- Built
- 1992
- Last inspected
- 29 October 2025
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 259 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2005
Identity
984418
WDI4996
374335
Flag
UNITED STATES
367066470, 367704110 (licence lapsed)
Maury page id
psix-374335
Inspections, by type
…with no type recorded21
Years with a record
31 calendar years (1992–2025)
The 87 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)46.0 ft × 16.4 ft × 3.0 ft
Registered tonnagegross 9 / net 7
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTROPICAL · OPA LOCKA, FL, UNITED STATES · built 1992
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationTwin Hull
Hailing portMIAMI, FL
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationValid · issued 11 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it7 - Simplified, Net Ton
9 - Simplified, Gross Ton
9 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDI4996MMSI 367704110 · expired · compulsorily equipped · granted 20 November 2015, cancelled 7 March 2026
WCU5195MMSI 367066470 · expired · compulsorily equipped · granted 22 August 2015, cancelled 7 March 2026 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 87
29 October 2025
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8260855
3 December 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8041540
4 October 2024
COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8008975
20 September 2024
Damage Survey · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8006221
6 December 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7834344
19 January 2023
Deficiency Check · Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7623642
22 September 2022
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7618392
23 March 2022
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7417072
14 March 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7411281
19 January 2021
DAPI Audit · Drydock Exam · Internal Structural Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7126553
6 January 2021
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7120379
23 December 2019
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6883222
7 November 2019
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6851139
3 September 2019
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6796253
7 May 2019
In-Service Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6678925
14 November 2018
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6579875
15 November 2017
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6307163
30 October 2017
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6297332
1 November 2016
Annual Inspection · Deficiency Check · DAPI Audit · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6033556
18 November 2015
DAPI Audit · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5766300
23 September 2015
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5726416
26 August 2014
DAPI Audit · COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4958664
19 June 2012
Construction Oversight · Plan Review "T" Boat
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4358281
12 June 2012
Examination of Repairs · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4342710
4 June 2012
Deficiency Check · COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4328839
15 February 2012
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4245524
13 September 2011
Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4143737
14 October 2010
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3913549
5 October 2010
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3863490
17 September 2008
Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3326628
24 September 2007
Examination of Repairs · Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3064731
20 July 2007
COI Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2999285
12 September 2006
Deficiency Check · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2777945
17 April 2006
Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2626519
21 February 2006
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2588957
12 November 2005
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2541536
5 October 2005
Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2513763
13 September 2005
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2490995
17 December 2004
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2261415
21 September 2004
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2200796
25 September 2003
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1912532
2 September 2003
Deficiency Check · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1894535
27 April 2003
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1846005
1 July 2002
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1639214
4 October 2001
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1439280
13 September 2001
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1393772
14 August 2000
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1441715
15 July 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1051708
17 January 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 814734
17 January 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 814735
8 January 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 223582
3 January 2000
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 811846
30 September 1999
Hull Examination · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1361135
7 July 1999
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1441534
3 April 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 60258
31 October 1998
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 168691
22 October 1998
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 804156
19 October 1998
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 714275
12 August 1998
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1402697
4 July 1998
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 48656
2 July 1998
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 131152
18 September 1997
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 775726
25 August 1997
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1119882
24 July 1997
MARPOL Annex V Examination · Re-Inspection · Inclining Experiment
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1116462
2 July 1997
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1386018
20 November 1996
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 869645
12 July 1996
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1089788
11 July 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 713157
8 July 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1087309
5 July 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 224572
4 July 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 212380
25 March 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1083458
20 January 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1189996
6 December 1995
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 875525
1 September 1995
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 875789
16 August 1995
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 875790
12 July 1995
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 884095
8 December 1994
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1154115
28 October 1994
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1181842
26 October 1994
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 868146
25 April 1994
MARPOL Annex V Examination · Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 870108
8 December 1993
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1373957
12 July 1993
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 844342
20 May 1993
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 832862
15 July 1992
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1270996
20 May 1992
Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1270088
21 April 1992
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 959253
Deficiency record · 259
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 October 2024
Resolved
At each initial and subsequent inspection for certification the marine inspector shall examine and test the Main Propulsion Machinery to the extent necessary to determine that they are in proper operating condition and fit for, the service for which they are intended. Port engine reduction gear control was lost while underway.
46 CFR 176.25-10
(Old T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2024
Resolved
Each small battery installation must be located in a well ventilated space and protected from falling objects. Batteries for main propulsion engines and generators are not protected from falling objects.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 4 October 2024
Resolved
Watertight hatches must be marked in clearly legible letters at least 25 millimeters (1 inch) high “WATERTIGHT HATCH—KEEP CLOSED”. Hatches are not labeled.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 October 2024
Resolved
When the flexible section is a nonconductor of electricity, the metallic sections of the fill pipe separated thereby must be joined by a conductor for protection against generation of a static charge when filling with fuel.
