Records from 2001 to 2003. Most recent: operational control imposed, 13 August 2003.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation › Certificates/Documents
Issued 18 May 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Documentation › Certificates/Documents
Issued 18 May 2002
Resolved
Provide full-term IMO/SOLAS certificates for Tonnage, Load Line, Safety (Construction, Equipment, and Radio), and IOPP.
(These certificates have been issued "provisionally", twice.)
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 1 July 2002
Resolution: Corrected.
Documentation › Certificates/Documents
Issued 18 May 2002
Resolved
Provide original Minimum Safe Manning Document. LEGACY COMPONENT DESC: Minimum Safe Manning Document
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Documentation › Certificates/Documents
Issued 18 May 2002
Resolved
Provide evidence of registration of the 406 EPIRB under the vessel's current name, "Pendy's".
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Lifesaving › Inflatable Liferafts
Issued 18 May 2002
Resolved
Properly attach weak links, sea painters, and hydrostatic releases for both port and starboard lifeboats. LEGACY COMPONENT DESC: Hydrostatic Release Unit
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Electrical › Lighting (service)
Issued 18 May 2002
Resolved
Repair lighting fixture inside officer's shower room. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Pollution Prevention/Response › Prevention Equipment
Issued 18 May 2002
Resolved
Remove/replace leaking gauge on MSD tank. LEGACY COMPONENT DESC: Marine Sanitation Device, Type II
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Engineering › Steering Gear System
Issued 18 May 2002
Resolved
Repair leak on portside steering hydraulic ram. LEGACY COMPONENT DESC: Ram Seal
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Personnel › Certificates/Documents/Licenses
Issued 18 May 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 1 July 2002
Fire Fighting › Structural - A Class Divisions
Issued 18 May 2002
Resolved
Remove all wood paneling inside the paint locker and provide Class "A" approved door. LEGACY COMPONENT DESC: Bulkheads - Flammable Liquids Storage Spaces
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 6 June 2002
Documentation
Issued 18 May 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2002
Resolved 1 July 2002
Documentation
Issued 5 December 2001
Resolved
Provide updated Seaman's Book for A/B and Bosun
Condition: Unknown
Due 5 January 2002
Resolved 10 December 2001
Navigation
Issued 5 December 2001
Resolved
Repair and prove proper operation of rudder angle indicator for all steering locations.
Condition: Unknown
Due 26 January 2002
Resolved 26 February 2002
Resolution: Observed proper operation of rudder indicator. Observed operation of emergency steering system.
Documentation
Issued 5 December 2001
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 5 December 2001
Resolved 10 December 2001
Documentation
Issued 5 December 2001
Resolved
Provide surveyor's report for items 03DT, 05DT, and 06DT.
Condition: Unknown
Due 5 January 2002
Resolved 28 February 2002
Fire Fighting
Issued 5 December 2001
Resolved
Provide ship contact list, ship's plans/tanks drawings in accordance with appendix 1,3,4,5 of SOPEP.
Condition: Unknown
Due 5 January 2002
Resolved 28 February 2002
Navigation
Issued 5 December 2001
Resolved
Prove proper operation of steering gear whereas the rudder indicator on thebridge match that of the rudder indicator located in the Steering Room. Also, rudder responds time need to be increased.
Condition: Unknown
Due 5 December 2001
Resolved 10 December 2001
Lifesaving
Issued 5 December 2001
Resolved
Make proper repairs to rescue boat and prove watertight integrity under thekeel.
Condition: Unknown
Due 5 January 2002
Resolved 28 February 2002
Documentation › Certificates/Documents
Issued 5 December 2001
Resolved
Provide valid full term ships certificates onboard and provide copy to USCG. All certificates ITC, ILL, registry, SOLAS cert have expired. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 February 2002