MAURY USCG vessel records Sign in
← All vessels

RUBICONE

RUBICONE is a 1991 freight ship. The Coast Guard has recorded 37 inspections since 1993, most recently in November 2010, along with 30 deficiencies and 4 operational controls.

Records from 1993 to 2010. Most recent: operational control imposed, 1 November 2010.

Built
1991
Last inspected
1 November 2010
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8701947 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
375635
Flag
PANAMA
—
Maury page id
psix-375635

Inspections, by type

…with no type recorded26
Years with a record 15 calendar years (1993–2010)
The 37 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 16 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it8907 - Convention (Subpart B), Gross Ton
4307 - Convention (Subpart B), Net Ton
16616 - Displacement, Ton
11722 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 37

1 November 2010 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3876336
30 December 2008 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3386626
21 November 2008 Ballast Water Examination · ISPS III Exam · MARPOL Annex V Examination · MARPOL Annex I Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3364648
19 November 2008 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3366326
9 May 2008 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3202651
2 May 2008 Deficiency Check · ISPS I Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3197433
7 March 2008 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3160024
9 January 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3127582
30 July 2007 Random ISPS/MTSA-No PSC · PII Safety Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3011780
30 October 2006 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2810330
22 June 2005 Ballast Water Examination · NPV Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2399404
9 March 2004 Passenger/Freight Vessel Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2021851
24 January 2001 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 286230
1 May 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 277482
14 February 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 274805
6 January 1999 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 424353
23 April 1998 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 527955
23 August 1997 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 407127
23 August 1997 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 407161
23 June 1997 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 405050
11 May 1997 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 110107
9 May 1997 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 403564
5 May 1997 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 701272
8 April 1997 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 402408
8 August 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 394100
8 January 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 386714
7 January 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 16460
21 July 1995 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 380799
9 January 1995 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 374162
13 November 1994 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 372223
13 November 1994 Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1178209
24 July 1994 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 368647
6 June 1994 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 367498
6 June 1994 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1016432
16 March 1994 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 681985
7 March 1994 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 365073
21 May 1993 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 358278

