TOLMI is a 1989 freight ship. The Coast Guard has recorded 23 inspections since 1992, most recently in November 2007, along with 27 deficiencies and 3 operational controls.

Records from 1992 to 2007. Most recent: inspection, 6 November 2007.

Built
1989
Last inspected
6 November 2007
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8117615 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
370365
Flag
GREECE
—
Maury page id
psix-370365

Inspections, by type

…with no type recorded19
Years with a record 11 calendar years (1992–2007)
The 23 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 19 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it10412 - Regulatory (Subpart C or D), Net Ton
10412 - Convention (Subpart B), Net Ton
40741 - Displacement, Ton
30947 - Dead Weight, Ton
21305 - Regulatory (Subpart C or D), Gross Ton
21305 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 23

6 November 2007 PII Safety Exam · Deficiency Check · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3093970
1 May 2003 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1786784
30 April 2003 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1783860
17 September 2002 Re-Inspection · Deficiency Check · Ballast Water Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1676899
14 July 2002 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1645539
13 August 2001 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 292841
4 October 1999 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 433319
12 May 1998 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 415756
16 April 1997 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 402552
13 December 1995 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 692155
7 December 1995 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 385539
14 November 1995 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 384898
22 July 1995 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 380731
17 July 1995 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 380703
27 March 1995 Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 376372
18 December 1994 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 373455
18 December 1994 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 839917
9 December 1994 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 373378
9 December 1994 Control Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 832838
3 March 1994 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 364907
1 March 1994 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 364828
11 February 1993 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 356790
11 January 1992 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 348194

