Construction/Loadline › Structures › Rake
Issued 11 October 2012
Resolved
Provide Marine Chemist Certificate, verifying rakes and all voids are safe for entry.
Action required: 705 - Other - as specified
Resolved 15 October 2012
Electrical › Electrical Distribution System (emergency) › Bus Bar Connection
Issued 4 May 2012
Resolved
Provide and prove proper operation of emergency generator auto start as required by MVI Policy letter 23-90.
Due 15 June 2012
Resolved 6 June 2012
Fire Fighting › Fire Pumps › Pressure
Issued 26 April 2012
Resolved
Show proper operation of fire pump using emergency generator with 60 psi at the outlet of the pump.
Due 15 June 2012
Resolved 22 June 2012
Engineering › Steering Gear System › Rudder
Issued 26 April 2012
Resolved
Complete operational test (MDEs and steering) while underway.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2012
Operations/Management › Drills/Instruction › Not Conducted
Issued 26 April 2012
Resolved
Complete required crew training and drills IAW 46 CFR 185.420, 46 CFR 185.520 and 46 CFR 185.524 and log.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2012
Fire Fighting › Remote Fuel Shutoff › General
Issued 26 April 2012
Resolved
Properly mark fuel shut offs for bow thruster fwd under bench STBD side. (1" letters)
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 26 April 2012
Resolved
Provide proper housing (remote pull box) for fixed fire system release for bow thruster STBD side fwd under bench.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 25 May 2012
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 26 April 2012
Resolved
Properly mark ring buoys with name and retro tape.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 26 April 2012
Resolved
Remove combustible boxes (bins) next to deep fat fryer. Also ensure stbd exit is not blocked.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 26 April 2012
Resolved
Remove open flames from vessel (candles and sterno).
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 26 April 2012
Resolved
Properly stow gear in galley and #2 compartment. Secure for sea.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Engineering › Bilge Water Management System › Pump
Issued 26 April 2012
Resolved
Properly wire bow thruster compartment bilge pump float (currently plugged in above fixed fire system). Needs to be hardwired.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 April 2012
Resolved
Properly hardwire fresh water pumps in #4 compartment IWO hot water heater (currently plugged in).
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Engineering › Bilge Water Management System › Valve
Issued 26 April 2012
Resolved
Properly service #3 compartment (STBD side) check valve in bilge line (valve is allowing backflow).
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 26 April 2012
Resolved
Secure CO2 bottle for beverage distribution system and all loose (extra) fire extinguishers found in aft storage cabinet on barge.
Action required: 705 - Other - as specified
Due 23 May 2012
Resolved 4 May 2012
Documentation › Certificates/Documents › Stability Letter
Issued 26 April 2012
Resolved
Provide request to USCG MSC for amended Stability Letter IAW AAWPP of 185 lbs, effective 1DEC2011.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Operations/Management › Drills/Instruction › Not Conducted
Issued 26 April 2012
Resolved
Complete drills (fire and man overboard) in the presence of a USCG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2012
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 26 April 2012
Resolved
Provide onboard valid COD.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 25 May 2012
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 26 April 2012
Resolved
Provide onboard updated FCC Radiotelephony Certificate and Bridge-to-Bridge Certificate (exp 10MAR2012).
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 25 May 2012
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 26 April 2012
Resolved
Provide alcohol test kits onboard or available in 2 hours for all crew.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 25 May 2012
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 26 April 2012
Resolved
Show proof that supervisors have training (drug and alcohol) per 46 CFR 16.401.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Navigation › Piloting/Steering › Marine Charts
Issued 26 April 2012
Resolved
Provide updated charts, US Coast Pilot and USCG Light List onboard.
Action required: 705 - Other - as specified
Due 10 May 2012
Resolved 4 May 2012
Communications › Alarms/Indicators › Bilge Alarm
Issued 26 April 2012
Resolved
Show proper operation of bilge high level alarms, navigation lights and ships whistle in the presents of a USCG MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2012
Communications › Public Address System › Loudspeaker
Issued 26 April 2012
Resolved
Show proper operation of public address system all decks (main deck INIOP).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2012
Engineering › Bilge Water Management System › Piping
Issued 28 December 2011
Resolved
Crop and renew wasted bilge piping in forward rake starboard side.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 December 2011
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 1 March 2011
Resolved
Prove proper operation of water light for port side ring bouy.
Action required: 705 - Other - as specified
Resolved 28 March 2011
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 1 March 2011
Resolved
Attach water light lanyard IAW 46 CFR 180.70 (d)(2).
Action required: 705 - Other - as specified
Resolved 28 March 2011
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 16 September 2010
Resolved
Crop and renew wasted steel bulkhead between ice machine in galley and female head, as identified
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Hull › Hull Plating
Issued 14 September 2010
Resolved
Crop and renew to good metal all vertical angle iron frames on stern, as identified; provide repair proposal.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Stability › Watertight Integrity › General
Issued 14 September 2010
Resolved
Make repairs to leak in overhead port side aft compartment, above hatch.
Action required: 705 - Other - as specified
Resolved 24 February 2011
Construction/Loadline › Structures › Deck Plating
Issued 13 September 2010
Resolved
Crop and renew wasted underdeck beams and wasted deck in forward rake port and starboard sides as identified.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Structures › Deck Plating
Issued 13 September 2010
Resolved
Crop and renew x-verse under deck beams in cargo hold port side, #2 space, as identified.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Structures › Deck Plating
Issued 13 September 2010
Resolved
Crop and renew hole in overhead port side cargo space.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Structures › Deck Plating
Issued 13 September 2010
Resolved
Crop and renew x-verse and long under deck beams in port side stern void, as identified.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Structures › Deck Plating
Issued 13 September 2010
Resolved
Crop and renew wasted and holed overhead plating in port side sterm void, as identified.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Structures › Manhole
Issued 13 September 2010
Resolved
Crop and renew wasted ladder in port side stern void.
