FAITH

FAITH is a 1975 freight ship. The Coast Guard has recorded 30 inspections since 1988, most recently in February 2024, along with 97 deficiencies and 9 operational controls.

Records from 1988 to 2024. Most recent: inspection, 5 February 2024.

Built
1975
Last inspected
5 February 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7406722 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
HO-2178
384678
Flag
PANAMA
—
Maury page id
psix-384678

Inspections, by type

…with no type recorded24
Years with a record 12 calendar years (1988–2024)
The 30 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it287 - Regulatory (Subpart C or D), Gross Ton
303 - Convention (Subpart B), Gross Ton
242 - Regulatory (Subpart C or D), Net Ton
145 - Convention (Subpart B), Net Ton
440 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 30

5 February 2024 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7860831
12 March 2004 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2023495
4 September 2003 Periodic Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1896384
10 July 2003 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1841534
4 September 2002 Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1670457
6 December 2001 Type not recorded
No type recorded · USCGC CHANDELEUR (WPB 1319) · USCG Arctic District (CGD-A) · Activity 1620329
15 September 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 293369
27 August 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 157747
23 July 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 292173
2 May 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 289551
24 March 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 286368
28 February 1998 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 413097
31 December 1997 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 410586
2 December 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 398061
8 October 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 396327
5 September 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 394380
14 February 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 387924
17 October 1995 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 383847
15 March 1995 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 376250
22 August 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 369728
16 August 1994 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 871585
15 June 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 691248
17 May 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 366970
12 April 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 520420
12 March 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 366390
10 August 1993 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 691249
20 July 1993 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 360128
25 February 1993 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 691250
29 January 1993 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 356077
5 May 1988 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 323407

