MAURY USCG vessel records Sign in
← All vessels

HOS CENTERLINE

HOS CENTERLINE is a 2009 offshore supply vessel. The Coast Guard has recorded 81 inspections since 1992, most recently in March 2019, along with 103 deficiencies, 1 operational control and 3 casualty investigations between 2002 and 2015.

Records from 1992 to 2019. Most recent: inspection, 21 March 2019.

Built
2009
Last inspected
21 March 2019
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9040546 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
370425
Flag
UNITED STATES
338714000
Maury page id
psix-370425

Inspections, by type

…with no type recorded22
Years with a record 24 calendar years (1992–2019)
The 81 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Registered dimensions (L × B × D)358.4 ft × 72.0 ft × 25.0 ft
Registered tonnagegross 5,960 / net 2,436
ITC dimensions (L × B × D)358.4 ft × 72.0 ft × 25.0 ft
ITC tonnagegross 5,960 / net 2,436
BuilderEASTERN SHIPYARDS INC · PANAMA CITY, FL, UNITED STATES · built 2009
Hull materialSteel
PropulsionDiesel Electric
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 21 July 2026 · expires 31 August 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it5960 - Convention (Subpart B), Gross Ton
2436 - Convention (Subpart B), Net Ton
7902 - Dead Weight, Ton
11640 - Displacement, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

KYBZMMSI 338714000 · active · compulsorily equipped · granted 8 February 2018, expires 18 March 2028
KYBZMMSI 338714000 · cancelled · compulsorily equipped · granted 18 August 1999, cancelled 31 July 2002
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

S/R WILMINGTON Tank Ship · MISLE 232631 · 11 May 2001 · activity 138298HOS STRONGLINE Tank Ship · MISLE 380752 · 17 January 1997 · activity 5557LACACHE Towing Vessel · MISLE 67968 · 17 May 1992 · activity 118738

Inspection history · 81

21 March 2019 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6646992
8 May 2017 Administrative Inspection · MTSA/ISPS Verification · Periodic Inspection · ACP Periodic Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6141167
22 March 2016 MTSA/ISPS Verification · Administrative Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5839294
21 September 2015 Type not recorded
No type recorded · Activities Europe · Activity 5724257
24 March 2014 Annual Inspection · ACP COI Oversight · MTSA/ISPS Verification · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4818515
9 July 2012 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4376678
12 June 2012 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4341661
29 May 2012 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4334125
4 February 2010 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3675343
1 February 2010 In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3673653
7 March 2009 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3440048
24 November 2008 ACP COI Oversight · Inclining Experiment · Plan Review (Other than "T") · MTSA/ISPS Verification · Ballast Water Examination · MARPOL Annex VI Survey · ISM Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3368698
7 September 2006 ACP COI Oversight
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 2772073
1 August 2006 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2732901
16 June 2005 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2392316
13 April 2005 COI Inspection · MTSA Verification
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2332954
31 March 2004 Annual Inspection · Deficiency Check
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2034523
29 March 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2035199
29 January 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996918
26 August 2003 Deficiency Check
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1887423
1 August 2003 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1864005
30 July 2003 Deficiency Check · Periodic Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1859254
19 June 2003 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1825439
5 June 2003 Administrative Inspection
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1810155
1 April 2002 Annual Inspection · Hull Examination · Cargo Tank Internal · Internal Structural Exam
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1599691
22 February 2002 Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1489052
20 February 2002 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1492775
11 May 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 138298
8 May 2001 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1063461
19 April 2001 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1397635
14 March 2001 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1060461
9 March 2000 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1427793
8 November 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 801990
1 September 1999 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1116404
24 August 1999 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1115112
16 July 1999 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1099565
2 June 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 803127
17 May 1999 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 800434
15 April 1999 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1418516
9 February 1999 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 800924
29 January 1999 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1125197
28 January 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 44862
15 January 1999 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1122963
31 August 1998 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 796820
29 April 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1126769
14 April 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1123320
4 April 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 770014
30 March 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 788292
29 March 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 192967
24 March 1998 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1378303
18 November 1997 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 774607
4 April 1997 Hull Examination · Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1390496
11 March 1997 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1102018
31 January 1997 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1102935
17 January 1997 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 5557
8 August 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 758943
5 August 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 204134
8 July 1996 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1086743
11 March 1996 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1385659
7 March 1996 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 885618
22 September 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 8423
15 February 1995 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1428439
18 November 1994 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1457218
18 August 1994 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 869904
17 March 1994 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1374000
14 March 1994 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1451925
29 December 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 850558
1 September 1993 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 827553
23 March 1993 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429732
23 March 1993 Re-Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429733
8 January 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 128616
26 December 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 8940
19 October 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 960248
27 July 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 952823
23 July 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 956572
17 May 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 118738
17 May 1992 Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1256092
4 May 1992 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1254297
20 April 1992 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 943287
14 April 1992 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 954594
20 March 1992 Initial Certification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 954505

