Records from 1992 to 2006. Most recent: inspection, 1 October 2006.
Construction/Loadline › Hull › Hull Plating
Issued 14 March 2006
No resolution recorded
AT NEXT DRYDOCKING, MAKE PERMANENT REPAIRS TO DAMAGED HULL IN WAY OF FORWARD RAKE CORNER, STARBOARD SIDE, IMMEDIATELY ABOVE TURN OF BILGE.
Action required: 705 - Other - as specified
Due 31 October 2006 — due date passed with no resolution recorded
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 29 June 2005
Resolved
PROVIDE 1 ADDITIONAL B-II FIRE EXTINGUISER.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Construction/Loadline › Hull › Side Shell
Issued 29 June 2005
Resolved
RENEW WASTED METAL PORT AND STBD SIDES OF HULL IN FOREPEAK UNDERNEATH FORWARD HATCHES. AREA MUST BE ULTRASONICALLY TESTED TO INDICATE SIZE OF INSERT. IN NO CASE SHALL IT BE LESS THAN 18 X 18". REPAIR TO BE APPROVED PRIOR TO COMMENCEMENT OF WORK
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 June 2005
Resolved
RENEW WASTED METAL FOREPEAK BULKHEAD UNDERNEATH FORWARD HATCH STBD SIDE. AREA MUST BE ULTRASONICALLY TESTED TO INDICATE SIZE OF INSERT. IN NO CASE SHALL IT BE LESS THAN 18 X 18". REPAIR TO BE APPROVED PRIOR TO COMMENCEMENT OF WORK
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Construction/Loadline › Hull › Transverse Frame
Issued 29 June 2005
Resolved
REPAIR FRACTURED TRANSVERSE FRAMING WELDS IN FOREPEAK AS DESIGNATED BY THE ATTENDING MARINE INSPECTOR
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Construction/Loadline › Hull › Stiffener
Issued 29 June 2005
Resolved
RENEW FRACTURED SIFFENER IN FOREPEAK PORTSIDE IN ITS ENTIRETY AS DESIGNATED BY THE ATTENDING MARINE INSPECTOR
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Construction/Loadline › Hull › Sheerstrake
Issued 29 June 2005
Resolved
GOUGE OUT FRACTURED WELDS IN VEHICLE DECK TO HULL JOINT IN FOREPEAK IN ALL AREAS LEAKING AS DESIGNATED BY THE ATTENDING MARINE INSPECTOR
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 June 2005
Resolved
RENEW FRACTURED AND DISTORTED FRAMING IN VOID #1 CENTER AS DESIGNATED BY THE ATTENDING MARINE INSPECTOR
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 29 June 2005
Resolved
RENEW BILGE SUCTION LINE TRANSVERSING IN VOID #1 CENTER THAT SUPPLIES VOID #1 STBD
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 29 June 2005
Resolved
RENEW WASTED FOREPEAK BILGE SUCTION LINE IN VOID #1 CENTER
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Construction/Loadline › Hull › Stiffener
Issued 29 June 2005
Resolved
RENEW FRACTURED FRAMING IN VOID #2 CENTER AS DESIGNATED BY THE ATTENDING MARINE INSPECTOR
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 29 June 2005
Resolved
RENEW SUCTION PIPING IN VOID #2 FROM BASKET STRAINER TO THE FIRST WELD AT THE 90 DEG ELBOW
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Engineering › Steering Gear System › Piping
Issued 29 June 2005
Resolved
RENEW WELDED STEEL SOCKET PIPING IN RUDDER ROOM FROM BULKHEAD TO FIRST COUPLING (APPROX 6') THAT SUPPLIES HYD OIL TO STEERING RAMS. REPAIR IS TO INCLUDE BOTH SUPPLY AND RETURN PIPING IN THIS AREA.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Engineering › Steering Gear System › Bracket/Clamp
Issued 29 June 2005
Resolved
PROVIDE PERMANENT BRACKETS FOR HYDRAULIC HOSES AND DIVERTER VALVE LOCATED IN VOID #4
Due 29 July 2005
Resolved 29 July 2005
Engineering › Steering Gear System › Bracket/Clamp
Issued 29 June 2005
Resolved
RENEW U-BOLT BRACKETS ATTACHING CARGO RAMP LIFTING CYLINDERS PORT AND STBD SIDE.
Due 29 July 2005
Resolved 29 July 2005
Deck/Cargo › Mooring/Anchoring › Anchor Rope
Issued 29 June 2005
Resolved
PROVIDE THIMBLE FOR LINE TO CHAIN ATTACHMENT POINT ON ANCHOR AND SPLICE ACCORDINGLY
Due 29 July 2005
Resolved 1 July 2005
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 29 June 2005
Resolved
PROVIDE 1 ADDITIONAL HAND HELD FLASHLIGHT AT ENTRANCE TO THE MACHINERY SPACE
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 29 June 2005
Resolved
RELOCATE FIRE EXTINGUISHERS FROM INSIDE THE MACHINERY SPACE TO OUTSIDE THE ENTRANCE TO THE MACHINER SPACE. THERE IS TO BE DESIGNATED 1 B-II FIRE EXTINGUISHER FOR THE MACHINERY SPACE AND 2 B-II FIRE EXTINGUISHERS DESIGNATED FOR THE VEHICLE DECK IN ADDITION TO THE REQUIRED B-V.
Due 29 July 2005
Resolved 1 July 2005
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 29 June 2005
Resolved
INSTALL COVER OVER AIR HORN COMPRESSOR IN PILOTHOUSE
Due 29 July 2005
Resolved 29 July 2005
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 29 June 2005
Resolved
LABEL LIFEJACKET STORAGE STBD SIDE WITH TYPE AND QUANTITY IN A CONSPICOUS LOCATION OUTSIDE THE STORAGE AREA
Due 6 July 2005
Resolved 1 July 2005
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 29 June 2005
Resolved
PROVIDE 2 ADDITIONAL TYPE I PFD'S
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 June 2005
Resolved
REMOVE EXPOSED WIRES FOR PORTSIDE ENGINE TEMPERATURE GAUGE
Due 6 July 2005
Resolved 1 July 2005
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 29 June 2005
Resolved
REMOVE ALL OILY RESIDUES FROM ENGINE ROOM BILGES AND DECK PLATES
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 June 2005
Resolved 1 July 2005
Engineering › Diesel Engine (propulsion-reduction gear) › Air Silencer
Issued 29 June 2005
Resolved
INSTALL A DETROIT DIESEL APPROVED OIL VAPOR RECOVERY SYSTEM AND AIRBOX OIL COLLECTION DEVICE FOR ALL INTERNAL COMBUSTION ENGINES IN THE MACHINERY SPACE.
Due 29 July 2005
Resolved 29 July 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 29 June 2005
Resolved
RENEW DAMAGED LIGHTING FIXTURE PORTSIDE VEHICLE DECK UNDER PILOTHOUSE
Due 6 July 2005
Resolved 29 July 2005
Operations/Management › Drills/Instruction › Not Conducted
Issued 1 November 2004
Resolved
PROVIDE EVIDENCE THAT CREWMEMBERS HAVE PARTICIPATED IN THE REQUIRED DRILLS WITHIN THE PAST 3 MONTHS.
Due 1 November 2004
Resolved 8 November 2004
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 November 2004
Resolved
POST ALL 3 PAGES OF THE CERTIFICATE OF INSPECTION IN THE PILOTHOUSE.
