Records from 2016 to 2025. Most recent: inspection, 22 May 2025.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 April 2021
No resolution recorded
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel is overdue for dry dock exam as of 31Jan2021.
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 April 2021 — due date passed with no resolution recorded
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 5 February 2020
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: All 3 high water level had no light and signal. 46CFR182.530(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2020
Resolution: Sat
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 5 February 2020
Resolved
Vessel has no evidence of a DAPI enrolment and does not meet the minimum standard Employers must ensure that they and their crew members meet the requirements of 46CFR16 as required by 46CFR16.203.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 February 2020
Resolution: Sat
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 5 February 2020
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. EPIRB Battery expired on September 2019. 46CFR180.68
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 February 2020
Resolution: Onboard, Sat
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 5 February 2020
Resolved
Oceans, coastwise, limited coastwise, and Great Lakes routes. A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant; and (2) Six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. Vessel only has Six hand red flare distress signals.46CFR180.68(a
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 February 2020
Resolution: Onboard, Sat
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 5 February 2020
Resolved
This part prescribes regulations governing the design and construction of marine sanitation devices and procedures for certifying that marine sanitation devices meet the regulations and the standards of the Environmental Protection Agency promulgated under section 312 of the Federal Water Pollution Control Act (33 U.S.C. 1322), to eliminate the discharge of untreated sewage from vessels into the waters of the United States, including the territorial seas. Subpart A of this part contains regulations governing the manufacture and operation of vessels equipped with marine sanitation devices. Sewage discharge valve in overboard position. 33CFR159.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 February 2020
Resolution: Valve was switched to closed and locked. Sat
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 5 February 2020
Resolved
Each life float and buoyant apparatus must be individually attached to the painter by a line meeting § 180.175(e)(3) (ii), (iii), and (iv) and long enough that each life float or buoyant apparatus can float without contacting any other life float or buoyant apparatus in the group. Lifefloats did not have line attaching each lifefloat. 46CFR180.137(e)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 February 2020
Resolution: Corrected, Sat
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 5 February 2020
Resolved
Painter. The painter must Be of at least 30.5 meters (100 feet) in length, but not less than 3 times the distance between the deck where the life float or buoyant apparatus it serves is stowed and the lowest load waterline of the vessel. Vessel did not have 100 feet of painter line. 46CFR180.175(f)(3)(i)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 February 2020
Resolution: Sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 March 2019
Resolved
Vessels port and Starboard Fuel shutoff valves are not working as required by 46CFR182.455(b)(4).Vessel must correct prior to the carriage of passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2019
Resolution: Onsite verification Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 March 2019
Resolved
Reflective tape install retro reflective tape in way of all life ring buoys on the vessel in accordance with 46 CFR 180.70. Vessel must correct prior to the carriage of passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Onsite verification Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 21 March 2019
Resolved
Vessel needs 3 (160.021) hand red flares as required by 46 CFR180.68(a). Vessel must correct prior to the carriage of passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Onsite verification Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 March 2019
Resolved
Vessel is missing 2 Life jacket lights as required by 46 CFR180.75(a) for oceans routes. Vessel must correct prior to the carriage of passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Onsite verification Sat.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 21 March 2019
Resolved
Vessel is required to have DSC function installed on VHF as required by 47CFR80.905 and 46CFR184.502. Ensure correct MMIS number is entered. Vessel must correct prior to the carriage of passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Onsite verification Sat.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 21 March 2019
Resolved
Engine room high level light Vessels high level visual alarm is not working as required by 46 CFR182.530(a). Vessel must correct prior to the carriage of passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Onsite verification Sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 March 2019
Resolved
Vessels Bow bilge pump visual alarm is not working as required by 46CFR 182.530(c). Vessel must correct prior to the carriage of passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2019
Resolution: Onsite verification Sat.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 21 March 2019