46 CFR 182.20-30(d)
Old T
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 4 October 2024
Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated by the vessel's stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 25 millimeters (1 inch) numbers and letters at the entranceway to that deck. Number of passengers not marked as required.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage
Issued 4 October 2024
Resolved
A manned U.S. ship that is 26 feet or more in length must have a garbage placard. Garbage placard wasted.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 October 2024
Resolved
The owner, managing operator, or a qualified servicing facility as applicable must conduct Monthly inspections in accordance with NFPA 10. The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 4 October 2024
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Placard for emergency instructions missing.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 20 September 2024
Resolved
A vessel to which this subchapter applies may not be operated without having on board a valid U.S. Coast Guard Certificate of Inspection. Vessel's COI expired on 10 September 2024.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 December 2023
Resolved
Gages to indicate cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and locates so as to be in view of the operator. Cooling system gage on the port main engine is inoperable and must be replaced.
46 CFR 182.15-5 (b)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 December 2023
Resolved
All vessels of 26 feet in length and over shall be provided with individual bilge lines and bilge suctions for each watertight compartment. 03 bilge pumps were inoperable and must be fixed.
46 CFR 182.25-5
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 December 2023
Resolved
On or before March 11, 1999 an existing vessel must comply with the bilge high level alarm requirements in 182.530. Vessel has 03 bilge high level alarms that are inoperable on the starboard side and must be fixed.
46 CFR 182.115 (d)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 6 December 2023
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferable from an accessible position on the weather deck. Vessel has 03 inoperable fuel shutoff valves due to snapped cables.
46 CFR 182.20-40 (3)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 6 December 2023
Resolved
Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads and weather deck... so that the marine inspector may satisfy himself as to the condition of the hull structure. MI identified a 3" hole in the catamaran's inner side of the port hull where a drain penetration had cracked. Repair to the satisfaction of the MI to ensure proper watertight integrity.
46 CFR 176.25-5 (a)(1)
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 6 December 2023
Resolved
The following spaces must be equipped with a fire detection and alarm system of an approved type installed in accordance with 46 CFR part 76. Vessel's audible alarm for the fixed system was found inoperable and must be fixed in all CO2 protected machinery spaces.
46 CFR 181.405 (a)
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 December 2023
Resolved
All vessels shall be provided with an approved adult type life preserver for each person carried. Vessel only had 53 adult serviceable life preservers of the 79 total life preservers required.
46 CFR § 181.25-5 (a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 December 2023
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Both port and starboard generators and port main engine do not have a belt cover.
46 CFR § 177.35-15 (a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 December 2023
Resolved
Gauges to indicate engine revolutions per minute (RPM)... must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station. Vessel's port main engine's RPM gauge is inoperable.
46 CFR § 177.35-15 (a)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 December 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Replace outlet plate cover in the port main engine space.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 23 March 2022
Resolved
The Coast Guard will issue a medical certificate to a mariner meeting the medical and physical standards for merchant mariners. Captain did not have medical certificate with mariner credential.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 March 2022
Resolved
A vessel on a Lakes, Bays, and Sounds route must carry three hand orange and three red flares. Vessel had 3 red and 2 orange flares on board.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 March 2022
Resolved
A vessel must carry on floating waterlight for ring life buoy. Light onboard was not operable. Vessel restricted to daytime operations.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 March 2022
Resolved
A vessel must undergo an annual inspection within 3 months before or after each anniversary date. Last annual examination was conducted on 19JAN2021 and vessel is not permitted to operate until an inspection has been completed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 22 March 2021
Resolved
All life jackets found on board need new retro-reflective solas approved tape.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 22 March 2021
Resolved
audible alarm for the high water indicator panel did not operate for all compartments. Repair or replace alarm.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 6 January 2021
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual inspection within the periods specified in 176.500(b)(1) [annual inspection within 3 months before or after each anniversary date] and your Certificate of Inspection must be endorsed. Vessel is outside of three month window for Inspection and is not permitted to operate until annual inspection has been completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 September 2019
Resolved
Install the required metal bowl beneath the newly installed main engine fuel strainer.
46 CFR 182.20-40(b)(5)
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 10 September 2019
Resolved
Remount all below deck lighting fixtures.
46 CFR 183.10-20
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2019
Resolved
Replace the broken breakers on the starboard side control console.
46 CFR 183.10-35
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 September 2019
Resolved
Install fuel shut off valves for the ship service generators.
46 CFR 182.20-40(b)(3)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2019
Resolved
Remove unappproved installation of christamas lights and daisy chained extension cords and household power strips.
46 CFR 183.10-20
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 10 September 2019
Resolved
Provide updated charts, coast pilot, and light list.
46 CFR 185.20-35
05 - Radio Communications › N/A - No Subsystem › Distress messages: obligations and procedures
Issued 10 September 2019
Resolved
Provide an emergency broadcast palacard.
46 CFR 184.506
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2019
Resolved
Properly repair or replace the shore tie cable.
46 CFR 183.10-50
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 September 2019
Resolved
Clean the mold off of the lifejackets and replace retroreflective tape.
46 CFR 180.25-25
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 10 September 2019
Resolved
Label the lifejacket lockers with the proper number of jackets.