Deficiency record · 97

Lifesaving
Issued 12 March 2004 Resolved
Liferafts need servicing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Lifesaving
Issued 12 March 2004 Resolved
EPIRB does not work.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Engineering
Issued 12 March 2004 Resolved
Fire main does not work.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Fire Fighting
Issued 12 March 2004 Resolved
Emergency fire pump and emergency generators do not work.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 March 2004
Resolved 26 March 2004
Fire Fighting
Issued 12 March 2004 Resolved
Portable fire extinguishers need servicing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Communications
Issued 12 March 2004 Resolved
VHF radio(s) missing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Lifesaving
Issued 12 March 2004 Resolved
Provide SART
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Pollution Prevention/Response
Issued 12 March 2004 Resolved
Remove oily waste from bilges and provide RECEIPT.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Accommodation/Occupational Safety
Issued 12 March 2004 Resolved
Remove excess combustibles from engine room, numerous boxes and items through engine room. Housekeeping is a disaster.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 March 2004
Engineering
Issued 12 March 2004 Resolved
Make permanent and proper repairs to soft patches in main engine AND through engine room.
Action required: 15 - Rectify deficiencies by next port
Resolved 26 March 2004
Construction/Loadline › Structures
Issued 12 March 2004 Resolved
Provide gauging report for all of the main deck from stem to stern and send copy to MSO Miami. LEGACY COMPONENT DESC: Deck Plating
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 22 March 2004
Resolved 26 March 2004
Construction/Loadline › Structures
Issued 12 March 2004 Resolved
Crop out all wasted areas on main deck to good metal and renew plating to the satifaction of the flag administration. LEGACY COMPONENT DESC: Deck Plating
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 22 March 2004
Resolved 26 March 2004
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 12 March 2004 Resolved
Renew muffler and pipe on starboard side fore peak aft - to emergency generator. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 March 2004
Resolved 24 March 2004
Documentation › Certificates/Documents
Issued 12 March 2004 Resolved
Conduct survey IAW the ILLC and have report sent to MSO Miami. LEGACY COMPONENT DESC: International Load Line Certificate
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 22 March 2004
Resolved 5 February 2024
Resolution: 5FEB23:Cleared open def's from activities# 1670457 & 2023495. After MISLE review these open defs should have been closed from previous activities. From activity #2023495 "31Mar04 - Attended vsl to clear defs. All defs cleared. Vsl sold in auction and
Pollution Prevention/Response › Prevention Equipment
Issued 12 March 2004 Resolved
Properly repair portside fuel vent and sounding tube containment opening to secure properly. LEGACY COMPONENT DESC: Fixed Containment
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 22 March 2004
Resolved 26 March 2004
Documentation › Certificates/Documents
Issued 12 March 2004 Resolved
Vessel does not hold a valid COFR.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 February 2024
Resolution: 5FEB23:Cleared open def's from activities# 1670457 & 2023495. After MISLE review these open defs should have been closed from previous activities. From activity #2023495 "31Mar04 - Attended vsl to clear defs. All defs cleared. Vsl sold in auction and
Documentation › Certificates/Documents
Issued 15 March 2003 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2003
Resolved 18 March 2003
Resolution: Vessel has decided to have a second licensed engineer onboard permanently.
Personnel › Manning/Qualifications
Issued 4 September 2002 Resolved
Man vessel in accordance with safe manning document. LEGACY COMPONENT DESC: Minimum Safe Manning
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Documentation › Certificates/Documents
Issued 4 September 2002 Resolved
Have flag state address safe manning document. Provide in accordance with the requirements of STCW. LEGACY COMPONENT DESC: Minimum Safe Manning Document
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Documentation › Certificates/Documents
Issued 4 September 2002 Resolved
Provide all original certifications/ documents for vessel to MSO Miami office.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Documentation › Certificates/Documents
Issued 4 September 2002 Resolved
Flag state to complete annual survey for ccssc and provide report to MSO Miami Office.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Deck/Cargo › Holds/Tanks
Issued 4 September 2002 Resolved
Remove all waste oil from cargo hold and engine room bilge by approved facility. Provide receipts of removal to MSO Miami Office.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Engineering › Sea-water System (primary cooling)