Due 1 November 2004
Resolved 8 November 2004
Navigation › Piloting/Steering › Marine Charts
Issued 1 November 2004
Resolved
PROVIDE UPDATED CHARTS
Due 1 November 2004
Resolved 8 November 2004
Navigation › Piloting/Steering › Magnetic Compass
Issued 1 November 2004
Resolved
MAKE COMPASS LIGHT OPERATIONAL
Due 1 November 2004
Resolved 8 November 2004
Communications › Radio Communications › EPIRB
Issued 1 November 2004
Resolved
RENEW EPIRB BATTERY OR PROVIDE DOCUMENTATION THAT BATTERY IS IN COMPLIANCE.
Due 1 November 2004
Resolved 8 November 2004
Lifesaving › Buoyant Apparatus › Float-free Link
Issued 1 November 2004
Resolved
REPOSITION WEAK LINK UNDER LIFEFLOAT PAINTER STORAGE UNIT.
Due 1 November 2004
Resolved 8 November 2004
Lifesaving › Buoyant Apparatus › Float Free
Issued 1 November 2004
Resolved
CONNECT ALL 3 LIFEFLOATS TOGETHER
Due 1 November 2004
Resolved 8 November 2004
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 1 November 2004
Resolved
MAKE WATERLIGHT OPERATIONAL FOR CENTER LIFEFLOAT
Due 1 November 2004
Resolved 8 November 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 1 November 2004
Resolved
PROVIDE 2 ADDITIONAL B-II FIRE EXTINGUISHERS.
Due 1 November 2004
Resolved 8 November 2004
Stability › Intact Righting Energy › General
Issued 1 November 2004
Resolved
PROVIDE MEASURING DEVICES FOR AMIDSHIPS AND STERN IN ACCORDANCE WITH VESSEL'S STABILITY LETTER.
Due 5 November 2004
Resolved 8 November 2004
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 1 November 2004
Resolved
MAKE BILGE ALARMS OPERABLE IN ENGINE ROOM AND STEERING ROOM
Due 1 November 2004
Resolved 5 November 2004
Engineering › Steering Gear System › Bracket/Clamp
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT REPAIRS TO EXCESSIVE CLEARANCE IN WAY OF STARBOARD STEERING GEAR HYDRAULIC RAM FIXED PADEYE FOUNDATION AND RAM PIN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Engineering › Steering Gear System › Pin
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE AND INSTALL PIN CLIP FOR STARBOARD STEERING GEAR RAM ROD PIN, LOWER END.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Fire Fighting › Fire Main › Valves
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT REPAIRS TO ALL LEAKS IN WAY OF ELECTRIC BILGE PUMP SUCTION PIPING, TO INCLUDE STRAINER, VALVE AND UNION, AS SHOWN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Engineering › Bilge Water Management System › Manifold
Issued 1 November 2004
Resolved
PROVIDE AND INSTALL VALVE HANDLE FOUND MISSING AND IDENTIFY IT ON ENGINE ROOM MANIFOLD.
Action required: 705 - Other - as specified
Due 1 November 2004
Resolved 5 November 2004
Engineering › Bilge Water Management System › Not Operational
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, PROVE PROPER OPERATION OF ENGINE HIGH WATER BILGE ALARM.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Engineering › Bilge Water Management System › Not Operational
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, PROVE PROPER OPERATION OF STEERING GEAR COMPARTMENT HIGH WATER BILGE ALARM.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Air Silencer
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE AND INSTALL AIR BREATHER ASSEMBLY FOR GENERATOR DISEL ENGINE. IN ADDITION, ENSURE VALVE COVER VAPORS ARE PROPERLY DIRECTED TO SAID BREATHER AS PER MANUFACTURER'S INSTRUCTIONS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 1 November 2004
Resolved
MAKE PERMANENT REPAIRS TO PORT MAIN DIESEL ENGINE EXPANSION TANK SIGHTGLASS.
Due 5 November 2004
Resolved 5 November 2004
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT REPAIRS TO LEAKING FUEL OIL SUPPLY VALVE, STARBOARD SIDE, AS SHOWN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, REMOVE ALL DEAD-ENDED WIRING FOUND IN ENGINE ROOM AND STEERING GEAR COMPARTMENT, AS SHOWN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Engineering › Fuel Oil Service System › Valve
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE A BLANK OR A LOCKING DEVICE TO STARBOARD BUTTERFLY VALVE TO PREVENT ACCIDENTAL OPENING AND FLOODING THE ENGINE ROOM, AS SHOWN.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Stability › Unintentional Flooding › General
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, DOUBLE UP ALL FLEXIBLE HOSES IN ENGINE ROOM WITH STEEL CLAMPS.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Fire Fighting › Emergency Fire Pumps › Power Source
Issued 1 November 2004
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT ELECTRICAL CONNECTIONS TO 12V BUS BAR FOR PORT AND STARBOARD ENGINE-DRIVEN FIRE PUMP CLUTCH.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Fire Fighting › Semiportable CO2 Fire Extinguishers › Service
Issued 1 November 2004
Resolved
PRIOR TO CARRYING FLAMMABLE FUEL TRUCKS, PROVIDE HYDROSTATIC TESTING OF SEMI-PORTABLE FIRE EXTINGUISHER (B-V) UNIT. HYDROSTATIC TESTING SHALL BE PERFORMED ON NITROGEN BOTTLE, DRY CHEMICAL BOTTLE AND HOSE ASSEMBLY.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 November 2004
Resolved 5 November 2004
Resolution: Replaced entire unit with a serviceable unit.
Construction/Loadline › Hull › Bottom Plating
Issued 21 October 2004
Resolved
Crop and renew four sections of bottom plating in aft section of vessel. Found four areas on aft bottom plating which due to shaft misaligment fractured the bottom plating. Crop and renewed four inserts of 4' x 3' x 3/8" each above the tail shaft in both sides.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 October 2004
Resolved 21 October 2004
Construction/Loadline › Structures › End Bulkhead
Issued 21 October 2004
Resolved
Crop and renew section of 4' x 7' x 1/4" of bulkhead in void tank #4 port side. Noticed severe wastage of the end bulkhead in this void tank.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 October 2004
Resolved 21 October 2004
Construction/Loadline › Hull › Longitudinal Frame
Issued 21 October 2004
Resolved
Crop and Renewed several wasted long frames in tanks #2, 3, 4 both port and stbd.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 October 2004
Resolved 21 October 2004
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 21 October 2004
Resolved
Remove and align both propeller shafts and conduct sea trials to verified proper operations of the propulsion system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2004
Resolved 8 November 2004
Engineering › Steering Gear System › Rudder Bearing
Issued 21 October 2004
Resolved
Replace rudder bearing and conduct sea trials to verify proper operations of steering gear.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 November 2004
Resolved 8 November 2004
Construction/Loadline › Hull › Bottom Plating
Issued 28 August 2004
Resolved
Crop and renew two sections of the bottom plate.
a. 8' x 12' x 3\8"
b. 9' x 13' x 3\8"
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 September 2004
Resolved 28 September 2004
Electrical › Electric Supply System (service)
Issued 20 May 2004
Resolved
INSTALL A MARINE USE APPROVED PERMENANTLY INSTALLED BATTERY CHARGER TO CHARGE PILOTHOUSE BATTERY. LEGACY COMPONENT DESC: Battery Charger
Due 27 May 2004
Resolved 15 June 2004
Engineering › Steering Gear System
Issued 23 July 2003
Resolved
Provide chaffing gear for all hydraulic hoses in steering room void. LEGACY COMPONENT DESC: Hydraulic Hose
Due 31 July 2003
Resolved 11 August 2003
Engineering
Issued 23 July 2003
Resolved
Renew port main engine oil soaked exhaust lagging.
Due 29 August 2003
Resolved 4 September 2003
Engineering › Steering Gear System
Issued 21 July 2003
Resolved
Repair starboard rudder retaining chain to overhead and install packing for starboard rudder. LEGACY COMPONENT DESC: Chain
Due 31 July 2003
Resolved 11 August 2003
Fire Fighting › Fire Pumps
Issued 21 July 2003
Resolved
Make permanent repairs to leaking engine-driven fire pump at faceplate.