Action required: 705 - Other - as specified
Resolved 24 February 2011
Construction/Loadline › Structures › Deck Plating
Issued 13 September 2010
Resolved
Crop and renew wasted underdeck beams in starboard stern void, as identified.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Fire Fighting › Fire Pumps › Suction Valve
Issued 13 September 2010
Resolved
Replace wasted suction line for fire pump.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Structures › Transverse Bulkhead
Issued 13 September 2010
Resolved
Crop and renew wasted steel bulkhead port side aft in female head.
Action required: 705 - Other - as specified
Resolved 1 February 2011
Construction/Loadline › Structures › Superstructure
Issued 13 September 2010
Resolved
Crop and renew wasted stanchion starboard side IWO gangway and 3rd and 5th stanchion from bow.
Action required: 705 - Other - as specified
Resolved 24 February 2011
Construction/Loadline › Structures › Superstructure
Issued 13 September 2010
Resolved
Crop and renew wasted cable conduit on bow.
Action required: 705 - Other - as specified
Resolved 28 March 2011
Construction/Loadline › Structures › Superstructure
Issued 13 September 2010
Resolved
Crop and renew wasted stanchion on bow port side inboard next to cable conduit.
Action required: 705 - Other - as specified
Resolved 28 March 2011
Construction/Loadline › Hull › Hull Plating
Issued 13 September 2010
Resolved
Remove water, de-scale and make repairs to screw hole in bottom hull plating.
Action required: 705 - Other - as specified
Resolved 29 September 2010
Construction/Loadline › Penetrations › Pipe Flange
Issued 13 September 2010
Resolved
Crop and renew wasted bilge piping in forward rake starboard side.
Action required: 705 - Other - as specified
Resolved 30 December 2010
Lifesaving › Rescue Boat › Markings
Issued 9 April 2010
Resolved
Mark rescue boat IAW 46 CFR 185.604(a) and (d).
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Communications › Alarms/Indicators › Bilge Alarm
Issued 9 April 2010
Resolved
Re-attach bilge high level alarm in #3 compartment STBD side.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 19 April 2010
Fire Fighting › Fire Pumps › Pressure
Issued 9 April 2010
Resolved
Provide specification sheet for newly installed fire pump. (model #3P703A 7.5 hp).
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 9 April 2010
Accommodation/Occupational Safety › Potable Water System › General
Issued 9 April 2010
Resolved
Provide specification sheet for hot water heater, contact MFG and verify if water heater meets UL174 or UL1453. (Heater shows UL 786H on sticker attached to unit).
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 9 April 2010
Resolved
Mark new lifejackets with vessel name.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 19 April 2010
Engineering › Electric Propulsion System › Battery
Issued 7 April 2010
Resolved
Attach battery covers for the two battery boxes in bow thruster compartment and secure batts to prevent movement.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 19 April 2010
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 April 2010
Resolved
Provide cover for electrical junction box above port bilge in potable water tank compartment (3rd compartment) and properly secure STBD elec. Junction box cover (currently wrapped with elec. tape).
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 19 April 2010
Engineering › Bilge Water Management System › Valve
Issued 7 April 2010
Resolved
Provide valve handle for STBD bilge pump in 3rd compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 7 April 2010
Resolved
Update first-aid-kit.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 9 April 2010
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 7 April 2010
Resolved
Provide STBD #5 compartment hatch cover with chain or devise to prevent it from going over the side.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 7 April 2010
Resolved
Degrease under generator for tug.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 7 April 2010
Resolved
Remove debris and water from all compartments.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 13 September 2010
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 7 April 2010
Resolved
Field day/properly stow equipment and vessel operational supplies for sea.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 13 September 2010
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 7 April 2010
Resolved
Remove all flammables from vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Construction/Loadline › Hull › Side Shell
Issued 7 April 2010
Resolved
Scale back hole in STBD # 5 compartment inboard side and make available for USCG inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Navigation › Piloting/Steering › Marine Charts
Issued 7 April 2010
Resolved
Provide updated charts onboard that are current edition and updated.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 7 April 2010
Resolved
Remove candles from vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 April 2010
Resolved
Remove timers and associated wiring or terminate properly.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 9 April 2010
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 7 April 2010
Resolved
Properly secure port running light.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 13 September 2010
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 7 April 2010
Resolved
Scale down and repaint P/S running light screens IAW 72COLREGS.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Electrical › Electrical Distribution System (service) › Junction Box
Issued 7 April 2010
Resolved
Install cover on electrical box upper deck, fwd, port side.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 9 April 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 April 2010
Resolved
Properly splice electrical wire IWO STBD side aft upper deck refer.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 April 2010
Resolved
Properly terminate wiring on overhead IWO bar area port side aft upper deck.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Construction/Loadline › Structures › Deck Plating
Issued 7 April 2010
Resolved
Scale back and make available for inspection deck area under operating station.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 13 September 2010
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 7 April 2010
Resolved
Provide 5 adult life jackets Type 1.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 7 April 2010
Resolved
Properly install water light on ring buoy 3-6' line.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 7 April 2010
Resolved
Properly sanitize galley.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Accommodation/Occupational Safety › Ventilation › General
Issued 7 April 2010
Resolved
Make repairs to ventilation duct in galley.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Accommodation/Occupational Safety › Ventilation › General
Issued 7 April 2010
Resolved
Address the cooling of the ice machine vise using portable fans.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 13 September 2010
Electrical › Electrical Distribution System (service) › Panelboard
Issued 7 April 2010
Resolved
Re-label electrical breakers throughout.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Engineering › Bilge Water Management System › Pump
Issued 7 April 2010
Resolved
Show proper operation of bow thruster bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Fire Fighting › Fire Pumps › Pressure
Issued 7 April 2010
Resolved
Show proper operation of fire pump with pressure of 60psi at the pump outlet (discharge side).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 7 April 2010
Resolved
Hydro CO2 cylinders for fixed fire system for bow thruster and tug.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 April 2010
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type 1
Issued 7 April 2010
Resolved
Fix leaking pipe fwd end of MSD tank and properly clean MSD compartment.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 13 September 2010
Accommodation/Occupational Safety › Potable Water System › General
Issued 7 April 2010
Resolved
Replace hot water heater with approved unit, prior to use.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 28 March 2011
Operations/Management › Drills/Instruction › Not Conducted
Issued 7 April 2010
Resolved
Prior to the carriage of passengers, in the presents of a USCG inspector complete fire and man overboard drills and show proper operation of rescue boat.