46 CFR 180.25-15(b)
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 3 September 2019
Resolved
Provide proof of drills that have been conducted.
46 CFR 185.25-10
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2019
Resolved
Audible alarms were inoperable on all five compartments of the starboard side hull. Audible alarm at the console not working properly. Make repairs to the speaker at the console.46CFR182.530(a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2019
Resolved
Visual alarm inoperable on starboard forward bulkhead room. Make repairs to visual light at the console. 46CFR182.530(a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 May 2019
Resolved
Excessive coolant leak in the starboard side engine compartment at the cap. Repair seal on the cap to stop leaking into the bilges. 33CFR177.07(c)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 May 2019
Resolved
Excessive oil leaking on port side engine compartment, suspected to be an O ring leak. Make repairs to the engine and make ready for sea trial inspection. 33CFR177.07(c)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2019
Resolved
Multiple broken valves at both port side hull manifold and starboard side hull manifold. Make repairs or replace valves. 46CFR182.510(c)
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 November 2018
Resolved
Prove proper operation of fire pump.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 November 2018
Resolved
Prove proper operation of port lazerette bilge alarm.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 November 2018
Resolved
Remove all deadend wiring in the STBD generator room and secure electrical switch.
Engineering › Bilge Water Management System › Valve
Issued 1 November 2016
Resolved
Replace bilge pipe valves aft of collision bulkhead with screw-down type. 46 CFR 182.25-5
Navigation › Piloting/Steering › Marine Charts
Issued 1 November 2016
Resolved
Provide up-to-date charts and coast pilot. 46 CFR 185.20-35
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 November 2016
Resolved
Provide guards for port/starboard engine flywheels. 46 CFR 177.35-15
Documentation › Markings/Placards › Capacity Marking
Issued 1 November 2016
Resolved
Provide proper marking of maximum persons allowed on upper deck. 46 CFR 185.20-5
Documentation › Markings/Placards › Lifejacket Placard
Issued 1 November 2016
Resolved
Provide proper markings for type/amount of life jacket stowage. 46 CFR 180.20-5
Personnel › Certificates/Documents/Licenses › License, GMDSS Radio Operator
Issued 1 November 2016
Resolved
Provide Radio Operator permit for the Master. 47 CFR 80
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 18 November 2015
Resolved
Provide valid COD.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 18 November 2015
Resolved
Provide updated chart, light list and Navigation Rules and Regulations handbook.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 18 November 2015
Resolved
Provide proof of annual MIS report.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 18 November 2015
Resolved
Provide first aid kit equipped IAW 46CFR160.041
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 18 November 2015
Resolved
Provide battery for waterlight.
Documentation › Certificates/Documents › FCC SSL
Issued 18 November 2015
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 18 November 2015
Resolved
Provide valid radiotelephoney certificate.
Personnel › Certificates/Documents/Licenses › License, Operator
Issued 18 November 2015
Resolved
Provide radio operator license.
Lifesaving › Lifebuoys › Serviceable
Issued 18 November 2015
Resolved
Retro-reflective material is obstructed by vessel name and hailing port and must be renewed.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 18 November 2015
Resolved
Retroreflective material is worn on PFDs and requires renewal.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 18 November 2015
Resolved
Provide documentation of fire system servicing.
Communications › Alarms/Indicators › High Water Alarm
Issued 18 November 2015
Resolved
Prove operation of high water alarms in fwd port space, stbd generator room and both fuel tank rooms.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 18 November 2015
Resolved
Prove operation of bilge pumps.
Fire Fighting › Fire Pumps › Pressure
Issued 18 November 2015
Resolved
Prove operation of fire pumps.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 18 November 2015
Resolved
Renew handle for valve number 4, stbd bilge manifold.
Fire Fighting › Remote Fuel Shutoff › General
Issued 18 November 2015
Resolved
Provide labeling for emergency fuel shut off valves.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 6 October 2015
Resolved
Port propeller has an unsatisfactory fit on shaft. P&S prop nuts are installed improperly and must be renewed. O/O required to have inspected and verified.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 6 October 2015
Resolved
Both port and stb railings at midship landing area are loose at base due to degraded FRP substrate. O/O to repair.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 6 October 2015
Resolved
Railing base is loose/ unfastened at upper deck aft centerline.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 6 October 2015
Resolved
Deck rail stbd side is loose due to missing/ loose fasteners.
Construction/Loadline › Structures › Deck Plating
Issued 6 October 2015
Resolved
Deck area, upper deck, fwd delaminated.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 6 October 2015
Resolved
Masthead light broken at base and hanging by power supply cable.
Construction/Loadline › Hull › Transverse Frame
Issued 6 October 2015
Resolved
Transverse deck frame in fwd port space wasted/ degraded by active termite activity.
Construction/Loadline › Hull › Longitudinal Frame
Issued 6 October 2015
Resolved
Scarf repair of longitudinal frame is seperated and not supporting deck joint. Deck joint repair is incomplete with open/unfinished wood/foam core interface.