Due 31 July 2003
Resolved 11 August 2003
Construction/Loadline › Penetrations
Issued 8 July 2003
Resolved
MAKE FWD ENGINE ROOM BULKHEADS WATERTIGHT
Due 8 July 2003
Resolved 23 August 2003
Construction/Loadline › Penetrations
Issued 8 July 2003
Resolved
MAKE PERMENANT REPAIRS TO STBD AFT STORAGE VOID VENT PIPE
Due 8 July 2003
Resolved 21 July 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 8 July 2003
Resolved
REMOVE ALL PAINT AND FLAMMABLES FROM THE VESSEL THAT ARE STORED IN THE PORT AND STBD MAIN DECK STORAGE AREAS.
Due 8 July 2003
Resolved 21 July 2003
Fire Fighting › Portable Dry Chemical Fire Extinguisher
Issued 8 July 2003
Resolved
MOUNT AND IDENTIFY ALL PORTABLE FIRE EXTINGUISHERS IN APPROPRIATE MOUNTING BRACKETS. LEGACY COMPONENT DESC: Mounting Bracket
Due 8 July 2003
Resolved 21 July 2003
Construction/Loadline › Hull
Issued 8 July 2003
Resolved
PERMANENTLY REPAIR HOLED HULL IN WAY OF PORT MAIN DECK PLATFORM STAIRS AND EXTERIOR HULL LEGACY COMPONENT DESC: Hull Plating
Due 8 July 2003
Resolved 21 July 2003
Electrical › Lighting (service)
Issued 8 July 2003
Resolved
MAKE MAIN DECK FLOOD LIGHT FIXTURES WIRE PENETRATIONS WATERTIGHT LEGACY COMPONENT DESC: Lighting Fixture
Due 8 July 2003
Resolved 21 July 2003
Electrical › Electrical Distribution System (service)
Issued 8 July 2003
Resolved
REMOVE AL DEAD-ENDED WIRING IN VICINITY OF PORT AND STBD ENGINES. LEGACY COMPONENT DESC: Wiring
Due 8 July 2003
Resolved 21 July 2003
Pollution Prevention/Response › Prevention Equipment
Issued 8 July 2003
Resolved
REMOVE EXCESS OIL AND BILGE SLOPS FROM ENGINE ROOM BILGE
Due 8 July 2003
Resolved 21 July 2003
Electrical › Electric Generation Source (service)
Issued 8 July 2003
Resolved
MAKE PERMANENT REPAIRS TO GENERATOR OIL LEAKS AND REMOVE ALL OIL FROM GENERATOR WINDINGS. IN ADDITION, CLOSE BOTH OPENINGS FOUND ON GENERATOR END. LEGACY COMPONENT DESC: Generator
Due 8 July 2003
Resolved 21 July 2003
Lifesaving › Lifebuoys
Issued 8 July 2003
Resolved
RENEW PORT AND STBD RING BUOYS
Due 8 July 2003
Resolved 21 July 2003
Construction/Loadline › Hull
Issued 8 July 2003
Resolved
MAKE PERMENANT REPAIRS TO PORT AND STBD WATERTIGHT HATCHES LOCATED ON MAIN DECK AND PROVE WATERTIGHT INTEGRITY
Due 29 August 2003
Resolved 4 September 2003
Resolution: Installed new hatches.
Fire Fighting › Fire Hydrants
Issued 8 July 2003
Resolved
PROVIDE SPANNER WRENCHES AT EACH FIRE STATION
Due 8 July 2003
Resolved 21 July 2003
Documentation › Certificates/Documents
Issued 8 July 2003
Resolved
DISPLAY CERTIFICATE OF INSPECTION IN ITS ENTIRETY UNDER GLASS OR OTHER SUITABLE MATERIAL. LEGACY COMPONENT DESC: Certificate of Inspection
Due 8 July 2003
Resolved 21 July 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 8 July 2003
Resolved
RENEW PORT AND STBD MAIN ENGINE OIL SOAKED EXHAUST LAGGING. IN ADDITION PORT AND STBDMAIN ENGINE CRANKCASE VENT PIPING SHALL BE PERMENANTLY MODIFIED TO PREVENT SATURATION OF EXHAUST LAGGING. LEGACY COMPONENT DESC: Piping (exhaust)
Due 8 July 2003
Resolved 21 July 2003
Resolution: Corrected with exception of Port main engine which was written as a seperate deficiency 23 Jul 2003.
Operations/Management › Passenger Operations
Issued 8 July 2003
Resolved
VESSEL SHALL HAVE A COMPREHENSIVE LOADING PLAN/PROCEDURE ADDRESSING PROPER LOADING OF THE VESSEL IN REGARDS TO EMERGENCY EGRESS FROM THE VEHICLES, ACCESS TO FIREFIGHTING AND LIFESAVING EQUIPMENT. IN ADDITION, PHYSICAL BARRIER PLACEMENTS SHALL BE PERMENANTLY INSTALLED AND MARKED AT EACH FIRE STATION
Due 22 August 2003
Resolved 4 September 2003
Electrical › Lighting (service)
Issued 8 July 2003
Resolved
REPAIR ALL OVERHEAD LIGHTING FIXTURES INCLUDING GLOBES AND GUARDS. LEGACY COMPONENT DESC: Lighting Fixture
Due 8 July 2003
Resolved 23 July 2003
Electrical › Electrical Distribution System (service)
Issued 8 July 2003
Resolved
MAKE PERMENANT REPAIRS TO ENGINE ROOM ELECTRICAL CIRCUIT BREAKER PANEL BOX THAT HAS GUARD PLATE MISSING, UNUSED OPENINGS AND BROKEN FITTING ON TOP FOR ELECTRICAL CABLE LEGACY COMPONENT DESC: Distribution Panel Bus
Due 8 July 2003
Resolved 21 July 2003
Lifesaving › Lifejacket/PFD (General)
Issued 8 July 2003
Resolved
MAKE PERANENT REPAIRS TO STBD LIFEJACKET STORAGE AREA. EXTERIOR OF ACCESS DOOR SHALL BE LABELED WITH SIZE AND AMOUNTS OF LIFEJACKETS. LEGACY COMPONENT DESC: Storage
Due 8 July 2003
Resolved 21 July 2003
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 8 July 2003
Resolved
REMOVE OR RELOCATE COMMERCIAL SODA MACHINE LOCATED IN WHEELHOUSE THAT IS OBSTRUCTING PORT WHEELHOUSE DOOR.