Deficiency record · 103

Documentation › Certificates/Documents › Construction and Equipment Certificate (DSC)
Issued 24 November 2008 Resolved
Provide full term regulatory certificates to the local OCMI and forward copies to USCG Sector Mobile no later than 31 March 2009. After 31 March 2009 vessel is prohibited from engaging in OSV services as per vessels COI.
Action required: 705 - Other - as specified
Due 31 March 2009
Resolved 5 May 2009
Personnel › Certificates/Documents/Licenses › License, Mate
Issued 13 April 2005 Resolved
Provide proof of proper licenses and documents for crew prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Personnel › Certificates/Documents/Licenses › License, GMDSS Radio Operator
Issued 13 April 2005 Resolved
Provide proof of GMDSS endorsements for navigation watch officers prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Inflatable Liferafts › Servicing
Issued 13 April 2005 Resolved
Provide proof of proper servicing and installation of the two required inflatable life rafts.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Operations/Management › Ballast Water Managment › Mandatory Practices
Issued 13 April 2005 Resolved
Provide proof of a ballast water management plan and reporting requirements prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 13 April 2005 Resolved
Provide copy of current applicable Coast Guard regulations (CFRs).
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 20 April 2005
Resolution: Rescinded.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 13 April 2005 Resolved
Provide current navigation publications and charts prior to operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Communications › Alarms/Indicators › Steering Failure Alarm System
Issued 13 April 2005 Resolved
Prove proper operation of the steering gear alarms prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Communications › Radio Communications › EPIRB
Issued 13 April 2005 Resolved
Properly install and prove proper operation of the EPIRB, SARTs and lifeboat radios prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Communications › Visual Communication › Warning Sign (gangway)
Issued 13 April 2005 Resolved
Post warning sign on deck prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 20 April 2005
Resolution: Rescinded
Operations/Management › Drills/Instruction › Abandon Ship
Issued 13 April 2005 Resolved
Place copies of survival instructions in both life boats.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Lifeboat › Embarkation/Disembarkation Capabilities
Issued 13 April 2005 Resolved
Switch both lifeboats to proper stowage postions to allow proper embarkation and launching prior to vessel operation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Lifeboat Equipment › Bailer/Bucket
Issued 13 April 2005 Resolved
Replace fractured bailer in the starboard life boat prior to vessel operation.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Lifeboat Equipment › Thermal Protective Aid
Issued 13 April 2005 Resolved
Provide one additional thermal protective aid for the starboard lifeboat.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 13 April 2005 Resolved
Prove proper operation of all fire screen doors in the house to ensure positive closure prior to vessel operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 13 April 2005 Resolved
Properly secure water lights and buoyant life lines to the life ring buoys vice to the grab line prior to vessel operation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 13 April 2005 Resolved
