Records from 2012 to 2026. Most recent: inspection, 16 July 2026.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 8 May 2026
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2026
Resolved 3 June 2026
Resolution: vessel provided ships station license.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 8 May 2026
Resolved
Each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly, using the integrated test circuit and output indicator, to determine that it is operative. The EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable. Vessel owner could not produce log book for monthly EPIRB test.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2026
Resolved 15 June 2026
Resolution: log created.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 May 2026
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 2 1/2 gallon buckets. Buckets on board were 5 gallons.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2026
Resolved 8 June 2026
Resolution: proper fire buckets obtained.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 8 May 2026
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:Charts of large enough scale to make safe navigation possible. Vessel operator could not provide information when electronic charts were last updated.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2026
Resolved 8 June 2026
Resolution: Updated elctronic card for system obtained.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 May 2026
Resolved
Gauges to indicate engine revolutions per minute (RPM)
The gauges must be readily visible at the operating station. STBD engine RPM is not working properly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2026
Resolved 16 July 2026
Resolution: RPM gauge repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 28 April 2026
Resolved
When a marine employer determines that a casualty or incident is, or is likely to become, an SMI, the marine employer must ensure that the following alcohol and drug testing is conducted:Alcohol testing must be conducted on each individual engaged or employed on board the vessel who is directly involved in the SMI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2026
Resolved 8 June 2026
Resolution: required testing equipment obtained.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 28 April 2025
Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. Ventilation louvers to engine room are being blocked from closing with wire.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2025
Resolution: OMO removed wires blcking the operation of fire dampers.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 28 April 2025
Resolved
When operating a vessel on a body of water where the discharge of untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3, the operator must secure each Type III device in a manner which prevents discharge of sewage. Acceptable methods of securing the device include—
(1) Closing each valve leading to an overboard discharge and removing the handle;
(2) Padlocking each valve leading to an overboard discharge in the closed position; or
(3) Using a non-releasable wire-tie to hold each valve leading to an overboard discharge in the closed position.
Sewage holding tank overboard discharge found closed but without locking device.
33 CFR 159.7(c)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2025
Resolution: Installed zip tie to lock overboard discharge in the closed position.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 28 April 2025
Resolved
For vessels other than those covered in paragraphs (b) and (c) of this section, the name of the vessel must be marked on some clearly visible exterior part of the port and starboard bow and the stern of the vessel. Vessel name was not marked on the port or starboard side.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 11 June 2025
Resolution: Name properly applied to bow of vessel
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 28 April 2025
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. Vessel is missing original COD.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 11 June 2025
Resolution: New COD procured
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 28 April 2025
Resolved
Each ship transporting more than six passengers for hire equipped with a radiotelephone station in accordance with Part III of Title III of the Communications Act must carry a radio operator who meets the following requirements: Where the station power does not exceed 250 watts carrier power or 1500 watts peak envelope power, the radio operator must hold a marine radio operator permit or higher class license. Master did not provide a marine operator permit.
47 CFR80.159(e)(1)
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 11 June 2025
Resolution: FCC Operator permit procured
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 28 April 2025
Resolved
Fire fighting drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information:Date of the drill and training; and General description of the drill scenario and training topics. Documentation of drills and training was not available for review.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 12 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 April 2025
Resolved
The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections and tests. Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew. Monthly inspections of fire extinguishers not completed and logged.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 12 June 2025
10 - Safety of Navigation › N/A - No Subsystem › Navigation bridge visibility
Issued 28 April 2025
Resolved
Glass or other glazing material used in windows at the operating station must have a light transmission of not less than 70 percent according to Test 2 of ANSI Z 26.1 (incorporated by reference, see 46 CFR 175.600) and must comply with Test 15 of ANSI Z 26.1 for Class I Optical Deviation. Port side window of operating station sun damaged and highly fractured.
