Records from 2017 to 2026. Most recent: inspection, 17 June 2026.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 December 2024
Resolved
At each initial and subsequent inspection for certification and reinspection the firefighting equipment of all vessels shall be inspected and all deficiencies found shall be corrected. Fixed and portable fire fighting has not been serviced.
46 CFR 176.25-25
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 23 December 2024
Resolution: Corrected. Servicing tags provided by [name withheld].
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 6 December 2024
Resolved
Portable fire extinguishers shall be installed and located to the satisfaction of the Officer in Charge, Marine Inspection. Portable fire extinguishers were not permanently mounted.
46 CFR 181.30-10 (b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 26 December 2024
Resolution: Extinguishers are permanently mounted.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 December 2024
Resolved
All fuel tanks shall be electrically bonded to the common ground. Ensure fuel tanks are electrically bonded and recommended attaching bonding inside port & stbd lazarette and engine spaces.
46 CFR 182.20-25 (b)(4)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 19 December 2024
Resolution: Each fuel tank had properly installed electrical bonding.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 6 December 2024
Resolved
Remote fuel shutoff stations shall be marked in at least 1-inch letters indicating purpose of the valve and direction of operation. Missing labels for port and stbd emergency fuel shutoffs.
46 CFR 185.30-20 (a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 19 December 2024
Resolution: Remote fuel shutoffs rearranged to not require marking per CFR.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 December 2024
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. Vessel must meet CFR requirement for fuel shutoff valves.
46 CFR 182.20-40 (b)(3)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 19 December 2024
Resolution: Vessel rearranged their fuel shutoffs to meet regulations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 December 2024
Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). Vessel did not have portable hand bilge pump on board.
182.25-10 (a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 19 December 2024
Resolution: Vessel procured a portable hand bilge pump.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 December 2024
Resolved
Unless the service is such that children are never carried, there shall be provided a number of approved life preservers suitable for children equal to at least 10 percent of the total number of persons carried. Not enough child sized life jackets onboard. Vessel prohibited from carrying more than 05 passengers under 90 pounds until deficiency cleared.
46 CFR 180.25-5 (a) (Old T)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 19 December 2024
Resolution: Vessel procured an additional child size life jacket.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 6 December 2024
Resolved
A hatch cover must be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Port fuel tank compartment hatch not secured.
46 CFR 179.360 (3)(b)(2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 26 December 2024
Resolution: Laynard was attached to hatch cover.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 6 December 2024
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Placards for lifejackets, MARPOL, fire extinguishers, lifejacket donning instructions, and emergency instructions for weather at sea missing; post placard.
46 CFR 185.516 (a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 19 December 2024
Resolution: Placards posted throughout the vessel.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage comminuting and disinfecting system
Issued 6 December 2024
Resolved
At each initial and subsequent inspection for certification, reinspection and at every other vessel inspection the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. Sewage storage tanks were not secured in the lazarettes.
46 CFR 176.830 (a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 December 2024
Resolved 19 December 2024
Resolution: Sewage storage tanks now secured in the lazarette spaces.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to test the steering systems of the vessel and make them available for inspection to the extent extent necessary to determine that they are in suitable condition and fit for the service intended.
Port rudder was loosely seated. Make ready for inspection.
46CFR176.814
Action required: 705 - Other - as specified
Resolved 3 May 2024
Resolution: Vessel replaced rudder bearing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2024
Resolved
During the examination all accessible parts of the vessels underwater body and all through hull fittings including the propellers, shafts, bearings shall be made available for examination. Clean propellers and make available for inspection.
46CFR176.670
Action required: 705 - Other - as specified
Resolved 3 May 2024
Resolution: Vessel cleaned rudder and it was inspected satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Grind down to good fiberglass all areas of suspected delamination on both hulls and wing deck forward and aft identified by attending marine inspectors.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 13 May 2024
Resolution: Vessel repaired all areas of delamination.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Grind back starboard side of old anchor mount, port side stairs leading to bow, and provide repair proposal for deck repair that has already begun.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Grind down to good fiberglass identified areas surrounding the starboard engine hatch. Provide repair proposal for identified areas.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Grind down to good material outboard frame in the center of the starboard engine room. Provide repair proposal.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Grind down to good material inboard frame in the center of the port engine room. Provide repair proposal.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Ring frame separating port lazarette from port engine room wasted at turn of bilge. Provide repair proposal.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Port and starboard engine mounts were severely corroded. Clean and make ready for inspection.