Due 8 July 2003
Resolved 23 July 2003
Electrical › Electrical Distribution System (service)
Issued 8 July 2003
Resolved
RENEW SHIELDED ELECTRICAL CABLE FROM GENERATOR TO CIRCUIT PANEL BOX. LEGACY COMPONENT DESC: Wiring
Due 8 July 2003
Resolved 21 July 2003
Construction/Loadline › Structures
Issued 8 July 2003
Resolved
MAKE PERMENANT REPAIRS AND PRESERVE ALL WHEELHOUSE LEVEL DECK PL;ATING FOUND HOLED AND/OR WASTED. LEGACY COMPONENT DESC: Deck Plating
Due 8 July 2003
Resolved 21 July 2003
Electrical › Lighting (service)
Issued 8 July 2003
Resolved
MAKE PERAMNENT REPAIRS TO HANGING LIGHT FIXTURE IN WAY OF VEHICLE DECK OVERHEAD. LEGACY COMPONENT DESC: Lighting Fixture
Due 8 July 2003
Resolved 21 July 2003
Electrical › Lighting (service)
Issued 8 July 2003
Resolved
MAKE PERMENANT REPAIRS TO PORT AND STBD WALKWAY PLATFORM LIGHTING FIXTURES AND ASSOCIATED WIRING. LEGACY COMPONENT DESC: Lighting Fixture
Due 8 July 2003
Resolved 23 July 2003
Engineering › Fuel Oil Service System
Issued 8 July 2003
Resolved
PROPERLY IDENTIFY PORT AND STBD EMERGENCY FUEL SHUTDOWN VALVES. LEGACY COMPONENT DESC: Valve, Control
Due 8 July 2003
Resolved 21 July 2003
Lifesaving › Lifebuoys
Issued 8 July 2003
Resolved
RENEW UPPER DECK RING BUOUY
Due 8 July 2003
Resolved 23 July 2003
Documentation › Certificates/Documents
Issued 8 July 2003
Resolved
RENEW BROKEN GLASS FOR STABILITY LETTER FRAME LEGACY COMPONENT DESC: Stability Letter
Due 8 July 2003
Resolved 23 July 2003
Lifesaving › Buoyant Apparatus
Issued 8 July 2003
Resolved
REMOVE ANY REFERENCE TO THE GENERAL II ON THE BOUYANT APPARATUS AND MARK AS GENERAL
Due 8 July 2003
Resolved 21 July 2003
Stability
Issued 8 July 2003
Resolved
FABRICATE AND PROVIDE A PRECISION MEASURING DEVICE THAT QUICKLY AND ACCURATELY MEASURES THE VESSEL'S MINIMUM FREEBOARD AS STATED ON STABILITY LETTER
Due 8 July 2003
Resolved 11 August 2003
Communications › Radio Communications › EPIRB
Issued 4 June 2002
Resolved
RENEW EPIRB BATTERY
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Lifesaving › Buoyant Apparatus
Issued 4 June 2002
Resolved
PROVIDE A LIFEFLOANT PANTER AND CANISTER
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Lifesaving › Buoyant Apparatus
Issued 4 June 2002
Resolved
PROPERLY RAFT TOGETHER ALL LIFEFLOATS
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Lifesaving › Buoyant Apparatus
Issued 4 June 2002
Resolved
PROVIDE ONE ADDITIONAL PADDLE AND PROPERLY ATTACH ALL PADDLES TO LIFEFLOATS
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Engineering › Bilge Water Management System
Issued 4 June 2002
Resolved
PROVE PROPER OPERATION OF ALL HIGH BILGE LEVEL ALARMS LEGACY COMPONENT DESC: Alarm
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Fire Fighting › Fire Pumps › Gland Sealing
Issued 4 June 2002
Resolved
PROVE PROPER OPERATION OF ELECTRIC FIRE PUMP
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 4 June 2002
Resolved
SERVICE STBD ENGINE ROOM FIRE EXTINGUISHER (SAFETY PIN MISSING)
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Operations/Management › Passenger Operations
Issued 4 June 2002
Resolved
PROVIDE A RELIABLE MEANS TO LEAVE PASSENGER COUNT ASHORE
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 4 June 2002
Resolved
PROVIDE EPIRB TEST LOG
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2002
Resolved 6 June 2002
Navigation › Piloting/Steering › US Coast Pilot
Issued 4 June 2002
Resolved
PROVIDE A VALID REEDS ALMANAC
Due 4 June 2002
Resolved 4 June 2002
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 4 June 2002
Resolved
PROVE PROPER OPERATION OF STBD ENGINE ROOM EMERGENCY LIGHT
Due 4 June 2002
Resolved 6 June 2002
Documentation › Certificates/Documents › Stability Letter
Issued 4 June 2002
Resolved
PROVIDE PAGE 2 OF THE VESSEL'S STABILITY LETTER
Due 4 June 2002
Resolved 6 June 2002
Documentation › Certificates/Documents
Issued 4 June 2002
Resolved
PROVIDE A VALID SAFETY RADIO CERTIFICATE LEGACY COMPONENT DESC: Cargo Ship Safety Radio Certificate
Due 4 July 2002
Resolved 10 September 2002
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 4 June 2002
Resolved
PROPERLY LABEL THE OFFICE DOOR INDICATING LIFEJACKETS ARE IN THE PILOTHOUSE
Due 4 July 2002
Resolved 6 June 2002
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 4 June 2002
Resolved
REPLACE THE LOWER HINGE ON THE MAIN DECK LIFEJACKET STORAGE LOCKER
Due 4 July 2002
Resolved 6 June 2002
Electrical › Lighting (service) › Lighting Fixture
Issued 4 June 2002
Resolved
MAKE REPAIRS TO THE LIGHTING FIXTURE AFT MAIN DECK OVERHEAD
Due 4 July 2002
Resolved 6 June 2002
Navigation › Collision/Grounding Avoidance
Issued 4 June 2002
Resolved
REPAIR 2 BROKEN WINDOWS IN PILOTHOUSE LEGACY COMPONENT DESC: Navigation Bridge Visibility
Due 4 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
CLEAN RUST FROM DECK AROUND PILOTHOUSE WALKWAY AND MAKE AVAILABLE FOR INSPECTION LEGACY COMPONENT DESC: Deck Plating
Due 4 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
REPLACE MISSING BOLTS IN STBD ENGINE ROOM SOFT PATCH AND MAKE WATERTIGHT. LEGACY COMPONENT DESC: Machinery Space Opening
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
MAKE WATERTIGHT PORT ENGINE ROOM SOFT PATCH LEGACY COMPONENT DESC: Machinery Space Opening
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
PROPERLY PLUG AND MAKE WATERTIGHT THE AFT ENGINE ROOM BULKHEAD PENETRATION FROM THE OLD BILGE ALARM LEGACY COMPONENT DESC: Transverse Bulkhead
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Hull
Issued 4 June 2002
Resolved
GOUGE AND REWELD BROKEN WELDS ON THE LOWER CHANNEL IRON STIFFENERS IN THE PORT FRESH WATER TANK LEGACY COMPONENT DESC: Longitudinal Frame
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Hull
Issued 4 June 2002
Resolved
CROP AND RENEW ALL FOUR BOTTOM LONGITUDINALS IN THE PORT FRESH WATER TANK LEGACY COMPONENT DESC: Longitudinal Frame
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Hull
Issued 4 June 2002
Resolved
CROP AND RENEW BOTH SWASH BULKHEAD LOWER CHANNEL IRON STIFFENERS IN THE PORT FRESH WATER TANK. LEGACY COMPONENT DESC: Stiffener
Due 11 July 2002
Resolved 10 September 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 4 June 2002
Resolved
CROP AND RENEW THE WASTED STAIRS FROM THE CAR DECK TO THE UPPER DECK STBD SIDE FWD.
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
CROP AND RENEW THE WASTED STAIRS FROM THE CAR DECK TO THE UPPER DECK, STBD SIDE FORWARD.
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
CROP AND RENEW THE WASTED STAIRS FROM THE CAR DECK TO THE UPPER DECK, STBD SIDE AFT.
