Records from 2016 to 2026. Most recent: inspection, 29 May 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 May 2026
Resolved
De-water E/R bilge and make bilge suctions ready for testing.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 May 2026
Resolved 29 May 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 May 2026
Resolved
Prove proper operatin of bilge high levle audible alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 May 2026
Resolved 29 May 2026
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 September 2025
Resolved
The vessel operator of each vessel required by § 155.720 to have transfer procedures shall maintain them current and shall require vessel personnel to use the transfer procedures for each transfer operation. Vessel is restricted from any fuel transfer until fuel transfer procedures are inspected to the satisfaction of an attending CGMI.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2025
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 10 September 2025
Resolved
The letter referenced in § 155.710(e)(1) must designate the holder as a person-in-charge of the transfer of fuel oil and state that the holder has received sufficient formal instruction from the operator or agent of the vessel to ensure his or her ability to safely and adequately carry out the duties and responsibilities of the PIC described in 33 CFR 156.120 and 156.150. Vessel owner to ensure designated PIC is in charge of all transfers
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2025
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 10 September 2025
Resolved
The transfer procedures required by § 155.720 must contain a line diagram of the vessel's transfer piping, including the location of each valve, pump, control device, vent, and overflow.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2025
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 September 2025
Resolved
A fixed carbon dioxide or other approved system must be installed in all lamp and paint lockers, oil rooms, and similar spaces. Paint locker on main deck did not have affixed hose from dedicated fire extinguisher.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2025
Resolved 17 September 2025
Resolution: Fire extinguisher and fitting were replaced.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 5 September 2025
Resolved
All operator licenses required by this subpart must be readily available for inspection. Operator was not able to produce marine radio operator license upon request. 47 CFR 80.175
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2025
Resolved 9 September 2025
Resolution: Vessel master produced valid FCC radio operator's license.
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 5 September 2025
Resolved
As appropriate for the intended voyage, all vessels must carry adequate and up-to-date charts. For voyages seaward of the territorial sea baseline, ENCs must be displayed on systems meeting IEC 60945 or RTCM 10900 to be considered equivalent to paper charts. Vessel does not carry paper charts or ENC displays meeting either standard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2025
Resolved 29 September 2025
Resolution: IEC 60945 compliant display installed.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 5 September 2025
Resolved
Each vessel must have posters or signs displayed in the vicinity of each survival craft and the survival craft's launching controls that give relevant instructions or warnings. No life raft placards were posted on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 September 2025
Resolved 17 September 2025
Resolution: Life raft placards were posted.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 September 2025
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Several electrical wires on both port and starboard engines were chaffed with outer protective coating frayed and damaged. Additionally, overhead lighting wiring in machinery space was damaged. Repair or replace as needed to the satisfaction of the attending marine inspector prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 22 December 2025
Resolution: Cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 5 September 2025
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Starboard engine exhaust piping was leaking into machinery space and lagging showed signs of damage. Repair or replace as necessary prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 22 December 2025
Resolution: Exhaust leak welded.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 5 September 2025
Resolved
Shutoff valves must be installed in the fuel supply lines, one as close to each tank as practicable, and one as close to each fuel pump as practicable. Valves must be accessible at all times. Outer port side fuel shutoff valve broke during inspection making it impossible to close the valve. Repair or replace as necessary prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 22 December 2025
Resolution: Reach rod replaced.
09 - Working and Living Conditions › 091 - Living Conditions › Galley, handlingroom (maintenance)
Issued 5 September 2025
Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable, and sanitary condition. Reefer door handle on main deck was not latching properly, nor was the emergency push lever inside the space. Repair or replace as necessary to ensure proper operation prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 22 December 2025
Resolution: Reefer door handel replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 September 2025
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Unauthorized weld repair was made to steering gear ram without knowledge of the [name withheld] of affected area and provide report attesting to satisfactory repair.
Action required: 705 - Other - as specified
Resolved 22 December 2025
Resolution: Welded part has been replaced with OEM pad eye.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 5 September 2025
Resolved
Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew. Monthly inspection for August was not performed or recorded in the logbook.
