QUETZAL ARROW is a 1992 public freight. The Coast Guard has recorded 29 inspections since 2016, most recently in July 2026, along with 7 deficiencies and 9 operational controls.
Records from 2016 to 2026. Most recent: inspection, 15 July 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Tonnage as PSIX records it29369 - Convention (Subpart B), Gross Ton 12409 - Convention (Subpart B), Net Ton 29369 - Regulatory (Subpart C or D), Gross Ton 12409 - Regulatory (Subpart C or D), Net Ton 57741 - Displacement, Metric Ton 46908 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 15 July 2026Resolved
"A" class divisions are those divisions formed by bulkheads and decks which comply with the following: they shall be so constructed as to be capable of preventing the passage of smoke and flame to the end of the one-hour standard fire test.
PSCO observed a penetration through an "A" class boundary from the E/R to a workshop that was not properly insulated. The E/R to the workshop was labeled as an "A" class boundary on the Fire Control Plan.
74SOLAS(97) II-2/3.3
Action required: 10 - Deficiency Rectified
Resolved 15 July 2026
Resolution: Crew rectified the deficiency on the spot by adding insulation to the pentration to create a seal to prevent the passage of fire and smoke.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 8 January 2026Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all rspects will remain fit to proceed to sea without danger to the ship or persons on board.
PSCO received notification per survey report of holes in the bulkhead stcture between the No.2 port fuel oil tank and No.3 port water ballast tank, that caused contamination of both tanks.
Vessel is allowed to proceed to drydock to further assess damage and make repairs.
74 SOLAS (20) I/11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2026
Resolved 18 January 2026
Resolution: Class report was recieved attesting that the bulkhead holes of No. 2 pfo tank and No.3 pwb tank have been repaired with steel plate equivalent to the original. vacuum test was carried out and determined satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 8 January 2026Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
PSCO received notification that during initial report above, contaminated fuel oil was transferred from the No.2 port fuel tank to No.2 starboard fuel tank.
Provide documentation for proper disposal of contaminated fuel oil in No.2 starboard fuel tank.
74 SOLAS (20) I/11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2026
Resolved 18 January 2026
Resolution: Class report recieved detailing that the contaminated oil in No. 2 starboard fuel shall not be transferred to any other tanks or used for any means until able to discharge at next available port. Vessel safe to sail with contents of tank.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 June 2024Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulation to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel self-reported number 6 main engine bearing damaged, vessel unable to perform full sea speed. 74 SOLAS (20) I/11(a)
Action required: 15 - Rectify deficiencies by next port
Due 8 July 2024
Resolved 11 June 2024
Resolution: #6 Main engine bearing replaced. Sea trials successful.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 June 2020Resolved
02108- Electrical installations shall be such that the safety of crew and ship from electrical hazards shall be ensured. Multiple electrical outlets were not protected. Improper connections were found in all three of the vessel's laundry rooms and the light outside accommodation space near the CO2 room was secured by zip ties. SOLAS 72(97)II-1/40.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2020
Resolved 29 June 2020
Resolution: Class verified the noted electrical outlets were repaired and the light fixture was secured using proper mounting bracket.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 June 2020Resolved
99101-Each transfer pipe system must not leak under static liquid pressure at least 1.5 times the maximum allowable working pressure and for vessels must be tested annually. PSCO observed bunker lines were tested with air instead of hydrostatically prior to bunkering. 33 CFR 156.170
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 26 June 2020
Resolved 29 June 2020
Resolution: Vessel hydrostatically tested the FO bunker line and LS MGO bunker line successfully.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 April 2019Resolved
Means shall be provided whereby operation of propulsion machinery can be sustained or restored even though one of the essential auxiliaries becomes inoperative. vessel lost propulsion while leaving port due to a short in an electrical pane. Ensure with concurrence from class that appropriate repairs are completed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 April 2019
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.