MAURY USCG vessel records Sign in
← All vessels

SWAMP LADY

SWAMP LADY is a 1993 passenger vessel (inspected). The Coast Guard has recorded 36 inspections since 1993, most recently in June 2025, along with 47 deficiencies.

Records from 1993 to 2025. Most recent: inspection, 17 June 2025.

Built
1993
Last inspected
17 June 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

385281
Flag
UNITED STATES
—
Maury page id
psix-385281

Inspections, by type

…with no type recorded1
Years with a record 28 calendar years (1993–2025)
The 36 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)40.0 ft × 12.0 ft × 3.0 ft
Registered tonnagegross 12 / net 12
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMILTON R WALKER · WESTWEGO LA, UNITED STATES · built 1993
Hull materialAluminum
PropulsionGasoline Engine
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 6 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it12 - Simplified, Gross Ton
12 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 36

17 June 2025 Internal Structural Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8131193
21 October 2024 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8022103
5 September 2023 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7768465
18 July 2022 COI Inspection · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7503340
24 August 2021 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7275135
16 September 2020 Internal Structural Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7050090
2 July 2019 Annual Inspection · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6721151
1 August 2018 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6492291
6 June 2017 Drydock Exam · COI Inspection · Examination of Repairs · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6161191
2 June 2016 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5887407
30 September 2015 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5732761
26 August 2014 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4959431
22 May 2012 DAPI Audit · Simplified Stability Test · Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4295127
8 May 2009 Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3470426
20 April 2009 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3426323
3 June 2008 Hull Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3220391
29 May 2007 COI Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2934139
12 April 2005 Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2331886
8 March 2004 Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2020713
3 April 2002 COI Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1600381
19 March 2001 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1426554
12 June 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1050268
11 May 2000 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1386791
2 June 1999 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 804353
10 May 1999 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1129241
10 March 1999 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1400936
10 April 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1123587
10 March 1998 Hull Examination · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1458497
12 March 1997 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1467949
13 March 1996 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1411244
6 March 1996 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1441040
3 January 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1458264
30 March 1995 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1416105
2 May 1994 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 858431
23 February 1994 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1403740
8 March 1993 Initial Certification
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1463766