Construction/Loadline › Hull › Longitudinal Frame
Issued 6 October 2015
Resolved
Longitudinal frame joint mid port hull inboard, fwd space seperated and rotten at frame ends.
Electrical › Electrical Distribution System (service) › Busway
Issued 6 October 2015
Resolved
Cable runs are unsupported at numerous areas through-out both hulls.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 6 October 2015
Resolved
Port engine room ladder weld is broken at base mounting surface.
Fire Fighting › Fire Pumps › Power Source
Issued 6 October 2015
Resolved
Port fire pump disconnected. Operator in process of renewal due to failure.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 6 October 2015
Resolved
Port sanitary tank is unsecured and resting against port engine exhaust pipe.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 6 October 2015
Resolved
Bulkheads, both generator and engine rooms have multiple unsealed penetrations.
Construction/Loadline › Hull › Transverse Frame
Issued 6 October 2015
Resolved
Upper cross sectional transverse frame rotten on both sides of centerline interior of transom.
Construction/Loadline › Structures › End Bulkhead
Issued 6 October 2015
Resolved
Collision bulkhead in stbd hull has hole drilled at the base.
Construction/Loadline › Structures › Deck Plating
Issued 6 October 2015
Resolved
Deck core in galley stbd side beneath freezer is rotted at penetration from generator room.
Construction/Loadline › Structures › Deck Plating
Issued 6 October 2015
Resolved
A soft patch is cut into deck over stb generator room, deck joint st unsupported and unfinished.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 6 October 2015
Resolved
Fire detector in port hull appears to be degraded by corrosion. System is due for service, ensure operation on detector.
Construction/Loadline › Hull › Bottom Plating
Issued 6 October 2015
Resolved
A former drain through hull is unsealed between the cross member section IWO the stbd sanitary tank space and the sea allowing free communication.
Construction/Loadline › Hull › Transverse Frame
Issued 26 August 2014
Resolved
Transverse deck beam from starboard generator space to port generator space is rotted. Provide repair proposal for repair/replacement of transverse deck beam.
Construction/Loadline › Hull › Stiffener
Issued 26 August 2014
Resolved
Overhead longitudinal beam in starboard side generator space is rotted. Provide repair proposal for the repair/replacement of longitudinal beam.
Construction/Loadline › Structures › Deck Plating
Issued 26 August 2014
Resolved
Deck around hatch to port side lazerette is wasted/rotted. Replace/renew wasted area of deck around port lazerette hatch.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 26 August 2014
Resolved
Provide Certificate of Documentation aboard vessel.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 26 August 2014
Resolved
Provide USCG approved first aid kit aboard vessel.
Fire Fighting › Portable CO2 Fire Extinguisher › Number
Issued 26 August 2014
Resolved
Vessel is missing one A-II portable fire extinguisher. Provide one A-II portable fire extinguisher aboard.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 26 August 2014
Resolved
Conduct operational test of vessel and complete satisfactory fire/man overboard drills.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 12 June 2012
Resolved
Renew STBD fuel tank, piping, and fittings as original with U.S. Coast Guard approved equipment to the satisfaction of the attending USCG Marine Inspector.
Construction/Loadline › Hull › Transverse Frame
Issued 12 June 2012
Resolved
Crop/renew wasted transverse and longitudinal deck frames above STBD fuel tank. After cropping make available for inspection by USCG Marine Inspector prior to renewing frames.
Fire Fighting › Fixed Low-Expansion Foam Fire Extinguishing System › Operation Controls
Issued 12 June 2012
Resolved
Provide a servicing report upon re-installing the fixed fire fighting agent.
Fire Fighting › Fire Pumps › Pressure
Issued 4 June 2012
Resolved
Show proof of operation of the port fire pump.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 4 June 2012
Resolved
Provide a updated vessel COD.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 4 June 2012
Resolved
Provide a first aid kit.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 4 June 2012
Resolved
Provide all DAPI documention as req by compliance audit list for crew and company.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 4 June 2012
Resolved
Install circuit breaker blanks and labels for distribution panel.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 4 June 2012
Resolved
Remove and clean all debri/corrosion from pilothouse console electrical contacts and terminals.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 4 June 2012
Resolved
Show proof of operation of the fwd masthead light.
Electrical › Electrical Distribution System (service) › Cable
Issued 4 June 2012
Resolved
Remove and properly splice all wire nuts topside.
Engineering › Bilge Water Management System › Interface Detector
Issued 4 June 2012
Resolved
Show proof of operation of the following auto bilge pump indicators: aft port comp, stbd e/r, and stbd aft comp.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 June 2012
Resolved
Provide guard/shield for electrical terminal bus bars in both e/r's.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 4 June 2012
Resolved
Remove all lettering from retro-flective tape on ring bouy.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 13 September 2011
Resolved
Replace worn retro reflective tape on 17 Adult life jackets.
Navigation › Piloting/Steering › Marine Charts
Issued 13 September 2011
Resolved
Provide current/corrected charts for operating area.