Action required: 705 - Other - as specified
Due 22 April 2010
Resolved 13 September 2010
Documentation › Certificates/Documents › FCC SSL
Issued 20 January 2009
Resolved
Provide radio operators permit (FCC for master of vessel.
Action required: 705 - Other - as specified
Due 28 February 2009
Resolved 7 April 2010
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 20 January 2009
Resolved
Repair bow thruster remote fuel shut off fwd cable, remote fuel shut off port side, STBD side bow supply and STBD side service supply for mains. Show proper operation to attending USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 January 2009
Engineering › Bilge Water Management System › Pump
Issued 20 January 2009
Resolved
Make proper repairs to check valve (leaking) on bilge STBD side in storage compartment. Make repairs to port bilge pump (leaks around seams) in storage compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 January 2009
Engineering › Bilge Water Management System › Piping
Issued 20 January 2009
Resolved
Make proper repairs to wasted bilge pipe, port side IWO through hull in potable water void.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 January 2009
Engineering › Bilge Water Management System › Pump
Issued 20 January 2009
Resolved
Make repair and show proper operation of STBD bilge pump in potable water void and STBD bilge pump in MSD void.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 January 2009
Communications › Alarms/Indicators › Bilge Alarm
Issued 20 January 2009
Resolved
Properly mount bilge high water float in MSD void.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 January 2009
Lifesaving › Lifebuoys › Serviceable
Issued 20 January 2009
Resolved
Replace line on all ring buoys (grab line).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 January 2009
Accommodation/Occupational Safety › Cooking Systems › Cooking Fuel
Issued 20 January 2009
Resolved
Degrease grill in Galley.
Action required: 705 - Other - as specified
Due 27 January 2009
Resolved 22 January 2009
Fire Fighting › Nozzles › Condition
Issued 20 January 2009
Resolved
Repair or replace fire fighting nozzle on lower fir hose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 January 2009
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 20 January 2009
Resolved
Provide proper metal bowl under Racor filter at fueling station. Provide metal cap/plug for filter.
Action required: 705 - Other - as specified
Due 28 February 2009
Resolved 7 April 2010
Lifesaving › Rescue Boat › Markings
Issued 20 January 2009
Resolved
Properly mark rescue boat IAW 46 CFR 185.604.
Action required: 705 - Other - as specified
Due 28 February 2009
Resolved 28 March 2011
Stability › Watertight Integrity › General
Issued 20 August 2008
Resolved
Provide proposal for port and starboard deck drains. Work must be done to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Resolved 29 August 2008
Construction/Loadline › Hull › Bottom Plating
Issued 20 August 2008
Resolved
Make aft rake available for inspection.
Action required: 705 - Other - as specified
Resolved 21 August 2008
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 20 August 2008
Resolved
Properly apply fire retardant coating to exterior wooden areas as per manufacture.
Action required: 705 - Other - as specified
Resolved 29 August 2008
Accommodation/Occupational Safety › Ventilation › General
Issued 20 August 2008
Resolved
Submit proposal to install ventilation adequate in a manner suitable for the purpose of each enclosed or partially enclosed space IAW 46 CFR 177.600. To be completed during next scheduled drydock Aug 2010.
Action required: 705 - Other - as specified
Resolved 28 March 2011
Construction/Loadline › Structures › Transverse Bulkhead
Issued 20 August 2008
Resolved
Properly de-scale all voids and have confined spaces certified safe for entry by a Marine Chemist for next dry-dock 2010.
Action required: 705 - Other - as specified
Due 31 August 2010
Resolved 29 August 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 August 2008
Resolved
Make proper repairs to STBD stair handrail bottom leading from main deck to upper deck.
Action required: 705 - Other - as specified
Resolved 29 August 2008
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 20 August 2008
Resolved
Remove all flammables from barge.
Action required: 705 - Other - as specified
Resolved 29 August 2008
Construction/Loadline › Structures › Scupper
Issued 6 May 2008
Resolved
Repair or replace deck drain port side, bow thruster room.
Due 21 May 2008
Resolved 29 August 2008
Construction/Loadline › Structures › Scuttle
Issued 6 May 2008
Resolved
Repair waterthight hatch closure for bow thruster room.
Due 21 May 2008
Resolved 22 May 2008
Construction/Loadline › Structures › Scuttle
Issued 6 May 2008
Resolved
Provide closure for water tight hatch instorage void.
Due 21 May 2008
Resolved 22 May 2008
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 6 May 2008
Resolved
Repair exhust leak on port MDE.
Due 21 May 2008
Resolved 22 May 2008
Engineering › Fuel Oil Service System › Valve, Control
Issued 6 May 2008
Resolved
Prove proper operation of fuel shut-off for MDE / generator (3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 May 2008
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 6 May 2008
Resolved
Lable amount of lifejackets stowed in each location.
Due 21 May 2008
Resolved 22 May 2008
Construction/Loadline › Structures › Transverse Bulkhead
Issued 6 May 2008
Resolved
Properly seal foward bulkhead in e/r (watertight and fire retardent)
Due 21 May 2008
Resolved 22 May 2008
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 6 May 2008
Resolved
Secure microwave oven in galley.
Due 21 May 2008
Resolved 22 May 2008
Fire Fighting › Combustible Materials › Partial Bulkheads/Decks
Issued 6 May 2008
Resolved
Remove flamables / combustables from under galley stove and electrical equipment throughout the vessel (housekeeping).