46CFR182.100
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Decks in port and starboard head showed signs of delamination. Grind down and make available for inspection the decks in the port and starboard engine rooms.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Stern crossbeam was wasted in 3 areas below vessel name sign and starboard swim ladder. Grind down to good material and make available for inspection. Provide repair proposal.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Vessel provided repair proposal and completed satisfactory repairs.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 April 2024
Resolved
Each hatch exposed to the water must be watertight. Renew gaskets on deck hatches.
46CFR171.124
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Gaskets renewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 29 April 2024
Resolved
At each inspection of a vessel, the owner or managing operator shall be prepared to conduct tests including the following: Inspection and operation of through hull fittings and sea valves. Make remaining through hull fittings available for inspection.
46CFR176.802(a)(2)
Action required: 705 - Other - as specified
Resolved 3 May 2024
Resolution: Sea valves were removed and inspected satisfactorily.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 April 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: protect passengers, crew, other persons and the vessel from electrical hazards. Electrical panels at operating station had exposed components.
46CFR183.200(b)
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: All electrical components installed satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Remove starboard rub rail to make hull available for inspection. Provide repair proposal for port side where the hull meets the deck where port rub rail was removed.
46CFR177.300
Action required: 705 - Other - as specified
Resolved 13 May 2024
Resolution: Vessel repaired delaminated areas of fiberglass.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 April 2024
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Suspected areas of delamination found on wing deck near drains from port and starboard heads. Grind down to good fiberglass and provide repair proposal.
6CFR177.300
Action required: 705 - Other - as specified
Resolved 13 May 2024
Resolution: Vessel repaired all delaminated areas.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2024
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing machinery failure. Hydraulic hoses for steering ram in port and starboard lazarettes were wasted. Replace hoses.
46CFR182.100
Action required: 705 - Other - as specified
Resolved 6 December 2024
Resolution: Hydraulic fittings replaced.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 May 2023
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have a means to reset devices used to automatically shut down engines. The fixed gas system for the starboard engine compartment could not be reset. Restore and demonstrate functionality of the reset for the starboard engine.
46 CFR 181.420(b)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 25 May 2023
Resolution: Vessel pre-engineered system proven to operate properly.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 May 2023
Resolved
A marine employer whose vessel is involved in a casualty or incident that is, or is likely to become, a serious marine incident shall comply with the requirements of 46 CFR 4.06. The required alcohol swabs on the vessel were expired. Provide valid alcohol swabs on the vessel or demonstrate ability to conduct proper alcohol testing.
46 CFR 185.212
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 30 May 2023
Resolution: Alcohol swabs provided.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 24 May 2023
Resolved
The EPIRB tests shall be logged or otherwise documented. There was no documentation for the testing of the EPIRB. Log required monthly testing of the EPIRB.
46 CFR 185.728(c)
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2023
Resolved 25 May 2023
Resolution: EPIRB testing properly logged.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 24 May 2023
Resolved
Abandon ship and man overboard drills and training shall be logged or otherwise documented. The drill entry shall include date of the drill and training and general description of the scenario and topics. The drill records did not include any of the required information. Enter required information when logging drills.
46 CFR 185.212(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 25 May 2023
Resolution: Drill properly logged.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 24 May 2023
Resolved
A vessel must comply with the applicable requirements for any radio installations certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR 80. The Radiotelegraph Operator's Certificate for the vessel is expired. Renew the certificate.
46 CFR 184.502
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 1 June 2023
Resolution: A valid FCC Safety Radiotelephony Certificate was provided.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 June 2022
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the navigation rules. The starboard running light was extinguished. Provide operational navigation lights.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 June 2022
Resolution: Starboard nav light was repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 June 2022
Resolved
A vessel must carry one floating waterlight attached to a life buoy, unless it is limited to daytime operation, in which case no floating waterlight is required. The provided floating waterlight was extinguished. Provide an operational floating waterlight. Vessel is restricted to daytime operations.
46 CFR 180.70(d)
Action required: 705 - Other - as specified
Resolved 22 June 2022
Resolution: Vessel's floating waterlight operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 May 2022
No resolution recorded
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI. Vessel experienced an overheating main engine causing the head gasket to fail resulting in the loss of the engine. Until repair of the engine is completed and proper operation of the main engine and propulsion is demonstrated to the satisfaction of Coast Guard Marine Inspector carriage of passengers is not permitted.