Properly mark the aft port life ring buoy on the weather deck with the vessel's name and retro-reflective tape prior to vessel operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 13 April 2005 Resolved
Properly mark the vessel's name on the life ring buoy located starboard side midship on the weather deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Operations/Management › Drills/Instruction › Abandon Ship
Issued 13 April 2005 Resolved
Conduct a fire and lifeboat drill prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Launching Appliances › Release Mechanism
Issued 13 April 2005 Resolved
Prove proper operation of the releasing gear on both lifeboats and prove proper operation of both lifeboats in the water and the water spray system.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Fire Fighting › Fire Main › Valves
Issued 13 April 2005 Resolved
Renew the wasted valve bonnet bolts for the fire main isolation valve on main deck in way of fire station number 11.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Operations/Management › FireFighting › Patrol System (Special Category Spaces)
Issued 13 April 2005 Resolved
Properly label the emergency gear lockers with the words "Safety Equipment" in accordance with 46 CFR 156.215(d).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Construction/Loadline › Structures › Door
Issued 13 April 2005 Resolved
Renew the wasted striker plate on the watertight door to the forward (Number 2) safety equipment locker.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Communications
Issued 13 April 2005 Resolved
Prove proper operation of the cargo system high level and pressure alarms and shutdowns.
Action required: 705 - Other - as specified
Due 15 April 2006
Resolved 19 March 2009
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 13 April 2005 Resolved
Freshen the port and starboard navigation light screens with matte black paint.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 13 April 2005 Resolved
Properly designate and mark the lifeboat and liferaft embarkation stations in accordance with 46 CFR 199.110.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Combustible Gas Indicator
Issued 13 April 2005 Resolved
Prove proper operation of toxic vapor detectors per 46 CFR 153.520.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 13 April 2005 Resolved
Provide proof of conducting hydrostatic test of the cargo piping system.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 13 April 2005 Resolved
Properly label the stowage areas for lifesaving and firefighting systems and equipment per 46 CFR 199.70 prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Engineering › Bilge Water Management System › Pump
Issued 13 April 2005 Resolved
Prove proper operation of the bilge system to take suction from various compartments, and proper operation of the bilge alarms in cargo tank voids and bow thruster room.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Fire Fighting › Structural - A Class Divisions › Windows
Issued 13 April 2005 Resolved
Prove proper operation of the "fire fly" window screens for the engineering control room prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Engineering › Thrusters › Motor
Issued 13 April 2005 Resolved
Prove proper operation of the bow thruster unit prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Electrical › Lighting (emergency) › Lighting Fixture
Issued 13 April 2005 Resolved
Properly label all lights that are on the emergency lighting circuit.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 20 April 2005
Resolution: Rescinded
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 13 April 2005 Resolved
