Records from 1991 to 2014. Most recent: operational control imposed, 4 August 2014.
Inspection history · 38
4 August 2014
Ballast Water Examination · PII Safety Exam · ISPS II Exam · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4937197
4 August 2014
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4962658
15 March 2010
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3696304
14 March 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3691165
19 January 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3666047
19 January 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3666474
15 January 2010
Ballast Water Examination · ISPS II Exam · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3664842
26 June 2003
Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1827621
25 February 2002
In-Service Inspection · Certificate of Compliance
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1489931
24 February 2002
Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1488754
11 July 2000
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 279905
11 July 2000
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 820375
21 May 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 429664
21 May 1999
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 809382
16 April 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 95526
6 April 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 427495
6 April 1999
Letter of Compliance (Initial/Renewal)
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1123256
16 April 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 539261
30 June 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 405192
29 June 1997
Letter of Compliance (Initial/Renewal)
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1113248
29 March 1997
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 401901
19 September 1996
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 395485
17 May 1995
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 378452
17 May 1995
Letter of Compliance (Initial/Renewal)
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1181026
12 May 1995
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 377880
8 August 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 532328
20 March 1994
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1165595
1 December 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 362789
23 November 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 362561
23 November 1993
Certificate of Compliance
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 848716
24 August 1993
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 678901
20 November 1992
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 826815
19 November 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 354828
27 May 1992
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1268815
21 May 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 490597
13 December 1991
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 949581
17 November 1991
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 347325
17 November 1991
Certificate of Compliance
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 937509
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 4 August 2014
Resolved
Oil filtering equipment referred to in paragraph 1 of this regulation shall be such as will ensure that any oily mixture discharge into the sea after passing through the system has an oil content not exceeding 15 ppm. Port State Control team witnessed removal of overboard piping adjacent to overboard discharge valve and discovered oil residues inside the pipe. Marpol 2011 Annex I Reg 14.7
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 August 2014
Resolution: Class and OCM technician attended the vessel to certify systems was fully operational. USCG Examiners also attended the vessel and witnessed operation of the system.Reports attached to documents on MISLE act # 4937197.
Documentation › Logs/Records › Oil Record Book
Issued 4 August 2014
Resolved
The Oil Water Separator Oil Content Meter had numerous discharges of bilge water recordings that where not recorded in the vessel's Oil Record Book Part I. Additionally there where numerous entries of discharge of bilge water recorded on the Oil Record Book that where not found on the memory for the Oil Content Meter. Marpol 2011, Annex I Reg 17.2.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 August 2014
Resolution: ISM Non conformoty was issued for ORB operations.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 4 August 2014
Resolved
PSC officers observed several fire doors leading to machinery spaces that were unable to self close. Additionally PSC officers observed several fire doors on the main stair well that were unable to self close. PSC officers also observed the main fire door leading to the engine room had significant deformation, and was difficult to open and close. 74 Solas (1997) Chap II-2 Reg 47.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 August 2014
Resolution: Class certified all fire doors operational. USCG examiners also witnessed operational fire doors.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 4 August 2014
Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with an operable Marine sanitation device. PSC officers observed a major sewage leak originating from the top of the sewage plant. 33CFR 159.7
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 August 2014
Resolution: Sewage Plant was repair to satisfaction of class and USCG
Engineering › Generator (propulsion/auxiliary-electric) › Battery
Issued 4 August 2014
Resolved
A second source of energy shall be provided for an additional three starts within 30 min unless manual starting can be demonstrated to be effective. The secondary means of staring the emergency generator, a set battery bank, did not have a change and could not start the generator. Solas 74 (1997) Chap II-I Reg 44.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 August 2014
Resolution: Corrected on the spot.
Lifesaving › Lifeboat Equipment › Water/Water Receptacles
Issued 4 August 2014
Resolved
The normal equipment of every lifeboat shall consist of watertight receptacles containing a total of 3 L of fresh water for each person the lifeboat is permitted to accommodate. PSC officers observed 1.5 liters of water per person. Solas 74 (1997) Chap III Reg 41.9
Condition: Improper/Lack of Maintenance
Due 4 August 2014
Resolved 4 August 2014
Resolution: Corrected on the spot.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 4 August 2014
Resolved
Based on the detainable deficiencies the USCG recommends the vessel undergo an external audit of the ISM system by the Administration to assess the level of implementation of the approved SMS. The audit must address the points raised and include corrective actions to rectify deficiencies. Audit findings must be presented to the COTP. 74 Solas(2009) Chap IX Reg 3.1, ISM Code Parts A 6.4, 10.2, 10.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 August 2014
Resolution: ISM Audit was completed and accepted. Audit is attached into "documents" of MISLE act #4937197
Deck/Cargo › Inert Gas System › Deck Isolating Valve
Issued 4 August 2014
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSC officer observed leaking water from the IG line and staining on the pipe and deck surrounding the leak. 74 Solas (1997) Chap II-I Reg 26
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 August 2014
Resolution: IG Line valve was repaired to the satisfaction of class and USCG.