Action required: 10 - Deficiency Rectified
Resolved 5 September 2025
Resolution: Visual inspection conducted during course of the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 August 2024
Resolved
Where pressure-indicating gages are used, they shall be chosen to be compatible with the pressure to be indicated. In no case shall the upper range of the gage be less than 1.2 times nor more than 2 times the pressure at which the relieving device is set to function. Air compressor pressure gauge maximum reading is below 1.2 times the pressure at which the relieving device is set to function.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2024
Resolved 10 September 2024
Resolution: A new gauge was installed with a range up to 1.5x MAWP.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 August 2024
Resolved
For each connected generator, each switchboard must have an ammeter with a selector switch that connects the ammeter to show the current in each phase. #1 generator ammeter was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2024
Resolved 10 September 2024
Resolution: New ammeter installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 August 2024
Resolved
A vessel equipped with fixed pitch propellers must have on the navigating bridge and at the engine room control station a propeller speed and direction indicator for each shaft. Propeller speed indicator in pilot house was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2024
Resolved 15 November 2024
Resolution: New targeting tape and sensors installed on both shafts.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 29 August 2024
Resolved
The operator of each vessel must verify to his or her satisfaction that the PIC of any transfer of fuel oil carries a letter designating him or her as the PIC, unless equivalent evidence is immediately available aboard the vessel or at his or her place of employment. There was no letter or equivalent evidence of PIC designation available at the time of the inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2024
Resolved 29 August 2024
Resolution: Operator provided letter of company designated PICs and stored on board.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 29 August 2024
Resolved
All vessels shall carry at least the minimum number of fire axes as set forth in Table 95.60-5(a). Vessel requires minimum of two but only carries one.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 September 2024
Resolved 10 September 2024
Resolution: Vessel mounted a second fire axe, installed inside the house.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 August 2024
Resolved
The periodic inspection shall be such as to ensure the vessel, as regards the structure, is in satisfactory condition. A stiffener on the starboard quarter bulwark was severely wasted. Repair prior to next credit drydock.
Action required: 705 - Other - as specified
Due 31 December 2025
Resolved 5 September 2025
Resolution: Acceptable weld repair.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 29 August 2024
Resolved
The painter must have a float-free link secured to the end of the painter that is attached to the vessel. The painters on both life rafts were attached to the shackle vice float-free link.
Action required: 10 - Deficiency Rectified
Resolved 29 August 2024
Resolution: Painter ends were moved from shackle to weak link on the spot.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 28 September 2023
Resolved
Alcohol testing must be conducted on each individual engaged or employed on board the vessel who is directly involved in the SMI. The alcohol testing of each individual must be conducted within 2 hours of when the SMI occurred, unless precluded by safety concerns directly related to the incident. The vessel's alcohol testing swabs were expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 October 2023
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 28 September 2023
Resolved
On vessels required by § 112.05–5(a) to have a temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source: Lighting for passageways, stairways, and escape trunks in passenger quarters, crew quarters, public spaces, machinery spaces. THe emergency lighting at the bottom of the ladder in the tunnel was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 October 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 September 2023
Resolved
All alarms must audibly annunciate until manually acknowledged. The bilge alarm panel on vessel's bridge was not audible upon activation.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 October 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 4 November 2021
Resolved
PROVIDE STABILITY LETTER/BOOK THAT REFLECTS THE NEW A-FRAME INSTALLATION AND TRIP/TOW CRITERIA FOR LOADS TOWED FROM THE A-FRAME. (prior to A-Frame Ops)....NEW STABILITY GOOD FOR AFRAME ON BOARD OR OFF, HOWEVER DOES NOT COVER TOWING FROM AFRAME. NO OPS OF AFRAME ALLOWED, PENDS FINAL INSPECTION.
Condition: Invalid
Action required: 705 - Other - as specified
Due 18 April 2022
Resolved 5 April 2022
Resolution: NEW STAB LTR ISSUED BY MSC 4APR INCLD TOW.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 August 2021
Resolved
CONDUCT INITIAL TESTING OF A-FRAME AT 1.25 OF SWL. NDT FOUNDATION TO DECK ATTACHMENT WELDS TO SAT OF ATTENDING [name withheld] TEST.(prior to A-frame OPS)
Condition: Invalid
Action required: 705 - Other - as specified
Due 18 April 2022
Resolved 22 April 2022
Resolution: CONDUCTED TEST OF A FRAME AT 125% SWL(25000LBS) AND WINCH AT 125% SWL (12000LBS). MP TEST OF WELDS SAT.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 18 August 2021
Resolved
Applicable plans shall be submitted for alterations. SUBMIT/OBTAIN ABS APPROVED PLANS NECESSARY TO MAINTAIN LOADLINE.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 March 2022
Resolved 18 March 2022
Resolution: LOADLINE MAINTAINED.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 August 2021
Resolved
SUBMIT/OBTAIN WINCH FOUNDATION AND DECK ATTACHMENT STRUCTURAL DETAIL TO USCG/ABS FOR APPROVAL, ENSURE WELD SCHD IS CALLED OUT. (prior to A-Frame ops)