Properly install a pressure gauge on the discharge side of the deck emergency fire pump.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 13 April 2005 Resolved
Prove proper operation of the relief valve on the emergency fire pump.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 13 April 2005 Resolved
Provide proof of approved automation test procedures for periodically unattended machinery operation per 46 CFR 62.20-1(a)(7).
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Electrical › Electric Generation Source (service) › Number of Sources
Issued 13 April 2005 Resolved
Prove proper operation of the ship's service generators to operate in parallel, and prove proper operation of the reverse power relay and reverse current trip.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Electrical › Lighting (emergency) › Lighting Fixture
Issued 13 April 2005 Resolved
Prove proper operation of the battery operated emergency lighting system. Battle lanterns should be removed if this is an inoperable redundant system.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 13 April 2005 Resolved
Replace broken cover for the voltage indicator lamp for the starboard mooring winch indicator light in the lower engine room.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Electrical › Electric Generation Source (emergency) › Switch
Issued 13 April 2005 Resolved
Prove proper operation of automatic power transfer when the emergency generator is energized.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Engineering › Steering Gear System › Hydraulic Hose
Issued 13 April 2005 Resolved
Renew deteriorated hydraulic hoses on both Z drives.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Communications › Internal Communications System › Sound-powered Telephone
Issued 13 April 2005 Resolved
Prove proper operation of the sound powered telephone to receive calls on the bridge.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 13 April 2005 Resolved
Prove proper operation of the oily water separator prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 21 April 2005
Resolution: Rescinded. Examined sat during inspection.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 13 April 2005 Resolved
Update required muster lists and training logs per 46 CFR 199 prior to vessel operation.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Deck/Cargo › Mooring/Anchoring › Winch
Issued 13 April 2005 Resolved
Prove proper operation of both port and starboard anchor windlasses.
Action required: 705 - Other - as specified
Due 14 April 2006
Resolved 19 March 2009
Operations/Management › Drills/Instruction › Abandon Ship
Issued 31 March 2004 Resolved
Prior to Sailing, Provide updated crew list and conduct satisfactory drills in attendance of Coast Guard Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 April 2005
Resolution: cleared and reissued.
Lifesaving › Inflatable Liferafts › Markings
Issued 26 August 2003 Resolved
Prior to sailing, prove compliance with [name withheld] approved Fire/Safety Control Plan. US Coast Guard marine inspector must verify plan with placement of equipment. LEGACY COMPONENT DESC: Carriage Requirement
Condition: Unknown
Due 26 August 2004
Resolved 30 August 2004
Lifesaving › Inflatable Liferafts › Approval
Issued 26 August 2003 Resolved
Update required muster lists and associated required reports under 46 CFR 199 prior to sailing, and to the satisfaction of an attending CG marine inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 14 April 2005
Resolution: cleared and reissued.
Documentation › Safety/Response Plans/Programs
Issued 30 July 2003 Resolved