46 CFR 176.20-1(a)
Action required: 701 - Prior to carriage of passengers/cargo
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 March 2021
Resolved
An inspection for renewal of a Certificate of Inspection is conducted to determine if the vessel is in satisfactory condition, fit for the service intended, and complies with all applicable regulations. The vessel is not in compliance with Work Instruction 31 due to not having Oxygen onboard or a Written Policy in place.
46CFR176.404(a)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 16 April 2021
Resolution: WI 31 removed from vessel's COI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 17 March 2021
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018. 16 Adult PFD’s had wasted retroreflective tape. The vessel’s total number of persons onboard is reduced to 37 until the retroreflective tape is replaced on the 16 Adult PFD’s to the satisfaction of the attending Marine Inspector.
46CFR185.604(h)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 31 March 2021
Resolution: Type I retro replaced for 16 Adult PFDs.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 March 2021
Resolved
Rails on passenger decks of a vessel engaged in excursion trips must be at least 39.5 inches high, and rail courses must be spaced at intervals of not more than 4 inches. The vessel’s aft rail on the upper deck was missing 4 inch courses or the equivalent. The use of the upper deck for carriage of passengers is prohibited until the 4 inch courses are installed.
46CFR177.900(g)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 31 March 2021
Resolution: Courses reinstalled.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 17 March 2021
Resolved
Portable fire extinguishers must be located so that they are clearly visible and readily accessible from the space protected. The aft starboard portable fire extinguisher bracket is not mounted. Properly mount the fire extinguisher bracket.
46CFR181.520
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 31 March 2021
Resolution: Fire extinguisher properly mounted.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 17 March 2021
Resolved
Provision must be made for closing all supply duct and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. The starboard aft ventilation closure needs to be adjusted to properly seal off vent. Adjust the ventilation closure to completely seal off the vent to prevent the escape of firefighting medium.
46CFR182.465(h)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 31 March 2021
Resolution: Ventilation closure adjusted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 March 2021
Resolved
Flexible hose installed in lengths of not more than 30 inches and subject to pressures of not more than 5 psig may meet the following requirements: flexible hose designed for use with hose clamps may be installed with two clamps. The starboard main engine exhaust hose had a broken hose clamp. Replace the wasted hose clamp.
46CFR182.720(e)(3)(v)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 31 March 2021
Resolution: Hose clamp replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 17 March 2021
Resolved
Life jackets must be stored in convenient places distributed throughout accommodation spaces. The upper deck has life jacket labeling where life jackets are not actually stowed. Remove the old labeling for the upper deck life jacket stowage which is no longer used.
46CFR180.78(a)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 16 April 2021
Resolution: Old labeling removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 March 2021
Resolved
A submersible electric bilge pump may be used as a power bilge pump provided that the pump is listed by an independent laboratory as meeting the requirements in UL 1113. The bilge pumps located in the Port and Starboard Engine Rooms are not UL rated. Replace the electric bilge pumps with the UL rated type.
46CFR182.520(e)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 18 May 2021
Resolution: Operator installed UL rated bilge pumps in the Port and Starboard Engine Room Compartments.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 March 2021
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. The visual indicators are operable, but not labeled. Label visual indicators to properly identify the operation of the automatic electric bilge pumps.
46CFR182.530(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2021
Resolved 31 March 2021
Resolution: Visual indicators labeled.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 March 2021
Resolved
The alcohol testing of each individual must be conducted within 2 hours of when a Serious Marine Incident occurred. The vessel’s alcohol test strips were expired. Replace alcohol test strips.
46CFR6.03(a)(i)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 16 April 2021
Resolution: Alcohol test strips replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 March 2021
Resolved
Electrical equipment exposed to corrosive environments must be of suitable construction and corrosion-resistant. The two electrical terminal blocks providing power to the electric submersible bilge pumps are corroded. Clean and properly protect the terminal blocks to the satisfaction of the Marine Inspector.
46 CFR 183.210(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 16 April 2021
Resolution: Terminal blocks replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 17 March 2021
Resolved
A hatch cover must be attached to the frame or coaming by captive chains or other devices of substantial strength to prevent its loss. The vessel’s hatch covers did not have captive chains installed to the hatch frames. Attach the captive chains/lanyards to the hatch frames.
46CFR179.360(b)(2)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 16 April 2021
Resolution: Chains reattached to hatch frames.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 March 2021
Resolved
When the flexible section is a nonconductor of electricity, the metallic sections of the fill pipe separated thereby must be joined by a conductor for protection against generation of a static charge when filling with fuel. The fuel fill for the port fuel oil tank and starboard fuel oil tank were not properly grounded. Properly ground the fuel fill to the satisfaction of the Marine Inspector.
