Electrical › Electric Supply System (service) › Battery Installation
Issued 19 July 2016
Resolved
Batteries in the engine room and passageway were not properly secured in boxes that could prevent them from moving.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 July 2016
Resolved 20 July 2016
Resolution: Battery trays were made and welded too deck
Electrical › Electrical Distribution System (service) › Switchboard
Issued 19 July 2016
Resolved
Interlock on switchboard would not work properly because door of switchboard was not properly securied.
Action required: 705 - Other - as specified
Due 19 July 2016
Resolved 19 July 2016
Resolution: Corrected on spot
Engineering › Pressure Vessel › Pressure Gauge
Issued 19 July 2016
Resolved
Pressure gauges on air recievers were cracked and unreadable.
Action required: 705 - Other - as specified
Due 24 July 2016
Resolved 20 July 2016
Resolution: New Pressure Gauges added
Communications › Radio Communications › EPIRB
Issued 19 July 2016
Resolved
Provide registration sticker for EPIRB
Action required: 705 - Other - as specified
Due 24 July 2016
Resolved 6 October 2016
Resolution: Spoke with Vessel rep and he stated new sticker was applied. Epirb wass currently registered with NOAA
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1-Routine Visual Inspections
Issued 19 July 2016
Resolved
Vessel was noty keeping any logs as required. To be corrected at next annual inspection.
Action required: 705 - Other - as specified
Due 19 July 2017
Resolved 26 February 2019
Resolution: All sat
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 19 July 2016
Resolved
Epirb monthly checks not being logged. To be cleared at next annual inspection
Due 19 July 2017
Resolved 26 February 2019
Resolution: All sat
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 19 July 2016
Resolved
Port, Stern and anchor lights not working.
Action required: 705 - Other - as specified
Due 19 July 2016
Resolved 19 July 2016
Resolution: Electrician corrected on spot.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 19 July 2016
Resolved
Alcohol test strips were expired by 2 years.
Action required: 705 - Other - as specified
Due 19 July 2016
Resolved 19 July 2016
Resolution: Corrected on spot.
Communications › Alarms/Indicators › Propeller Speed Indicator
Issued 5 November 2014
Resolved
SHAFT SPEED INDICATORS INOPERABLE AT BRIDGE CONTROLS. PROVE PROPER OPERATION OF SHAFT TACH. CITE: 46 CFR 113.37-5. DUE: 05DEC2014.
Condition: Improper/Lack of Maintenance
Due 19 December 2014
Resolved 10 December 2014
Engineering › Pressure Vessel › Shell Plate
Issued 13 September 2012
Resolved
Renew aft air receiver due to wastage behind data plate.
Condition: Improper/Lack of Maintenance
Due 12 October 2012
Resolved 27 September 2012
Resolution: Vessel rep remove old receiver from service and provided a receipt for the replacement air receiver.
Communications › Internal Communications System › Sound-powered Telephone
Issued 13 September 2012
Resolved
Repair sound power phone ringer from bridge to engine room.
Condition: Improper/Lack of Maintenance
Due 16 September 2012
Resolved 17 September 2012
Resolution: Provided 3rd party service report staing the system was repaired and tested sat.
Electrical › Electric Supply System (service) › Cable
Issued 30 August 2011
Resolved
Wire between PORT Engine Room Blower and its control box needs to be replaced with approved marine wiring. Wire sparked when blower was place in on position.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2011
Resolution: All wire for Blower was replaced. Sat operation of system checked.
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 30 August 2011
Resolved
Battery backup for nav equipment and Bridge Emergency equipment not working properly. Show proper operation of emergency power for navigation/General Alarm/PA.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2011
Resolution: Battery and constavolt charger replaced. Proper operation demonstrated to the satisfaction of MI.
Engineering › Steering Gear System › Ram
Issued 30 August 2011
Resolved
Steering system only reaching 5 degree hard port and 20 degrees hard STBD. Further investigation revealed improper Ram placed in system. Replace ram and demonstrate proper operation of steering gear.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2011
Resolution: Ram was replaced and full movement of rudders was demonstrated to the MI.
Engineering › Fuel Oil Service System › Hose
Issued 10 December 2009
Resolved
Renew all flexible hases as marked on both main engines, both generators, and the bow thruster engine (approx 12 hoses).
Action required: 705 - Other - as specified
Due 10 January 2010
Resolved 22 December 2009
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 10 December 2009
Resolved
Provide and install shaft guard on the dirty oil pump.
Action required: 705 - Other - as specified
Due 10 January 2010
Resolved 22 December 2009
Communications › Alarms/Indicators › General Alarm
Issued 10 December 2009
Resolved
Provide and install new general alarm light in the Engine Room and provide warning placard.
Action required: 705 - Other - as specified
Due 10 January 2010
Resolved 22 December 2009
Construction/Loadline › Structures › Door
Issued 26 September 2007
Resolved
Port Engine room escape vestibule WTD did not seal properly
Due 3 October 2007
Resolved 3 October 2007
Operations/Management › Drills/Instruction › Not Conducted
Issued 26 September 2007
Resolved
Vessel had new crew onboard and new operator, had not logged any drills
Due 4 October 2007
Resolved 26 September 2007
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 26 September 2007
Resolved
Rudder angle indicator inoperable.
