Records from 1999 to 2003. Most recent: inspection, 28 July 2003.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 9 July 2000
Resolved
VESSEL IS NOT TO OPERATE UNDER ANY CONDITIONS UNTIL A FULL INSPECTION OF ALL VESSEL SYSTEMS CAN BE CONDUCTED BY AN ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 9 October 2000
Resolved 8 November 2006
Navigation
Issued 19 May 2000
Resolved
Prove proper operation of the vessel's permanently affixed horn.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Construction/Loadline
Issued 19 May 2000
Resolved
Provide 10 GPM hand pump with hoses suitable to take a suction from the_x001C_ vessel sidehulls._x001C_
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Construction/Loadline › Hull › Bottom Plating
Issued 19 May 2000
Resolved
Cap sluice valve in engine room port side.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Construction/Loadline › Hull › Bottom Plating
Issued 19 May 2000
Resolved
Make engine room overhead escape hatch weathertigtht.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Engineering › Bilge Water Management System › Eductor
Issued 19 May 2000
Resolved
Prove proper operation of both MDE high water temp alarms
Condition: Unknown
Due 5 June 2000
Resolved 5 June 2000
Deck/Cargo › Ballast › CBT
Issued 19 May 2000
Resolved
Properly mark crane controls and safe working load on vessel crane.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Documentation › Certificates/Documents › Annex VI Statement of Voluntary Compliance
Issued 19 May 2000
Resolved
Provide FCC license per 47 CFR 80.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Documentation
Issued 19 May 2000
Resolved
Provide means to post COI and stabililty letter.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Unknown
Issued 19 May 2000
Resolved
Seal pilothouse control pulpit on bridge from E/R vapors
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Engineering
Issued 19 May 2000
Resolved
Provide lagging on MDE exhausts.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Fire Fighting
Issued 19 May 2000
Resolved
Provide fire detection system in E/R per 46 CFR 181.400(c)
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Construction/Loadline
Issued 19 May 2000
Resolved
Properly mount high level bilge alarms on bridge.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Engineering › Bilge Water Management System › Eductor
Issued 19 May 2000
Resolved
Prove proper operation of port MDE oil press alarm/shutdown.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Engineering › Bilge Water Management System › Eductor
Issued 19 May 2000
Resolved
Prove proper operation of overspeed shutdowns or topping lifts on MDEs.
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Construction/Loadline
Issued 19 May 2000
Resolved
Provide means to secure bridge doors in open position
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Construction/Loadline › Hull › Bottom Plating
Issued 19 May 2000
Resolved
Make engine room aft bulkhead watertight IWO exhausts_x001C_
Condition: Unknown
Due 30 June 2000
Resolved 12 June 2000
Documentation › Certificates/Documents › Annex VI Statement of Voluntary Compliance
Issued 19 May 2000
Resolved
Provide evidence of DAPI program that meets 46 CFR 16
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Fire Fighting
Issued 19 May 2000
Resolved
Provide fire bucket.
Condition: Unknown
Due 19 May 2000
Resolved 26 May 2000
Documentation › Safety/Response Plans/Programs › Damage Stability Calculation Program/Plans
Issued 19 May 2000
Resolved
Preliminary plan review conducted. Complete plan review with this office.
Condition: Unknown
Due 19 July 2000
Resolved 8 November 2006
Lifesaving
Issued 19 May 2000
Resolved
Provide lifejacket donning placard.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Engineering
Issued 19 May 2000
Resolved
Provide metallic FO return lines for MDEs and provide approved flexible_x001C_ hoses for FO supply lines as discussed._x001C_
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Lifesaving › Buoyant Apparatus › Approval
Issued 19 May 2000
Resolved
Provide guards on rotating machinery in engine room for main engine fwd_x001C_ dampers, JABSCO pump and alternator pulley
Condition: Unknown
Due 12 June 2000
Resolved 12 June 2000
Construction/Loadline
Issued 19 May 2000
Resolved
Properly mark bilge system valves.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Documentation › Markings/Placards › Injury Placard
Issued 19 May 2000
Resolved
Provide permanent markings for temporary amrking for E/R vent and escape markings.
Condition: Unknown
Due 12 June 2000
Resolved 8 November 2006