PRIOR TO DEPARTING THE PORT OF TAMPA, PROVIDE IN WRITING THE FOLLOWING: A) REQUEST FOR A ONE-WAY TRIP TO NEXT PORT AND LAY-UP; B) YOUR LIFERAFT ARRANGEMENT AS TO MEETING 46 CFR 199.260; C) DESIGNATED LIFEBOATMEN AND COPIES OF CERTS.
Due 30 July 2003
Resolved 30 July 2003
Resolution: RCV''D WRITTEN STATEMENT.
Operations/Management › Lifesaving
Issued 30 July 2003 Resolved
PRIOR TO DEPARTURE FROM NEXT U.S. PORT CONTACT THE LOCAL OCMI TO ADDRESS ITEMS 2-7, AND 12. LEGACY COMPONENT DESC: Op Readiness/Maintenance/Inspection
Due 4 August 2003
Resolved 30 July 2003
Resolution: RESCINDED REQUIREMENT PRIOR TO DEPARTING PORT OF TAMPA
Documentation › Safety/Response Plans/Programs
Issued 30 July 2003 Resolved
UPDATE FIRE CONTROL/LIFESAVING ARRANGEMENT PLAN AND PROVIDE TO [name withheld] TO REFLECT UPDATED LIFESAVING ARRANGEMENTS FOR LIFERAFT POSITIONS. FOLLOWED BY [name withheld] PLAN. LEGACY COMPONENT DESC: Fire Control Plans
Due 13 August 2003
Resolved 26 August 2003
Resolution: Cleared and issued another to submit F/S Control Plan to [name withheld].
Documentation › Safety/Response Plans/Programs
Issued 30 July 2003 Resolved
PROVIDE SMPEP UPDATE TO VESSEL SOPEP PRIOR TO AUGUST 2, 2003 AND PROVIDE INTERIM APPROVAL FROM CG HQ G-MOR-2 FOLLOWED BY FULL APPROVAL OF PLAN. LEGACY COMPONENT DESC: SOPEP
Due 2 August 2003
Resolved 26 August 2003
Engineering › Diesel Engine (propulsion-direct drive)
Issued 30 July 2003 Resolved
Demonstrate MDE's overspeed trip or provide ABS report attesting a satisfactory test. LEGACY COMPONENT DESC: Governor
Condition: Unknown
Due 29 August 2003
Resolved 26 August 2003
Electrical › Electric Generation Source (emergency)
Issued 29 July 2003 Resolved
Prior to operation of the automated control/monitoring system for engineroom, prove proper operation of the EDG taking the load. Manned engineroom watch required until a CG Inspector witnesses test. LEGACY COMPONENT DESC: Generator
Action required: 705 - Other - as specified
Due 1 August 2003
Resolved 26 August 2003
Operations/Management › Cargo Transfer/Lightering
Issued 29 July 2003 Resolved
Provide transfer procedures meeting 33 CFR 155.720 prior to transfering cargo. LEGACY COMPONENT DESC: Conducted IAW Vessel Transfer Procedures
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 August 2003
Resolved 1 August 2003
Resolution: CLEARED BY MOBMS ACTIVITY 1864005
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 29 July 2003 Resolved
Demonstrate H2S alarm following calibrations prior to loading next cargo. LEGACY COMPONENT DESC: Combustible Gas Indicator
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2003
Resolution: Demonstrated operation of two portable H2S sensors/alarms.
Pollution Prevention/Response › Prevention Equipment
Issued 29 July 2003 Resolved
Demonstrate cargo tank #2 temp sensor T202 prior to loading next cargo. LEGACY COMPONENT DESC: Cargo Monitor/Control System
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2003
Resolution: Demonstrated proper operation of cargo tank #2 temperature sensor, t202.
Operations/Management › Drug and Alcohol Testing
Issued 29 July 2003 Resolved
Demonstrate chemical drug testing program meets 46 CFR PART 16 and 46 CFR PART 4.06 LEGACY COMPONENT DESC: Employee Coverage
Condition: Unknown
Due 25 August 2003
Resolved 26 August 2003
Documentation › Safety/Response Plans/Programs
Issued 29 July 2003 Resolved
Provide interim approval for SOPEP and SMPEP for this vessel from G-MOR-2 per 33 CFR Part 151 followed by final approval. LEGACY COMPONENT DESC: SOPEP
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2003
Resolved 30 July 2003
Resolution: Rescinded - duplicate requirement issued.
