Professional
The full record for this vessel
Behind this panel: 7 inspections, each with its date, unit and type; 6 deficiencies with the resolution recorded against each, 3 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 7
15 June 2026
COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8382058
18 October 2024
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8021107
21 November 2023
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7828555
20 June 2023
Initial Certification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7714828
8 March 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7647857
13 January 2022
Deadweight Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7379743
7 November 2019
Plan Review "T" Boat · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6852191
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 June 2023
No resolution recorded
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Intake impellers servicing the cooling systems on the vessel's port and STBD engines were found inoperable. Replace impellers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 July 2023 — due date passed with no resolution recorded
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 22 June 2023
Resolved
Vessel must comply with all applicable FCC requirements. Station must be licensed by the FCC. The ship must have a valid Communications Act Safety Radiotelephony (CASR) Certificate. No FCC license or CASR Certificate on board. Route limited to 1000 ft from shore.
Action required: 705 - Other - as specified
Due 7 July 2023
Resolved 21 November 2023
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 22 June 2023
No resolution recorded
Vessel must have an all-around white light. All-around white light inoperable and not visible for 360 degrees. Operations limited to daytime and fully visible conditions.
Action required: 705 - Other - as specified
Due 7 July 2023 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 22 June 2023
No resolution recorded
Vapor barriers must be provided where insulation of any type is used in spaces where flammable and combustible liquids or vapors are present, such as machinery spaces and paint lockers. Fire retardant insulation required around wire runs that penetrate the machinery space bulkheads.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 July 2023 — due date passed with no resolution recorded
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 22 June 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. Provide a first aid kit that meets these requirements or has equivalent contents.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 July 2023
Resolved 21 November 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 June 2023
Resolved
Each small battery installation must be located in a well ventilated space and protected from falling objects. Install natural ventilation in battery storage compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 July 2023
Resolved 21 November 2023