Due 4 October 2007
Resolved 3 October 2007
Electrical › Lighting (emergency) › Lighting Fixture
Issued 26 September 2007
Resolved
Stbd side escape vestibule lighting broke
Due 4 October 2007
Resolved 3 October 2007
Engineering › Fuel Oil Service System › Hose
Issued 20 August 2004
Resolved
Renew 2 fuel lines flexible hoses on bow thruster.
Action required: 705 - Other - as specified
Due 20 September 2004
Resolved 23 August 2004
Resolution: Installed correct flexible hoses.
Engineering › Fuel Oil Service System › Hose
Issued 20 August 2004
Resolved
Renew 3 fuel oil flexible hoses on starboard main engine and 2 hoses on port main engine.
Action required: 705 - Other - as specified
Due 20 September 2004
Resolved 23 August 2004
Resolution: Installed correct flexible hoses.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 20 August 2004
Resolved
Make air receivers ready for visual inspection of accesses to internals of receivers prior to sailing, take thickness measurements on collars and hydro tanks as required by 46 CFR 61.10.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 September 2004
Resolved 23 August 2004
Resolution: Replaced both tanks with approved tanks.
Stability › Watertight Integrity
Issued 16 October 2003
Resolved
Make repairs to port side engine room emergency escape watertight door. LEGACY COMPONENT DESC: Emergency escape watertight door
Action required: 17 - Rectify deficiencies prior to departure
Due 16 November 2003
Resolved 17 October 2003
Engineering › Thrusters
Issued 16 October 2003
Resolved
Renew two marked fuel hoses and repair fuel leak on bow thruster engine. LEGACY COMPONENT DESC: Hose
Action required: 705 - Other - as specified
Due 16 November 2003
Resolved 17 October 2003
Engineering › Fuel Oil Service System › Filter
Issued 16 October 2003
Resolved
Provide flame shield on aft generator fuel filter.
Action required: 705 - Other - as specified
Due 16 November 2003
Resolved 17 October 2003
Fire Fighting › Miscellaneous Items
Issued 16 October 2003
Resolved
Provide placards for engine room fire station. LEGACY COMPONENT DESC: Placards
Action required: 705 - Other - as specified
Due 16 November 2003
Resolved 17 October 2003
Navigation › Piloting/Steering › Magnetic Compass
Issued 11 December 2002
Resolved
PROVIDE CURRENT DEVATION CARD.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 11 January 2003
Resolved 12 December 2002
Lifesaving › Buoyant Apparatus
Issued 11 December 2002
Resolved
PROVIDE SPACERS BETWEEN LIFE FLOATS. LEGACY COMPONENT DESC: SPACERS
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 11 January 2003
Resolved 11 December 2002
Engineering › Fuel Oil Service System › Hose
Issued 11 December 2002
Resolved
RENEW FORWARD GENERATOR FUEL OIL FLEXIBLE HOSE.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 11 January 2003
Resolved 11 December 2002
Construction/Loadline › Structures › Door
Issued 11 December 2002
Resolved
ADJUST DOGS ON ALL WATERTIGHT DOORS.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 January 2003
Resolved 11 December 2002
Accommodation/Occupational Safety
Issued 24 September 1998
Resolved
PROVIDE SEWAGE HOLDING TANK 3/4 FULL LEVEL INDICATOR.
Condition: Unknown
Due 24 October 1998
Resolved 1 October 1998
Electrical
Issued 24 September 1998
Resolved
PROVIDE EMERGENCY POWER FOR SSB RADIO.
Condition: Unknown
Due 24 October 1998
Resolved 1 October 1998
Engineering
Issued 24 September 1998
Resolved
MAKE OPERABLE, REMOTE PROPULSION ENGINE STOPS AT PILOT HOUSE CONTROL.
Condition: Unknown
Due 14 September 2015
Resolved 14 September 2015
Accommodation/Occupational Safety
Issued 24 December 1991
Resolved
PROVIDE APPROVAL FOR INSTALLED TOAST MASTER RANGE AS REQUIRED BY 46 CFR 111.77-3.
Condition: Unknown
Due 14 September 2015
Resolved 14 September 2015
Electrical
Issued 24 December 1991
Resolved
PROVIDE APPROVED PLANS OF DECK WIRING AS REQUIRED BY 46 CFR 110.25-1.
Condition: Unknown
Due 14 September 2015
Resolved 14 September 2015
Engineering
Issued 24 December 1991
Resolved
PROVIDE APPROVAL OF BOTH PRESSURE VESSELS MADE BY MANCHESTER TANK AS REQUIRED BY 46 CFR 54.01-5(D) AND CORROSION ALLOWANCE AS REQUIRED BY 46 CFR54.01-35.
Condition: Unknown
Due 14 September 2015
Resolved 14 September 2015