Deficiency record · 47

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 November 2024 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than small buoyancy compartments, under all practicable conditions. The bilge pump for the STBD aft void was inoperable. 16c, 46CFR182.25-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2024
Resolved 5 November 2024
Resolution: Rcvd photos showing bilge pump operation
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 5 November 2024 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. The anchor light was inoperable. 16c, 46CFR183.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2024
Resolved 5 November 2024
Resolution: Rcvd photos showing operational anchor light
14 - Pollution Prevention › 145 - MARPOL Annex V › Placards
Issued 18 July 2022 Resolved
The master or person in charge of a ship, including a drilling rig or platform, to which this section applies shall ensure that one or more placards meeting the requirements of this section are displayed in prominent locations and in sufficient numbers so that they can be read by the crew and passengers. These locations must be readily accessible to the intended reader and may include embarkation points, food service facilities, garbage handling spaces, living spaces, and common areas on deck. Vessel did not have a up-to-date MARPOL placard for garbage. 46 CFR 151.59(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 July 2022
Resolved 29 July 2022
Resolution: MI verified corrective actions were complete to the satisfcation of the CG.
14 - Pollution Prevention › 145 - MARPOL Annex V › Placards
Issued 18 July 2022 Resolved
A ship, except a ship of less than 26 feet in length, must have a placard of at least 5 by 8 inches, made of durable material fixed in a conspicuous place in each machinery space, or at the bilge and ballast pump control station, for Discharge of Oil Prohibited. Vessel did not have a Discharge of Oil Prohibited posted. 33 CFR 155.450(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 July 2022
Resolved 29 July 2022
Resolution: MI verified corrective actions were complete to the satisfcation of the CG.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2022 Resolved
Retroreflective material required by this section must be Type I material that is approved under subpart 164.018 of this chapter. Retroreflective material on multiple life jackets needed to be replaced. 46 CFR 180.25-25(b) Old T-CFR
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 July 2022
Resolved 29 July 2022
Resolution: MI verified corrective actions were complete to the satisfcation of the CG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 July 2022 Resolved
Such pipes shall terminate on the weather deck clear of any coamings and shall be fitted with shutoff valves, watertight deck plates or screw caps suitably marked for identification. Fuel shut-off valves were not marked for identification. 46 CFR 182.15-30(c) Old T-CFR
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 July 2022
Resolved 29 July 2022
Resolution: MI verified corrective actions were complete to the satisfcation of the CG.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 July 2022 Resolved
Each ring life buoy must be of an approved type, constructed in accordance with subpart 160.050 of this chapter; except a ring life buoy that was approved under former subpart 160.009 of this chapter may be used if it is in good serviceable condition. Ring buoy found damaged and non-serviceable. 46 CFR 180.30-1 (a) Old T-CFR
Action required: 10 - Deficiency Rectified
Due 18 July 2022
Resolved 18 July 2022
Resolution: MI verified corrective actions were complete to the satisfcation of the CG.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 18 July 2022 Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Mark the identification and quantity of life jackets at their proper stowage and to the satisfaction of the MI. 46 CFR 185.604(f) Old T-CFR
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 July 2022
Resolved 29 July 2022
Resolution: MI verified corrective actions were complete to the satisfcation of the CG.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 18 July 2022 Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following tests and inspections of the hull structure. (1) examine all accessible parts of the exterior and interior of the hull structure. Cracked weld found on overhead in center void. Correct at next drydock and to the satisfaction of 46 CFR 176-5 (a)(1)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2022
Resolved 18 August 2022
Resolution: Received Photo of repair satisficing the requirement.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 6 June 2017 Resolved
Floating waterlight found inoperable, repair/replace to satisfaction of attending MI
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2017
Resolved 5 July 2017
Resolution: Light Replaced to satisfaction of attending MI.
Construction/Loadline › Hull › Hull Plating
Issued 6 June 2017 Resolved
Bow Rake Stbd side forward 3/4inch hole and immediately adjacent cracked weld. Repair to satisfaction of attending MI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2017
Resolved 5 July 2017
Resolution: Weld repair verified to satisfaction of attending MI.
Construction/Loadline › Hull › Hull Plating
Issued 6 June 2017 Resolved
#3 Void, Multiple cracked welds, wraps, and broken stiffeners. Repair to satisfaction of attending MI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2017
Resolved 5 July 2017
Resolution: Multiple repairs verified to satisfaction of attending MI.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 6 June 2017 Resolved
Forward Navigation light found inoperable. Repair to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: All nav lights replaced/verified to satisfaction of attending MI.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 6 June 2017 Resolved
Medical first aid kit missing x8 items. Repair to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Replaced 1st aid kit to satisfaction of attending MI.
Construction/Loadline › Structures › Superstructure
Issued 6 June 2017 Resolved
Top canopy framing amidshipe both port/stbd sides cracked. Repair to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Repairs verified to satisfaction of attending MI.
Construction/Loadline › Hull › Hull Plating
Issued 6 June 2017 Resolved
Outboard motor cage/protection foudn with multiple cracks throughout transom attachment points. Repair to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Repairs verified to satisfaction of attending MI.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 6 June 2017 Resolved