Due 21 May 2008
Resolved 22 May 2008
Documentation › Certificates/Documents › FCC SSL
Issued 8 March 2007
Resolved
Provide valid Radio Safety Certificate.
Due 15 March 2007
Resolved 14 March 2007
Documentation › Certificates/Documents › FCC SSL
Issued 8 March 2007
Resolved
Provide valid Bridge-to-Bridge Certificate.
Due 15 March 2007
Resolved 14 March 2007
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 8 March 2007
Resolved
Provide correct retro tape on all life rings.
Due 15 March 2007
Resolved 9 March 2007
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 8 March 2007
Resolved
Provide retro tape on identified life jackets.
Due 15 March 2007
Resolved 9 March 2007
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 8 March 2007
Resolved
Provide operational water light
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 March 2007
Resolved 9 March 2007
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 March 2007
Resolved
remove dead ended wires at DJ station, provide cover for exposed wires, repair fan switch and provide missing bulds in sockets.
Due 15 March 2007
Resolved 14 March 2007
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 8 March 2007
Resolved
Clean circuit breakers in fan unit above sink in galley.
Due 15 March 2007
Resolved 14 March 2007
Communications › Public Address System › Loudspeaker
Issued 8 March 2007
Resolved
Provide PA speakers for mens and womens bathrooms.
Due 15 March 2007
Resolved 14 March 2007
Electrical › Lighting (service) › Lighting Fixture
Issued 8 March 2007
Resolved
Provide covers for overhead lights in mens and womens bathrooms and galley.
Due 15 March 2007
Resolved 14 March 2007
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 27 July 2006
Resolved
Reapply fire retardant on all wood areas.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Construction/Loadline › Hull › Hull Plating
Issued 27 July 2006
Resolved
Properly repair holes in bow and deck where transducer line penetrates hull plating.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Construction/Loadline › Hull › Longitudinal Frame
Issued 27 July 2006
Resolved
Crop and renew 5 vertical frame members and 1 deck stringer in port bow void.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Resolution: Allowed to remain as they are.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 27 July 2006
Resolved
Properly mount missing insulation in bow void.
Action required: 705 - Other - as specified
Resolved 8 September 2006
Engineering › Bilge Water Management System › Valve
Issued 27 July 2006
Resolved
Provide valve handle on starboard sub pump in sewage/fuel tank space.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Construction/Loadline › Hull › Hull Plating
Issued 27 July 2006
Resolved
Properly seal hole in deck of galley to sewage/fuel tank space.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 July 2006
Resolved
Remove dead ended wires to hot water tank in sewage/fuel tank space.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Engineering › Pressure Vessel › Support
Issued 27 July 2006
Resolved
Properly mount accumulator tank for potable water in sewage/fuel tank space.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 27 July 2006
Resolved
Remove old AC lines in sewage/fuel tank space and properly seal penetration in aft bulkhead.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 27 July 2006
Resolved
Remove flammable materials from center void.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 27 July 2006
Resolved
Properly stow combustible in center void. No combustible shall be stored in inaccessible areas.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 27 July 2006
Resolved
Properly attach proper flame screens on fuel oil vent pipes.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 27 July 2006
Resolved
Properly hard wire florescent light in center void.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 27 July 2006
Resolved
Properly repair/replace outlet box by florescent light in center void.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Stability › Watertight Integrity › General
Issued 27 July 2006
Resolved
Service all scuttles to include cleaning gaskets, seals and attaching lanyards to scuttles.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 27 July 2006
Resolved
Replace broken deck rail stanchions on port side of barge and starboard side of tug.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type 1
Issued 27 July 2006
Resolved
Provide sewage pump out receipts.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Stability › Watertight Integrity › General
Issued 27 July 2006
Resolved
Schedule inspection for tug with Sector Miami uninspected vessel examiner.
Action required: 705 - Other - as specified
Resolved 14 August 2006
Construction/Loadline › Structures › Superstructure
Issued 27 July 2006
Resolved
Provide written proposal to remove obstructions from second deck stanchions and make them available for inspection no later than 30AUG06.
Due 30 August 2006
Resolved 8 September 2006
Construction/Loadline › Structures › Superstructure
Issued 27 July 2006
Resolved
Prove structural strength and integrity of railing on 2nd deck to include railing stanchions as per 46 CFR 177.900 or make available for inspection all railing stanchions on 2nd deck.
Due 6 September 2006
Resolved 8 September 2006
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 31 January 2006
Resolved
Sanitary conditions identified by Marine Inspectors in Galley (i.e., Grease Traps, rotting food items underneath ovens, etc.) shall be addressed.
Condition: Unknown
Due 3 March 2006
Resolved 3 March 2006
Electrical › Electrical Distribution System (service) › Cable
Issued 31 January 2006
Resolved
Several extension cords located throughout the vessel. All extension cords not of the proper Marine Grade, shall be removed.
Condition: Unknown
Due 3 March 2006
Resolved 3 March 2006
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 31 January 2006
Resolved
Outdated Navigation Rules.
Condition: Unknown
Due 3 March 2006
Resolved 9 February 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 31 January 2006
Resolved
Based on Marine Inspector's observation of the CO2 fixed extinguishing systems onboard and servicing reports, there is doubt as to whether all systems were inspected properly, due to specific items in system not identified on report.
Condition: Unknown
Due 3 March 2006
Resolved 13 March 2006
Engineering › Sea-water System (primary cooling) › Piping
Issued 31 January 2006
Resolved
Provide support for raw water intake hoses on main generator.
Condition: Unknown
Due 3 March 2006
Resolved 9 February 2006
Engineering › Generator (propulsion/auxiliary-electric) › Circuit Board
Issued 31 January 2006
Resolved
Repair and prove proper operation of alarm panel on Main generator.
Condition: Unknown
Due 3 March 2006
Resolved 3 March 2006
Lifesaving › Rescue Boat › Markings
Issued 31 January 2006
Resolved
Missing name of vessel on rescue boat and retro-reflective tape.