Issued 4 September 2002 Resolved
Remove hose that is connected to main engine raw water discharge pipe. LEGACY COMPONENT DESC: Piping
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Construction/Loadline › Markings
Issued 4 September 2002 Resolved
Have flag state address load line markings and draft markings on hull. LEGACY COMPONENT DESC: Load Line Mark
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Documentation › Certificates/Documents
Issued 4 September 2002 Resolved
Have flag state complete load line periodical inspection and provide report to MSO Miami Office. LEGACY COMPONENT DESC: International Load Line Certificate
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Documentation › Certificates/Documents
Issued 4 September 2002 Resolved
Provide ship radio station license and ship's registry due to both certificates expiring 10DEC2002. LEGACY COMPONENT DESC: Cargo Ship Safety Radio Certificate
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 March 2003
Construction/Loadline › Structures
Issued 4 September 2002 Resolved
Fiberglass covering on rescue boat deck of supersturcture. Coverage is approximately 20' X 20'. Remove feberglass, doublers and wasted steel. Make permnanent/proper (steel) repairs to deck. LEGACY COMPONENT DESC: Superstructure
Action required: 705 - Other - as specified
Due 15 March 2003
Resolved 8 April 2003
Resolution: Resolved with doublers, but to be permanently repaired in the drydock.
Stability › Watertight Integrity
Issued 4 September 2002 Resolved
Hatch combing on focsle, starboard side, is holed on the base of the combing. Make permanent/proper repairs to combing. apxy, silicone, and "Bondo" is not a permanent repair. (Steel) LEGACY COMPONENT DESC: Hatch Combing
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2003
Resolved 8 April 2003
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 4 September 2002 Resolved
Large CO2 extinguisher in engine room next to switchboard is missing mounting bracket. Provide and mount bracket for extinguisher. Hose for extinguisher is also missing. LEGACY COMPONENT DESC: Mounting Bracket
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2003
Resolved 8 April 2003
Electrical › Electric Supply System (service)
Issued 4 September 2002 Resolved
Bettery box under generator is missing cover. Replace missing cover. LEGACY COMPONENT DESC: Battery Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2003
Resolved 8 April 2003
Engineering › Sea-water System (primary cooling)
Issued 4 September 2002 Resolved
Main engine saltwater discharge pipe has temp repair (Soft Patch). Make permanent/proper repairs to piping. LEGACY COMPONENT DESC: Piping
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2003
Resolved 8 April 2003
Construction/Loadline › Penetrations
Issued 4 September 2002 Resolved
Aft peak tank discharge pipe is severed and plugged with a rag. Seal or close pipe using permanent/proper repairs. LEGACY COMPONENT DESC: Pipe Flange
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2003
Resolved 8 April 2003
Navigation › Piloting/Steering
Issued 4 September 2002 Resolved
Magnetic compass deviation table has expired. Update deviation table prior to entry into next U.S. Port. LEGACY COMPONENT DESC: Compass Deviation Table
Action required: 15 - Rectify deficiencies by next port
Due 15 March 2003
Resolved 4 September 2002
Fire Fighting › Fire Pumps
Issued 4 September 2002 Resolved
Fire main pressure was not adequate due to worn belts on fire pump. Make permanent repairs to fire pump. LEGACY COMPONENT DESC: Pressure
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2003
Resolved 18 March 2003
Resolution: Tested onboard sat.
Documentation › Certificates/Documents
Issued 4 September 2002 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Placed in Improper Service
Due 7 April 2003
Resolved 5 February 2024
Resolution: 5FEB23:Cleared open def's from activities# 1670457 & 2023495. After MISLE review these open defs should have been closed from previous activities. From activity #2023495 "31Mar04 - Attended vsl to clear defs. All defs cleared. Vsl sold in auction and
Construction/Loadline › Structures
Issued 4 September 2002 Resolved
Provide weathertight closures for newly installed vents in aft bulkhead in pilot house. LEGACY COMPONENT DESC: Ventilators
Condition: Placed in Improper Service
Due 1 May 2003
Resolved 15 September 2003
Construction/Loadline
Issued 15 September 2001 Resolved
Provide a guard for belt on main fire pump.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Engineering
Issued 15 September 2001 Resolved
Repair fuel leak from day tank.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Deck/Cargo
Issued 15 September 2001 Resolved
Secure all on deck.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Unknown
Issued 15 September 2001 Resolved
Remove all garbage on deck.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Electrical
Issued 15 September 2001 Resolved
Secure all loose wiring throughout engine room and ship.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Construction/Loadline