Unable to provide documentation showing submission of drug testing report by consortium to USCG. Provide proof of submission to attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Verified MIS documentation to satisfaction of attending MI.
Engineering › Fuel Oil Service System › Valve, Control
Issued 6 June 2017 Resolved
No fuel oil shutoff valve in supply line from independant fuel tank to outboard engine. Provide shut off valve to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Verified F/O cutoff valve installed and operational to satisfaction of attending MI.
Engineering › Bilge Water Management System › Not Operational
Issued 6 June 2017 Resolved
Bilge alarm in #2 void was not operational. Repair to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Verified operational bilge alarm to satisfaction of attending MI.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 6 June 2017 Resolved
Fuel vent flame screen found with restricted flow. Clean/Repair to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Replaced/cleaned flame screen to satisfaction of attending MI.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 6 June 2017 Resolved
No evidence of monthly portable fire extinguisher checks. Provide procedure for monthly checks iaw NFPA 10 Chap 7 to satisfaction of attending Marine Inspector.
Due 5 July 2017
Resolved 5 July 2017
Resolution: Verified monthly inspection log in place and being utilized.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 22 May 2012 Resolved
Replace retro on identified lifejackets.
Due 24 June 2012
Resolved 12 July 2012
Documentation › Markings/Placards › Lifejacket Placard
Issued 22 May 2012 Resolved
Provide lifejacket donning placard for lifejacket type on board.
Due 24 June 2012
Resolved 12 July 2012
Communications › Alarms/Indicators › Bilge Alarm
Issued 22 May 2012 Resolved
Label Bilge alarm compartments
Due 24 June 2012
Resolved 12 July 2012
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 22 May 2012 Resolved
Re-stencil lifejacket storage containers.
Due 24 June 2012
Resolved 12 July 2012
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 20 April 2009 Resolved
Improper battery installed in ring buoy life light. Install correct "post type" battery in light.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2009
Stability › Watertight Integrity › General
Issued 20 April 2009 Resolved
Port corner wrap cracked at gunnel.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2009
Resolution: Inspected new corner wrap insert. Insert tested SAT.
Electrical › Electrical Distribution System (service) › Cable
Issued 20 April 2009 Resolved
Battery cable for port battery were cracked and frayed. Re-splice cable or renew.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2009
Resolution: Cable was re-spliced.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 20 April 2009 Resolved
Re-install toilet junction box to bulkhead.
Condition: Damaged By Earlier Event
Due 21 May 2009
Resolved 4 May 2009
Resolution: The previous metal box was replaced with a plastic one that is now screwed into the bulkhead.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 20 April 2009 Resolved
Repair fractures in fuel tank mounting brackets and inspect tank bottom for wear.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 May 2009
Construction/Loadline › Hull › Weld
Issued 20 April 2009 Resolved
Make repairs to fractures at stern gussets and port cleat.
Condition: Damaged By Earlier Event
Due 21 May 2009
Resolved 4 May 2009
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 April 2002 Resolved
Do not operate vessel without a valid Certificate of Inspection IAW 46 CFR 176.100(a).
Due 3 April 2002
Resolved 3 April 2002
Resolution: Completed Certificate of Inspection.
Navigation
Issued 19 March 2001 Resolved
INSTALL ONE (1) MASTHEAD LIGHT IN ACCORDANCE WITH INLAND NAVIGATIONAL RULES.
Condition: Unknown
Due 19 April 2001
Resolved 31 March 2003
Accommodation/Occupational Safety
Issued 19 March 2001 Resolved
PROVE EXTERMINATION OF ROACHES IN LIFEJACKETS AND STOWAGE AREAS.
Condition: Unknown
Due 19 April 2001
Resolved 31 March 2003
Lifesaving
Issued 19 March 2001 Resolved
REPLACE LIFERING. INCREASE AMOUNT OF RETRO REFLECTIVE MATERIAL ON IT.
Condition: Unknown
Due 19 April 2001
Resolved 31 March 2003
Accommodation/Occupational Safety
Issued 11 May 2000 Resolved
REPLACE HOSE FOR SEWAGE TANK TO DECK CONNECTION.
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Construction/Loadline
Issued 11 May 2000 Resolved
REPAIR CRACKED WELDS IN WAY OF PORT AND STARBOARD OUTBOARD MOTOR BRACKETS (AT THE CORNERS).
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Construction/Loadline
Issued 10 March 1999 Resolved
INSTALL BILGE HIGH LEVEL ALARMS IN ACCORDANCE WITH 46 CFR182.530.
Condition: Unknown
Due 10 March 1999
Resolved 10 March 1999
Construction/Loadline
Issued 10 March 1999 Resolved
MAKE PROPER REPAIRS TO STBD BOW TO SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 10 March 1999
Resolved 10 March 1999
Construction/Loadline
Issued 10 March 1999 Resolved
PROPERLY SECURE BILGE PIPING IN #2 COMPARTMENT; PROPERLY ATTACH BILGE PUMP FLOAT.
Condition: Unknown
Due 10 March 1999
Resolved 10 March 1999
Navigation
Issued 10 March 1998 Resolved
PROVIDE VESSEL WITH COPY OF NAVIGATION RULES (COLREGS).
Condition: Unknown
Due 10 March 1998
Resolved 10 March 1998
Construction/Loadline
Issued 10 March 1998 Resolved
PROVIDE VESSEL WITH REQUIRED PORTABLE HAND BILGE PUMP.
Condition: Unknown
Due 10 March 1998
Resolved 10 March 1998
Construction/Loadline
Issued 10 March 1998 Resolved
MAKE PROPER PERMANENT REPAIR TO WELD FRACTURE ON STBD BOW.
Condition: Unknown
Due 10 March 1998
Resolved 10 March 1998
Lifesaving
Issued 10 March 1998 Resolved
PROVE THAT RING BUOY LINE COMPLIES W/ BREAKING STRENGTH AND UV LIGHT RESISTANCY REQUIREMENTS OR REPLACE ACCORDINGLY.
Condition: Unknown
Due 10 March 1998
Resolved 10 March 1998
Lifesaving
Issued 10 March 1998 Resolved
PROPERLY ATTACH RING BUOY LIGHT W/ A CORROSION RESISTANT WATER CLIP IAW 46 CFR 180.70.
Condition: Unknown
Due 10 March 1998
Resolved 10 March 1998
Navigation
Issued 6 March 1996 Resolved
Prove operation of 2 way radio (intermitent operation)
Condition: Unknown
Due 6 March 1996
Resolved 6 March 1996
Documentation
Issued 23 February 1994 Resolved
Vessel's representative to provide shipyard documentation/verification proving identical construction with M/V Swamp Thing (D988315) for the purpose of proving vessel stability.
Condition: Unknown
Due 23 February 1994
Resolved 23 February 1994

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.