Records from 1993 to 2019. Most recent: inspection, 30 December 2019.
Inspection history · 29
30 December 2019
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6880748
25 October 2017
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6293848
5 October 2017
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6298811
20 July 2017
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6208661
14 July 2017
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6216396
7 June 2016
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5899743
20 May 2016
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5881765
11 January 2016
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5795184
7 January 2016
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5793096
20 June 2014
Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4892944
5 June 2014
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4880136
6 June 2012
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4374771
18 January 2011
Deadweight Survey
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3928466
5 January 2011
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3920830
6 April 2000
Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1404946
30 March 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1433465
20 April 1998
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 791237
19 March 1998
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 787599
13 March 1998
Hull Examination · MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1108773
17 December 1996
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1093485
24 August 1995
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 876833
10 August 1995
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1191745
4 November 1994
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 865831
22 July 1994
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 180401
16 February 1994
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 853699
19 May 1993
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 158886
29 March 1993
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1148050
12 February 1993
Initial Certification
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 831667
25 January 1993
Initial Construction-Excluding Oversight · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1144610
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 20 July 2017
Resolved
Replace retro-reflective tape on 6 child and 3 adult PFDs.
Action required: 705 - Other - as specified
Due 27 July 2017
Resolved 27 July 2017
Resolution: Retro tape was renewed.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 20 July 2017
Resolved
Provide 3-6 foot lanyard with corrossion resistant clip for lifebuoy waterlight.
Action required: 705 - Other - as specified
Due 27 July 2017
Resolved 27 July 2017
Resolution: Lanyard was provided.
Engineering › Sea-water System (primary cooling) › Piping
Issued 20 July 2017
No resolution recorded
Show proper operation of engine cooling water temperature gauges.
Action required: 705 - Other - as specified
Due 3 August 2017 — due date passed with no resolution recorded
Construction/Loadline › Structures › Superstructure
Issued 20 July 2017
Resolved
Provide repair proposal for cracks in way of helm structure.
Action required: 705 - Other - as specified
Due 3 August 2017
Resolved 25 August 2017
Resolution: Vessel repaired cracks to satisfaction of attending MI.
Engineering › Shafting/Propeller Arrangements › Strut
Issued 7 June 2016
Resolved
Repair or replace port propeller strut.
Action required: 705 - Other - as specified
Due 21 June 2016
Resolved 15 June 2016
Resolution: Received report of strut repair.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 7 June 2016
Resolved
Check port propeller shaft for trueness.
Action required: 705 - Other - as specified
Due 21 June 2016
Resolved 15 June 2016
Resolution: Received report of shaft inspection.
Construction/Loadline › Structures › Superstructure
Issued 7 June 2016
Resolved
Replace rotted deck beam in way of fwd port compartment.
Action required: 705 - Other - as specified
Due 21 June 2016
Resolved 15 June 2016
Resolution: Deack beam replaced.
Construction/Loadline › Penetrations › Valve Flange
Issued 20 May 2016
Resolved
Replace pipe or provide cap on sea valve at fwd port space.
Due 6 June 2016
Resolved 12 June 2016
Resolution: Pipe capped with threaded cap.
Engineering › Bilge Water Management System › Valve
Issued 20 May 2016
Resolved
Provide positive shut-off valves at all overboard discharge through hull fittings for bilge system.
Due 6 June 2016
Resolved 7 June 2016
Resolution: Positive shut-off valves installed.
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 20 May 2016
Resolved
Replace missing motor mount nut on port side MDE.
Action required: 705 - Other - as specified
Due 6 June 2016
Resolved 7 June 2016
Resolution: Nut replaced and tightened.
Electrical › Electric Supply System (service) › Battery Installation Ventilation
Issued 20 May 2016
Resolved
Provide ventilation for battery storage box.
Action required: 705 - Other - as specified
Due 6 June 2016
Resolved 7 June 2016
Resolution: Vents installed.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 20 May 2016
Resolved
Properly secure STBD raw water strainer.
Action required: 705 - Other - as specified
Due 6 June 2016
Resolved 7 June 2016
Resolution: Strainer properly secured.
Sail Rigging › Deck Hardware › Furling Gear
Issued 20 May 2016
Resolved
Repair stripped bolt on headsail roller furler.
Action required: 705 - Other - as specified
Due 6 June 2016
Resolved 7 June 2016
Resolution: Bolt properly tightened.
Engineering › Steering Gear System › Rudder Stock
Issued 20 May 2016
Resolved
Replace cracked couplers on rudder stock.
Action required: 705 - Other - as specified
Due 6 June 2016
Resolved 7 June 2016
Resolution: Both couplers replaced.