Issued 15 September 2001 Resolved
Remove oily waste water from bilge and provide reciept to USCG.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Documentation
Issued 15 September 2001 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Lifesaving
Issued 15 September 2001 Resolved
Provide rescue boat engine.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Lifesaving
Issued 15 September 2001 Resolved
Properly install hydrostatic release units on liferafts.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Documentation
Issued 15 September 2001 Resolved
Provide a crew list.
Condition: Unknown
Due 16 September 2001
Resolved 16 September 2001
Unknown
Issued 2 May 2001 Resolved
Provide survey report attesting to the proper operation of the emergency generator ventalation system.
Condition: Unknown
Due 23 July 2001
Resolved 23 July 2001
Electrical
Issued 2 May 2001 Resolved
Make repairs to emergency generator ventalation system.
Condition: Unknown
Due 23 July 2001
Resolved 23 July 2001
Documentation
Issued 24 March 2001 Resolved
Prior to loading and departure provide properly licensed master and chief officer for size of vessel.
Condition: Unknown
Due 25 March 2001
Resolved 25 March 2001
Lifesaving
Issued 24 March 2001 Resolved
Prior to departure prove proper operation of rescue boat winch and davit
Condition: Unknown
Due 25 March 2001
Resolved 25 March 2001
Fire Fighting
Issued 24 March 2001 Resolved
Prior to loading and departure conduct satisfactory fire fighting drill with attending Coast Guard Marine Inspector.
Condition: Unknown
Due 25 March 2001
Resolved 25 March 2001
Deck/Cargo
Issued 24 March 2001 Resolved
Prior to use in US waters provide containment for STBD side lube oil fill.
Condition: Unknown
Due 3 May 2001
Resolved 3 May 2001
Lifesaving
Issued 24 March 2001 Resolved
Prior to next US port repair general alarm bell aft of bridge.
Condition: Unknown
Due 3 May 2001
Resolved 3 May 2001
Navigation
Issued 24 March 2001 Resolved
Prior to next US port prove proper operation of steering gear failure alarms.
Condition: Unknown
Due 3 May 2001
Resolved 3 May 2001
Deck/Cargo
Issued 24 March 2001 Resolved
Prior to next US port provide guards for all machinery in EMG Gen space.
Condition: Unknown
Due 23 July 2001
Resolved 23 July 2001
Navigation
Issued 24 March 2001 Resolved
Prior to next US port, and after drydock provide current deviation table
Condition: Unknown
Due 23 July 2001
Resolved 23 July 2001
Navigation
Issued 28 February 1998 Resolved
Provide daylight signaling lamp.
Condition: Unknown
Due 28 February 1998
Resolved 2 March 1998
Electrical
Issued 28 February 1998 Resolved
Provide non-conductive matting in front of emergency generator.
Condition: Unknown
Due 28 February 1998
Resolved 2 March 1998
Lifesaving
Issued 28 February 1998 Resolved
Show proper operation of rescue boat engine.
Condition: Unknown
Due 28 February 1998
Resolved 2 March 1998
Lifesaving
Issued 28 February 1998 Resolved
Provide proper cradle for liferafts so they do not have to be tied down while underway.
Condition: Unknown
Due 28 February 1998
Resolved 2 March 1998
Accommodation/Occupational Safety
Issued 28 February 1998 Resolved
Provide first-aid kit for vessel's crew.
Condition: Unknown
Due 28 February 1998
Resolved 2 March 1998
Navigation
Issued 28 February 1998 Resolved
Provide compass deviation table.
Condition: Unknown
Due 28 February 1998
Resolved 2 March 1998
Documentation
Issued 28 February 1998 Resolved
Prior to loading cargo above deck, provide loading calculations for above deck in stability book.
Condition: Unknown
Due 28 February 1998
Resolved 2 March 1998
Fire Fighting
Issued 31 December 1997 Resolved
Prior to 01JAN98, provide an operational emergency firepump IAW the CCSSC.
Condition: Unknown
Due 1 January 1998
Resolved 31 December 1997
Deck/Cargo
Issued 31 December 1997 Resolved
Prior to departure, provide proper replacement for undersized port and starboard anchor chains.
Condition: Unknown
Due 31 December 1997
Resolved 31 December 1997
Fire Fighting
Issued 31 December 1997 Resolved
Prior to loading cargo, prove proper operation of the vessel's fireman system; insure that the system can produce sufficient water pressure.
Condition: Unknown
Due 31 December 1997
Resolved 31 December 1997
Documentation
Issued 31 December 1997 Resolved
Prior to 01JAN98, submit evidence from the vessels flag government or authorized class society that the ships design meets a recognized class society standard as required by the CCSSC.
Condition: Unknown
Due 1 January 1998
Resolved 31 December 1997
Documentation
Issued 31 December 1997 Resolved
Prior to departure, provide flag government issued licenses for the Chief Mate and Chief Engineer.
Condition: Unknown
Due 31 December 1997
Resolved 31 December 1997
Navigation
Issued 31 December 1997 Resolved
Prior to departure, provide on board NOAA chart 11468 with corrections.
Condition: Unknown
Due 31 December 1997
Resolved 31 December 1997
Navigation
Issued 31 December 1997 Resolved
Prior to departure, provide on board day shapes.
Condition: Unknown
Due 31 December 1997