46CFR182.450(g)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 April 2021
Resolved 16 April 2021
Resolution: Fuel tank ground renewed.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 17 March 2021
Resolved
The shutoff valve at the fuel tank must be manually operable from outside the compartment in which the valve is located. The emergency fuel shutoff for the port diesel fuel tank did not completely close the fuel valve. Adjust the fuel shutoff to completely close the fuel valve.
46CFR182.455(b)(4)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 March 2021
Resolved 17 March 2021
Resolution: Emergency fuel shutoff corrected in the presence of the Marine Inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 4 January 2021
Resolved
A hatch cover must have securing devices and be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Repair hinges and keepers for starboard engine room hatch cover and reattach captive chain.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 January 2021
Resolution: Repaired hinges.
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 4 January 2021
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Install protective cover for power take-off belt for pumps driven off the front of both engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 January 2021
Resolution: Installed belt covers for both engines.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 November 2020
Resolved
During the examination all accessible parts of the vessels underwater body and all through hull fittings including the propellers, shafts, bearings shall be made available for examination. Fiberglass damage observed inside starboard stern tube, but obstructed by shaft. Marine growth covering both rudders and shafts. Pitting observed on rudders. Clean up and remove shafts and rudder posts for inspection by Marine Inspector.
46CFR61.20-23
Action required: 705 - Other - as specified
Resolved 22 December 2020
Resolution: Replaced cutlass bearings
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 November 2020
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Provide repair plans for the marked areas on hull exterior as discussed, to include interior of starboard stern tube and stepladder support area.
46CFR176.700(a)
Action required: 705 - Other - as specified
Resolved 22 December 2020
Resolution: Repaired indicated areas on hull
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 23 November 2020
Resolved
Each hatch exposed to the weather must be watertight. Replace gasket for the starboard engine compartment.
46 CFR 171.124(a) “Old T”
Action required: 705 - Other - as specified
Resolved 4 January 2021
Resolution: Vessel installed new gasket.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 23 November 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Starboard shaft support is missing a screw, bolt and washer. Reinstall.
46CFR182.01-5(a) "Old T"
Action required: 705 - Other - as specified
Resolved 21 December 2020
Resolution: Reinstalled screw, bolt and washer.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 23 November 2020
Resolved
All machinery must be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure and personnel injury. Hydraulic piping on starboard engine deteriorated. Replace in kind.
46CFR182.01-5(a) "Old T"
Action required: 705 - Other - as specified
Resolved 29 December 2020
Resolution: Installed new hoses.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 November 2020
Resolved
A pre-engineered fixed gas fire extinguishing system must: Be installed in accordance with the manufacturer's instructions. Dead end wire enclosed in Fireboy electrical cable. Remove dead end wire.
46CFR181.420(a)(4)
Action required: 705 - Other - as specified
Resolved 29 December 2020
Resolution: Capped off wire.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 23 November 2020
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practical. Cable penetration on the forward fuel tank room bulkhead on starboard side has a penetration that is not vapor tight. Provide a proper seal to prevent the passage of vapors.
46CFR177.10-5(a) “Old T”
Action required: 705 - Other - as specified
Resolved 21 December 2020
Resolution: Sealed cable penetration.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 November 2020
Resolved
At each inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances including the following: Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks. Clean up horizontal beam in compartment directly forward of the fuel tank room for inspection as discussed.
46CFR176.802(a)(1)
Action required: 705 - Other - as specified
Resolved 21 December 2020
Resolution: Vessel prepared beam for inspection. All sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 November 2020
Resolved
At each inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances including the following: Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks. Drain forward-most compartment for inspection.
46CFR176.802(a)(1)
Action required: 705 - Other - as specified
Resolved 21 December 2020
Resolution: Vessel drained fwd compartment for inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 23 November 2020
Resolved
Deck rails must be designed and constructed to withstand a point load of 200 pounds applied at any point in any direction. Reattach deck rail on starboard side.
46CFR177.900(b)
Action required: 705 - Other - as specified
Resolved 29 December 2020
Resolution: Reattached deck rail.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 November 2020
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Provide repair plan for port forward bulkhead vertical support frame.
46CFR176.700(a)
Action required: 705 - Other - as specified
Resolved 21 December 2020
Resolution: Replaced and installed new wood support frame.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 November 2020
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Provide repair plan for forward bulkhead of the compartment directly forward of the port fuel tank.
