Documentation record
Registered dimensions (L × B × D)95.5 ft × 38.0 ft × 8.8 ft
Registered tonnagegross 94 / net 64
ITC dimensions (L × B × D)95.5 ft × 38.0 ft × 8.8 ft
ITC tonnageNot recorded
BuilderPETERSON BUILDERS, INC. · STURGEON BAY WI, UNITED STATES · built 1993
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPUT-IN-BAY, OH
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 10 February 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it94 - Regulatory (Subpart C or D), Gross Ton
64 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 22 inspections, each with its date, unit and type; 11 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 22
27 April 2026
Annual Inspection · MTSA Verification · Vessel Attendance · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8356379
5 December 2025
Examination of Repairs · Deadweight Survey · Internal Structural Exam · Hull Examination · Vessel Attendance
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8278084
17 November 2025
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8269832
22 July 2025
Plan Review (Other than "T")
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 8191723
27 August 2024
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7990510
1 May 2024
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7905382
29 November 2023
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7836708
26 April 2023
DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7676085
21 April 2022
COI Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7435203
31 August 2021
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7302117
8 May 2021
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7192121
27 April 2021
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7185428
29 October 2020
Examination of Repairs · Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7086595
7 July 2020
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6999640
25 April 2019
MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6670827
10 May 2018
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6411184
24 March 2017
COI Inspection · MTSA Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6108705
1 December 2016
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6050794
2 November 2016
MTSA Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6033785
18 October 2016
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6029380
7 June 2016
Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5906201
3 February 2016
Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5808866
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 27 April 2026
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board an FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessel's EPIRB battery was found to be out of date. Vessel cannot operate beyond 3 miles from coastline of Great Lakes.
46 CFR 117.64
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 15 May 2026
Resolution: New hydro and battery
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 April 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. On the bridge of the vessel, there are multiple power strips “daisy chained” together, creating an electrical hazard. 46 CFR 120.200(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2026
Resolved 21 May 2026
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 May 2021
Resolved
Based on gauging report and reported cooler leak, vessel is to submit repair plan for review to local [name withheld] repair plan is reviewed, a CG MI will attend to verify repair plan is adequate and to ascertain any additional gauging requirements. Please note after CG MI review of repair plan and further on-site inspection the CG may require the vessel to proceed to dry-dock for permanent repairs if temporary repairs are determined to be inadequate or extensive. 46CFR176.20-1(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2021
Resolution: MI attended vessel and are requiring permanent repairs based on unsatisfactory hull condition. New 835v issued.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 May 2021
Resolved
Based on damage survey conducted, gauging report from CCSR, and active main engine cooling leak, vessel is to make permanent repairs to bottom plate in way of MDE/Gen keel coolers from frame 40-60 port and stbd sides. Crop and renew bottom plate and cooler channels port side approx 20ft by 8ft (entire length of space) and STBD side 10x6 ft in aft section and 18x18 insert fwd toward centerline. Crop and renew wasted bilge piping/foot/strainer in same location. Dimensions are approximate and will be determined by bottom inspection and condition of hull while cropping.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 May 2021
Resolution: Satisfactory repairs to bottom plates completed.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 27 April 2021
Resolved
Area surrounding the Sewage tank (19' in length and 5' in width) was found to have areas of wastage in the HULL plate. Vessel Owner shall have the area Gauged within 30Days.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2021
Resolved 14 May 2021
Resolution: MI attended vessel after receipt of gauging report as required above. MI is requiring permanent repairs based on unsatisfactory hull condition. New 835v issued.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 29 October 2020
Resolved
Multiple deck hatches have gasket material that are faulty (improperly sized, not seated, etc.) and must be reattached and prove that the closure is watertight, prior to departure. Captive chains must be reattached to prevent loss, prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2020
Resolved 23 November 2020
Resolution: After adjusting the dogs on the hatches, all seals were watertight. Deficiency is cleared.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 October 2020
Resolved
#1 port void has an inset that is approximately 3" deep and 6" x 10" on the forward bulkhead of the compartment where the hull meets the overhead (main deck). Crop & renew hull plating as well as the tripped web frame.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2020
Resolved 11 November 2020
Resolution: Welds were visually inspected and found to be satisfactory. Deficiency is cleared.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 29 October 2020
Resolved
In the #2 port void there is an insert that is only welded from the outside. properly seal the insert.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2020
Resolved 11 November 2020
Resolution: All welds were visually inspected and found to be satisfactory. Deficiency is cleared.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 29 October 2020
Resolved
Where the forward ramp connects to the vessel, there are cracks at the base of that point. Properly prepare and weld those cracks, to the satisfaction of the Coast Guard Marine Inspector within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2020
Resolved 11 November 2020
Resolution: The welds were visually inspected and found to be satisfactory. The deficiency is cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 7 July 2020
Resolved
Painters attaching three sets of life floats (3) were deteriorated and in need of replacement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 July 2020
Resolved 16 July 2020
Resolution: Received objective evidence (pictures and painter line specs) that the above has been completed.
Communications › Radio Communications › EPIRB
Issued 7 June 2016
Resolved
The HRU (hydrostatic release unit) for the EPIRB indicated an expired date (10/2015). Replace HRU or re-mark with proper date (2yrs after installation) if intitially marked incorrectly. (46 CFR 185.740).
Due 21 June 2016
Resolved 9 June 2016