Deficiency record · 27

Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 6 November 2007 Resolved
Fire boundaries compromised in several locations in accommodation spaces. Several A-0 doors leading into accommodation stairwell and B-0 doors leading into accommodation spaces from outside not closing properly, allowing air ingress. In port A/C room, A-0 door and air intake duct corroded, allowing air ingress in the event of fire.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Repaired: Superstructure weathertight doors rubber packing on decks A-D. Renewed and thereafter doors tested for tightness. Port A/C room watertight doors and intake ducts repaired at main deck.
Lifesaving › Lifeboat › Watertight Enclosure
Issued 6 November 2007 Resolved
Poor maintenance conducted on lifeboats. Excess water observed and single point release removed but not replaced on starboard lifeboat. Port lifeboat fire extinguisher bracket broken.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: Excess water has been removed and brake release wire inserted back in position.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 6 November 2007 Resolved
Fire Control and Lifesaving plans do not match number and location of equipment onboard. Immersion suits on bridge not marked on plan. Crew made numerous changes on several version of the plans without class approval. To the satisfaction of the Flag/class administration. SOLAS (74 am) II-2/15.2.4 and ISM Code part A.11.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Plans placed onboard have been verified & updated & stamped.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 6 November 2007 Resolved
Two plastic water tanks installed on C-Deck without evidence of class approval/oversight; to the satisfaction of Flag/Class Administration. ISM Code Part A/10.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Permanent installation documents to be submitted to DNV for approval. Due date 15Feb08
Documentation › Logs/Records › Oil Record Book
Issued 6 November 2007 Resolved
Oil Record Book supplied by Flag State does not incorporate new code changes in accordance w/ MARPOL 2006 Amendments; C-11.1, 11.2, 11.3 & H-26. Entries not made in accordance w/ Amendments; to the satisfaction of Flag/Class Administration. MARPOL (As Am) I/17 & ISM Part A/7.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: New codes changes inserted and incorporated in the ORB. New entries have been updated/entered IAW new codes.
Documentation › Logs/Records › Garbage Recordkeeping
Issued 6 November 2007 Resolved
Garbage management plan not being followed in E/R where containers are not color-coded in accordance w/ plan; to the satisfaction of the Flag/Class Administration. ISM Part A/7.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: Color-coded garbage bins implemented in E/R. Plan updated to include handling and disposal of haz waste.
Deck/Cargo › Holds/Tanks › Coaming
Issued 6 November 2007 Resolved
Cracks in hatch coaming to deck support frames were found at the following cargo holds: #3 Starboard aft, #4 Port&Stbd, Fwd&Aft; to the satisfaction of Flag/Class Administration. ICLL 66 Article 15.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: Condition of Class issued. Cracks were found and partially repaired brackets and permanent repairs to be carried out by 15Feb08.
Documentation › Logs/Records › Ballast Water Logs/Records
Issued 6 November 2007 Resolved
Ballast Water Management handling log is not maintained in accordance w/ plan. Also there are no records of training conducted, sediments records, and sampling points diagram; to the satisfaction of Flag/Class Administration. ISM Part A/7.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Records have been verified that several training and drills have been conducted and implemented. The ballast water handling log started implementation in filing out and to bring up to date as reported by master. The sampling points diagram as...
Engineering › Bilge Water Management System › Eductor
Issued 6 November 2007 Resolved
Eductor suction pipe for chain locker is rotted through on aft bulkhead in bosun store; to the satisfaction of Flag/Class Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: Corroded eductor pipe manifold renewed.
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 6 November 2007 Resolved
Numerous closure devices (Dogs) are missing from natural vent covers on main deck, forecastle, cargo holds and crane houses; to the satisfaction of Flag/Class Administration.
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Vent cover closure devices (wing nuts) provided and installed to all missing covers located on deck.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 6 November 2007 Resolved
Lifejackets in bosun stores are deteriorated. Replace/renew to satisfaction of flag/class administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: 3 new lifejackets provided on board.
Fire Fighting › Fire Hoses › Condition
Issued 6 November 2007 Resolved
Numerous spanner wrenches are missing from fire hose boxes on the main deck. Fire hose from hose box at #1 hold had several pinholes & leaks as observed during tests. question integrity of fire hoses onboard. Replace/renew as needed from test; Satisfaction of Flag/Class. SOLAS 74(AS AM) II-2/10.2.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: Numerous spanner wrenches were provided. Fire hosed tested and found in order.
Construction/Loadline › Structures › Door