Sail Rigging › Catamaran › Crossbeam
Issued 7 January 2016
Resolved
Provide damage survey and repair proposal for broken A-Frame and crossbeam damage.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 February 2016
Resolved 15 February 2016
Resolution: Vessel repaired in accordance with approved plans from Gold COast Yachts.
Stability › Unintentional Flooding › General
Issued 5 January 2011
Resolved
Prior to carrying passengers, seal all watertight bulkhead penetrations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 January 2011
Resolved 1 June 2011
Stability › Unintentional Flooding › General
Issued 5 January 2011
Resolved
Prior to carrying passengers, provide and install non-plastic device to seal collision bulkhead access, port and stbd.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 January 2011
Resolved 1 June 2011
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 5 January 2011
Resolved
Prior to carrying passengers, provide and re-install structural fire protection for port and stbd engine room deck overhead as per original USCG Approved construction drawing..
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 January 2011
Resolved 1 June 2011
Engineering › Fuel Oil Service System › Filter
Issued 5 January 2011
Resolved
Prior to carrying passengers, provide and install flame shield for RACOR Fuel Oil Filter/Separator Unit located in port and stbd engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 January 2011
Resolved 1 June 2011
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 January 2011
Resolved
Prior to carrying passengers, provide and install four (4) inch rail courses or equivalent at main deck railings as per 46 CFR 177.900(g)(1)(iii).
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 January 2011
Resolved 1 June 2011
Construction/Loadline › Hull › Hull Plating
Issued 5 January 2011
Resolved
Due to break in service, the vessel must comply with the regulations of 46 CFR Part 177. Submit all required vessel plans, drawings, specifications and/or documentation required to the Commanding Officer, U. S. Coast Guard Marine Safety Center, 2100 2nd St., Stop 7102, Washington, DC 20593-7102.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 January 2011
Resolved 1 June 2011
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 6 April 2000
Resolved
INSTALL A COAST GUARD APPROVED FIXED FIRE FIGHTING SYSTEM IN PORT AND STARBOARD ENGINE ROOMS TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 7 May 2000
Resolved 1 June 2011
Engineering › Steering Gear System › Rudder
Issued 6 April 2000
Resolved
MAKE PERMANENT REPAIRS TO PORT RUDDER, PROPELLER SHAFT, AND STERN TUBE BEARING.
Condition: Unknown
Due 7 May 2000
Resolved 5 January 2011
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 6 April 2000
Resolved
PROVIDE USCG APPROVED PORTABLE FIRE EXTINGUISHERS AS PER COI.
Condition: Unknown
Due 7 May 2000
Resolved 1 June 2011
Lifesaving
Issued 13 March 1998
Resolved
Provide 2 paddles for each lifefloat stencilled with vessel's name.
Condition: Unknown
Due 20 March 1998
Resolved 24 March 1998
Navigation
Issued 13 March 1998
Resolved
Install separate sidelights or relocate combination light to top of the mast to comply with rule 25 of Nav Rules.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Lifesaving
Issued 13 March 1998
Resolved
Renew battery in EPIRB.
Condition: Unknown
Due 20 March 1998
Resolved 24 March 1998
Construction/Loadline
Issued 4 November 1994
Resolved
Replace 6 plastic thru-hulls located within 6 inches of the waterline. Install metal valves inboard of the thru-hulls.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
Repair cracks in rigid canopy where canopy attaches to hull aft.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Accommodation/Occupational Safety
Issued 4 November 1994
Resolved
Repair cracks in steps of diver access ladder.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
Repair broken #5 port railing stanchion.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Accommodation/Occupational Safety
Issued 4 November 1994
Resolved
repipe both toilet overboard systems.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
Reroute electric bilge pump overboard line to eliminate crimp.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Construction/Loadline
Issued 4 November 1994
Resolved
Tighten all loose stanchions.
Condition: Unknown
Due 4 November 1994
Resolved 4 November 1994
Construction/Loadline
Issued 12 February 1993
Resolved
MARK VESSEL NAME ON STERN.
Condition: Unknown
Due 12 February 1993
Resolved 12 February 1993
Construction/Loadline
Issued 12 February 1993
Resolved
REPLACE SHORT SECTIONS OF FLEX HOSE IN RAW WATER LINES WITH PROPER FITTINGS.
Condition: Unknown
Due 12 February 1993
Resolved 12 February 1993
Engineering
Issued 12 February 1993
Resolved
INSTALL FLAME SHIELDS ON RACOR FUEL FILTERS.
Condition: Unknown
Due 12 February 1993
Resolved 12 February 1993
Engineering
Issued 12 February 1993
Resolved
INSTALL GROUND WIRE BETWEEN FUEL FILL FITTING AND FUEL TANK.
Condition: Unknown
Due 12 February 1993
Resolved 12 February 1993