Records from 1993 to 2023. Most recent: inspection, 7 March 2023.
Inspection history · 54
7 March 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7646850
17 February 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7638356
27 July 2021
Drydock Exam · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7269393
14 April 2021
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7175235
2 March 2021
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7148627
27 January 2020
MTSA Verification · Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6895623
25 July 2019
Cargo Tank Internal · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6761975
7 December 2018
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6593473
29 January 2018
Periodic Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6345175
25 January 2017
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6076753
19 July 2016
Drydock Exam · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5946346
15 January 2016
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5798218
15 July 2014
Administrative Inspection
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 4923034
1 July 2014
COI Inspection · Annual Inspection · Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4907671
12 September 2013
Annual Inspection · Administrative Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 4713272
25 May 2012
COI Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 4321575
19 July 2011
Internal Structural Exam · Underwater Inspection in lieu of Drydock · Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 4085859
8 September 2010
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 3857939
16 February 2010
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 3680651
13 August 2009
Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 3563455
9 September 2008
Annual Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 3320160
12 June 2007
COI Inspection
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 2951598
20 July 2006
Re-Inspection · Underwater Inspection in lieu of Drydock · Internal Structural Exam
Physical examination · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 2719260
27 July 2005
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 2441612
12 August 2004
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 2163292
17 May 2004
Internal Structural Exam · Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2070391
18 July 2003
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1849221
12 June 2002
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1628754
17 July 2001
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1070096
16 July 2001
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1070094
18 April 2000
COI Inspection · Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1444312
16 September 1999
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 784557
16 September 1999
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1119924
14 September 1999
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1119766
26 April 1999
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1469582
26 October 1998
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1114339
15 September 1998
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 803530
17 April 1998
Drydock Extension · COI Inspection · Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1124378
5 January 1998
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 784826
5 August 1997
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1117984
30 July 1997
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1116279
14 May 1997
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1419789
17 April 1997
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1102776
13 February 1997
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1103347
17 January 1997
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1374838
20 December 1996
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1100095
8 October 1996
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1405957
16 July 1996
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1090334
10 April 1996
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1437085
13 July 1995
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1183278
10 February 1995
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 849625
27 July 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 829658
15 July 1993
Hull Examination · Initial Certification · Permit to Proceed · Initial Construction-Excluding Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1155193
7 June 1993
Permit to Proceed
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1133322
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 February 2023
Resolved
Certificates of inspection may be revoked or suspended
by the Coast Guard where such process is authorized by
law. This may occur if the vessel does not meet the
requirements of law or regulations in this chapter or if
there is a failure to maintain the safety requirements
requisite to the issuance of a certificate of
inspection. Vessel was sold, new owner did not request
new certification and did not complete required annual
inspection. 46CFR31.05-10(c)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 May 2023
Resolution: Operator determined that vessel will not renew COI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 March 2021
Resolved
Each vessel must carry the number of life buoys prescribed in table 199.271. 46 CFR 199.271 (table) indicates 8 life buoys are required for vessels under 328 feet in length. Vessel was equipped with 2.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2021
Resolved 12 April 2021
Resolution: Resolved. No Further Action Required.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 2 March 2021
Resolved
(c) Exercises. (1) Exercises must be conducted at least once each calendar year, with no more than 18 months between exercises.
During Inspection, no annual company exercise record was presented. Vessel operator has 30 days to present records of satisfactory Company Exercise drills being conducted.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2021
Resolved 5 March 2021
Resolution: Resolved. No further Action required.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 27 January 2020
Resolved
No person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel tests and inspects the equipment in accordance with paragraphs (b), (c) and (f) of this section and the equipment is in the condition specified. Each transfer pipe system, must not leak under static liquid pressure of at least 1.5 times the MAWP.
The operator had not tested the cargo piping within the last year. Conduct test and submit evidence to the satisfaction of the attending marine inspector prior to using the system, not to exceed 30 days.
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 February 2020
Resolved 5 March 2020
Resolution: Operator conducted hydro test and submitted cert.
Communications › Radio Communications › EPIRB
Issued 29 January 2018
Resolved
NOAA will provide registrants with proof of EPIRB registration. Provide EPIRB registration.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 7 December 2018
Resolution: The acquire a NOAA registration
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 29 January 2018
Resolved
There must be ground detection for each power or lighting system that is isolated from the ship's service power and lighting system by transformers, motor generator sets, or other devices. Provide new lightbulb for three phase ground detection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 7 December 2018
Resolution: They fix the lightbulb
Engineering › Pressure Vessel › Relief Valve
Issued 29 January 2018
Resolved
The spring in a relief valve in service for pressures up to and including 250 PSI shall not be reset for any pressure more or less than 10 percent than that for which the relief valve is marked. Relief valve is not marked with rated PSI.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 7 December 2018
Resolution: Market PSI on relief valve
Lifesaving › Inflatable Liferafts › Capacity
Issued 29 January 2018
Resolved
Each cargo vessel must carry liferafts with an aggregate capacity to accomodate the total number of persons on board. Provide liferaft on board.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 January 2018
Resolved 7 December 2018
Resolution: Liferaft was provided on board
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 25 January 2017
Resolved
Ground indication lights for 240V distribution system were extinguished. Replace lights and prove proper operation.