Condition: Unknown
Due 3 March 2006
Resolved 3 March 2006
Electrical › Electrical Distribution System (service) › Cable
Issued 30 January 2006
Resolved
Several exposed wires located throughout the vessel, identified by the Marine Inspectors. Properly remove or terminate.
Condition: Unknown
Due 3 March 2006
Resolved 31 January 2006
Resolution: Corrected on the spot.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 30 January 2006
Resolved
Missing Guards for freezers in Galley.
Condition: Unknown
Due 3 March 2006
Resolved 9 February 2006
Navigation › Piloting/Steering › US Coast Pilot
Issued 30 January 2006
Resolved
Outdated US Coast Pilot.
Condition: Unknown
Due 3 March 2006
Resolved 9 February 2006
Communications › Alarms/Indicators › Bilge Alarm
Issued 2 March 2005
Resolved
Prove proper operation of all bilge alarms.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2005
Resolved 7 March 2005
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 2 March 2005
Resolved
Prove proper operation of secondary source of power.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2005
Resolved 7 March 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 2 March 2005
Resolved
Provide proof of servicing for all fixed extinguishing systems and alarms.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2005
Resolved 7 March 2005
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 2 March 2005
Resolved
Remove excess fuel oil and slop from port bilge.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2005
Resolved 7 March 2005
Fire Fighting › Fire Pumps › Pressure
Issued 2 March 2005
Resolved
Prove proper operation of fire pump (60 PSI).
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2005
Resolved 7 March 2005
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 2 March 2005
Resolved
Prove proficiency in man overboard recovery drills.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 March 2005
Resolved 7 March 2005
Deck/Cargo › Mooring/Anchoring › Mooring Line/Hawser
Issued 2 March 2005
Resolved
Properly pin safety shackles for tug attachment to barge.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 2 March 2005
Resolved
Properly label life ring on tug.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 2 March 2005
Resolved
Properly secure cutting outfit and CO2 bottle on stern of barge.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 2 March 2005
Resolved
Properly mount breaker box and wires above fuel oil transfer pump.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Fire Fighting › Remote Fuel Shutoff › General
Issued 2 March 2005
Resolved
Remove all items in front of tug fuel oil shut downs.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 2 March 2005
Resolved
Remove gasoline and flammable stores on aft of barge or store IAW 46 CFR
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Engineering › Steering Gear System › Power Unit
Issued 2 March 2005
Resolved
Mount aft operating station and repair rudder angle indicator gauges.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Electrical › Electric Supply System (service) › Battery Charger
Issued 2 March 2005
Resolved
Properly mount battery charger and properly wire battery charger in engine room.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Lifesaving › Emergency Outfit › Fire ax
Issued 2 March 2005
Resolved
Properly stencil fire axe.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 2 March 2005
Resolved
Remove extension cords through out vessel (2nd deck bar, rope lights, galley) and provide correct wiring as pre 46 CFR 183.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 March 2005
Resolved
Remove dead end wiring 2nd deck starboard.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 2 March 2005
Resolved
Provide outlet for 2 gang outlet on 2nd deck starboard or properly blank off.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Electrical › Electrical Distribution System (service) › Switch
Issued 2 March 2005
Resolved
Repair/replace rheostat switches by DJ power panel.
Condition: Improper/Lack of Maintenance
Due 2 April 2005
Resolved 4 April 2005
Electrical › Electric Supply System (service) › Transformer
Issued 2 March 2005
Resolved
Mount transformers in 2nd deck bar cabinet.
Condition: Improper Installation
Due 2 April 2005
Resolved 4 April 2005
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 2 March 2005
Resolved
Provide proper extinguisher brackets for all extinguishers.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 2 March 2005
Resolved
Affix vessel name and hailing port on transom.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Navigation › Piloting/Steering › Coast Guard Light List
Issued 2 March 2005
Resolved
Provide current charts and navigation publications.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 March 2005
Resolved
Provide current training log book and proof of meeting crew drill requirements.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Personnel › Certificates/Documents/Licenses › Certificate, First Aid Course Completion
Issued 2 March 2005
Resolved
Provide red cross first aid/CPR cards for 50% of crew.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Documentation › Certificates/Documents › FCC SSL
Issued 2 March 2005
Resolved
Provide FCC operators permit.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Documentation › Certificates/Documents › FCC SSL
Issued 2 March 2005
Resolved
Provide FCC radio safety certificate.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Communications › Radio Communications › VHF Radiotelephone
Issued 2 March 2005
Resolved
Provide emergency broadcast placard.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Documentation › Manifests/Lists › Muster List/Emergency Instructions
Issued 2 March 2005
Resolved
Provide means of leaving passenger count on shore prior to departure.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Communications › Audible Communications › Bell
Issued 2 March 2005
Resolved
Provide proper size bell.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 March 2005
Resolved
Provide complete first aid kit.
Condition: Improper/Lack of Maintenance
Due 2 April 2005
Resolved 4 April 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 2 March 2005
Resolved
Replace all missing light fixture covers.
Condition: Improper/Lack of Maintenance
Due 2 April 2005
Resolved 31 January 2006
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 2 March 2005
Resolved
Provide cover on 220 VAC outlet in galley.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Electrical › Electrical Distribution System (service) › Panelboard
Issued 2 March 2005
Resolved
Install all missing fasteners on electrical distribution panel covers.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 7 March 2005
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 2 March 2005
Resolved
Provide all required drug testing program documentation.
Condition: Placed in Improper Service
Due 2 April 2005
Resolved 4 April 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 2 March 2005
Resolved
Remove improperly wired light fixtures on 2nd deck under umbrellas.
Condition: Placed in Improper Service
Due 2 March 2005
Resolved 2 March 2005
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 2 March 2005
Resolved
Provide receipts for sewage pump out for last six (06) months. Create and maintain waste disposal log and provide all receipts for sewage, trash and oily water.