Lifesaving › Lifebuoys › Serviceable
Issued 13 September 2011
Resolved
Remove or replace 2 unserviceable lifebuoys.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 13 September 2011
Resolved
Label total quantities at Life Jacket stowage locations.
Fire Fighting › Portable CO2 Fire Extinguisher › Marking
Issued 13 September 2011
Resolved
Label portable Fire extinguisher storage location.
Documentation › Markings/Placards › Capacity Marking
Issued 13 September 2011
Resolved
Mark upper deck total persons allowed with max capacity.
Construction/Loadline › Structures › Deck Plating
Issued 13 September 2011
Resolved
Crop and renew wasted main deck and under deck beams in FWD compartments. (prior to credit hull)
Personnel › Certificates/Documents/Licenses › License, Radio Officer
Issued 5 October 2010
Resolved
Show proof of Master’s FCC Marine Radio Operator License.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 5 October 2010
Resolved
Provide onboard FCC Radiotelephony Certificate.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 5 October 2010
Resolved
Provide onboard current edition of Current tables and 2010 USCG Light List.
Construction/Loadline › Structures › Deck Plating
Issued 5 October 2010
Resolved
Provide a repair proposal and time frame for repair completion for rotten deck, transverse and longitudinal under deck frames from generator compartment aft bulkhead fwd.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 5 October 2010
Resolved
Replace lens covers on stern and anchor light. Move masthead light up to achieve proper arc of visibility.
Engineering › Steering Gear System › Rudder Stock
Issued 5 October 2010
Resolved
Tighten both P/S packing for steering.
Engineering › Sea-water System (primary cooling) › Piping
Issued 5 October 2010
Resolved
Make repairs to port generator breather tubing.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 5 October 2010
Resolved
Tighten hoses for raw water for port side head (2nd system).
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 5 October 2010
Resolved
Replace floating line on ring buoy main deck FWD (60 ft of line).
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 5 October 2010
Resolved
Ensure all crew members are drug tested (pre-employment) prior to being in safety sensitive position.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 5 October 2010
Resolved
Provide fixed fire suppression servicing report and ensure CO2 bottles are properly installed prior to carriage of passengers.
Operations/Management › Drills/Instruction › Not Conducted
Issued 5 October 2010
Resolved
Complete drills in the presents of a USCG Inspection prior to carriage of passengers.
Operations/Management › Drills/Instruction › Fire
Issued 17 September 2008
Resolved
Properly post fire/bilge operating procedures in engine room.
Fire Fighting › Fire Pumps › Casing
Issued 17 September 2008
Resolved
Make permanent repairs to water leak on stbd fire pump.
Stability › Watertight Integrity › General
Issued 17 September 2008
Resolved
Properly seal port gen aft bulkhead with fire retardent material.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 17 September 2008
Resolved
Install machinery guard on port/stbd MDE.
Construction/Loadline › Hull › Bottom Plating
Issued 24 September 2007
Resolved
Dewater all compartments and make available for inspection.
Construction/Loadline › Penetrations › Valve Flange
Issued 24 September 2007
Resolved
Provide thru-hull valves for inspection.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 24 September 2007
Resolved
Provide servicing report for fixed fire fighting system.
Construction/Loadline › Structures › Deck Plating
Issued 24 September 2007
Resolved
Replace all wasted deck.
Construction/Loadline › Structures › Deck Plating
Issued 24 September 2007
Resolved
Provide repair proposal for all fiberglass repair work, noting general purpose resign.
Engineering › Bilge Water Management System › Not Operational
Issued 24 September 2007
Resolved
Prove proper operation of bilge water high water alarms and dewatering pump.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 24 September 2007
Resolved
Properly label all life jacket stowage lockers.
Fire Fighting › Remote Fuel Shutoff › General
Issued 24 September 2007
Resolved
Prove proper operation of port emergency fuel shutoff valve.
Engineering › Fuel Oil Service System › Filter
Issued 24 September 2007
Resolved
Remove all plastic Racor fuel filter drain valves.
Fire Fighting › Remote Fuel Shutoff › General
Issued 20 July 2007
Resolved
Make permanent repairs to both port/STBD ball valves on emergency fuel shut off so that valve does not spin 360 degrees. To complete at dry-dock.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 July 2007
Resolved
Make permanent repairs to aft STBD rail IWO ladder leading into water. To be completed at dry-dock.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 July 2007
Resolved
Make permanent repairs to railing attached to pilot house on both port/STBD sides.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 20 July 2007
Resolved
Provide current copy of tides and tide currents.
Electrical › Lighting (service) › Lighting Fixture
Issued 20 July 2007
Resolved
Provide proper cover on overhead lights on top deck.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 September 2006
Resolved
Permently wire in the electrical bilge pump on port hull.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 12 September 2006
Resolved
Distribute Fire Extinguishers IAW 46 CFR 181.500.
Engineering › Bilge Water Management System › Pump
Issued 12 September 2006
Resolved
Provide drawing showing the installation of new electrical bilge pump in port hull for approval. Include electrical and plumbing details.
