Records from 2001 to 2002. Most recent: inspection, 24 April 2002.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Fire Fighting › Emergency Fire Pumps
Issued 24 April 2002
Resolved
Prove proper operation of emergency Fire Pump to the satisfaction of Class prior to departure from the port of Pensacola, FL. LEGACY COMPONENT DESC: Pressure
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2002
Resolution: Received class report dated 09 May 2002 from RINA. CG PSC boarding team attended vessel attesting to repairs.
Engineering › Steering Gear System
Issued 24 April 2002
Resolved
DEF.# 2 issued 27 Feb. 2002 by BRND under activity # 1488852 was not corrected prior to next U.S. port as per port state control boarding dated 01 March 2002. Repair hydraulic leak on # 1 and # 2 steering pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2002
Resolution: Received class report dated 09 May 2002 from RINA. CG PSC boarding team attended vessel attesting to repairs.
Deck/Cargo › Holds/Tanks
Issued 24 April 2002
Resolved
Cargo hatches, numerous doors not water/weather tight. Renew/repair to satisfaction of class. LEGACY COMPONENT DESC: Hatch Cover
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2002
Resolution: Received class report dated 09 May 2002 from RINA. CG PSC boarding team attended vessel attesting to repairs.
Pollution Prevention/Response › Prevention Equipment
Issued 24 April 2002
No resolution recorded
Provide proper fixed containment for fuel oil and bulk lube oil stations. LEGACY COMPONENT DESC: Fixed Containment
Action required: 703 - Prior to bunkering operations
Navigation › Piloting/Steering
Issued 24 April 2002
No resolution recorded
Provide steering gear instructions to include block diagram for bridge and aft steering.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 24 April 2002
Resolved
Provide instructions for the operation of ships fixed CO 2 system in a language understood by the crew. LEGACY COMPONENT DESC: Operating Controls
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 April 2002
Resolution: Received class report dated 09 May 2002 from RINA. CG PSC boarding team attended vessel attesting to repairs.
Lifesaving › Lifeboat
Issued 24 April 2002
Resolved
Affix retro-reflective material to lifeboats to satisfaction of class. LEGACY COMPONENT DESC: Markings
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2002
Resolution: Received class report dated 09 May 2002 from RINA. CG PSC boarding team attended vessel attesting to repairs.
Construction/Loadline › Markings
Issued 24 April 2002
Resolved
Provide class report attesting to proper application of Loadline markings. LEGACY COMPONENT DESC: Load Line Mark
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2002
Resolution: Received class report dated 09 May 2002 from RINA. CG PSC boarding team attended vessel attesting to repairs.
Documentation › Certificates/Documents
Issued 24 April 2002
Resolved
Vessel failed to submit information regarding Ballast water prior to entering U.S. waters. LEGACY COMPONENT DESC: Dedicated Clean Ballast Tanks Amending Letter
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2002
Resolution: Received class report dated 09 May 2002 from RINA. CG PSC boarding team attended vessel attesting to repairs.
Pollution Prevention/Response
Issued 27 February 2002
Resolved
SHIPBOARD OIL POLLUTION EMERGENCY PLAN (SOPEP) NOT PRESENT TO BE CORRECTED PRIOR TO NEXT U.S. PORT.
Action required: 15 - Rectify deficiencies by next port
Resolved 24 April 2002
Resolution: Had new SOPEP on board.
Operations/Management › Dedicated Clean Ballast Tanks
Issued 27 February 2002
Resolved
MISSING BALLAST WATER MANAGEMENT RECORD BOOK PER 33CFR2035(a)(7)
Action required: 15 - Rectify deficiencies by next port
Resolved 1 March 2002
Resolution: MASTER FOUND BALLAST WATER RECORD BOOK.
Construction/Loadline
Issued 16 August 2001
Resolved
ILLC 66 Annex I/15 Cargo hatch gaskets are falling off and have large 2-3"gaps. Item to be corrected prior to return to U.S.
Condition: Unknown
Due 17 August 2001
Resolved 1 March 2002
Resolution: VESSEL HAS CORRECTED THIS DEFICIENCY.
Fire Fighting
Issued 16 August 2001
Resolved
SOLAS 74 II-2/3 Emergency fire pump is inoperative. Vessel is detained until repairs are completed. _x001C_ 08/18/01 - Fire pump repair verified by Marine Inspector._x001C_ Detention lifted @ 1520.
Condition: Unknown
Due 16 August 2001
Resolved 20 August 2001
Navigation
Issued 16 August 2001
Resolved
SOLAS V/20 International rules of the road not on board. Correct prior toreturn to U.S.
Condition: Unknown
Due 17 August 2001
Resolved 1 March 2002
Resolution: VESSEL HAS RECEIVED THIS PUBLICATION.
Navigation
Issued 16 August 2001
Resolved
SOLAS 74 V/20 U.S. Inland Rules of the Road Publication not on board. Correct prior to return to U.S.
Condition: Unknown
Due 17 August 2001
Resolved 1 March 2002
Resolution: VESSEL HAS RECEIVED THIS PUBLICATION.
Deck/Cargo
Issued 16 August 2001
Resolved
SOLAS - Aft capstan brakes are inoperative. Item to be corrected within 30days or prior to return to U.S.
Condition: Unknown
Due 15 September 2001
Resolved 1 March 2002
Resolution: VESSEL HAS CORRECTED THIS DEFICIENCY.
Navigation
Issued 16 August 2001
Resolved
SOLAS 74 I/12(f) Compass gyro repeater in emergency steering is 30 deg offthe true course of the vessel. Item to be corrected prior to return to theU.S.
Condition: Unknown
Due 17 September 2001
Resolved 1 March 2002
Resolution: VESSEL HAS CORRECTED THE GYRO REPEATER IN EMERGENCY STEERING.
Fire Fighting
Issued 16 August 2001
Resolved
SOLAS 74 (unamended) II-2/5 The international shore connection is missing.Master granted 30 days to order and receive onboard ship.
Condition: Unknown
Due 15 September 2001
Resolved 1 March 2002
Resolution: OPTAINED INTERNATIONAL SHORE CONNECTION.
Navigation
Issued 16 August 2001
Resolved
SOLAS 74 V/20 Tidal current tables not on board. Item to be corrected prior to return to U.S.
Condition: Unknown
Due 17 August 2001
Resolved 1 March 2002
Resolution: VESSEL HAS RECEIVED THIS PUBLICATION.