Records from 1992 to 2007. Most recent: operational control imposed, 27 June 2007.
Inspection history · 17
27 June 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2975247
27 June 2007
ISPS III Exam · MARPOL Annex V Examination · PI Safety Exam · MARPOL Annex I Examination · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2975469
20 March 2007
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2891369
15 March 2007
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2888303
17 February 2007
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2873427
17 April 2006
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2626550
17 April 2006
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2626559
22 February 2006
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2589901
8 August 2005
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2456107
15 February 2005
ISPS II Exam
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2294430
8 December 2004
ISPS II Exam
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2254059
31 October 2004
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2225960
1 October 2004
PII Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2211048
26 June 2004
ISPS II Exam
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2111200
14 June 2004
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2098419
15 March 2004
MARPOL Annex I Examination · Annual Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 2021159
22 May 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 350281
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 27 June 2007
Resolved
The controllable pitch propeller failed to attain full ahead after having just been stopped.
Action required: 705 - Other - as specified
Resolved 27 June 2007
Resolution: Chief Engineer cleaned hydraulic oil filters. Class satisfactorily tested systems.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 27 June 2007
No resolution recorded
Approximately 3 meters of handrail was damaged while the vessel was being pushed to the berth by the attending tug.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 17 February 2007
Resolved
Fire control plan does not show class A & B divisions as required. Amend fire control plan to show class A & B divisions as appropriate. SOLAS 74/78 (2004 ed) II-2/15.2.4.1
Due 20 March 2007
Resolved 15 March 2007
Resolution: Vsl management provided acceptable statement attesting to revisions of FCP.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 17 February 2007
Resolved
Fixed CO2 system does not provide for suitable period of time once system is activated before CO2 agent is delivered into engine room. No time delay device could be found on system as required by original SOLAS 74. SOLAS 74 II-2/8(e) . Also: Recommend flag re-evaluate suitability of ventilation provided in CO2 room as required by SOLAS 74 II-2(d)(vii)
Due 20 March 2007
Resolved 20 March 2007
Resolution: Class statement rcvd attesting to proper operation of fixed CO2 system.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 February 2007
Resolved
Exhaust fan blades (electric fan motor) on emergency generator room port side bulkhead lacks any sort of hand guards. Fan blades can easily cause injury to crewmembers if left unguarded. Fit guard device on interior side of fan. ILO 147
Due 20 March 2007
Resolved 15 March 2007
Resolution: Vsl management provided acceptable statement attesting to repairs.
Operations/Management › Mandatory Ship Reporting Systems › Entry Report
Issued 17 April 2006
Resolved
Vessel failed to report into the WHALESOUTH Mandatory Ship Reporting System while transiting into the Port of Brunswick, Ga.
Condition: Placed in Improper Service
Due 17 April 2006
Resolved 17 April 2006
Resolution: Issued LOW
Fire Fighting › Fire Pumps › Gland Sealing
Issued 1 October 2004
Resolved
Emer. fire pump could not produce adequate pressure due to worn/wasted gasket. Gasket to be replaced/repaired as original. Vessel to provide report from Flag/Class attesting to proper repair/ops of emer. fire pump
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2004
Resolved 1 October 2004
Resolution: Rcvd Class Report attesting ot proper repairs/ops
Lifesaving › Rescue Boat › Propulsion Engine
Issued 1 October 2004
Resolved
Vessel's rescue boat engine was disassembled and required repair. Engine to be repaired/replaced as original. Flag/Class to provide a report attesting to sat repairs/ops of rescue boat.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2004
Resolved 1 October 2004
Resolution: Rcvd report from Class attesting to proper repairs/ops of rescue boat.
Engineering › Sea-water System (primary cooling) › Pump
Issued 1 October 2004
Resolved
Vessel's gerneral service pump was inoperative due to mechanical failure. Pump to be repaired/replaced as original. Flag/Class to provide a report attesting to sat repair/ops of GS pump
Action required: 705 - Other - as specified
Due 15 October 2004
Resolved 16 November 2004
Resolution: Verified pump is operational - deficiency cleared.
Lifesaving › Lifebuoys › Immediately Available
Issued 1 October 2004
Resolved
Vessel missing a ring buoy IAW approved life saving appliance plan starboard-side foward (on bulkhead prior to forcastle). Vessel to provide a ring buoy IAW LS plan
Due 30 October 2004
Resolved 1 October 2004
Navigation › Piloting/Steering › Maneuvering Information Fact Sheet
Issued 1 October 2004
Resolved
Vessel did not have on board maneuvering fact sheet or warning statement. Vessel to provide info and post on bridge
Due 30 October 2004
Resolved 1 October 2004
Navigation › Piloting/Steering › Chronometer
Issued 1 October 2004
Resolved
Vessel did not have steering gear instructions for emergency change over procedures on the brudge
Due 30 October 2004
Resolved 1 October 2004