MAURY USCG vessel records Sign in
← All vessels

DS SYMPHONY

DS SYMPHONY is a 2001 tank ship. The Coast Guard has recorded 11 inspections since 2002, most recently in August 2018, along with 9 deficiencies — 1 with no resolution recorded — and 1 operational control.

Records from 2002 to 2018. Most recent: inspection, 24 August 2018.

Built
2001
Last inspected
24 August 2018
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9249324 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
LIBERIA
—
Maury page id
psix-38058

Inspections, by type

…with no type recorded2
Years with a record 8 calendar years (2002–2018)
The 11 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it149995 - Dead Weight, Ton
172746 - Displacement, Ton
79525 - Convention (Subpart B), Gross Ton
47769 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 11

24 August 2018 ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6513706
20 January 2011 COC-TVE Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3925869
7 January 2010 COC-TVE Renew · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3660129
10 November 2008 ISPS II Exam · Ballast Water Examination · COC-TVE Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3358201
20 July 2007 ISPS II Exam · COC-TVE Renew
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2997010
15 January 2007 ISPS II Exam · MARPOL Annex I Examination · Ballast Water Examination · MARPOL Annex V Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2855253
13 January 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2854865
16 May 2006 COC-TVE Annual · PII Safety Exam · Ballast Water Examination · ISPS II Exam · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2650596
14 February 2006 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2584428
1 April 2005 Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2321321
14 November 2002 Ballast Water Examination · Certificate of Compliance
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1705874

Deficiency record · 9

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 24 August 2018 Resolved
Each tankship with a VCS must be fitted with a vapor pressure- sensing device which activates an alarm when the device measures a pressure of not more than 90% of the lowest pressure relief valve settings in the cargo tank venting system. The ships lowest pressure relief valve setting is 700mm/ng per the ships VECS manual. The high vapour pressure alarms should be set for not more than 90% of 700mm/ng, or 630mm/ng. The ships vapour alarm is set for 1260mm/ng, as listed on the ship generated instruction posted in the cargo control room. *Rectify prior to cargo operations*
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2018
Resolution: Ships alarm set to 630 mm/ng. Verified by class and CG.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 24 August 2018 Resolved
The venting arrangements shall be so designed and operated as to ensure that neither pressure nor vacuum in cargo tanks shall exceed design parameters. The vessels VECS manual requires the ships cargo tanks to be protected from over pressure by pressure relief valves set at 700mm/ng. The ships crew have bypassed all individual P/V valves and have the common vapour pressure relief running to a breather valve at the mast riser set to 1100mm/ng *rectify prior to cargo operations*
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2018
Resolution: Vessel fixed arrangements so P/V valves were no longer bypassed. rectified to satisfaction of class and CG
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 24 August 2018 Resolved
The venting system shall be provided with devices to prevent the passage of flame into the cargo tanks. The vessels cargo tank P/V vents & ballast tank vents are not fitted with appropiate flame screens. Cargo tanks P/V vents: Slops (P&S), 7S, 6(P&S), 5(P&S), 4(P&S), 3(P&S), 2(P&S), 1S. Wing ballast tanks vents: All except for 1 vent on 4S *Rectify prior to cargo operations*
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2018
Resolution: Vessel replaced all flame screens with proper material. Rectified to satisfaction of class and CG
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 24 August 2018 Resolved
PSCO observed missing variable nozzles at 02 fire stations and missing spanner wrenches at 03 fire stations. *Rectify prior to cargo ops.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2018
Resolution: replaced to the satisfaction of class and CG
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 24 August 2018 Resolved
PSCO observed 07 starboard tank gauging port leaking cargo vapors to the atmosphere. 07 starboard gauging port’s stop valve was defective. *Rectify prior to cargo ops.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2018
Resolution: Vessel repaired valve to satisfaction of Class and CG
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 August 2018 Resolved
The high expansion foam concentrate storage tank has ship-generated instructions posted that conflict with the manufacturers instructions posted at the activation panel. Specifically the ships instructions require the user to activate the foam liquid pump in between the systems standby and discharge modes. The manufacturers instructions do not require the manual activation of the foam supply pump prior to discharge. Additionally the sequence of steps for the starting of the emergency fire pump and placing the system into standby mode are different on the 2 sets of instructions. *Rectify prior to cargo ops.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2018
Resolution: vessel removed extra set of instructions to avoid confusion to satisfaction of class and CG
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 24 August 2018 No resolution recorded
Vessel has not conducted 1.5 times MAWP test in over 3 years. Vessel shall be limited to maximum pressure of 9.9kg/cm2 until a 1.5 times MAWP test is conducted.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 24 August 2018 Resolved
Vessel did not have MAWP marked; instead had test pressure marked on piping. *Rectify prior to cargo ops.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2018
Resolution: Vessel removed test pressure and replaced with MAWP on the cargo pipes to the satisfaction of class and CG.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 1 April 2005 Resolved
1) Deficiency issued Vessel's Fire fighting ensambles were in a deteriated condition. Prior to 04 April 2005 have master send attestation that 4 new fire suits that meet SOLAS II-2 Reg 17 are on board.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 April 2005
Resolved 3 April 2005
Resolution: Master sent attestation at 0817, 04 April 2005 by fax that on 03 April 2005 at 1830 4 fire suits from Dongtai City, Jianghai Lifesaving & Fire-fighting Equipment Limited Company Model DTXF-93-I; Serial Nos. 040937, 040938, 041043, 041044 were delivered

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.