Electrical › Electric Generation Source (service) › Power Requirement
Issued 12 September 2006
Resolved
Provide drawing for approval of port and starboard side gensets showing exhaust systems, fuel piping, and raw water cooling system for approval.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 September 2006
Resolved
Provide an electrical one line drawing for approval of the 110 volt A.C. power system.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 12 September 2006
Resolved
Provide proof vessel has current Certificate of Documentation.
Navigation › Piloting/Steering › Marine Charts
Issued 12 September 2006
Resolved
Provide all required Navigational Publications onboard.
Operations/Management › Drug and Alcohol Testing › Testing, Pre-employment
Issued 12 September 2006
Resolved
Provide Pre-employment Drug test results for Lucas, crewmember has been working on the vessel for several months without Pre-employment test results.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 12 September 2006
Resolved
Schedule a Chemical Testing Program Audit. Unsuccessful Audit attempted on 11 OCT 2006, gave operator another week.
Engineering › Bilge Water Management System › Pump
Issued 12 September 2006
Resolved
Prove proper operation of Engine driven Bilge pumps.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 12 September 2006
Resolved
Provide copy of Annual Fixed Fire System Service Report.
Electrical › Electric Generation Source (service) › Generator
Issued 12 September 2006
Resolved
Show proper operation of port Generator.
Engineering › Bilge Water Management System › Interface Detector
Issued 12 September 2006
Resolved
Show proper operation of both engine room and port forward compartment high water alarms.
Fire Fighting › Fire Pumps › Pressure
Issued 12 September 2006
Resolved
Show proper operation of Fire Pump.
Engineering › Bilge Water Management System › Pump
Issued 12 September 2006
Resolved
Show proper operation of fixed hand bilge pump.
Engineering › Bilge Water Management System › Pump
Issued 12 September 2006
Resolved
Install and prove proper operation to the satisfaction of an attending Coast Guard Marine Inspector, bilge pump in port hull as required by 46 CFR 182.520.
Engineering › Bilge Water Management System › Valve
Issued 5 October 2005
Resolved
Install positive shutoff valves on all submersible bilge pump discharges where they penetrate the sidshell hull.
Engineering › Bilge Water Management System › Valve
Issued 5 October 2005
Resolved
Replace or repair both port andstarboard forward bilge line valves located just aft of the collision bulkheand.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 October 2005
Resolved
Remove or properly terminate all dead end wires located in the port and starboard forward compartments.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 5 October 2005
Resolved
Install metal wire hangers on all wire runs located in engine space.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 5 October 2005
Resolved
Repair secondary bond failures in forward port compartment.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 5 October 2005
Resolved
Replace forward starboard side tansverse bulkhead frame.
Engineering › Diesel Engine (propulsion-direct drive) › Crankcase
Issued 5 October 2005
Resolved
Replace breather hose on starboard engine.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 September 2005
Resolved
Provide non-conducting cover over exposed terminal strips.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 13 September 2005
Resolved
Required renewal of the retro-tape on 31 PFDs.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 13 September 2005
Resolved
Comdemned one PFD due to missing hook on belly strap.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 September 2004
Resolved
Properly wire Christmas lights on upper deck.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 September 2004
Resolved
Properly wire white forward facing lights on upper deck.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 21 September 2004
Resolved
Provide proper blanks or labels at starboard A/C panel
Documentation › Logs/Records › Drug Test Records
Issued 21 September 2004
Resolved
Provide MIS Report
Documentation › Logs/Records › Drug Test Records
Issued 21 September 2004
Resolved
Provide EAP information
Personnel › Training › Familiarization Training
Issued 21 September 2004
Resolved
Provide proof of new crew member training
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 21 September 2004
Resolved
Replace retroreflective tape on PDF's.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 21 September 2004
Resolved
Properly lable aft lifejacket locker
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 21 September 2004
Resolved
Provide complete first aid kit
Documentation › Certificates/Documents › Stability Letter
Issued 21 September 2004
Resolved
Provide Max passenger placards for upper deck as per Stability Letter
Documentation › Markings/Placards › Warning Signs
Issued 21 September 2004
Resolved
Post Emergency Instructions at helm
Engineering › Diesel Engine (propulsion-reduction gear) › Piston
Issued 21 September 2004
Resolved
Repair/Replace port engine tachometer
Construction/Loadline › Hull
Issued 25 September 2003
Resolved
Make permentant repairs to damage IWO the Port pontoon Stem. Soft spot found. Grind back and repair same. LEGACY COMPONENT DESC: Bottom Plating
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 25 September 2003
Resolved
Extend the piping 2" beyond discharge nozzel.
Engineering › Sea-water System (primary cooling) › Piping
Issued 25 September 2003
Resolved
Renew hose clamps IWO raw water system.
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 25 September 2003
Resolved
Provide documentation of the routine renewal of the packing for the rudder posts and shafts, sea valves, and cutlass bearings.