Resolved 31 December 1997
Documentation
Issued 31 December 1997 Resolved
Prior to 01JAN98, submit workplan showing the owners plan for bringing the vessel into compliance with the CCSSC.
Condition: Unknown
Due 1 January 1998
Resolved 31 December 1997
Lifesaving
Issued 31 December 1997 Resolved
Prior to return to U.S. waters, demonstrate proper launching of the vessel's rescue boat.
Condition: Unknown
Due 25 February 1998
Resolved 25 February 1998
Documentation
Issued 31 December 1997 Resolved
Prior to 01JAN98, obtain a Caribbean Cargo Ship Safety Code Certificate.
Condition: Unknown
Due 25 February 1998
Resolved 25 February 1998
Lifesaving
Issued 31 December 1997 Resolved
Prior to return to U.S. waters, provide documentation from flag state or certified class society that rescue boat launching appliance meets the requirements of the CCSSC.
Condition: Unknown
Due 25 February 1998
Resolved 25 February 1998
Lifesaving
Issued 8 October 1996 Resolved
PROVIDE A RADAR TRANSPONDER.
Condition: Unknown
Due 8 October 1996
Resolved 25 October 1996
Electrical
Issued 8 October 1996 Resolved
PROVIDE GUARDS AND GLOBES FOR LIGHT IN ENGINE ROOM.
Condition: Unknown
Due 2 December 1996
Resolved 2 December 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE GUARDS AND GLOBES FOR LIGHTING IN ENGINE ROOM.
Condition: Unknown
Due 8 January 1997
Resolved 14 January 1998
Unknown
Issued 5 September 1996 Resolved
PROVE NAV LIGHT MEET COLREGS (CANDALE POWER AS PER COLREGS ON PAGE 140) ORREPLACE.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
REPLACE BURNED OUT LIGHT BULBS IN ACCOMMODATIONS.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE SOLAS RETRO TAPE FOR LIFE RINGS.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE BELT FOR EMERGENCY FIRE PUMP.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE MEDICAL CERTS. ISSUED BY FLAG STATE.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE A HOSE, NOZZEL AND SPANNER WRENCH AT EACH FIRE STATION.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
HARD WIRE LIGHT INTO COMPASS.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE FLAME SCREENS ON ALL FUEL VENTS, 30 X 30 MESS.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE A RADAR TRANSPONDER.
Condition: Unknown
Due 8 November 1996
Resolved 11 October 1996
Unknown
Issued 5 September 1996 Resolved
PROVIDE MEANS OF SECURING VAULVE ON MSD IN THE CLOSED POSITION.
Condition: Unknown
Due 8 October 1996
Resolved 11 October 1996
Documentation
Issued 17 October 1995 Resolved
Vsl was required to provide proof of adequate manning from the flag state. ref: SOLAS CH III, reg. 26.
Condition: Unknown
Due 25 October 1995
Resolved 25 October 1995
Navigation
Issued 17 October 1995 Resolved
Vsl was required to provide onboard currently corrected Savannah entrance chart #11512, Coast Pilot vol-4 and Light List vol-III. _x001C_ ref: SOLAS CH V, reg. 20.
Condition: Unknown
Due 23 October 1995
Resolved 25 October 1995
Construction/Loadline
Issued 17 October 1995 Resolved
Vsl was required to repair four ballast vent closure devices. (missing checkballs)_x001C_ ref: ILC 1966, reg. 20
Condition: Unknown
Due 24 October 1995
Resolved 25 October 1995
Engineering
Issued 17 October 1995 Resolved
Vsl was required to install proper insulation on generator exhaust piping._x001C_ref: SOLAS CH II, reg. 20
Condition: Unknown
Due 23 October 1995
Resolved 25 October 1995
Lifesaving
Issued 17 October 1995 Resolved
Vsl was required to provide onboard proof of current life raft service report for Stbd raft #4061. _x001C_ ref: SOLAS CH III, reg. 19
Condition: Unknown
Due 23 October 1995
Resolved 25 October 1995
Documentation
Issued 12 March 1994 Resolved
The Margarita IV, a vessel with greater than 10,000 gallons oil capacity, failed to provide oil transfer procedures.
Condition: Unknown
Due 17 May 1994
Resolved 18 May 1994
Documentation
Issued 12 March 1994 Resolved
The Margarita IV, a vessel with greater than 10,000 gallons oil capacity, failed to complete a DOI prior to conducting an oil transfer. Further, the vesslel conducted a transfer without completing a DOI.
Condition: Unknown
Due 17 May 1994
Resolved 18 May 1994
Documentation
Issued 20 July 1993 Resolved
A violation of 46 C.F.R. 42.15-1 in that the "NEW VESSEL" stability information was not available to the master. Vessel subject to U.S. regulations as per 46 C.F.R. 2.01-13(b). This is the second violation.
Condition: Unknown
Due 18 May 1994
Resolved 18 May 1994
Documentation
Issued 29 January 1993 Resolved
A violation of 46 C.F.R. 42.15-1 in that the "NEW VESSEL" stability information was not availible to the master. Vessel subject to U.S. regulations as per 46 CFR 2.01-13(b).
Condition: Unknown
Due 18 May 1994
Resolved 18 May 1994
Accommodation/Occupational Safety
Issued 29 January 1993 Resolved
The Margarita, a vessel with two installed toilets, failed to have an operable Marine Sanitation Device installed. The present system is piped directly over the side and into the waterway.
Condition: Unknown
Due 18 May 1994
Resolved 18 May 1994

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.