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
RENEW THE PORT RAMP TOWER AFT DOUBLER PLATE ON MAIN DECK. REPAIR RAMP TOWER LEGACY COMPONENT DESC: Deck Plating
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Hull
Issued 4 June 2002
Resolved
CROP AND RENEW THE PORT QUARTER AT THE TRANSOM LEGACY COMPONENT DESC: Hull Plating
Due 11 July 2002
Resolved 10 September 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 4 June 2002
Resolved
RENEW DAMAGED PORT STERN RAIL LEGACY COMPONENT DESC: Deck Rail
Due 11 July 2002
Resolved 10 September 2002
Construction/Loadline › Structures
Issued 4 June 2002
Resolved
RENEW HATCH GASKETS AND VOID COVERS AT STBD FRESH WATER TANK, STBD FWD VOID, STBD PEAK, PORT PEAK, PORT FRESH WATER TANK, NUMBER 2 VOID, NUMBER 2 PORT VOID. LEGACY COMPONENT DESC: Manhole
Due 11 July 2002
Resolved 10 September 2002
Fire Fighting › Fire Hoses › Condition
Issued 4 June 2002
Resolved
RENEW STBD FIRE HOSE
Due 4 June 2002
Resolved 6 June 2002
Fire Fighting › Fire Hydrants
Issued 4 June 2002
Resolved
RENEW STBD FIRE STATION HANDLE LEGACY COMPONENT DESC: Condition
Due 13 June 2002
Resolved 10 September 2002
Fire Fighting › Fire Pumps
Issued 4 June 2002
Resolved
REPAIR LEAKING VALVE AT ELECTRIC FIRE PUMP DISCHARGE
Due 11 July 2002
Resolved 10 September 2002
Accommodation/Occupational Safety
Issued 29 August 2001
Resolved
REMOVE DROPLIGHTS FROM ENGINE ROOM.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Electrical
Issued 29 August 2001
Resolved
REPAIR ENGINE ROOM LIGHTS AMIDSHIPS.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Electrical
Issued 29 August 2001
Resolved
PROVIDE COVER FOR EXPOSED WIRE CONNECTIONS ON STBD ENGINE.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Fire Fighting
Issued 29 August 2001
Resolved
RENEW STBD FIRE HOSE.
Condition: Unknown
Due 29 August 2001
Resolved 5 December 2001
Fire Fighting
Issued 29 August 2001
Resolved
PROVIDE EVIDENCE OF B-V FIRE EXTINGUISHER SERVICE PRIOR TO CARRIAGE OF FLAMMABLE CARGO.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Construction/Loadline
Issued 29 August 2001
Resolved
REPAIR NUISANCE CRACKS ON FRAMES #2 & #4 STIFFENERS AND #2 LONGITUDINAL IN BOW RAKE.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Construction/Loadline
Issued 29 August 2001
Resolved
PROVIDE POTABLE WATER FILL CAP ON STARBOARD SIDE.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Deck/Cargo
Issued 29 August 2001
Resolved
SPREAD COTTER PIN FOR DECK RAMP SECURING PIN PORTSIDE.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Accommodation/Occupational Safety
Issued 29 August 2001
Resolved
REMOVE BATTERY IN ENGINE ROOM SPACE AMIDSHIPS.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Construction/Loadline
Issued 29 August 2001
Resolved
REPAIR RAMP CABLE TOWERS.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Engineering
Issued 29 August 2001
Resolved
STENCIL WITH PAINT EMERGENCY FUEL SHUT-OFF VALVES.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Construction/Loadline
Issued 29 August 2001
Resolved
INSTALL MISSING BOLTS FOR ENGINE ROOM SOFT PATCHES.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Documentation
Issued 29 August 2001
Resolved
PROVIDE TRAINING RECORD BOOK.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Documentation
Issued 29 August 2001
Resolved
PROVIDE LIFESAVING MAINTENANCE LOG.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Navigation
Issued 29 August 2001
Resolved
PROVIDE OPERATIONAL COMPASS LIGHT. VESSEL RESTRICTED TO DAYTIME USE ONLY UNTIL CORRECTED.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Navigation
Issued 29 August 2001
Resolved
PROVIDE SHIPS BELL.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Construction/Loadline
Issued 29 August 2001
Resolved
REPLACE STARBOARD ENGINE ROOM HATCH.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Construction/Loadline
Issued 29 August 2001
Resolved
PROVIDE NEW GASKET FOR PORT STORAGE COMPARTMENT DOOR.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Accommodation/Occupational Safety
Issued 29 August 2001
Resolved
STENCIL WITH PAINT ON ENGINE ROOM DOORS "DOOR MUST BE CLOSED WHILE UNDERWAY".
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Lifesaving
Issued 29 August 2001
Resolved
LABEL LIFEJACKET STORAGE.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Lifesaving
Issued 29 August 2001
Resolved
REMOVE OR RENEW LIFEJACKET LIGHTS.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Accommodation/Occupational Safety
Issued 29 August 2001
Resolved
RENEW CRACKED PILOTHOUSE WINDOW.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Lifesaving
Issued 29 August 2001
Resolved
RENEW NETTING IN LIFEFLOATS.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Lifesaving
Issued 29 August 2001
Resolved
STENCIL ALL LIFEFLOATS USING PAINT WITH THE VESSELS NAME AND CAPACITY.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Lifesaving
Issued 29 August 2001
Resolved
STENCIL OARS WITH VESSELS NAME AND ATTACH TO LIFEFLOATS.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Lifesaving
Issued 29 August 2001
Resolved
RENEW HYDROSTATIC RELEASE ON EPIRB.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Accommodation/Occupational Safety
Issued 29 August 2001
Resolved
PROVIDE A GATE OR CHAIN FOR STERN RAILING.
Condition: Unknown
Due 30 September 2001
Resolved 10 September 2002
Lifesaving
Issued 22 August 2001
Resolved
ATTACH WATERLIGHT TO LIFERING WITH 3-6' LINE AND CORROSION RESISTANT CLIP.
Condition: Unknown
Due 23 August 2001
Resolved 23 August 2001
Documentation
Issued 27 July 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, LIMIT PASSENGERS TO 16 WHILE CARRYING FLAMMABLE TANK TRUCKS.
Condition: Unknown
Due 27 July 2001
Resolved 30 July 2001
Engineering
Issued 30 May 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW MISSING LAGGING ON BOTH MAIN ENGINES.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Electrical
Issued 30 May 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, REPAIR ALL EXPOSED WIRES AND FIXTURES THROUGHOUT THE VESSEL.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Engineering
Issued 30 May 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS REPAIR FUEL LEAK ON STBD ENGINE.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Construction/Loadline
Issued 30 May 2001
Resolved
REPAIR DAMAGED PORT RAMP TOWER. RENEW UPPER ASSEMBLY. (DAMAGED-CRACKED I- BEAM AND SUPPORTS.) REPAIR DAMAGED DECK SUPPORT AT BASE OF RAMP TOWER. PROVIDE REPAIR PROPOSAL PRIOR TO THE COMMENCEMENT OF ANY WORK. TO BE COMPLETED NO LATER THAN 25MAY01.
Condition: Unknown
Due 25 July 2001
Resolved 10 September 2002
Lifesaving
Issued 30 May 2001
Resolved
REMOVE OILY WASTE FROM BILGE, DISPOSE OF PROPERLY.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Fire Fighting
Issued 30 May 2001
Resolved
INSTALL PIPING TO FIRE STATIONS PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Electrical
Issued 30 May 2001
Resolved
REPAIR AFT DECK LIGHT. PROVIDE REQUIRED GLASS PROTECTIVE COVER.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Accommodation/Occupational Safety
Issued 30 May 2001
Resolved
REPAIR AFT DECK HANDRAILS NO LATER THAN 02MAY01.
Condition: Unknown
Due 10 September 2002
Resolved 10 September 2002
Construction/Loadline
Issued 30 May 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, MAKE ALL DECK HATCHES WATERTIGHT.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Accommodation/Occupational Safety
Issued 30 May 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, MAKE TOILETS USABLE AND SANITARY OR PERMANENTLY SEAL ACCESS TO PASSENGERS.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Accommodation/Occupational Safety
Issued 30 May 2001
Resolved
PROVIDE RECEIPTS FOR SEWAGE DISPOSAL.