46CFR176.700(a)
Action required: 705 - Other - as specified
Resolved 21 December 2020
Resolution: Replaced and installed new wood bulkhead.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 23 November 2020
Resolved
Sea chests, sea valves, and sea strainers must be opened for examination.
46CFR176.610(a)
Action required: 705 - Other - as specified
Resolved 21 December 2020
Resolution: Vessel made remaining sea valves ready for inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 23 November 2020
Resolved
Each vessel must have permanent draft marks at each end of the vessel or have permanent loading marks placed on each side of the vessel forward and aft to indicate the maximum allowable trim and amidships to indicate the maximum allowable draft. Vessel must be marked IAW 46 CFR 185.602(c).
46CFR185.602(c)
Action required: 705 - Other - as specified
Resolved 29 December 2020
Resolution: Vessel installed loading marks based on engineer's drawing. Drawing is by [name withheld] from Hawaii Marine Company.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 January 2020
Resolved
It is further intended that all machinery be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure & personnel injury. Vessels sea valve for port main engine sea water cooling was found with valve stem inoperable rendering it incapable of being closed in an emergency.
46 CFR 182.01-5
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2020
Resolved 3 February 2020
Resolution: Sea valve changed out
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 January 2020
Resolved
A pre-engineered fixed gas fire extinguishing system must be capable of manual activation from outside the space. Both port and stbd pre-engineered systems found with manual pull cable disconnected from they system. Equipment was serviced by Econ’s fire protection last week but no paperwork was provided.
46 CFR 181.420
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2020
Resolved 3 February 2020
Resolution: Manual pull cable reinstalled, fireboy tested.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 January 2020
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the international rules of the road. Vessel’s stern light was removed.
46 CFR 183.420
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2020
Resolved 3 February 2020
Resolution: Vessel reinstalled stern light.
09 - Working and Living Conditions › 092 - Working Conditions › Danger areas
Issued 27 January 2020
Resolved
It is further intended that all machinery be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure & personnel injury. Vessel has an exhaust leak on stbd engine causing caked soot on engine intake air filter and dangerous gases being released into space.
46 CFR 182.01-5
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2020
Resolved 3 February 2020
Resolution: Vessel repaired exhaust leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 January 2020
Resolved
It is further intended that all machinery be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure & personnel injury. Mechanical drip less packing on stbd side missing one of two hose clamps
46 CFR 182.01-5
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2020
Resolved 3 February 2020
Resolution: Vessel reinstalled missing hose clamp
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 27 January 2020
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Vessel does not have any hose clamps on port bilge pump suction side.
46 CFR 182.410 (d) (1)
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2020
Resolved 3 February 2020
Resolution: Vessel reattached hose and reinstalled hose clamps.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 January 2020
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Vessel's life ring buoy grab line deteriorated and in need of replacement.
46 CFR 176.808(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 9 March 2020
Resolution: Replaced with a new lifering buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 January 2020
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Sixteen life jackets had deteriorated retrorelfective tape.
46 CFR 176.808(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 20 February 2020
Resolution: Vessel renewed damaged retro with SOLAS approved reflective tape.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 27 January 2020
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction. Upper deck rail fractured at attachment point to deck.
46 CFR 177.900 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 18 March 2020
Resolution: Vessel reinforced fractured handrail.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 27 January 2020
Resolved
A vessel must comply with the structural design requirements of one of the standards listed. Areas of damaged deck, missing shelf and tabbing, and missing deck beam in space just aft of collision bulkhead on stbd hull.
46 CFR 177.300
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 18 March 2020
Resolution: Vessel completed repairs.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 January 2020
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines at the tank connection. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The vessel's stbd fuel shutoff valve was not operable.
46 CFR 182.455(b)(4)
Action required: 17 - Rectify deficiencies prior to departure
Due 27 January 2020
Resolved 27 January 2020
Resolution: Vessel demonstrated satisfactory operation of shutoff valve.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 January 2020
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Multiple dead end wires found in most compartments.
46 CFR 183.200 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 20 February 2020
Resolution: Vessel removed dead end wires.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 January 2020
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 9 March 2020
Resolution: Vsl had a new AED onboard.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 January 2020
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 1 inch numbers and letters at the entranceway to that deck. Vessel did not have the correct number of passengers allowed posted on aft stairwell, and missing sign on front stairwell.