Deck/Cargo › Cargo Stowage
Issued 29 July 2003 Resolved
Provide operable oxygen (portable) meter and demonstrate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2003
Resolution: Demonstrated operation of portable oxygen meter.
Electrical › Electric Supply System (service)
Issued 29 July 2003 Resolved
Restrap electrical wiring runs on maindeck.
Due 29 August 2003
Resolved 26 August 2003
Lifesaving › Inflatable Liferafts
Issued 29 July 2003 Resolved
Provide sufficient liferaft capacity on each side of vessel as required by 46 CFR 199.261(e). Provide additional bow raft as required by 46 CFR 199 or prove vessel measurements exempt required bow raft. Demonstrate to the OCMI issuing the COI that liferaft arrangement on cargo deck meets plans.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 August 2003
Resolved 26 August 2003
Resolution: Cleared and issued another requirement to submit F/S Control Plan to [name withheld].
Deck/Cargo › Mooring/Anchoring
Issued 22 February 2002 Resolved
IDENTIFY SHORT IN STARBOARD ANCHOR WINDLASS CIRCUIT. LEGACY COMPONENT DESC: Anchor
Condition: Damaged By Earlier Event
Due 22 February 2002
Resolved 22 February 2002
Resolution: SHORT IDENTIFIED AT BREAKER PANEL IN BOW THRUSTER SPACE. CREW REPLACED FUSE AT BREAKER PANEL AND DEMONSTRATED SATISFACTORY WINDLASS OPERATION.
Construction/Loadline › Structures › Door
Issued 22 February 2002 Resolved
DAMAGE SUSTAINED AT WATERTIGHT DOOR KNIFE EDGE WARPING SAME AND RESULTING IN INABILITY TO REMAIN WATERTIGHT.
Condition: Damaged By Earlier Event
Due 22 February 2002
Resolved 22 February 2002
Resolution: CREW REPLACED WATERGTIGHT DOOR WITH NEW. SATISFACTORY INSTALLATION WITNESSED BY USCG.
Construction/Loadline › Structures
Issued 22 February 2002 Resolved
LOUVERED POWER VENTILATORS TO BOW THRUSTER SPACE DAMAGED BY HEAVY SEAS. MAINTAIN TEMPORARY REPAIRS AND MAKE PERMANENT REPAIRS OR REPLACE IN KIND TO SATISFACTION OF COGNIZANT [name withheld]: Ventilators
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2002
Resolved 19 June 2003
Resolution: See narrative
Navigation
Issued 19 April 2001 Resolved
REPAIR ECHO DEPTH SOUNDING/RECORDING DEVICE.
Condition: Unknown
Due 19 April 2001
Resolved 19 April 2001
Deck/Cargo
Issued 19 April 2001 Resolved
INSTALL PROTECTIVE MESH ON BOW THRUSTER DAMPERS (FWD DAMPERS). CURRENTLY NONE ARE INSTALLED AND DAMPERS CLOSE SO QUICKLY AND WITH SUCH GREAT PRESSURE, THAT IT POSES A PERSONNEL SAFETY HAZARD.
Condition: Unknown
Due 19 April 2001
Resolved 19 April 2001
Lifesaving
Issued 2 June 1999 Resolved
REPAIR STBD LIFEBOAT LIFTING GEAR AND RENEW/WEIGHT TEST FALLS IN THE PRESENCE OF A CG MARINE INSPECTOR. VSL ALLOWED TO SAIL W/ 16 PERSON INFLATABLE LIFERAFT IN LIEU OF STBD LIFEBOAT UNTIL REPAIRS TO STBD LIFEBOATARE COMPLETE.
Condition: Unknown
Due 2 June 1999
Resolved 2 June 1999
Fire Fighting
Issued 15 April 1999 Resolved
MAKE REPAIRS TO EMERGENCY FIRE PUMP HOUSING CASE.
Condition: Unknown
Due 15 April 1999
Resolved 15 April 1999
Engineering
Issued 29 January 1999 Resolved
PROVE PROPER OPERATION OF PORT Z DRIVE UNIT INCLUDING SATISFACTORY CLUTCH LUBE OIL AND STEERING PRESSURE.
Condition: Unknown
Due 29 January 1999
Resolved 29 January 1999
Documentation
Issued 29 January 1999 Resolved
VESSEL MUST CLEAR ABOVE ITEM TO RESUME OPERATIONS, MUST BE CLEARED PRIOR TOGETTING UNDERWAY FROM CURRENT MOORING.
Condition: Unknown
Due 29 January 1999
Resolved 29 January 1999
Engineering
Issued 30 March 1998 Resolved
PROCEED TO ST. MARY'S STREET WHARF TO EFFECT REPAIRS TO PORT Z-DRIVE UNIT. CONDUCT OPERATIONAL TEST OF UNIT IN PRESENCE OF CG MARINE INSPECTOR AFTER WORK IS COMPLETED.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Lifesaving