Condition: Placed in Improper Service
Due 14 March 2005
Resolved 17 April 2005
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 5 August 2004
Resolved
Apply hull markings IAW 46 CFR 185.602
Condition: Improper/Lack of Maintenance
Due 31 August 2004
Resolved 10 August 2004
Construction/Loadline › Hull › Hull Plating
Issued 5 August 2004
Resolved
Provide hull plate gauging report for plating in way of channel iron inboard tug notch.
Condition: Improper/Lack of Maintenance
Due 31 August 2004
Resolved 10 August 2004
Engineering › Bilge Water Management System › Piping
Issued 5 August 2004
Resolved
Provide positive closure valves on all submersible pump discharge lines.
Condition: Placed in Improper Service
Due 31 August 2004
Resolved 10 August 2004
Construction/Loadline › Hull › Stringer
Issued 5 August 2004
Resolved
Submit proposal for renewal of internal strength members where wasted, bent in way of fore peak void #1.
Condition: Improper/Lack of Maintenance
Due 31 August 2004
Resolved 10 August 2004
Engineering › Bilge Water Management System › Piping
Issued 5 August 2004
Resolved
Properly support bilge pump discharge piping #2 void.
Condition: Placed in Improper Service
Due 31 August 2004
Resolved 10 August 2004
Electrical › Electrical Distribution System (service)
Issued 16 December 2003
Resolved
Provide approved electrical one-line plan & load analysis calculations for all electrical modifications
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Operations/Management › Drills/Instruction
Issued 16 December 2003
Resolved
Update operations manual to reflect all changes in operation procedures and management involved parties. LEGACY COMPONENT DESC: Machinery and operations instructions
Due 29 February 2004
Resolved 12 February 2004
Engineering › Bilge Water Management System
Issued 16 December 2003
Resolved
Ensure all bilge pumps are operational, vessel has independent electrical submersible bilge pumps. LEGACY COMPONENT DESC: Pump
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Communications › Alarms/Indicators
Issued 16 December 2003
Resolved
Provide audible alarm for bilge high level alarms LEGACY COMPONENT DESC: Bilge Alarm
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Documentation › Certificates/Documents
Issued 16 December 2003
Resolved
Provide a Certificate of Documentation to reflect new owners LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Documentation › Certificates/Documents
Issued 16 December 2003
Resolved
Provide current FCC Station License LEGACY COMPONENT DESC: FCC Station License
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Documentation › Certificates/Documents
Issued 16 December 2003
Resolved
Provide a current FCC Safety Certificate. LEGACY COMPONENT DESC: FCC Safety Certificate
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 February 2004
Resolved 3 March 2004
Construction/Loadline › Markings
Issued 16 December 2003
Resolved
Provide means for identifying minimum freeboard at midship as required on stability letter
Due 29 February 2004
Resolved 12 February 2004
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 16 December 2003
Resolved
Provide current servicing report for dry chemical fixed fire fighting system in the galley
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Lifesaving › Hand Flares
Issued 16 December 2003
Resolved
Remove all outdated flares from vessel. LEGACY COMPONENT DESC: Condition
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Lifesaving › Lifejacket/PFD (General)
Issued 16 December 2003
Resolved
Ensure all PFD's are labeled with the vessels new name (TIKKI BEACH) LEGACY COMPONENT DESC: Marking
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Lifesaving › Lifejacket/PFD (Type I)
Issued 16 December 2003
Resolved
Replace three deteriorated adult PFD's LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Deck/Cargo › Mooring/Anchoring
Issued 16 December 2003
Resolved
Provide adequate means for rigging, deploying and retrieving anchor LEGACY COMPONENT DESC: Anchor
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 February 2004
Resolved 12 February 2004
Accommodation/Occupational Safety › Potable Water System
Issued 16 December 2003
Resolved
Remove two wasted hot water heaters in tank space void LEGACY COMPONENT DESC: Electrical water heaters
Due 20 February 2004
Resolved 12 February 2004
Fire Fighting › Remote Fuel Shutoff
Issued 16 December 2003
Resolved
Identify and label each remote F/O shut-off valve for F/O service tank on tug
Due 10 February 2004
Resolved 12 February 2004
Engineering › Fuel Oil Storage/Transfer System
Issued 16 December 2003
Resolved
Provide automatic close valves for the port & starboard F/O tank sight glass level indicators 46 CFR 182.20-25 (a) (5) LEGACY COMPONENT DESC: Sight glass
Due 29 February 2004
Resolved 12 February 2004
Engineering › Fuel Oil Storage/Transfer System
Issued 16 December 2003
Resolved
Repair leaking manhole flange in starboard F/O tank LEGACY COMPONENT DESC: Flange
Due 8 February 2004
Resolved 12 February 2004
Electrical › Electrical Distribution System (service)
Issued 16 December 2003
Resolved
Repair ground detection system on main switchboard LEGACY COMPONENT DESC: Ground Detection
Due 10 February 2004
Resolved 12 February 2004
Electrical › Electric Generation Source (service)
Issued 16 December 2003
Resolved
Provide cover for MDE start battery bank terminals LEGACY COMPONENT DESC: MDE start batteries
Due 10 February 2004
Resolved 12 February 2004
Fire Fighting › Fire Pumps
Issued 16 December 2003
Resolved
Provide a hand fire pump with capacity of at least 5 gallons per minute LEGACY COMPONENT DESC: Hand fire pump
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Lifesaving › Rescue Boat
Issued 1 May 2003
Resolved
Repair transom rip on RHI as discussed. LEGACY COMPONENT DESC: Transom
Condition: Improper/Lack of Maintenance
Due 20 June 2003
Resolved 2 February 2004
Resolution: Vessel has been equipped with a new RHI and satisfactory launching and operation during MOB drills was observed.