46 CFR 185.602 (g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 20 February 2020
Resolution: Vessel posted correct number of passengers at rear staircase and created new sign for forward staircase.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 January 2020
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the international rules of the road. Vessels anchor light inoperable.
46 CFR 183.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 9 March 2020
Resolution: Verified that anchor light was working properly.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 January 2020
Resolved
Marine employers shall establish programs for the chemical testing for dangerous drugs on a random basis of crewmembers on inspected vessels who occupy a position or perform the duties and functions of a position, required by the vessel's COI. Marine employers may form or otherwise use sponsoring organizations, or may use contractors to conduct the random chemical testing programs. Vessel's consortium enrollment paperwork expired.
46 CFR 16.230(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 9 March 2020
Resolution: Vsl had current enrollment in consortium.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 January 2020
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. The air filter on the stbd engine caked with carbon build up and restricting airflow.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 20 February 2020
Resolution: Vessel cleaned air filter.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 January 2020
Resolved
A pre-engineered fixed gas fire extinguishing system must: Be installed in accordance with the manufacturer's instructions. Holes in stbd engine room bulkhead allow fixed fire extinguishing medium to communicate through bulkhead. Make vapor tight to ensure quantity of extinguisher is sufficient.
46 CFR 181.420 (a)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 9 March 2020
Resolution: Bulkheads were vapor tight.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 January 2020
Resolved
All cable and wire must be installed with metal supports spaced not more than 24 inches apart. Countless wires unsupported in all compartments.
46 CFR 183.340 (b)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 9 March 2020
Resolution: All electrical wiring properly supported as required.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 January 2020
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. Vessel's port side engine room ventilation cover gasket is missing in some places.
46 CFR 182.465 (h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 20 February 2020
Resolution: Vessel renewed gasket on ventillation cover.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 January 2020
Resolved
The Certificate of Inspection issued to a vessel describes the vessels minimum manning requirements and any equivalences accepted or authorized by the cognizant OCMI. Vessel does not have have required notice and restraining device for the upper deck when no passengers are carried on upper deck IAW COI endorsement for operating under one deckhand.
46 CFR 176.103
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 21 February 2020
Resolution: Vessel installed restraining device.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 January 2020
Resolved
At each inspection all observed hazardous situations must be corrected. Vessel has portion of rotten step on aft stairwell causing fall hazard.
46 CFR 176.830
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 February 2020
Resolved 20 February 2020
Resolution: Vessel repaired rotted step.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 13 March 2019
Resolved
A hatch cover on a vessel must be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent loss. Install hinges, captive chains, or devices of substantial strength on hatch covers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 March 2019
Resolution: Attached hatch covers to vessel.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 13 March 2019
Resolved
Provision must be made for closing all supply cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. Provide a means to close the starboard aft engine room duct.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 March 2019
Resolution: Installed latch to hold ventilation closure closed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 March 2019
Resolved
An electric bilge pump may be used on a vessel of not more than 65 ft provided that a positive shutoff valve is installed at the hull penetration. Positive shutoff valves are not installed at the hull penetration for bilge discharge lines. Ensure positive shutoff valves are installed for bilge discharge lines at the hull penetration.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2019
Resolved 13 March 2019
Resolution: Positive shut off valves were installed at the hull penetration for all bilge discharges.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 March 2019
Resolved
All vessels shall be provided with suitable steering apparatus. Prove proper alignment of port and starboard steering gear.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 March 2019
Resolved 13 March 2019
Resolution: Properly aligned steering and demonstrated operation at the dock.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 January 2019
Resolved
A self priming, power driven pump must be installed on each vessel that carries more than 49 passengers. Vessel must install fire pumps prior to carrying more than 49 passengers. There are not belts or guards installed for fire pumps.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 February 2019
Resolved 13 March 2019
Resolution: Company requested a reduction in passengers to no more then 49. See deficiency documents for letter.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 2 January 2019
Resolved
Complete installation of Starboard MSD and test in the presence of [name withheld] reinstallation not complete.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 February 2019
Resolved 8 March 2019
Resolution: Witnessed proper operation of installed toilet and MSD.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 30 December 2018
Resolved
Vessel requires three fire buckets.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 January 2019
Resolved 2 January 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 December 2018
Resolved
Strong and effective rudder stops must be provided.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 February 2019
Resolved 8 March 2019
Resolution: Satisfactory stops installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 December 2018
Resolved
Store and label life jackets on main deck.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 30 December 2018
Resolved 30 December 2018
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 December 2018
Resolved
Mount life buoy.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 30 December 2018
Resolved 30 December 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 December 2018
Resolved
Install starboard side fuel tank fill line.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 30 December 2018
Resolved 2 January 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 December 2018
Resolved
Install fuel shut off lines with labels.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 30 December 2018
Resolved 2 January 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 December 2018
Resolved
Install grounding wire for rudder and struts in aft compartments.