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 March 2022
Resolved 15 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 18 August 2021
Resolved
ALL A-FRAME EQUIPMENT, ELECTRICAL, HYDRAULIC VALVES ETC. SHALL REMAIN TAGGED OUT, PROHIBITED FROM USE UNTIL FINAL
USCG/ABS INSPECTIONS ARE COMPLETED.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 April 2022
Resolved 16 September 2022
Resolution: Witnessed proper oparational test. Ensure controls were properly labeled.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 August 2021
Resolved
EACH VESSEL MUST MEET THE APPLICABLE REQUIREMENTS OF 46 CFR SUBCHAPTER S. PROVIDE UPDATED APPROVED STABILITY LETTER/BOOK REFLECTING LIGHTSHIP CHANGES, NEW A FRAME INSTALLATION, AND DEAD WIEGHT SURVEY CONDUCTED 11FEB2022. DECK CARGO IS LIMITED TO 25LT WITH A MAXIMUM VCG OF 5 FT. THE NEWLY INSTALLED A FRAME SHALL BE SECURED ON DECK WITH A VCG OF NOT MORE THAN 6.5 FT OR TAKEN OFF THE VESSEL. UNDERWAY OPS SHALL BE IAW THE VESSELS EXISTING STABILITY LETTER.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2022
Resolved 18 March 2022
Resolution: NEW STABILITY LETTER ISSUED AFRAME ON OR OFF.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 June 2021
Resolved
A battery installation is classified as one of three types, based upon power output of the battery charger. Amp meter inoperable on battery charger. Repair, demonstrate proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2021
Resolution: Verified installation and operation of new amp meter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 June 2021
Resolved
All vessels except unmanned barges shall be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment except for ballast. Valve for engine room hall labeled incorrectly. Mark valve with correct location.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 June 2021
Resolution: Valve was labled to reflect proper location.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 June 2021
Resolved
Bilge system must be provided with bilge high level alarms that annunciate in the machinery spaces and at a manned control location and are independent of the pump controls. Laz bilge alarm inoperable. Make repairs, demonstrate proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 June 2021
Resolution: Bilge alarm was repaired and is operable.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 June 2021
Resolved
Vessel required to have rudder angle indicator. Rudder angle indicator inoperable. Make repairs and demonstrate proper operation at all stations.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2021
Resolution: Verified installation and operation of new rudder angle indicators.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 14 June 2021
Resolved
Fire plan outdated and inacurate. Make corrections and conduct verification walkthrough with attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2021
Resolution: Fire control plan was updated to match the on board arrangement.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 15 December 2020
Resolved
There shall be at least two means of escape from all general areas accessible to the passengers, if carried, or where the crew may be quartered or normally employed. At least one of these two means of escape shall be independent of watertight doors. Emergency escape hatches located in vessel pump room and engine room were inoperable. Vessel owner shall ensure that all escape hatches are operable to the satisfaction of an attending Coast Guard MI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2021
Resolved 26 May 2021
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 15 December 2020
Resolved
The position of the rudder, if power operated, must be shown at the principal steering station. Vessel rudder angle indicator was not operating properly at time of inspection. Vessel owner shall ensure that the rudder angle indicator properly indicates rudder operation to the satisfaction of an attending Coast Guard MI
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 26 May 2021
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 15 December 2020
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapors, gases or liquids whose temperature exceeds 150 °F., shall be suitably insulated where necessary to preclude injury to personnel. Vessel had several locations of engine exhaust missing or deteriorated in the engine room. Vessel owner shall ensure that all exposed engine exhaust that exceeds 150 °F has sufficient insulation to the satisfaction of an attending Coast Guard MI.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2021
Resolved 26 May 2021
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 5 September 2019
Resolved
All enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators. Vessel's engine room stack vent on the 02 deck did not have a means of closing. 46 CFR 92.15-10(a) OLD I, Correct within 30 days.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2019
Resolved 2 October 2019
Resolution: Metal closure was fabricated to be used to close off stack space vent in the event of a fire.
Communications › Internal Communications System › Sound-powered Telephone
Issued 17 August 2017
Resolved
Vessels sound powered phone was inoperable. Provide proper operation of the sound powered phone with technician report.
Action required: 705 - Other - as specified
Due 24 August 2017
Resolved 18 August 2017
Resolution: Technician attended and replaced bad line. Sound powered phones operational.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 17 August 2017
Resolved
Vessel had several expired items in both first aid kits. Replace expired first aid kits (2).
Action required: 705 - Other - as specified
Due 24 August 2017
Resolved 18 August 2017
Resolution: Vessel purchased two new first aid kits.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 9 August 2016
Resolved
FCC documents expired
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2016
Resolved 9 August 2016
Resolution: New documents issued.