Deficiency record · 30

Engineering › Diesel Engine (propulsion-direct drive) › Cylinder
Issued 1 November 2010 Resolved
1410-Propulsion Main Engine-The machinery, boilers, and other pressure vessels shall be of a design and construction adequate for intended service. It was observed that at the interface of the jacket water cooling collar on the main diesel engine at cylinders #1, 2 and 4 have multiple leaks. SOLAS 74 am II/I-26
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the permanent repair to the jacket water cooling system.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder Liner
Issued 1 November 2010 Resolved
1410-Propulsion Main Engine-The machinery, boilers, and other pressure vessels shall be of a design and construction adequate for intended service. It was observed that at the interface of the head with the cylinder liner that there is a jacket water leak on cylinder #2. SOLAS 74 am II/I-26
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the permanent repair to the jacket water cooling system.
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 1 November 2010 Resolved
1410-Propulsion Main Engine-Arrangements for the distribution and utilization of fuel oils shall be such to ensure the safety of the ship and persons onboard. It was observed on the main diesel engine #4 cylinder, discharge side of the high pressure fuel oil pump at the interface of the double jacket shielding that there is an excessive fuel oil leak. SOLAS 74 am II/II-4 2.2
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the permanent repair to the jacket water cooling system.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 1 November 2010 Resolved
1410-Propulsion Main Egine-External high pressure fuel delivery lines shall be protected.It was observed that on all ship's service generators, that all high pressure double jackets for the fuel systems have either failed, been removed from service or are not properly installed. SOLAS 74 am II/II-4.2.2.5.2
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the permanent repairs to the double jackets for the high pressure fuel system to the ship''s service generator''s.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 1 November 2010 Resolved
1499-Other (prop. & Aux. machinery)-It was observed that there are multiple hoses located throughout the engineering spaces that are moving leaking fluids both waste oil and water directly back to the sounding tubes for the double bottom bilge tanks, the closure devices for the sounding tubes are being kept opened by the hoses that are forced down the openings. SOLAS 74 am II/II-4.2.2.5.2
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the removal of all non class approved drain hoses and testing of the automatic closure devices to the double bottom waste oil tanks.
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 1 November 2010 Resolved
0950-Electric Equipment in General-The electrical power available shall be sufficient to supply all essential services. Vessel failed to provide adequate voltage during testing of the Emergency Diesel generator that it was only capable of producing 225 volts In lieu of the vessel required 380 volts. SOLAS 74 am II/II-4.2.2.3.5.1.3/ MSC 647
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from Germanischer Lloyd that tthe Emergency Diesel Generator is now putting out proper voltage and amperage.
Engineering › Lubricating Oil Storage/Transfer System › Cooler
Issued 1 November 2010 Resolved
1410-Propulsion Main Engine-The machinery, boilers, and other pressure vessels shall be of a design and construction adequate for intended service.It was observed that there are multiple active lube oil and cooling water leaks from lube oil plate heat exchanger. SOLAS 74 am II/I-26
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the permanent repair to the main diesel engine lube oil heat exchanger and the purchase of spare replacement parts.
Engineering › Feedwater/Condensate Water System › Piping
Issued 1 November 2010 Resolved
1410-Propulsion Main Engine-The machinery, boilers, and other pressure vessels shall be of a design and construction adequate for intended service.It was observed that there is a non class approved temporary fiberglass wrap on the feed water line to the intercooler for the main diesel engine. SOLAS 74 am II/I-26
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the permanent repair to the feed water line to the intercoolewr on the main diesel engine.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 1 November 2010 Resolved
2110- The crew could not demonstrate the ability to recover any data from the 107(49) data logger for the installed Oily Water Separator, taking into account the guidance provided in MEPC 107(49). When shown how to recover data by PSCO the data that was displayed was inconsistent with the oil record hook. MARPOL 73/78 Annex 1/Reg.11
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2010
Resolved 6 November 2010
Resolution: Received, reviewed and accepted Class Report from [name withheld] attesting to the crew now being able to recover data from the 107(49) data logger and ensuring that the oil record book entries will match the data logger.
Navigation › Piloting/Steering › Gyro Compass
Issued 21 November 2008 Resolved
Before entering the Mississippi River the vessel reported having an inoperable gyro-compass. Issued 01 deficiency to make permanent repairs to the satisfaction of the attending technician.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2008
Resolved 24 November 2008
Resolution: Received technician’s report stating that the gyro-compass was repaired to the satisfaction of the attending technician.
Engineering › Lubricating Oil Service System › Piping
Issued 21 November 2008 Resolved