Action required: 10 - Deficiency Rectified
Due 30 December 2018
Resolved 2 January 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 December 2018
Resolved
Provide first aid kit.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 30 December 2018
Resolved 2 January 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 December 2018
Resolved
Install marine fire extinguishing system.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 30 December 2018
Resolved 2 January 2019
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 2 November 2018
Resolved
Vessel has under gone several changes to the weight and height from the original Simplified Stability Test conducted in 1991.
Vessel will be required to conduct Stability Test prior to carrying more than 49 passengers for hire.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 December 2018
Resolved 15 March 2019
Resolution: Received new stability letter from MSC.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 October 2018
Resolved
Vessel must complete annual inspection prior to carrying passengers.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 November 2018
Resolved 2 January 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 October 2018
Resolved
Conduct annual inspection for Certification
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 November 2018
Resolved 2 January 2019
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 October 2018
Resolved
Notify Coast Guard of any and all repairs or alterations.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 November 2018
Resolved 2 January 2019
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 15 October 2018
Resolved
Vessel has added a canopy not listed on the SST. Need to provide proof that canopy was apart of SST or remove.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 November 2018
Resolved 1 November 2018
Resolution: Attended vessel and verified vessels files. Vessel needs to conduct a Stability Test for it's current route, service and passenger count.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 20 November 2017
Resolved
Provide up to date FCC Safety Radiotelephony Certificate. 46 CFR 184.502; 47 CFR 80
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 December 2017
Resolved 6 December 2017
Resolution: Vessel rep provided picture of FCC Safety Radiotelephony Certificate
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 20 November 2017
Resolved
Schedule DAPI Audit with Sector Honolulu
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 December 2017
Resolved 27 November 2017
Resolution: Vessel rep scheduled DAPI Audit for 07DEC17.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 20 November 2017
Resolved
Install approved brackets for fire extinguishers. 46 CFR 181.520; 46 CFR 181.500
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 December 2017
Resolved 6 December 2017
Resolution: Vessel rep provided pictures of fire extinguishers mounted in approved brackets.
Engineering › Diesel Engine (propulsion-reduction gear) › Emergency shutdown
Issued 20 November 2017
Resolved
Install markings for fuel shutoff IAW 46 CFR 185.608
Action required: 705 - Other - as specified
Due 4 December 2017
Resolved 6 December 2017
Resolution: Vessel rep provided picture of emergency fuel shut off markings.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 20 November 2017
Resolved
Make engine room ventilation closures airtight.
Condition: Invalid
Action required: 705 - Other - as specified
Due 4 December 2017
Resolved 6 December 2017
Resolution: Vessel rep provided picture of new gasket material installed on engine room ventilation closures.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 20 November 2017
Resolved
Install 30 x 30 mesh flame screen at discharge end of fuel tank vent pipes. 46 CFR 182.20-35
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 December 2017
Resolved 6 December 2017
Resolution: Vessel rep provided picture of 30 x 30 mesh flame screen installed at discharge end of fuel tank vent pipes
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 November 2017
Resolved
Install proper guard for fire pump belt. 46 CFR 177.35-15
Action required: 705 - Other - as specified
Due 20 December 2017
Resolved 18 December 2017
Resolution: Received picture of fire pump belt guard.
Operations/Management › Vessel Activity › Construction/Repair
Issued 7 November 2017
Resolved
Replace stbd rudder bearing.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 14 November 2017
Resolution: Stbd rudder bearing was replaced.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 26 October 2017
Resolved
Replace corroded sewage valve
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: Sewage valve was replaced in kind.
Operations/Management › Vessel Activity › Construction/Repair
Issued 26 October 2017
Resolved
Provide repair proposal for rotted stbd frame, stbd hull compartment #2.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: Repair proposal for rotted frame was provided. Repair was made in accordance with repair proposal.
Operations/Management › Vessel Activity › Cleaning/Stripping
Issued 20 October 2017
Resolved
Remove and clean propellers, shafts, and rudders for CG inspection
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: Props, shafts, and rudders were removed and cleaned for CG inspection.