46 CFR 177.1030(b)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 12 June 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 28 April 2025
Resolved
Watertight hatches must be marked on both sides in clearly legible letters at least 25 millimeters (1 inch) high: “WATERTIGHT HATCH—KEEP CLOSED”. All watertight hatches were found with no labels
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 11 June 2025
Resolution: Hatches properly labeled
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 28 April 2025
Resolved
Stations in the maritime service must be licensed by the FCC either individually or by fleet. FCC Station license is from previous owner is no longer valid.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 11 June 2025
Resolution: FCC Station License procured
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 April 2025
Resolved
Unless other means are provided to ensure that a potential waste receptacle fire would be limited to the receptacle, waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Waste receptacles were constructed of plastic.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 May 2025
Resolved 11 June 2025
Resolution: Replaced receptacles in accordance with regulation. Resolved.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 April 2025
Resolved
The discharge ends of fuel tank vent pipes must terminate on the hull exterior as high above the waterline as practicable and remote from any hull openings, or they must terminate in U-bends as high above the weather deck as practicable and as far as practicable from openings into any enclosed spaces. Vent pipes terminating on the hull exterior must be installed or equipped to prevent the accidental contamination of the fuel by water under normal operating conditions. Fuel tank vent is arranged to discharge to the interior of the vessel over hatches. Re-route vents to discharge to the exterior of the hull.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 27 June 2025
Resolution: Properly installed fuel tank vents to exterior of hull.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 28 April 2025
Resolved
Except on a vessel limited to daytime operations, the compass must be illuminated. Vessel compass is not illuminated
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 12 June 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 28 April 2025
Resolved
A hatch cover must be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Lanyard securing port engine room hatch to vessel broken.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 12 June 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 April 2025
Resolved
Each small battery installation must be protected from falling objects. Battery cover for port engine is not capable of staying on. Make modifications to cover to account for battery wires and close properly.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 12 June 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 April 2025
Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station. Starboard engine lubricating oil pressure gauge not working.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 27 June 2025
Resolution: Replaced oil pressure sending unit with new.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 April 2025
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Identification of the items may be in words, or the appropriate symbols in IMO Resolution A.760(18) (incorporated by reference; see 46 CFR 175.600). Letters and numbers must be at least 50 millimeters (2 inches) high. Markings for life jacket stowage worn and unreadable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 May 2025
Resolved 12 June 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 28 April 2025
Resolved
A hatch cover must have securing devices. Port/Stbd engine room hatch to vessel are ceased and unable to be secured.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 19 January 2024
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual inspection within the periods specified in § 176.500(b)(1) [annual inspection within 3 months before or after each anniversary date] and your Certificate of Inspection must be endorsed. Vessel did not conduct annual inspection for 2023.
46 CFR 176.502
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 February 2024
Resolution: Renewal Inspection Conducted.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 19 January 2024
Resolved
Crew training shall be logged or otherwise documented for review by the COast Guard upon request. The training entry shall include the following information. (1) Date of the training; and (2) General description of the training topics.
No documented drills or EPIRB testing documented. Document at least one of each drill/training/testing w/i one month.
46 CFR 185.420(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 February 2024
Resolution: Record of drills provided
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 4 October 2022
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual inspection within the periods specified in 176.500(b)(1) [annual inspection within 3 months before or after each anniversary date] and your Certificate of Inspection must be endorsed. Vessel is outside of three month window for Inspection and is not permitted to operate until annual inspection has been completed.
46CFR176.502
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 October 2022
Resolution: Annual Inspection Completed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 13 May 2021
Resolved
Each life jacket must be marked with Type I retro reflective material approved in 46 CFR 164.018. Replace all retro reflective tape from life jackets and life ring.
46 CFR 185.604 (h)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: Verified all li jackets propertly marked.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 May 2021
Resolved
The stowage locations of the personal flotation devices carried in addition to life jackets under §180.72, must be separate from the life jackets, and such as not to be easily confused with that of the life jackets. Mark each life jacket storage container with the type and quantity of stored life jackets. Ensure child are separated from adult.
46 CFR 180.78 (5)(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: MIs verified all storage containers marked accordingly
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 May 2021
Resolved
Six hand red flare distress signals approved in accordance with §160.021 and Six hand orange smoke distress signals approved in accordance with §160.037. Ensure the vessel has either 6 red flares and 6 orange smoke or a total of 12 red flares. 46 CFR 180.68 (a)(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: MIs verified vessel is required amount of distress signals IAW route.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 13 May 2021
Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Replace the current EPIRB hydrostatic release unit. 46 CFR 185.740 (2)(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: Owner purchased a new EPIRB and MIs verified appropriate type
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 13 May 2021
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date. Ensure current charts, light list, navigation rules, tide tables are on board at all times.
46 CFR 184.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: Owner provided new updated publications and charts for current route.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 13 May 2021
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. Ensure first aid on board contains required items and instructions IAW 46 CFR 160.041.
46 CFR 184.710
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: MIs verified content of new first aid provided by owner.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 May 2021
Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). Ensure Port Side bilge pump is fully operational. 46 CFR 182.520 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: Owner changed bilge pump. MIs verified proper operation of bilge pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 May 2021
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. Ensure Starboard side high water alarm is fully operational. 46 CFR 182.530 (a)
Action required: 10 - Deficiency Rectified
Resolved 22 June 2021
Resolution: MIs verified high water alarm fully functional.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 May 2021
Resolved
A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Make penetrations from both forward compartments going aft watertight. 46 CFR 179.320 (c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2021
Resolution: Verify penetrations fixed making watertight compartment.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 13 May 2021
Resolved
A hatch exposed to the weather must be watertight. Ensure all hatches are made watertight to include replacing gaskets when necessary. 46 CFR 179.360 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2021
Resolution: Verified all hatches have new gaskets.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 February 2020
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel is past due for drydock inspection.