Action required: 705 - Other - as specified
Due 9 February 2017
Resolved 30 January 2017
Resolution: Lights were replaced and ground detection is operating properly.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 25 January 2017
Resolved
Labels for pull handles had been painted over, preventing operator from being able to follow posted instructions. Verify system arrangements and appropriately label handles.
Action required: 705 - Other - as specified
Due 9 February 2017
Resolved 30 January 2017
Resolution: Handles were labeled appropriately.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 25 January 2017
Resolved
Pressure switch on CO2 system protecting machinery space had been tripped and needed to be reset. Verify that the switch is functioning as designed.
Action required: 705 - Other - as specified
Due 9 February 2017
Resolved 30 January 2017
Resolution: Switch was reset and system was serviced to ensure proper operation of switch.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 25 January 2017
Resolved
Plunger reset handle was missing from the alarm pressure switch in the pump room CO2 system. Replace handle.
Action required: 705 - Other - as specified
Due 9 February 2017
Resolved 30 January 2017
Resolution: Handle was replaced.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 1 July 2014
Resolved
Ground detection is required on 120v distribution panel. Submit electrical plans for modification to local OCMI office prior to installation of any of ground detection component. Vessel shall have operational 120v ground detection. 46CFR111.05-21
Action required: 705 - Other - as specified
Due 25 August 2014
Resolved 21 August 2014
Resolution: Attended vessel to verity newly installed ground detection for 120V distribution system. Verified correct install and proper operation of the system.
Construction/Loadline › Penetrations › Gasket
Issued 12 September 2013
Resolved
Replace ullage opening gaskets
Action required: 705 - Other - as specified
Due 12 October 2013
Resolved 25 July 2014
Resolution: Attending CG inspector verified proper repair.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 12 September 2013
Resolved
Repair ground detection panel
Action required: 705 - Other - as specified
Due 12 October 2013
Resolved 25 July 2014
Resolution: Attending CG inspector verified proper operation.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 12 September 2013
Resolved
Repair emergency light at operator station
Action required: 705 - Other - as specified
Due 12 October 2013
Resolved 25 July 2014
Resolution: Attending CG inspector verified proper operation.
Deck/Cargo › Cargo Heating › General
Issued 12 September 2013
Resolved
Repair the burner gasket on the fluid thermal heater. Fluid thermal heater operation is prohibited until repaired.
Action required: 705 - Other - as specified
Due 12 October 2013
Resolved 25 July 2014
Resolution: Attending CG inspector verified proper repair.
Documentation › Certificates/Documents › Coastwise Load Line Certificate
Issued 9 September 2008
Resolved
Coastwise Loadline Certificate is expired. ABS to reissue at next drydocking (July 2009). Vessel is restricted to operations inside the Boundary Line as defined in 46 CFR Part 7 until a valid L/L certificate is issued.
Due 9 July 2009
Resolved 22 September 2009
Resolution: International Load Line Certificate dated 22 September 2009 issued by ABS Boston Station.
Lifesaving › Inflatable Liferafts › Servicing
Issued 9 September 2008
Resolved
Liferaft removed for servicing, which will be completed within the week. Raft to be placed on board prior to vessel operating.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 September 2008
Resolved 15 September 2008
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 20 July 2006
Resolved
Waterlight for lifering on aft deckhouse operating intermittently - replace battery.
Due 20 July 2006
Resolved 20 July 2006
Resolution: Battery replaced.
Engineering
Issued 18 April 2000
Resolved
REPLACE LUBE OIL GAUGE TO GENERATOR.
Condition: Unknown
Due 18 May 2000
Resolved 18 May 2000
Accommodation/Occupational Safety
Issued 18 April 2000
Resolved
FREE UP AND LUBRICATE VENT CLOSURE DOGS ON TOP OF DECKHOUSE.
Condition: Unknown
Due 18 May 2000
Resolved 18 May 2000
Electrical
Issued 18 April 2000
Resolved
RENEW AS ORIGINAL WIRING CABLE TO PORT AND STARBOARD NAIVIGATION SIDE LIGHTS.
Condition: Unknown
Due 18 May 2000
Resolved 18 May 2000
Lifesaving
Issued 18 April 2000
Resolved
PROVIDE LIFERAFT LAUNCHING INSTRUCTION PLACARD AND POST.
Condition: Unknown
Due 24 May 2000
Resolved 2 June 2000
Deck/Cargo
Issued 18 April 2000
Resolved
PROVIDE PLUGS FOR CONTAINMENT DRAINS.
Condition: Unknown
Due 18 May 2000
Resolved 18 May 2000
Deck/Cargo
Issued 18 April 2000
Resolved
RE-CALIBRATE GAUGE FOR CARGO PUMP.