Engineering › Fuel Oil Service System
Issued 2 September 2003
Resolved
Repair and prove proper operation of stbd remote fuel shut off. LEGACY COMPONENT DESC: Valve
Engineering › Bilge Water Management System
Issued 2 September 2003
Resolved
Repair and prove proper operation of bilge high level alarms.
Electrical › Electric Supply System (service)
Issued 2 September 2003
Resolved
Remove or properly dead end cable on overhead port and stbd aft main deck.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 2 September 2003
Resolved
Make engine room hatches watertight, provide securing devices.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 2 September 2003
Resolved
Make all openings to hull under bench seats in way of fuel tank remote shut off watertight or provide comings and make weatertight.
Navigation › Piloting/Steering
Issued 2 September 2003
Resolved
Provide up to date nautical publications as required by 46 CFR 184.420
Personnel › Training
Issued 2 September 2003
Resolved
Provide training manual
Stability › Watertight Integrity
Issued 2 September 2003
Resolved
Plug stbd generator raw water strainer or remove.
Electrical › Electrical Distribution System (service)
Issued 2 September 2003
Resolved
Renew labels on all electrical panels where missing. LEGACY COMPONENT DESC: Panelboard
Electrical › Electric Generation Source (service)
Issued 2 September 2003
Resolved
Prove proper operation of stbd generator. LEGACY COMPONENT DESC: Generator
Engineering › Fuel Oil Storage/Transfer System
Issued 2 September 2003
Resolved
Renew port generator fuel lines with SAE J-1942 hose and SAE J-1475 fittings. LEGACY COMPONENT DESC: Hose
Fire Fighting › Fire Pumps
Issued 2 September 2003
Resolved
Prior to operation repair and prove proper operation of fire pump.
Engineering › Steering Gear System
Issued 2 September 2003
Resolved
Starboard rudder found leaking. LEGACY COMPONENT DESC: Rudder Bearing
Operations/Management › Drills/Instruction
Issued 1 July 2002
Resolved
Provide emergency instructions IAW 46 CFR 185.512.
Navigation › Piloting/Steering
Issued 1 July 2002
Resolved
Provide updated Nav. Pubs. LEGACY COMPONENT DESC: Marine Charts
Stability › Watertight Integrity
Issued 1 July 2002
Resolved
Seal all holes in watertight bulkheads.
Electrical › Electrical Distribution System (service)
Issued 1 July 2002
Resolved
Remove all dead end wiring throughout the vessel. LEGACY COMPONENT DESC: Wiring
Electrical › Lighting (service)
Issued 1 July 2002
Resolved
Renew lighting fixture inside the portside engine room. LEGACY COMPONENT DESC: Lighting Fixture
Engineering › Fuel Oil Storage/Transfer System
Issued 1 July 2002
Resolved
Provide flameguards for Raycor filters inside generator rooms. LEGACY COMPONENT DESC: Filter/Strainer
Engineering › Fuel Oil Storage/Transfer System
Issued 1 July 2002
Resolved
Renew fuel hoses for portside generator with SAE J1942. LEGACY COMPONENT DESC: Hose
Engineering › Fuel Oil Storage/Transfer System
Issued 1 July 2002
Resolved
Replace porside fuel shutdown valve. LEGACY COMPONENT DESC: Valve
Navigation
Issued 4 October 2001
Resolved
Prior to night operations provide illuminated compass at the operating station.
Accommodation/Occupational Safety
Issued 4 October 2001
Resolved
Provide rail corsings on fwd passenger walkway.
Documentation
Issued 4 October 2001
Resolved
Provide evidence of compliance with drug program prior to carriage of passengers.
Documentation
Issued 4 October 2001
Resolved
Provide current CPR cards for 50% of the deckhands.
Lifesaving
Issued 4 October 2001
Resolved
Prior to carry passengers conduct training in firefighting, and flooding procedures and general vessel familiarization.
Electrical
Issued 4 October 2001
Resolved
Provide battery terminal covers.
Documentation
Issued 14 August 2000
Resolved
PROVIDE CHARTS AND PUBS FOR AREA OF OPERATIONS.
Unknown
Issued 14 August 2000
Resolved
MAKE REPAIR TO CABLE RUN BETWEEN AFTER STERRING AND ENGINE ROOM.
Unknown
Issued 14 August 2000
Resolved
PROVIDE PROOF THAT ALL MARINE EMPLOYEES ARE PART OF DRUG TESTING PROGRAM.
Documentation
Issued 14 August 2000
Resolved
MISSING VALID SAFETY CERTIFICATE.
Deck/Cargo
Issued 14 August 2000
Resolved
REPLACE GASKET MATERIAL ON DECK HATCH, PORT SIDE AFT.
Engineering
Issued 15 July 2000
Resolved
Prior to getting u/w on 17JUL00, connect and prove proper operation of starboard engine gauges.
Accommodation/Occupational Safety
Issued 15 July 2000
Resolved
Install chains on all exits.
Fire Fighting
Issued 15 July 2000
Resolved
Permanently mount fixed CO2 system heat detectors in each engine space.