46CFR176.600(c)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 March 2020
Construction/Loadline › Hull › Hull Plating
Issued 9 January 2018
Resolved
Make repairs to identified areas on hull.
Action required: 705 - Other - as specified
Resolved 26 January 2018
Resolution: Repairs completed.
Stability › Watertight Integrity › General
Issued 4 January 2018
Resolved
Demonstrate means to make all ahtches watertight. 02 forward, 01 port aft.
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 9 January 2018
Resolution: New gaskets and hatches installed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 4 January 2018
Resolved
Secure all battery boxes (3).
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 9 January 2018
Resolution: Batteries secured
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 4 January 2018
Resolved
Remove inverter from under operating station.
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 9 January 2018
Resolution: Power inverter removed.
Lifesaving › Lifefloat › Painter
Issued 4 January 2018
Resolved
Reattach lifefloat painter.
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 4 January 2018
Resolution: painter line wrapped around body of LF
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 4 January 2018
Resolved
Mark/label stowage location for Adult/Child PFD's.
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 9 January 2018
Resolution: Stowage marking provided.
Fire Fighting › Fire Bucket › Availability
Issued 4 January 2018
Resolved
Provide 03 fire buckets, 1 missing.
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 4 January 2018
Resolution: All fire buckets on board.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 4 January 2018
Resolved
Hydro fireboy cylinder or replace.
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 9 January 2018
Resolution: New cyclinders installed (Port/STBD)
Engineering › Steering Gear System › Ram
Issued 4 January 2018
Resolved
Renew/repair hydraulic ram for port ssteering (Leaking fluid).
Action required: 705 - Other - as specified
Due 11 January 2018
Resolved 9 January 2018
Resolution: Hydraulic ram replaced.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 21 February 2017
Resolved
Prove proper operation of port and starboard fireboy visual and audible alarms.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 February 2017
Resolution: New fireboys indicators installed.
Communications › Alarms/Indicators › High Water Alarm
Issued 21 February 2017
Resolved
Each bilge high level alarm must have its own audible and visual indicator.
Action required: 705 - Other - as specified
Due 21 March 2017
Resolved 31 March 2017
Resolution: High level indicator provided.
Communications › Alarms/Indicators › High Water Alarm
Issued 21 February 2017
Resolved
Provide proper operation of visual indicator for starboard automatic bilge pump.
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 11 April 2017
Resolution: Confirmed with vessel operator that starboard high level alarm is operational.
Communications › Radio Communications › VHF Radiotelephone
Issued 21 February 2017
Resolved
Provide VHF radio with GPS unit.
Action required: 705 - Other - as specified
Due 21 March 2017
Resolved 11 April 2017
Resolution: VHF has been connected to GPS.
Communications › Radio Communications › EPIRB
Issued 16 February 2016
Resolved
Replace expired hydrostatic release on EPIRB prior to operating beyond 3 miles from shore.
Action required: 705 - Other - as specified
Resolved 16 February 2016
Resolution: Vessel installed approved hydrostatic release on EPIRB.
Lifesaving › Lifefloat › Float-free Link
Issued 16 February 2016
Resolved
Properly attach float-free link to life float painter and vessel prior to carrying passengers beyond 3 miles from shore when carrying an approved EPIRB.
Action required: 705 - Other - as specified
Resolved 16 February 2016
Resolution: Vessel properly attached float-free link to life float painter and vessel.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 16 February 2016
Resolved
Bond metallic sections of port and starboard fuel fill and vent lines to prevent static build up.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2016
Resolution: Vessel bonded metallic sections of port and starboard fuel fill and vent lines with grounding wire.
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 January 2016
Resolved
Install metal supports on wiring and cables throughout vessel at intervals no greater than 24" or in accordance with 14.h of ABYC E-8.
Action required: 705 - Other - as specified
Due 19 February 2016
Resolved 25 January 2016
Resolution: Vessel installed metal supports on wiring and cables throughout vessel at intervals that did not exceed 24"
Stability › Watertight Integrity › General
Issued 19 January 2016
Resolved
Secure Bomar watertight hatches to hatch frames with captive chains prior.
Action required: 705 - Other - as specified
Due 19 February 2016
Resolved 25 January 2016
Resolution: Vessel secured Bomar watertight hatches to hatch frames with captive wire of sufficient strength.