Condition: Unknown
Due 10 September 2002
Resolved 10 September 2002
Fire Fighting
Issued 30 May 2001
Resolved
SERVICE B-5 FIRE EXTINGUISHER PRIOR TO THE CARRIAGE OF ANY FLAMMABLE CARGO IAW 49 CFR 172.101. MAKE B-5 UNIT SO THAT VEHICLE DECK IS ACCESSIBLE WITH INSTALLED LENGTH OF HOSE.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Fire Fighting
Issued 30 May 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, RENEW HOLED FIRE HOSES.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Lifesaving
Issued 30 May 2001
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, MAKE LIFERING LIGHTS OPERATIONAL OR REMOVE THEM IAW REQUIRED AMOUNT BY COI.
Condition: Unknown
Due 27 June 2001
Resolved 27 June 2001
Navigation
Issued 30 June 2000
Resolved
Provide light for magnetic compass.
Condition: Unknown
Due 21 September 2000
Resolved 18 October 2000
Engineering
Issued 30 June 2000
Resolved
Renew exhaust insulation wrapping on both engines.
Condition: Unknown
Due 21 September 2000
Resolved 18 October 2000
Engineering
Issued 30 June 2000
Resolved
Renew fuel tank flame screen on vessel's port side.
Condition: Unknown
Due 21 September 2000
Resolved 18 October 2000
Construction/Loadline
Issued 22 December 1999
Resolved
Provide a gas free certificate indicating vessel is safe for workers to conduct a complete internal structural exam. Cursory examination of bow rake revealed split in port sideshell plating near bottom and fractured & severely wasted deck stiffeners.
Condition: Unknown
Due 22 December 1999
Resolved 22 December 1999
Construction/Loadline
Issued 26 October 1999
Resolved
Install zincs as stated in corrosion survey.
Condition: Unknown
Due 26 October 1999
Resolved 26 October 1999
Construction/Loadline
Issued 26 October 1999
Resolved
The following plans are to be submitted, verified and approved: Scantlingsand Details, Logitudinal Sections & Details, and Frams and Bulkheads- Details OR fully restore the vesset to its original, approved configuration.
Condition: Unknown
Due 26 October 1999
Resolved 26 October 1999
Construction/Loadline
Issued 26 October 1999
Resolved
Remove cajun grease and apply tank coatings to all internal tanks as statedin corrosion survey.
Condition: Unknown
Due 26 October 1999
Resolved 26 October 1999
Construction/Loadline
Issued 7 January 1999
Resolved
PERMANENTLY WELD DRAFT MARKS ON STARBOARD STERN.
Condition: Unknown
Due 7 January 1999
Resolved 7 January 1999
Lifesaving
Issued 7 January 1999
Resolved
CONDUCT UNDERWAY DRILLS (FIRE & MAN OVERBOARD) AND STEERING TEST PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 7 January 1999
Resolved 7 January 1999
Construction/Loadline
Issued 7 January 1999
Resolved
RE-PAINT CAR LANE LINES ON MAIN DECK PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 7 January 1999
Resolved 7 January 1999
Construction/Loadline
Issued 23 November 1998
Resolved
Completely pump out the vessel and provide gauge readings of the remainder of the vessel that was previously not gauged prior to requesting a marine inspectors attendance.
Condition: Unknown
Due 31 January 1999
Resolved 12 January 1999
Documentation
Issued 23 November 1998
Resolved
Provide to the Coast Guard an original set of Coast Guard approved buildersplans in order to determine the original construction of the vessel prior to a marine inspectors attendance on the vessel.
Condition: Unknown
Due 31 January 1999
Resolved 12 January 1999
Construction/Loadline
Issued 23 November 1998
Resolved
Submit to the Coast Guard a corrosion survey to be conducted by a CorrosionEngineer accredited by the National Administration of Corrosion Engineers addressing both Galvanic and Stray Current corrosion modes. The survey must also include corrective recommendations.
Condition: Unknown
Due 23 November 1998
Resolved 23 November 1998
Documentation
Issued 23 November 1998
Resolved
Provide to the Coast Guard for approval, a detailed plan of the modifications/repairs that you propose to make to the vessel prior to the attendance of a marine inspector.
Condition: Unknown
Due 31 January 1999
Resolved 12 January 1999
Documentation
Issued 23 November 1998
Resolved
Provide to the Coast Guard a timeline as to when the modifications/repairs will be accomplished in order to schedule a marine inspector prior to the attendance of marine inspector.
Condition: Unknown
Due 31 January 1999
Resolved 12 January 1999
Documentation
Issued 23 November 1998
Resolved
Upon completion of all modifications and repairs in drydock, have a qualified marine architect make a full set of plans of the vessel, showing its current configuration and construction for scantling review by the Marine Safety Center.
Condition: Unknown
Due 23 November 1998
Resolved 23 November 1998
Construction/Loadline
Issued 23 November 1998
Resolved
Provide the complete final gauging report to the Coast Guard prior to a marine inspectors attendance to the vessel.
Condition: Unknown
Due 31 January 1999
Resolved 12 January 1999
Construction/Loadline
Issued 9 November 1998
Resolved
PROVIDE A GAUGING PLAN FOR REVIEW AND THEN PROVIDE GAUGINGS FOR ALL BOTTOM PLATING, SIDE SHELL PLATING, WATERTIGHT BULKHEADS, AND STRENGTHENING MEMBERS. A COAST GUARD MARINE INSPECTOR WILL BE PRESENT WHEN THE GAUGING EQUIPMENT IS CALIBRATED.
Condition: Unknown
Due 9 November 1998
Resolved 9 November 1998
Documentation
Issued 6 November 1998
Resolved
PROVIDE THIS OFFICE WITH A WRITTEN DRYDOCK EXTENSION REQUEST WITH A VALID DATE FOR DRYDOCK PRIOR TO CARRYING PASSENGERS OR FREIGHT FOR HIRE.
Condition: Unknown
Due 31 January 1999
Resolved 10 November 1998
Documentation
Issued 6 November 1998
Resolved
THE VESSEL IS NOT TO CARRY PASSENGERS OR FREIGHT FOR HIRE UNTIL A DRYDOCK EXTENSION EXAM IS COMPLETED BY A COAST GUARD INSPECTOR AND THE DRYDOCK EXTENSION IS APPROVED.
Condition: Unknown
Due 31 January 1999
Resolved 10 November 1998
Documentation
Issued 6 November 1998
Resolved
PROVIDE THIS OFFICE WITH A GUARANTEED DRYDOCK DATE AT A REPUTABLE DRYDOCK FACILITY PRIOR TO CARRYING PASSENGERS OR FREIGHT FOR HIRE.
Condition: Unknown
Due 31 January 1999
Resolved 10 November 1998
Construction/Loadline
Issued 22 September 1997
Resolved
CONDUCT AUDIO GAUGING AND PROVIDE SURVEY REPORT OF FOREPEAK AT INTERSECTIONOF BOW RAMP.
Condition: Unknown
Due 15 December 1997
Resolved 1 February 1998
Construction/Loadline
Issued 17 March 1997
Resolved
PROPERLY REPAIR SMALL HOLE IN BOW OF VESSEL.
Condition: Unknown
Due 19 March 1997
Resolved 22 March 1997
Construction/Loadline
Issued 17 March 1997
Resolved
CROP AND RENEW 8 INCHES OF THE OVERHEAD LONGS CONNECTED TO THE COLLISION BULKHEAD AND MEASURING FROM THE COLLISION BULKHEAD FORWARD.
Condition: Unknown
Due 19 March 1997
Resolved 22 March 1997
Construction/Loadline
Issued 17 March 1997
Resolved
PROPERLY REPAIR ALL DIAGONAL MEMBERS IN THE FOREPEAK.