Accommodation/Occupational Safety › Cooking Systems
Issued 1 May 2003
Resolved
Secure all galley equipment. LEGACY COMPONENT DESC: Not secured
Condition: Placed in Improper Service
Due 2 June 2003
Resolved 30 May 2003
Personnel › Training
Issued 20 November 2002
Resolved
PROVIDE COMPANY TRAINING/QUALIFICATION PROGRAM FOR VESSEL ENGINEERS. PROVIDE DOCUMENTATION TO THE OCMI FOR ACCEPTANCE OF TRAINING PROGRAM AND PERSONNEL QUALIFIED UNDER THIS PROGRAM. LEGACY COMPONENT DESC: Diesel Engineering
Action required: 705 - Other - as specified
Due 20 November 2002
Resolved 20 November 2002
Resolution: duplicate requirement - rescinded.
Engineering › Bilge Water Management System
Issued 20 November 2002
Resolved
Provide a high bilge level alarm system for push-barge IAW 46CFR182.530. LEGACY COMPONENT DESC: High Bilge Level Alarm
Condition: Unknown
Due 15 January 2003
Resolved 2 May 2003
Engineering › Diesel Engine (propulsion-electric)
Issued 13 September 2002
Resolved
Provide a containment area under each generator to retain any leaks. LEGACY COMPONENT DESC: Containment
Due 15 January 2003
Resolved 30 May 2003
Operations/Management › Drills/Instruction
Issued 13 September 2002
Resolved
Provide a copy of your Passenger Safety Orientation as per 46CFR185.506. LEGACY COMPONENT DESC: Passenger Orientation
Due 15 January 2003
Resolved 1 May 2003
Operations/Management › Drills/Instruction
Issued 13 September 2002
Resolved
Provide an emergency/training instructions manual to the OCMI for acceptance outlining all machinery and electrical systems for vessel engineer training and include qualification standards. LEGACY COMPONENT DESC: Machinery Maintenance Instructions
Action required: 705 - Other - as specified
Due 15 January 2003
Resolved 1 May 2003
Navigation › Piloting/Steering
Issued 13 September 2002
Resolved
Prior to the carriage of passengers, demonstrate the proper operation of the steering gear from operating station, along with all associated machinery gauges. (Vsl electrical hook up to steering system and gauges malfunctioned, while mooring after U/W drills. Cause was a broken rheostat)
Due 20 November 2002
Resolved 11 December 2002
Unknown
Issued 24 May 2001
Resolved
ENSURE GEAR ADRIFT SECURED BELOW DECKS
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
REPAIR FRACTURES IN ACCESS HATCH HINGE, COMPARTMENT #2, AND INSTALL CATCH CHAIN TO PREVENT FUTURE FRACTURES
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
THIGHTEN SHAFT COUPLING ON STARBOARD MAIN ENGINE
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
DEMONSTRATE PROPER OPERATION OF STARBOARD MAIN ENGINE JACKET WATER AND OIL PRESSURE GUAGES
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
PROPERLY GROUND PORT FUEL OIL TANK- PUSH UNIT_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
INSTALL DOUBLE-NUT ON PORT MAIN ENGINE SHUT DOWN SOLENOID
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
INSTALL HAZARD GUARD ON FORWARD END OF BT PRIME MOVER.
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
ADD WORDS "BOWTHRUSTER" TO FORWARD FIXED FIRE FIGHTING SYSTEM LABEL
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
DEMONSTRATE PROPER OPERATION OF GALLEY HOOD VENTILLATION SHUT DOWN
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
System not recorded
Issued 24 May 2001
Resolved
PRIOR TO OPERATING WITH PASSENGERS ON BOARD CONDUCT EMERGENCY DRILLS (FIRE,MAN OVERBOARD, VESSEL CONTROL, ETC) IN PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 1 September 2001
Resolved 11 December 2002
Resolution: Witnessed emergency drills - all sat.
Unknown
Issued 24 May 2001
Resolved
PACK STUFFING TUBE IN WT BLKHD, BT SPACE
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
System not recorded
Issued 24 May 2001
Resolved
PRIOR TO OPERATING WITH PASSENGERS ON BOARD COMPLETE A SATISFACTORY, DOT/USCG DRUG AND ALCOHOL PROGRAM AUDIT.
Condition: Unknown
Due 1 September 2001
Resolved 14 November 2002
System not recorded
Issued 24 May 2001
Resolved
PRIOR TO OPERATING WITH PASSENGERS ONBOARD, DEMONSTRATE PROPER OPERATION OFVESSEL UNDERWAY IN PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 1 September 2001
Resolved 11 December 2002
Resolution: Visited vsl and witnessed operation underway of the vessel - all sat.
System not recorded
Issued 24 May 2001
Resolved
PRIOR TO OPERATING WITH PASSENGERS ON BOARD ENSURE ALL REQUIRED SAFETY EQUIPMENT IS IN CURRENT SERVICE, ON STATION AND READY FOR IMMEDIATE USE.
Condition: Unknown
Due 1 September 2001
Resolved 14 November 2002
System not recorded
Issued 24 May 2001
Resolved
PRIOR TO OPERATING WITH PASSENGERS ON BOARD, ENSURE ALL FURNISHINGS AND DECOR COMPLY WITH THE REGULATIONS FOUND IN 46 CFR 116.423 (COMBUSIBILITY) TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR. PROVIDE DOCUMENTATION OF THE REDARDENT CHEMICAL DATA USED TO THE COGNIZANT OCMI.
Condition: Unknown
Due 1 September 2001
Resolved 14 November 2002
Unknown
Issued 24 May 2001
Resolved
DEMONSTRATE PROPER OPERATION OF LIGHTING IN COMPARTMENT #2
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
DEMONSTRATE PROPER OPERATION OF PORT SIDE F/O TANK FUEL CROSSOVER PIPING EMERGENCY SHUT OFF VALVE.