Issued 6 November 2007 Resolved
Opening between #1 Hold and stairway leading up in between the Port & STBD vent spaces is only closed off w/ wooden planks. Class to verify need for watertight closure requested.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: The opening between holds and the stairway leading up are not required to be watertight.
Construction/Loadline › Structures › Superstructure
Issued 6 November 2007 Resolved
Upper railing on main deck is cracked at two locations outboard of #1 cargo hold; to the satisfaction of the flag administration/class.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: Guard rail near cargo hold #1 at port side has been repaired between frame 200 and 205.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 6 November 2007 Resolved
Foundation for #2 Fwd cargo hold holdback hook is rotted through; to the satisfactions of flag administration/class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Condition of class issued. Securing hook device to be stowed in open position until repaired. Due by 15Feb08.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 6 November 2007 Resolved
Fixed CO2 pipe after cutoff valve for #3 hold in STBD tunnel is wasted; to the satisfactions of flag administration/class.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: CO2 pipe for #3 cargo hold has been partially cropped out and renewed in STBD underdeck passage. After completion, air blow test of pipe carried out and found in order.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 6 November 2007 Resolved
Hydraulic pipes for cargo hatch cylinder for #3 Fwd port side hatch and #5 fwd port side hatch are leading oil on deck; to the satisfactions of flag administration/class
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2007
Resolution: Hydraulic pipe connections for hatch cover cylinders have been re-tightened and repaired.
Electrical › Electric Supply System (service) › Battery Installation
Issued 6 November 2007 Resolved
Emergency batteries for E/R Control Console are on the deck and not properly/safely secured; to the satisfactions of flag administration/class
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Emergency batteries have been properly secured. Old batteries that are not in use have been removed.
Deck/Cargo › Cargo Stowage › General
Issued 6 November 2007 Resolved
High level detections have not been installed in cargo holds, & bosun stores. Automated valves also not installed. Satisfaction of Flag/Class
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 December 2007
Resolution: According to DNV, this vessel (open hatch bulk carriers) is by SOLAS definition not a Bulk carrier and the water ingress alarms etc. are not required.
Documentation › Logs/Records
Issued 14 July 2002 Resolved
GARBAGE LOG ENTRIES NOT BEING MADE (SPECIFICALLY GARBAGE BEING INCINERATED), A VIOLATION OF MARPOL 73/78 ANNEX V REG. 9 (3)(a). LEGACY COMPONENT DESC: Garbage Recordkeeping
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2002
Resolved 17 September 2002
Resolution: Inspected garbage log and found satisfactory.
Lifesaving › Lifeboat Equipment
Issued 14 July 2002 Resolved
STARBOARD LIFEBOAT CONTAINED FOUR BAD FOOD RATIONS (NO VACUUM SEAL), A VIOLATION OF SOLAS 74/78 III/41-8.12. LEGACY COMPONENT DESC: Food Ration
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 July 2002
Resolved 17 July 2002
Resolution: RECEIVED FAX RECEIPT WITH SHIP''S STAMP FOR 4 RATIONS
Pollution Prevention/Response › Prevention Equipment
Issued 14 July 2002 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 August 2002
Resolved 17 September 2002
Resolution: Inspected OWS to find the analyzer working properly. OWS automatic stopping device no longer permanently engaged.
Engineering › Steering Gear System
Issued 14 July 2002 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 July 2002
Resolved 22 July 2002
Resolution: RECEIVED CLASS REPORT STATING SATISFACTORY REPAIRS WERE MADE TO STEERING GEAR HYDRAULIC SYSTEM.
Accommodation/Occupational Safety
Issued 7 December 1995 Resolved
MARINE SANITATION DEVICE WAS INOPERATIVE. OVER FLOW FROM MSD WENT FROM MSDVENT TO BILGE TANK. WHEN BILGE TANK BECAME FULL, BACK FLOW, INCLUDING OIL WENT INTO THE MSD. MSD WAS DISASSEMBLED TO CLEAN OIL OUT. VESSEL IS REQUIRED TO HAVE MSD OPERATIONAL PRIOR TO NEXT U.S. PORT.
Condition: Unknown
Due 18 April 1997
Resolved 18 April 1997
Construction/Loadline
Issued 22 July 1995 Resolved
REPAIR/REPLACE LEAKING HIGH SEA SUCTION LINE. MAIN SEA WATER SUCTION LINE HOLDED ON THE SPOOL PIECE OFF THE SEA STRAINER. CLASS SOCIETY MADE A CONDTION FOR THE VESSEL TO MAKE TEMP REPAIR WITH A CEMENT BOX. VESSEL HAS TO MAKE PERMANENT REPAIR PRIOR TO DEPARTING NEXT U.S. PORT 31JUL95.
Condition: Unknown
Due 14 November 1995
Resolved 14 November 1995
Engineering
Issued 22 July 1995 Resolved
REPAIR/REPLACE LEAKING FUEL OIL HEATERS FOR THE MAIN DIESEL. SIDE SHELL FORTHE FUEL OIL HEATERS ARE HOLED AND LEAKING EXCESSIVELY IN THE ENGINE ROOM BILGE. CLASS SOCIETY MADE CONDTIONAL FOR THE VESSEL TO MAKE PERMANENT REPAIRS BEFORE DEPARTING NEXT U.S. PORT 31JUL95.
Condition: Unknown
Due 14 November 1995
Resolved 14 November 1995
Engineering
Issued 9 December 1994 Resolved
REPAIR AND PROVE PROPER OPERATION OF OILY WATER SEPARATOR'S AUDIBLE AND_x001C_ VISUAL ALARM PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 9 December 1994
Resolved 9 December 1994

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.