Construction/Loadline
Issued 30 September 1999
Resolved
Prior to 08Oct99, repair cracked bulwark on STBD side just AFT of pilot house.
Construction/Loadline
Issued 30 September 1999
Resolved
PRIOR TO 08OCT99, REPLACE BROKEN PLASTIC HOSE DRAIN FOR STBD AFT HEAD IN AFT VOID ALONG WITH ALL OTHER WASTED PLASTIC HOSES IN THE AFT PORT AND STBDVOIDS.
Fire Fighting
Issued 30 September 1999
Resolved
PRIOR TO 21 OCT 99 PROVIDE A U.L. LISTED OR CG APPROVED FIRE DETECTION SYSTEM.
Documentation
Issued 30 September 1999
Resolved
Prior to 08Oct99, properly display vessel's name on PORT and STBD bow.
Construction/Loadline
Issued 30 September 1999
Resolved
Prior to 08Oct99, make repair to FWD BLKHD in way of engineroom where pipe comes thru the BLKHD, not watertight.
Electrical
Issued 30 September 1999
Resolved
Prior to 08Oct99, remove dead end wiring in FWD VOID._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 12 August 1998
Resolved
PRIOR TO 26AUG98, RELABLE RING BUOY WITH VESSELS NAME.
Engineering
Issued 12 August 1998
Resolved
PRIOR TO 28AUG98, LABEL EMERGENCY FUEL SHUT OFF VALVES.
Navigation
Issued 12 August 1998
Resolved
Omit.
Lifesaving
Issued 12 August 1998
Resolved
PRIOR TO 26AUG98, PROVIDE A WATER TIGHT CONTAINER FOR FLARE KIT.
Construction/Loadline
Issued 12 August 1998
Resolved
PRIOR TO 26AUG98, REPAIR AFT PORT AND STBD VOID WATERTIGHT QUICK ACTING HATCH HANDLES.
Engineering
Issued 12 July 1996
Resolved
Provide guards over belts & flywheel on both main engines.
Lifesaving
Issued 12 July 1996
Resolved
Label maximum number of passengers on upper deck.
Documentation
Issued 12 July 1996
Resolved
Provide FCC operators license.
Electrical
Issued 12 July 1996
Resolved
Provide Frequency meter for generator.
Lifesaving
Issued 12 July 1996
Resolved
Provide PFD placards.
Navigation
Issued 20 January 1996
Resolved
Do not operate upper deck strobe lights while the vessel is underway & remove from vessel.
Construction/Loadline
Issued 1 September 1995
Resolved
Properly mount battery switches in battery compartment.
Fire Fighting
Issued 1 September 1995
Resolved
Properly Mount B-II extinguisher.
Construction/Loadline
Issued 1 September 1995
Resolved
Secure batteries in storage compartment.
Construction/Loadline
Issued 1 September 1995
Resolved
Install ventilation in battery storage compartment.
Lifesaving
Issued 28 October 1994
Resolved
Replace ring life buoy, attach water light on seperate six foot lanyard.
Electrical
Issued 28 October 1994
Resolved
Prove generator installation is in accordance with 46 CFR subchapter T. Also, install volt and amp meters.
Construction/Loadline
Issued 28 October 1994
Resolved
Make all bilge pump electrical connections in watertight boxes.
Electrical
Issued 28 October 1994
Resolved
Re-hang electrical wires in forward stbd pontoon.
Engineering
Issued 28 October 1994
Resolved
Ensure f/o emergency shut off valves operate freely and label.
Electrical
Issued 28 October 1994
Resolved
Secure generator and service batteries.
Unknown
Issued 28 October 1994
Resolved
Provide evidence of Drug Testing Program.
Electrical
Issued 28 October 1994
Resolved
Repair/replace light fixture in stbd e/r space.
Electrical
Issued 28 October 1994
Resolved
Replace all 110v wiring on board with wiring in accordance with 46 CFR part183.
Electrical
Issued 28 October 1994
Resolved
Provide covers for fixtures on board.
Accommodation/Occupational Safety
Issued 28 October 1994
Resolved
Provide positive locking mechanism for MSD overboard valve.
Electrical
Issued 26 October 1994
Resolved
Submit a proposal for the lights (disco) on main deck to be operated in a safe manner IAW Inland Rule 20(b).
Electrical
Issued 26 October 1994
Resolved
Remove all lights on 01 deck that are not necessary for the purpose of safety or navigation.
Documentation
Issued 20 May 1993
Resolved
PROVIDE ORIGINAL COPY OF THE VESSEL'S FCC STATION LICENSE._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 20 May 1993
Resolved
PROVIDE WRITTEN PROOF OF AN ESTABLISHED EMPLOYEE DRUG TESTING PROGRAM IN ACCORDANCE WITH TITLE 46 PART 16._x001C_ _x001C_ _x001C_
Documentation
Issued 20 May 1993
Resolved
PROVIDE ORIGINAL FCC OPERATOR'S LICENSE.
Casualty record · 1
12 November 2005Routine · role: Involved in a Marine Casualty · activity 2541536
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.