Issued 24 March 1998 Resolved
INSTALL QUICK RELEASE LAUNCH TYPE LIFE BUOY IN ACCORDANCE WITH 46 CFR 199.70.
Condition: Unknown
Due 17 April 1998
Resolved 17 April 1998
Lifesaving
Issued 24 March 1998 Resolved
MAKE PERMANENT REPAIRS TO PORT SIDE OF AFT RUB RAIL SECTION IN STBD LIFE/RESCUE BOAT. ENSURE REPAIRS ARE MADE BY AN APPROVED FACILITY/INDIVIDUAL.
Condition: Unknown
Due 24 March 1998
Resolved 24 March 1998
Fire Fighting
Issued 24 March 1998 Resolved
INSTALL NEW TIME DELAYS FOR BOTH ENGINE ROOM AND BOW THRUSTER ROOM FIXED FIREFIGHTING SUPPRESION SYSTEMS.
Condition: Unknown
Due 24 March 1998
Resolved 24 March 1998
Electrical
Issued 23 March 1993 Resolved
PROVE PROPER OPERATION OF EMERGENCY GEN. OVERSPEED TRIP/ALARMS (AUDIBLE ANDVISUAL) AND ALL SHUTDOWNS.
Condition: Unknown
Due 3 May 1993
Resolved 3 May 1993
Documentation
Issued 23 March 1993 Resolved
COMPLETE ACCU TEST PROCEDURE VERIFICATION.
Condition: Unknown
Due 3 May 1993
Resolved 3 May 1993
Electrical
Issued 23 March 1993 Resolved
PROVE PROPER OPERATION OF PORT GENERATOR OVERSPEED TRIP AND REMOTE SHUTDOWN.
Condition: Unknown
Due 3 May 1993
Resolved 3 May 1993
Accommodation/Occupational Safety
Issued 23 March 1993 Resolved
PROVE PROPER OPERATION OF BOTH SHIP SERVICE AIR AND BOW THRUSTER STARTING AIR RECEIVER SAFETY RELIEF VALVES.
Condition: Unknown
Due 3 May 1993
Resolved 3 May 1993
Engineering
Issued 23 March 1993 Resolved
PROVE PROPER OPERATION OF PORT MAIN ENGINE OVERSPEED TRIP.
Condition: Unknown
Due 3 May 1993
Resolved 3 May 1993
Navigation
Issued 20 March 1992 Resolved
DEMONSTRATE OPERATION OF ROBERTSON CONTROL UNIT (PORTABLE) THAT ACTIVATES FROM PORT AND STARBOARD BRIDGE WING._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Engineering
Issued 20 March 1992 Resolved
FAILURE OF THE MICRO CONTROLLER I/O BOARDS, ITEMS 11(g) AND 13(g) OF TANO DESIGN VERIFICATION TEST PROCEDURE DOCUMENT [withheld], MUST BE DISTINCTLY IDENTIFIED AND ALARMED. THE ALARM MUST HAVE A MANUAL ACKNOWLEDGEMENT DEVICE._x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Electrical
Issued 20 March 1992 Resolved
THERE MUST BE A TEST SWITCH AT THE EMERGENCY SWITCHBOARD TO SIMULATE A FAILURE POTENTIAL FROM THE NORMAL SOURCE AND CAUSE THE EMERGENCY LOADS TO BE SUPPLIED FROM THE EMERGENCY POWER SOURCE. SEE 46 CFR 112.45-5._x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Deck/Cargo
Issued 20 March 1992 Resolved
PROVE OPERATION OF CARGO TEMPERATURE SENSORS REQUIRED BY 46 CGR 153.440.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Electrical
Issued 20 March 1992 Resolved
ALARM SHALL BE POWERED FROM THE GENERAL ALARM POWER SOURCE, SEE 46 CFR 113.27(c)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Lifesaving
Issued 20 March 1992 Resolved
PROVIDE DOCUMENTATION CERTIFYING WIRE ROPE FALLS TO PORT AND STARBOARD LIFEBOAT DAVITS.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Fire Fighting
Issued 20 March 1992 Resolved
SUBMIT PLANS TO U.S COAST GUARD MARINE SAFETY CENTER DEPICTING CHANGES TO FIRE DETECTION SYSTEM THERMAL DETECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Electrical
Issued 20 March 1992 Resolved
THERE MUST BE TWO INDEPENDENT SOURCES OF POWER FOR THE 24 VDC SUPPLY TO THETANO MONITORING AND ALARM SYSTEM. THE SECONDARY SOURCE OF POWER MUST BE SUFFICIENT TO SUSTAIN SYSTEM OPERATION FOR A MINIMUM OF 18 HOURS. IN ADDITION SYSTEM MUST BE CONTINUOUSLY POWERED.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Navigation
Issued 20 March 1992 Resolved
PROVIDE AND POST MANEUVERING CHARACTERISTICS IN ACCORDANCE WITH 46 CFR 35.20-40.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Engineering