During the engine room examination, the PSCO found dirty oil drain lines to the 1 and 2 lube oil purifiers which drain into sludge tank No. 70 modified. The No. 1 flexible drain pip and flange was removed and the No. 2 lube oil flexible drain pipe and flange was rerouted to a portable tank with float alarm which then drained into sludge tank No. 70.
Action required: 705 - Other - as specified
Due 5 December 2008
Resolved 30 December 2008
Resolution: The drain system form # 1 and # 2 purifier was upgraded and approved by Germanischer Lloyd according to survey statement #18 dated 25APR2005, The installation only required a overflow alarm which was not fitted during building. Surveyor [name withheld]
Navigation › Piloting/Steering › Gryo Compass Repeater
Issued 2 May 2008 Resolved
During the Rubicones transit to Tampa Bay their Gyro-Compass failed. Vessel reported the Failure to the COTP and requested a LOD for entry into port.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 May 2008
Resolution: MacKay Services repaired the Gyro-Compass and repeaters, which are now found in good wroking order.
Documentation › Certificates/Documents › IOPP Certificate
Issued 7 March 2008 Resolved
VESSEL DOES NOT HAVE AN INCINERATOR AS INDICATED BY THE IOPP. HAVE CLASS REISSUE IOPP TO VESSEL PRIOR TO DEPARTURE.
Action required: 705 - Other - as specified
Resolved 8 March 2008
Resolution: From Germanischer Lloyd, vessels IOPP Certificate Form A 3.2.1 had indicated that the vessel is fitted with incinerator. This has been indicated in error. The IOPP Form A has been ammended to remove the "x" on line 3.2.1
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 7 March 2008 Resolved
UNABLE TO SHOW PROPER OPERATION OF OWS/BILGE DISCHARGE PUMP. VERIFY PROPER OPERATION TO THE SATISFACTION OF CLASS PRIOR TO DEPARTURE.
Action required: 705 - Other - as specified
Resolved 8 March 2008
Resolution: Vessel has sufficient storage capacity to hold all bilge water and sludge for above period of time. When the vessel is at its discharge port (cuba) the accumulated sludge/bilge water is to be properly disposed of to a shore side reception facility.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 7 March 2008 Resolved
UNABLE TO VERIFY AUDIBLE ALARM FOR OILY WATER SEPERATOR. HAVE CLASS VERIFY ALARM PRIOR TO DEPARTURE.
Action required: 705 - Other - as specified
Resolved 8 March 2008
Resolution: The OWS is not to be used until the audible alarm is restored. Condition of Class imposed. Work will be done in Cuba march15 by Markers Service Engineer.
Lifesaving
Issued 14 February 2000 Resolved
BULKHEAD PANELS IN STAIRCASE WERE CRACKED AND FALLING APART AS REQUIRED BY SOLAS 74 I/11. TO BE REPAIRED PRIOR TO NEXT U.S. PORT CALL.
Condition: Unknown
Due 28 February 2000
Resolved 2 May 2000
Fire Fighting
Issued 6 January 1999 Resolved
PRIOR TO DEPARTURE CONDUCT A SATISFACTORY FIRE AND ABANDON SHIP DRILL.
Condition: Unknown
Due 7 January 1999
Resolved 8 January 1999
Accommodation/Occupational Safety
Issued 6 January 1999 Resolved
PRIOR TO 6FEB99 DEMONSTRATE TO CG INSPECTORS THAT THE MSD IS A PROPERLY APPROVED SYSTEM.
Condition: Unknown
Due 8 January 1999
Resolved 8 January 1999
Lifesaving
Issued 6 January 1999 Resolved
PRIOR TO DEPARTURE REMOVE OR REPLACE CURLED ELECTRICAL MATTING IN MAIN PASSAGE WAY.
Condition: Unknown
Due 8 January 1999
Resolved 8 January 1999
Accommodation/Occupational Safety
Issued 6 January 1999 Resolved
PRIOR TO DEPATURE PROVE PROPER OPERATION OF AFT STEERING PUMP ROOM EMERGENCY ESCAPE HATCH.
Condition: Unknown
Due 7 January 1999
Resolved 8 January 1999
Documentation
Issued 6 January 1999 Resolved
PRIOR TO 6FEB99 PROVIDE MSO TAMPA WRITTEN STATEMENT ON SET COURSE OF ACTIONFROM RESPONSABLE COMPANY FOR UPDATING OR CORRECTING THE SHIPS SMS IN ACCORDANCE WITH ITS DOCUMENTED PROCEDURES FOR #1DF
Condition: Unknown
Due 15 February 2000
Resolved 15 February 2000
Lifesaving
Issued 6 January 1999 Resolved
PRIOR TO DEPARTURE REPLACE INSUFFICIENT LIFERINGS THROUGHOUT VESSEL.
Condition: Unknown
Due 8 January 1999
Resolved 8 January 1999
Documentation
Issued 6 January 1999 Resolved
PRIOR TO DEPARTURE PROVIDE MSO TAMPA WRITTEN NON-CONFORMITY PER VESSEL'S SMS FROM THE MASTER ADDRESSING #1 ISSUE ON 6JANUARY99.
Condition: Unknown
Due 7 January 1999
Resolved 8 January 1999
Engineering
Issued 6 January 1999 Resolved
PRIOR TO 6FEB99 DEMONSTRATE TO CG INSPECTORS THAT THE OWS IS A PROPERLY APPROVED SYSTEM.
Condition: Unknown
Due 8 January 1999
Resolved 8 January 1999
Lifesaving
Issued 6 January 1999 Resolved
PRIOR TO DEPATURE PROVIDE SUFFICIENT EVIDENCE THAT THE NEW CREWMEMBERS INCLUDING ALL STAYING CREWMEMBERS HAVE HAD SUFFICIENT REST.
Condition: Unknown
Due 8 January 1999
Resolved 8 January 1999
Engineering
Issued 6 January 1999 Resolved
PRIOR TO 6FEB99 PROVIDE A LATCHING SYSTEM SO THAT THE ENGINE ROOM OVERHEAD WEATHER TIGHT HATCH COVER CAN STAY OPEN WHEN VENTILATING.
Condition: Unknown
Due 6 February 1999
Resolved 8 January 1999
Engineering
Issued 21 July 1995 Resolved
Vessel Class society to examine soft patch on steam condenser s/w outlet located in engine room, starboard level. Class to make written proposal to unit listed below prior to departure of vessel from this port. SOLAS Ch II-1 Reg 26(1)
Condition: Unknown
Due 10 January 1996
Resolved 10 January 1996
Lifesaving
Issued 21 July 1995 Resolved
Prior to vsl departure provide documentary evidence of annual servicing of #3 inflatable liferaft, located inboard on starboard side. to the MSO Portland SOLAS Ch III Reg 19(8)
Condition: Unknown
Due 24 July 1995
Resolved 24 July 1995
Navigation
Issued 13 November 1994 Resolved
VSL PRE-ARRIVAL TEST NOT LOG IN SHIP LOG BOOK.
Condition: Unknown
Due 29 November 1994
Resolved 29 November 1994
Lifesaving
Issued 24 July 1994 Resolved
SOLAS SAFETY EQUIPMENT CERTIFICATE REQUIRES 10 LIFERINGS ON BOARD. VSL ONLY HAD 9.
Condition: Unknown
Due 29 November 1994
Resolved 29 November 1994

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.