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
CLEAN OIL FROM BILGE OF PUSH UNIT
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
REATTACH AMP GUAGE AT SERVICE GENERATOR
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
LABEL FIRE PUMP CONTROL SWITCH ON MAIN AND UPPER DECKS
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
RENEW DRAFT MARKS ON VESSEL HULL AT EACH CORNER
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Unknown
Issued 24 May 2001
Resolved
DEMONSTRATE PROPER OPERATION OF BILGE HIGH LEVEL ALARM IN COMPARTMENT #3
Condition: Unknown
Due 1 June 2001
Resolved 31 May 2001
Accommodation/Occupational Safety
Issued 21 July 2000
Resolved
MKAE STRAW ROOF LOCATED AFT OF VESSEL FIRE RETARDANT. DEMONSTRATE TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR THE NON COMBUSTIBILITY OF THE AFT ROOF PRIOR TO CARRING PASSENGER FOR HIRE.
Condition: Unknown
Due 21 July 2000
Resolved 21 July 2000
Lifesaving
Issued 28 April 1999
Resolved
Provide vessel name for ship's rescue boat in accordance with 46 CFR 185.604(a)(1) to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 11 May 1999
Engineering
Issued 28 April 1999
Resolved
Provide proper flame screens for barge starboard fuel tank vent and for thepusher vessel fuel tank vent to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 11 May 1999
Fire Fighting
Issued 28 April 1999
Resolved
Provide operating instructions for fixed CO2 systems at bow thruster space and engine room local control stations to the satisfaction of the attendingmarine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 11 May 1999
Construction/Loadline
Issued 12 March 1998
Resolved
Prior to carrying passengers, make port/forward knuckle available for complete internal inspection and make any necessary repairs if damage is discovered.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Construction/Loadline
Issued 12 March 1998
Resolved
crop and renew as originalupper longitudinal frame on port side of bow rakein way of forward knuckle.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Construction/Loadline
Issued 12 March 1998
Resolved
Make permanent repairs to fractured plating on starboard/forward knuckle inbow rake.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Documentation
Issued 12 March 1998
Resolved
Provide copy of current stability letter.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Engineering
Issued 12 March 1998
Resolved
Prior to carrying passengers, reconfigure remote emergency fuel shutoff cable so that it is accessible and may be actuated from the barge.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Engineering
Issued 12 March 1998
Resolved
Prove proper operation of all required alarms and shutdowns on the prime mover for the ship's service generator.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Documentation
Issued 12 March 1998
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 2 June 1998
Resolved 4 September 1998
Documentation
Issued 12 March 1998
Resolved
Prior to carrying passengers, provide current stability calculations and deadweight survey with approved calculations.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Navigation
Issued 12 March 1998
Resolved
Prior to carrying passengers, provide currently corrected charts for vessel's operating area.
Condition: Unknown
Due 15 April 1998
Resolved 17 July 1998
Lifesaving
Issued 9 August 1996
Resolved
Install emergency exit signs at egress locations and affix Es for all emergency lighting.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Construction/Loadline
Issued 9 August 1996
Resolved
Prior to carriage of passengers, but not later than compliance date, properly wire the bilge pumps and mount all float switches.
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Documentation
Issued 9 August 1996
Resolved
Prior to carriage of passengers, but not later than compliance date, provide proof that all combustible materials and carpeting are fire resistant or treated as such including method of treatment.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Engineering
Issued 9 August 1996
Resolved
Prior to use of fuel tanks and transfer lines/pumps, but not later than compliance date, obtain Coast Guard approved plans.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Engineering
Issued 9 August 1996
Resolved
Re-route emergency generator exhuast piping to vent only to free/exposed atmosphere.
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Engineering
Issued 9 August 1996
Resolved
Prior to use of fuel tanks, but not later than compliance date, demonstratein presence of Coast Guard Marine Inspector 5 lbs. pressure test.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Accommodation/Occupational Safety
Issued 9 August 1996
Resolved
Prior to carriage of passengers, but not later than compliance date, make operable all toilets, potable water pumps, and waste pumps.
Condition: Unknown
Due 7 January 1997
Resolved 7 January 1997
Documentation
Issued 9 August 1996
Resolved
Provide proof of current FCC Radio Station license and Great Lakes FCC Agreement.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Documentation
Issued 9 August 1996
Resolved
Provide proof of current Certificate of Documentation.
Condition: Unknown
Due 9 August 1996
Resolved 9 August 1996
Navigation
Issued 10 August 1993
Resolved
PROPERLY LIGHT BOTH PUSH BOAT AND BARGE IN ACCORDANCE WITH CLOREGS OR PROVIDE A CERTIFICATE OF ALTERNATIVE COMPLIANCE IN ACCORDANCE WITH COLREGS.
Condition: Unknown
Due 10 August 1993
Resolved 10 August 1993
Documentation
Issued 10 August 1993
Resolved
COMPLETE THE FOLLOWING WORKLIST ITEMS DATE 4 JAN 93 (ENCL 1 OF 29 JUL 93 LETTER): 2, 5, 11, 14, 15, 21, 23, 32, 35, 44, 45, 46, AND 56.
Condition: Unknown
Due 10 August 1993
Resolved 10 August 1993
Documentation
Issued 10 August 1993
Resolved
SUBMIT THE FOLLOWING PLANS TO THE MARINE SAFETY CENTER FOR REVIEW: FIREMAIN SYSTEM, ONE LINE WIRING DIAGRAM OF POWER SYSTEM, ELECTRICAL PLANT LOAD ANALYSIS, GENERATOR CONSTRUCTION AND CIRCUITS, SWITCHBOARDS, AND EMERGENCY SOURCE OF POWER.
Condition: Unknown
Due 20 December 1993
Resolved 20 December 1993
Lifesaving
Issued 10 August 1993
Resolved
SCHEDULE FOLLOW UP INSPECTION TO EXAMINE VESSEL IN ACCORDANCE WITH APPROVEDPLANS AFTER THEY HAVE BEEN COMPLETED.
Condition: Unknown
Due 10 August 1993
Resolved 10 August 1993