Operations/Management › Vessel Activity › Other
Issued 20 October 2017
Resolved
Make second compartment aft of collision bulkhead in port and starbord hull available for inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 26 October 2017
Resolution: Second compartment aft of collision bulkhead in each hull were made available for inspection.
Operations/Management › Vessel Activity › Cleaning/Stripping
Issued 20 October 2017
Resolved
Remove and clean all thru-hulls and sea suction grates for inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: Thru-hulls and sea suctions grates were removed and cleaned for inspection.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Remove and renew cutlass bearings as original
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 14 November 2017
Resolution: Cutlass bearings were renewed.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Remove and replace as original port strut due to deep scores.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 14 November 2017
Resolution: Port strut was replaced in kind.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Grind down and provide a repair proposal for the identified gouge on upper, outboard port hull at approximately amindships.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 26 October 2017
Resolution: Area around gouge was ground down; structural integrity of vessel not impacted.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Provide a repair plan in accordance wih CG approved plans for the three identified delaminated areas on the outboard port hull.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 26 October 2017
Resolution: Upon reinspection, areas were not delaminated but rather appeared to be delaminated due to many layers of paint. FRP still intact.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Secure all loose mooring bits.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 20 November 2017
Resolution: Mooring bits were secured.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
In space directly aft of collision bulkhead in port hull, renew hatch gasket and clean sealing surface to make hatch weatertight.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 6 November 2017
Resolution: Hatch gasket was renewed and sealing surface was cleaned.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
In space directly aft of collision bulkhead in port hull, provide repair plan for rotted stiffener in accordance with CG approved plans.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 6 November 2017
Resolution: Stiffener was repaired in accordance wih repair plan.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
In space forward of collision bulkhead in port hull, provide a repair plan for renewing wet and rotted wood in way of deck inspection port.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: Wet/rotted wood was cut out and a new inspection port was installed.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Secure all loose railings on main deck
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 6 November 2017
Resolution: All railings on main deck were secured.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Repair and secure damaged railing on upper deck, port side
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 20 November 2017
Resolution: Damaged railing on upper deck, port side was repaired and secured.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Grind FRP around starboard rudder mount. Remove all putty fillers and repair FRP in accordance with original layup.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: Putty fillers were removed and FRP was renewed.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Remove damaged FRP on starboard main engine shafts thru-hull penetration. Repair/renew as original.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 26 October 2017
Resolution: FRP around stbd main engine shfats thru-hull penetration was renewed as original.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Crop and renew wood rot found above MSD tank at starboard side transom.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 26 October 2017
Resolution: Wood rot was cropped out and renewed.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Secure stbd side passenger bench to prevent movement.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 6 November 2017
Resolution: Stbd side passenger bench was resecured to the deck.
Operations/Management › Vessel Activity › Cleaning/Stripping
Issued 20 October 2017
Resolved
Empty stbd MSD tank and remove thru-hull valve for inspection.
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: MSD tank was emptied and thru-hull valve was removed for inspection.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Crop and renew wood rot found in starboard forward compt #1, counting from bow.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 6 November 2017
Resolution: Wood rot was cropped out, dried, and new marine grade plywood was installed.
Operations/Management › Vessel Activity › Cleaning/Stripping
Issued 20 October 2017
Resolved
Stbd diesel tank found corroded. Clean all connections to fuel tanks on port and starboard side. Renew grounding wire on starboard fuel tank.
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 26 October 2017
Resolution: Connections to fuel tanks were cleaned. Grounding wire was renewed.
Operations/Management › Vessel Activity › Construction/Repair
Issued 20 October 2017
Resolved
Remove and replace damaged port propeller.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 14 November 2017
Resolution: Port propeller was replaced.
Operations/Management › Vessel Activity › Underway
Issued 20 October 2017
Resolved
Conduct underway sea trials in presence of CG Marine Inspector prior to receiving credit dry dock.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 20 November 2017
Resolution: Underway seatrials condcuted satisfactory.
Operations/Management › Vessel Activity › Cleaning/Stripping
Issued 20 October 2017
Resolved
Make underside of disel fuel tanks available for inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 1 November 2017
Resolution: Vessel rep provided a boroscope to view underside of fuel tanks.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 October 2017
Resolved
Conduct annual inspection to maintain currency of COI as required by 46 CFR 176.500.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2017
Resolved 20 November 2017
Resolution: Completed satisfactory COI Renewal Inspection. TCOI issued on 20 NOV 2017. See Activity 6290610 for more information.