Engineering › Bilge Water Management System › Pump
Issued 4 August 2014
No resolution recorded
An efficient bilge pumping system shall be provided, capable of pumping from and draining any water tight comparment. PSC officers observe a non operational/out of service bilge pump. A condition of class was issued to repair the pump no later than 22Sep2014. The deficiency was issued to be rectify prior to next US port after sailing foreign. Solas 74(CONS 97) II-I REG 21.1.1
Action required: 15 - Rectify deficiencies by next port
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 21 January 2010
Resolved
Main engine not fit for full service. Complete repairs shall be made to bring into conformity with equipment certification as issued by Administration. SOLAS 2004 Cons. Chapter 1, Reg 11
Action required: 15 - Rectify deficiencies by next port
Resolved 17 March 2010
Resolution: Sector received an additional report attesting to the repair and proper operation of the main engine.
Fire Fighting › Fire Hoses › Connections
Issued 15 January 2010
Resolved
The applicator coupling is wasted on the port fwd dry chemical hose station. SOLAS 74, II-2, Reg 2
Action required: 705 - Other - as specified
Due 15 February 2010
Resolved 17 March 2010
Resolution: Sector received an additional report attesting to the repair and proper operation of both the deck applicator coupling for the fire fighting system.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Piping
Issued 15 January 2010
Resolved
The deck water spray system piping to 3 nozzles at the stbd manifold is blocked. SOLAS 74, II-2, reg2
Action required: 705 - Other - as specified
Due 15 February 2010
Resolved 13 March 2010
Resolution: Sector Houston/Galveston received a tech report from the classification society attesting to the repair of the vessels'' deck water spray system piping systems.
Lifesaving › Launching Appliances › Falls
Issued 26 June 2003
Resolved
Port lifeboat davit arm topping sheaves wasted and starboard lifeboat davit head block sheave wasted. LEGACY COMPONENT DESC: Davit
Due 26 July 2003
Resolved 15 January 2010
Resolution: Observed satisfactory condition of the stbd lifeboat launching equipment.
Engineering
Issued 25 February 2002
Resolved
Vessel IGS system had gas regulating valve not functioning properly. SOLAS II-2/62.9.1. Repair to the satisfaction of the Certificate of Fitness issuing authority prior to carrying cargo requiring IGS in accordance with IBC chapter 19 minimum requirements.
Action required: 705 - Other - as specified
Due 25 February 2002
Resolved 26 June 2003
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 25 February 2002
Resolved
Deck water spray system missing several diffuser heads and several others plugged.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 February 2002
Resolved 26 February 2002
Resolution: Received satisfactory class report attesting to repairs.
Deck/Cargo
Issued 11 July 2000
Resolved
Prove proper operation of cargo tank HI and LO pressure alarms prior to 11AUG00.
Condition: Unknown
Due 1 November 2000
Resolved 1 November 2000
Lifesaving
Issued 11 July 2000
Resolved
Provide servicing report for 6 person liferaft prior to 13JUL00.
Condition: Unknown
Due 13 July 2000
Resolved 13 July 2000
Deck/Cargo
Issued 6 April 1999
Resolved
GAS DETECTION SYSTEM (FIXED) NOT PROPERLY CALIBRATED OR WORKING. PROVE PROPER OPERATION PRIOR TO DEPARTURE.
Condition: Unknown
Due 8 April 1999
Resolved 29 April 1999
Construction/Loadline
Issued 6 April 1999
Resolved
PROPERLY MARK LOADLINE, IN CONTRASTING COLOR, ON PORT SIDE OF VESSEL NO LATER THAN 06MAY99.
Condition: Unknown
Due 6 April 1999
Resolved 6 April 1999
Fire Fighting
Issued 6 April 1999
Resolved
MAKE PERMANENT REPAIRS (REPLACE LINE) AT DISCHARGE SIDE OF EMERGENCY FIRE PUMP, NO LATER 06MAY99.
Condition: Unknown
Due 6 April 1999
Resolved 6 April 1999
Deck/Cargo
Issued 6 April 1999
Resolved
VESSEL NOT EQUIPPED WITH CALIBRATION GRAPHS/CORRESPONDING LEL COMPARISON GRAPHS, FOR THE FIXED GAS DETECTION SYSTEM, WHEN USING SPAN GAS DIFFERENT THAN THAT OF CARGO TO BE DETECTED.
Condition: Unknown
Due 6 April 1999
Resolved 6 April 1999
Deck/Cargo
Issued 30 June 1997
Resolved
Test IG generator prior to 30JUL97. The vessel was incapable of testing_x001C_ IG plant's O2 analyser.
Condition: Unknown
Due 16 April 1998
Resolved 16 April 1998