Issued 20 March 1992 Resolved
DETERMINE THE CAUSE OF THE OVERLOADED CONDITION ON BOTH PORT AND STARBOARD MAIN DIESEL ENGINE AND CORRECT OVERLOAD CONDITION._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Documentation
Issued 20 March 1992 Resolved
PROVIDE ALL REQUIRED FCC CERTIFICATES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Navigation
Issued 20 March 1992 Resolved
THE HEIGHT OF THE PILOT HOUSE WINDOWS SHALL MEET THE CRITERIA SET IN 46 CFR32.16(b)(4)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Lifesaving
Issued 20 March 1992 Resolved
PROVIDE AND POST PLACARD OF LIFESAVING SIGNALS AND BREECHES BUOY INSTRUCTION AS PER 46 CFR 35.12._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Lifesaving
Issued 20 March 1992 Resolved
CONTROL OF OIL PIPING POSITIVE SHUT-OFF VALVES MUST BE FROM THE FIRE CONTROL STATION. INSTALL REACH ROD ASSEMBLY TO CONTROL LUBE OIL TANK SHUT- OFF VALVE FROM ERC.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Engineering
Issued 20 March 1992 Resolved
FAILURE OF THE MAIN ENGINE SPEED CONTROL 24 VDC POWER SUPPLY IS NOT PROPERLY MONITORED BY THE TANO._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Engineering
Issued 20 March 1992 Resolved
A FAILURE OF THE MASTER COMPUTER MUST BE SUFFICIENTLY ALARMED TO ATTRACT IMMEDIATE CREW ATTENTION.
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Engineering
Issued 20 March 1992 Resolved
FAILURE OF THE COMMUNICATIONS MICROCONTROLLERS MUST BE ALARMED IN THE ERC AND AT THE ENGINEER'S ACCOMMODATIONS PANELS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Electrical
Issued 20 March 1992 Resolved
ONE OF THE 120VAC/24VDC CONVERTERS MUST BE FED FROM THE MAIN SWITCHBOARD. CURRENTLY BOTH CONVERTERS ARE FED FROM THE EMERGENCY SWITCHBOARD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Fire Fighting
Issued 20 March 1992 Resolved
INSTALL COAST GUARD APPROVED 2.5 INCH ALL PURPOSE FIRE NOZZLES TO EACH EXTERIOR FIRE STATION. ALL NOZZLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 46 CFR 162.027._x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Fire Fighting
Issued 20 March 1992 Resolved
DEMONSTRATE THAT EACH FIRE PUMP IS CAPABLE OF DELIVERING SIMULTANEOUSLY THENUMBER OF STREAMS OF WATER REQUIRED BY TABLE 46 CFR 34.10-5(a) FROM THE OUTLETS HAVING THE GREATEST PRESSURE DROP BETWEEN FIRE PUMP AND NOZZLES AT A PITOT TUBE PRESSURE OF 75 PSI._x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Lifesaving
Issued 20 March 1992 Resolved
PROVIDE AND DEMONSTRATE OPERATION OF INTRINSICALLY SAFE TOXIC VAPOR DETECTOR IAW 46 CFR 153.526._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Lifesaving
Issued 20 March 1992 Resolved
PROVIDE AND PROVE OPERATION OF INTRINSICALLY SAFE COMBUSTIBLE GAS INDICATOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992
Fire Fighting
Issued 20 March 1992 Resolved
PROVIDE A PROPOSAL FOR AN EQUIVALENT TO THE DECK FOAM FIRE EXTINGUISHING SYSTEM REQUIRED BY 46 CFR 34.05-5(a)(2). AN ADEQUATE DECK WATER FOG SYSTEM WOULD FULLFILL THE REQUIREMENTS FOR A DECK FIRE FIGHTING SYSTEM IS DEMONSTRATED TO THE SATISFACTION OF THE COGNIZANT MARINE INSPECTOR._x001C_
Condition: Unknown
Due 20 March 1992
Resolved 20 March 1992

Casualty record · 3

20 February 2002Routine · role: Involved in a Marine Casualty · activity 1492775
16 December 2013Routine · role: Acknowledged Pollution Source · activity 4771585
21 September 2015Routine · role: Involved in a Marine Casualty · activity 5724257
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

BENNO C. SCHMIDT (2002). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.