Records from 1992 to 2004. Most recent: inspection, 16 July 2004.
Inspection history · 6
16 July 2004
NPV Safety Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2135274
12 August 2003
MARPOL Annex I Examination · Uninspected Towing Vessel · MARPOL Annex V Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1874912
1 May 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1747698
17 May 1996
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 16672
30 November 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 690037
5 November 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 444194
Documentation › Certificates/Documents
Issued 12 August 2003
Resolved
Provide valid IOPP certificate. IOPP certificate to be obtained through class/administration concluding a complete MARPOL I survey. 33 CFR 151.19(b). LEGACY COMPONENT DESC: IOPP Certificate
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 12 August 2003
Resolved 2 September 2003
Resolution: Based on a letter from the vessel''s administration (Transport CA), the vessel uses it''s "existing tonnage" which is reads 394 GRT vice 461 ITC, the vessel is not required to have an IOPP certificate.
Pollution Prevention/Response › Prevention Equipment
Issued 12 August 2003
Resolved
Provide a standard discharge connection. Standard discharge connection to be fitted with proper containment. 33 CFR 15.430. LEGACY COMPONENT DESC: Standard Discharge Connection
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 12 August 2003
Resolved 2 September 2003
Resolution: Based on a fax from Pacific [name withheld], [name withheld], the vessel now possesses a standard discharge connection.
Documentation › Safety/Response Plans/Programs
Issued 12 August 2003
Resolved
Obtain class/administration approval for Shipboard Oil Pollution Emergency Plan (SOPEP). 33 CFR 151.26/33 CFR 151.29. LEGACY COMPONENT DESC: SOPEP
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Due 12 August 2003
Resolved 2 September 2003
Resolution: Based on a letter from the vessel''''s administration (Transport CA), the vessel uses it''''s "existing tonnage" which is reads 394 GRT vice 461 ITC, the vessel is not required to have an "approved" SOPEP.
Documentation › Logs/Records
Issued 12 August 2003
Resolved
Provide oil record book with entries following required format. 33 CFR 151.25. LEGACY COMPONENT DESC: Oil Record Book
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 12 August 2003
Resolved 2 September 2003
Resolution: Based on a fax from Pacific [name withheld], [name withheld], the vessel possesses a new oil record book as required.
Pollution Prevention/Response › Prevention Equipment
Issued 12 August 2003
Resolved
MSD Type III failed to have some means of securing the valve for the overboard discharge port. Valve was discovered in the open position. 33 CFR 159.7(c). LEGACY COMPONENT DESC: Marine Sanitation Device, Type III
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Due 12 August 2003
Resolved 2 September 2003
Resolution: Based on a fax from Pacific [name withheld], [name withheld], the vessel''s MSD pipeline valves have been repaired and is operating as designed.
Accommodation/Occupational Safety › Occupational Safety
Issued 12 August 2003
Resolved
Make proper repairs to starboard railing on upper deck as noted. Repair emergency lighting in steering compartment. ILO-147. LEGACY COMPONENT DESC: Deck Rail
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 12 August 2003
Resolved 2 September 2003
Resolution: Based on a fax from Pacific [name withheld], [name withheld], the vessel railing has been repaired.
Lifesaving › Inflatable Liferafts
Issued 12 August 2003
Resolved
Make both liferafts float-free with proper weak link attached to painter as required. 46 CFR 25. LEGACY COMPONENT DESC: Hydrostatic Release Unit
Condition: Placed in Improper Service
Action required: 15 - Rectify deficiencies by next port
Due 12 August 2003
Resolved 2 September 2003
Resolution: Based on a fax from Pacific [name withheld], [name withheld], the vessel liferafts are now in proper a float free arrangment.