Resolved
Vessels first aid kit had expired contents and does not meet 46 CFR 184.710 and 46 CFR 160.041. Replace expired contents. Vessel has 30 days to correct to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2019
Resolved 22 March 2019
Resolution: Onsite verification Sat.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 March 2019
Resolved
Vessel must obtain a Marine radios operator permit as required by 47CFR § 80.159(e)(1) and 46CFR184.502. Vessel has 30 days to correct to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2019
Resolved 13 May 2019
Resolution: Received picture as evidence of MROP, SAT
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 March 2019
Resolved
Obtain a Communications Act Safety Radiotelephony Certificate as required by 47CFR 80.903 and 46CFR184.502. Vessel has 30 days to correct to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2019
Resolved 7 May 2019
Resolution: Received picture as evidence of Communications Act Safety Radiotelephony Certificate, Issued 6MAY19, Expires 6MAY24, Inspectors were unable to attend due to availability
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 21 March 2019
Resolved
Vessels charts, Light List, Tide Tables we’re out of date as required by 46 CFR184.420. Vessel has 30 days to correct to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2019
Resolved 2 May 2019
Resolution: Sat
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 March 2019
Resolved
Engine room wire supports in way of starboard side longitudinal beam Vessels wiring in the engine room in way of starboard side longitudinal beam is not properly supported and does not meet minimum standard as described in 46 CFR 183.340(b)(4). Wiring must be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Vessel has 30 days to correct to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 April 2019
Resolved 2 May 2019
Resolution: Sat
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 23 January 2019
Resolved
Evaluate the areas of delamination, weeping, and Wasted Rub rail, identified below. Provide a repair proposal, listing the materials, procedures and layup intended for repairs that is acceptable to this office to the satisfaction of an attending Coast Guard Marine Inspectors. Proposal must be approved by CG prior to work starting. The following areas were identified and marked in chalk.
1. Delamination of Tabbing Port Side Stem longitudinal.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2019
Resolution: Repairs complete
Construction/Loadline › Hull › Side Shell
Issued 12 September 2017
Resolved
Vessels hull was damaged during Hurricane Irma and does not meet the structural design requirements per 46CFR177.300(c). Provide repair plan proposal to the Coast Guard and receive approval for repairs from the Coast Guard as described in 46CFR176.700 and carry out repairs after approval is received . Vessel restricted from carrying passengers until corrected to the satisfaction of the attending M
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2017
Resolution: Attended vessel, repairs completed cleared the CG-835.
Construction/Loadline › Hull › Bottom Plating
Issued 18 January 2017
Resolved
Provide to the Coast Guard a repair proposal for Crack forward of shaft thru hull including the shaft tube port side.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 20 January 2017
Resolved 9 February 2017
Resolution: Onsite Verification
Construction/Loadline › Hull › Bottom Plating
Issued 18 January 2017
Resolved
Provide to the Coast Guard a repair proposal for Crack forward of shaft thru hull including the shaft tube Starboard side.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 20 January 2017
Resolved 9 February 2017
Resolution: Onsite verification
Construction/Loadline › Hull › Side Shell
Issued 18 January 2017
Resolved
Provide to the Coast Guard a repair proposal for 7 inch crack on starboard side chine aft
Condition: Design Flaw
Due 20 January 2017
Resolved 9 February 2017
Resolution: Onsite Verification
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 18 January 2017
Resolved
Replace Cutlass Bearings both Port and Starboard
Condition: Improper/Lack of Maintenance
Due 20 January 2017
Resolved 2 February 2017
Resolution: Onsite verification
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 3 March 2016
Resolved
Properly renew retro-reflective tape on 15 lifejackets.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 14 March 2016
Resolution: Verified lifejackets contained proper retroreflective tape.
Lifesaving › Lifefloat › Painter
Issued 3 March 2016
Resolved
Properly replace lifefloats painter line.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 14 March 2016
Resolution: Verified installment of new painter life for lifefloats.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 March 2016
Resolved
Properly replace expired First Aid kit expired items.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 14 March 2016
Resolution: Verified contents of first aid kit. Master purchased new kit.
Engineering › Fuel Oil Service System › Valve
Issued 3 March 2016
Resolved
Properly adjust port side emergencyy fuel shutoff.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 March 2016
Resolved 14 March 2016
Resolution: Master ensured shutoff valve was adjusted to properly close valve from emergency handle.
Navigation › Piloting/Steering › Marine Charts
Issued 7 January 2016
Resolved
Provide onboard updated charts areas of operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 March 2016
Resolved 14 March 2016
Resolution: New charts were purchased with last revision August 2015.