Condition: Unknown
Due 19 March 1997
Resolved 22 March 1997
Construction/Loadline
Issued 17 March 1997
Resolved
VEE/WELD AS NEED THE WELDS CONNECTING THE OVERHEAD LONGS TO THE FORWARD ENDOF THE COLLISION BULKHEAD.
Condition: Unknown
Due 19 March 1997
Resolved 22 March 1997
Construction/Loadline
Issued 21 October 1996
Resolved
PROPERLY REMOVE DOUBLER ON PORT SIDE OF COLLISION BULKHEAD AND INSTALL A 18X18" INSERT.
Condition: Unknown
Due 21 October 1996
Resolved 21 October 1996
Lifesaving
Issued 21 October 1996
Resolved
RENEW GASKET TO FUEL OIL TANK COMPARTMENT HATCH COVER.
Condition: Unknown
Due 21 October 1996
Resolved 21 October 1996
Lifesaving
Issued 17 September 1996
Resolved
PROPERLY LOG ABANDON SHIP, MAN OVERBOARD, AND FIRE FIGHTING DRILLS IAW 46 CFR 122.520 AND 122.524.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Construction/Loadline
Issued 17 September 1996
Resolved
COMPLETE DECK PENETRATIONS WELDS.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PROPERLY MOUNT AT OPERATORS STATION EMERGENCY INSTRUCTIONS IAW 46 CFR 122.510.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Engineering
Issued 17 September 1996
Resolved
INSTALL VENTS IN DIESEL FUEL OIL TANK COMPARTMENT IAW 46 CFR 182.20-50.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Navigation
Issued 17 September 1996
Resolved
RENEW OR REPAIR SHIP'S WHISTLE.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Electrical
Issued 17 September 1996
Resolved
PLACE PROPER FITTINGS ON WIRES TO BATTERY CONNECTED TO GENERATOR.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PROPERLY ATTACH PADDLES TO SIDES OF LIFE FLOATS.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Construction/Loadline
Issued 17 September 1996
Resolved
VEE AND WELD 2 INCH FRACTURE IN COLLISION BULKHEAD TO THE INBOARD SIDE OF THE PORT INSERT AND VEE AND WELD 2 INCH FRACTURE STBD SIDE OF KEEL IN FWD BULKHEAD OF #2 C/L VOID.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Engineering
Issued 17 September 1996
Resolved
PROPERLY SECURE STBD FLAME SCREEN.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Navigation
Issued 17 September 1996
Resolved
PROVIDE THE U.S. COAST PILOT OR SIMILAR PUBLICATION AND COAST GUARD LIGHT LIST.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
POST A EMERGENCY BROADCAST PLACARD AS REQUIRED BY 46 CFR 121.506.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Construction/Loadline
Issued 17 September 1996
Resolved
PROPERLY REPAIR BILGE PIPING IN #1 C/L VOID TANK. PROPERLY REPAIR FWD AND AFT BULKHEADS IN #1 C/L VOID BY REMOVING DOUBLER AND INSTALLING 18X18" INSERT.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PROPERLY STENCIL CAPASITY OF BA's AND LIFE FLOATS WITH 2 INCH LETTERS.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Navigation
Issued 17 September 1996
Resolved
PROPERLY REPAIR VESSEL'S ANCHOR LIGHT.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Electrical
Issued 17 September 1996
Resolved
PROPERLY REMOVE NON MARINE TYPE BATTERY CHARGER FROM VESSEL.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Documentation
Issued 17 September 1996
Resolved
PROVIDE PROOF OF ANNUAL DOC ENDORSEMENT (STICKER)
Condition: Unknown
Due 20 September 1996
Resolved 24 September 1996
Navigation
Issued 17 September 1996
Resolved
PROPERLY MOUNT SHIP'S BELL.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Engineering
Issued 17 September 1996
Resolved
PROVIDE LONG ENOUGH HOSE TO PUMP WATER FROM COLLISION BULKHEAD FOR PORTABLEFIRE/BILGE PUMP.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Electrical
Issued 17 September 1996
Resolved
PROPERLY REPLACE COMPRESSION FITTING TO PORT ENGINE ALTERNATOR WIRE.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Electrical
Issued 17 September 1996
Resolved
PROPERLY REPLACE OR REPAIR ALL 12 VOLT E-LIGHT FIXTURES
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Engineering
Issued 17 September 1996
Resolved
PROPERLY ADJUST SHAFT STUFFING BOXES TO REDUCE FLOW OF WATER INTO ENGINE ROOM.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Electrical
Issued 17 September 1996
Resolved
PROPERLY REMOVE OR CONNECT DEADEND CABLE AT 12 VOLT CURRENT BOARD.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Accommodation/Occupational Safety
Issued 17 September 1996
Resolved
INSTALL MSD TANK WATCH SYSTEM 33 CFR 159.83.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
NO LATER THAN 11 MARCH 1997 INSTALL ON BOARD IN A FLOAT FREE ARRANGEMENT, AFCC ACCEPTED CATEGORY 1 406 MHz EPIRB IN ACCORDENCE WITH 117.64.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Accommodation/Occupational Safety
Issued 17 September 1996
Resolved
PROPERLY REPAIR BOTH HEADS ON VESSEL.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Construction/Loadline
Issued 17 September 1996
Resolved
PROPERLY SEAL HOLE WHERE WIRE PENETRATEEES WATERTIGHT BULKHEAD.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Navigation
Issued 17 September 1996
Resolved
PROPERLY REPAIR HYDRALIC LEAK AT STBD STEERING RAM.
Condition: Unknown
Due 20 September 1996
Resolved 20 September 1996
Lifesaving
Issued 17 September 1996
Resolved
POST IN CONSPICUOUS SPACES LIFE JACKET PLACARDS CONTAINING INSTRUCTIONS FORTHE DONNING AND USE OF LIFE JACKETS IAW 46 CFR 122.516
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Lifesaving
Issued 17 September 1996
Resolved
PROPERLY POST A STATION BILL IDENTIFYING THE RESPONSIBILITIES OF THE MASTERAND CREW IN THE EVENT OF AN EMERGENCY IN THE OPERATORS STATION IAW 46 CFR 122.514.
Condition: Unknown
Due 17 September 1996
Resolved 17 September 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROVIDE A REPAIR PROPOSAL FOR THE SHARP INSET ON THE SIDE SHELL IN WAY OF THE STBD FRESH WATER TANK.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROVIDE REPAIR PROPOSAL FOR THE EXCESSIVE INSET ON THE BOTTOM PLATE (APPROX2' X 6') IN WAY OF THE STBD FRESH WATER TANK, AND EXTENDING TO THE FWD SECTION OF THE #2 STBD VOID.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROVIDE REPAIR PROPOSAL FOR THE EXCESSIVE INSET(S) IN THE HULL BOTTOM IN WAY OF THE #1 BALLAST TANK, ON EITHER SIDE OF THE CENTERLINE, NEAR THE AFT BULKHEAD. (APPROX 2'X4')
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROVIDE REPAIR PROPOSAL FOR THE EXCESSIVE INSET IN THE HULL BOTTOM IN WAY OF THE #2 PORT VOID, JUST FORWARD OF THE PORT KEEL COOLER. (APPROX 2'X6')
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROVIDE REPAIR PROPOSAL FOR THE NUMEROUS BROKEN AND WASTED FRAMES, BROKEN WELDS, AND IMPROPER PREVIOUS REPAIRS IN THE #1 BALLAST TANK AS INDICATED BYTHE ATTENDING CG MARINE INSPECTOR. THIS PROPOSAL SHOULD BE COORDINATED WITH REQ #03.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
RENEW THE MAIN DECK HATCH COVER GASKETS.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROPERLY REPAIR THE BROKEN BOTTOM LONGITUDINALS IN THE FWD END OF THE #2 STBD VOID AS INDICATED BY THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
REPAIR THE UNWELDED PILLAR (FIRST ON THE PORT SIDE) IN THE FWD RAKED COMPT.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
REPAIR THE #3 AND #4 BOTTOM LONGITUDINALS WHERE THEY MEET THE FWD BULKHEAD FRAMES IN THE #1 PORT VOID.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
REPAIR/REPLACE THE SUPPORTS FOR THE BOW RAMP AS NEEDED AND INDICATED BY THECG MARINE INSPECTOR.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
REMOVE WATER FROM BOTH FRESH WATER TANKS AND MAKE AVAILABLE FOR INTERNAL INSPECTION BY THE USCG.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROPERLY REMOVE OIL/WATER FROM THE ENGINE ROOM BILGE.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
REMOVE MUD AND RUST SCALE FROM THE FWD RAKE AND MAKE THE FWD BILGE SUCTION FREE FROM OBSTRUCTION.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Construction/Loadline
Issued 22 April 1996
Resolved
PROPERLY CLEAN AND REMOVE HYDRAULIC OIL FROM THE STORAGE COMPARTMENT BILGE.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Unknown
Issued 13 December 1995
Resolved
At next drydock remove rust repellant grease as required by the attending marine inspector for internal examination of framing and welds.
Condition: Unknown
Due 13 December 1995
Resolved 13 December 1995
Unknown
Issued 13 December 1995
Resolved
At next drydock repaint draft marks on vessel in a contrasting color to thehull.
Condition: Unknown
Due 13 December 1995
Resolved 13 December 1995
Electrical
Issued 24 August 1995
Resolved
Replace lightbulbs and globes in the engine room.
Condition: Unknown
Due 6 November 1995
Resolved 6 November 1995
Unknown
Issued 24 August 1995
Resolved
Permanently mark the Vessel identification number in the hull of the vessel.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Lifesaving
Issued 24 August 1995
Resolved
Label PFD storage box with number and type of PFD's.
Condition: Unknown
Due 6 November 1995
Resolved 6 November 1995
Engineering
Issued 24 August 1995
Resolved
Provide a cap to the cooling tank on the generator.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Construction/Loadline
Issued 24 August 1995
Resolved
Repair and make watertight the patch to the port side engine room.
Condition: Unknown
Due 6 November 1995
Resolved 6 November 1995
Electrical
Issued 24 August 1995
Resolved
Remove improper connections to battery in wheelhouse.
Condition: Unknown
Due 24 August 1995
Resolved 25 August 1995
Electrical
Issued 24 August 1995
Resolved
Prove operation of emergency lighting system.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Lifesaving
Issued 24 August 1995
Resolved
Provide "NO SMOKING" signs in conspicuous places aboard the vessel in accordance with 46 CFR 185.20-20.
Condition: Unknown
Due 6 November 1995
Resolved 6 November 1995
Fire Fighting
Issued 24 August 1995
Resolved
Repair or replace fire main pressure gauge.
Condition: Unknown
Due 6 November 1995
Resolved 6 November 1995
Unknown
Issued 24 August 1995
Resolved
Repaint draft marks on vessel in a contrasting color to the hull.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Lifesaving
Issued 24 August 1995
Resolved
Repair or replace 2 damaged bouyant apparatus, remove incorrect vessel names, replace retro reflective tape, and clean and stencil vessel name.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Unknown
Issued 24 August 1995
Resolved
At next drydock examination remove all rust repellant grease for internal inspection.
Condition: Unknown
Due 24 August 1995
Resolved 24 August 1995
Lifesaving
Issued 24 August 1995
Resolved
Repair 3 waterlights to lifefloats.
Condition: Unknown
Due 6 November 1995
Resolved 6 November 1995
Fire Fighting
Issued 25 August 1994
Resolved
PROVIDE SUFFICENT LENGTH OF HOSE FOR B-V EXTINGUISHER TO COVER ENTIRE DECK AREA.
Condition: Unknown
Due 31 October 1994
Resolved 19 October 1994
Lifesaving
Issued 25 August 1994
Resolved
PROVIDE WATER LIGHTS FOR ALL BUOYANT APPARATUS.
Condition: Unknown
Due 3 October 1994
Resolved 3 October 1994
Fire Fighting
Issued 23 February 1994
Resolved
An discharged B-V extinguisher was in place on vessel.
Condition: Unknown
Due 14 July 1994
Resolved 14 July 1994
Construction/Loadline
Issued 23 February 1994
Resolved
No major repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge and approval of the Officer in Charge, Marine Inspection._x001C_ _x001C_
Condition: Unknown
Due 19 October 1994
Resolved 19 October 1994
Engineering
Issued 23 February 1994
Resolved
PROVIDE FLAME SCREENS FOR BOTH FUEL TANK VENTS
Condition: Unknown
Due 25 June 1994
Resolved 25 June 1994
Lifesaving
Issued 23 February 1994
Resolved
PROPERLY INSTALL ALL BUOYANT APPARATUS_x001C_
Condition: Unknown
Due 25 June 1994
Resolved 25 June 1994
Construction/Loadline
Issued 23 February 1994
Resolved
INSPECT INTERNAL MEMBERS AND BOTTOM PLATING OF FORWARD RAKE AREA AT LEAST ONCE PER MONTH FOR FRACTURES AND FAILURES; REPORT ANY DAMAGE NOTED TO USCG.
Condition: Unknown
Due 23 February 1994
Resolved 23 February 1994
Lifesaving
Issued 23 February 1994
Resolved
PROPERLY LABEL ALL BUOYANT APPARATUS WITH VESSEL NAME AND PERSONS CAPACITY_x001C_
Condition: Unknown
Due 25 June 1994
Resolved 25 June 1994
Electrical
Issued 23 February 1994
Resolved
REPAIR OR REPLACE MISSING/DAMAGED EMERGENCY LIGHTS, PORT AND STARBOARD CATWALKS.
Condition: Unknown
Due 25 June 1994
Resolved 25 June 1994
Lifesaving
Issued 23 February 1994
Resolved
PROVIDE WATERLIGHTS FOR BUOYANT APPARATUS_x001C_
Condition: Unknown
Due 25 June 1994
Resolved 25 June 1994
Documentation
Issued 27 August 1993
Resolved
OBTAIN A VALID FCC RADIO STATION LICENSE AND RADIO SAFETY CERTIFICATE. PROVIDE A COPY TO THE COGNIZANT COAST GUARD OCMI.
Condition: Unknown
Due 27 August 1993
Resolved 27 August 1993
Fire Fighting
Issued 4 May 1993
Resolved
Provide plans to bring accomodation areas into compliance with the structural fire protection requirements contained in 46 CFR 72.
Condition: Unknown
Due 4 May 1993
Resolved 4 May 1993
Lifesaving
Issued 4 May 1993
Resolved
Submit an Application for Inspection and a letter detailing the exact routeupon which the vessel plans to operate. Plans should also include a layoutfor the lifesaving and safety equipment.
Condition: Unknown
Due 4 May 1993
Resolved 4 May 1993
Documentation
Issued 19 August 1992
Resolved
PROVIDE ELECTRICAL DRAWINGS AND PLANS REFLECTING AS BUILT INSTALLATIONS TO_x001C_COMMANDING OFFICER, MARINE SAFETY CENTER FOR APPROVAL; ANY AND ALL COMMENTSSHALL BE COMPLIED WITH TO THE SATISFACTION OF THE COGNIZANT OCMI._x001C_ 46 CFR PART 183
Condition: Unknown
Due 19 August 1992
Resolved 19 August 1992