Condition: Unknown
Due 18 May 2000
Resolved 18 May 2000
Lifesaving
Issued 18 April 2000
Resolved
RENEW AS ORIGINAL LANYARD FOR WATERLIGHT ON RING BUOY AND ATTACH A CORRISION RESISTANT CLIP.
Condition: Unknown
Due 18 May 2000
Resolved 18 May 2000
Deck/Cargo
Issued 26 April 1999
Resolved
Make relief valves available for inspection.
Condition: Unknown
Due 18 May 1999
Resolved 18 May 1999
Deck/Cargo
Issued 26 April 1999
Resolved
Install cargo tank level indicators.
Condition: Unknown
Due 26 April 1999
Resolved 26 April 1999
Deck/Cargo
Issued 26 April 1999
Resolved
Make available a mechanical plug for each containment.
Condition: Unknown
Due 18 May 1999
Resolved 18 May 1999
Deck/Cargo
Issued 26 April 1999
Resolved
Stencil cargo piping with M.A.W.P. and last hydrostatic test date.
Condition: Unknown
Due 28 May 1999
Resolved 28 May 1999
Deck/Cargo
Issued 26 April 1999
Resolved
Submit plans to modify/ or repair the existing liquid level indicators.
Condition: Unknown
Due 28 May 1999
Resolved 28 May 1999
Construction/Loadline
Issued 26 April 1999
Resolved
Make repairs to portable bilge pumps and prove operation.
Condition: Unknown
Due 18 May 1999
Resolved 18 May 1999
Deck/Cargo
Issued 26 April 1999
Resolved
Repair and test Thermal Fluid Heater.
Condition: Unknown
Due 18 May 1999
Resolved 18 May 1999
Fire Fighting
Issued 17 April 1998
Resolved
HAVE ALL PORTABLE FIRE EXTINGUISHERS SERVICED
Condition: Unknown
Due 6 July 1998
Resolved 6 July 1998
Fire Fighting
Issued 17 April 1998
Resolved
MARKE NAME ON FIRE AXE.
Condition: Unknown
Due 6 July 1998
Resolved 6 July 1998
Lifesaving
Issued 17 April 1998
Resolved
MAKE PERMANENT REPAIR TO LIFE RING WATER LIGHT.
Condition: Unknown
Due 6 July 1998
Resolved 6 July 1998
Lifesaving
Issued 17 April 1998
Resolved
RENEW OUTDATED BATTERIES FOR LIGHT ON THE EXPOSURE SUITS AND PFD'S.
Condition: Unknown
Due 6 July 1998
Resolved 6 July 1998
Electrical
Issued 14 May 1997
Resolved
REMOVE UN-AUTHORIZED ELECTRIC SPACE HEATER FROM MACHINERY SPACE OR PROVIDE PLANS FOR APPROVAL, INCLUDING UL RATINGS, CABLE DATA, AND ELECTRICAL LOAD. THE UNIT MAY NOT BE USED.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Electrical
Issued 14 May 1997
Resolved
LABEL EMERGENCY SHUT DOWNS FOR THERMAL FLUID HEATER, GENERATOR, AND HYDRAULIC PRIME MOVER ENGINE (DIESEL).
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Electrical
Issued 14 May 1997
Resolved
SECURE LOOSE CONNECTION BOX AND CHAFE FEEDER LINE FOR AIR COMPRESSOR MOTOR
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Electrical
Issued 14 May 1997
Resolved
CHAFE ELECTRICAL SHORETIE AT HOUSE OVERHANG.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Electrical
Issued 14 May 1997
Resolved
PROVIDE EITHER ENCLOSED OR FLANGED OPEN SPADE CONNECTORS ON SWITCHBOARD WIRING CIRCUITS, OPEN SPADE CONNECTORS THROUGHOUT, AS PER 46 CFR 111.60(B)2
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Engineering
Issued 10 April 1996
Resolved
Place chafing gear on hydraulic and fuel lines and battery lines on engine.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Fire Fighting
Issued 10 April 1996
Resolved
Provide positive ventilation to workshop.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Electrical
Issued 10 April 1996
Resolved
Place strain guage on shore tie, and replace shore tie plug with UL marine approved plug.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Fire Fighting
Issued 10 April 1996
Resolved
Reroute flexible hose on CO2 fixed firefighting system bottle rack to avoidchafing on pull cable conduit.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Fire Fighting
Issued 10 April 1996
Resolved
Reinstall machinery room vent fire damper to enable operation from outside the protected space.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Fire Fighting
Issued 10 April 1996
Resolved
Provide detailed diagram of bottles, piping, and controls for fixed CO2 system.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Engineering
Issued 10 April 1996
Resolved
Conduct thermal fluid heater test procedures # 2, 6, 10, and 11, and open combustion chamber for inspection, in the presence of a CG inspector.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Engineering
Issued 10 April 1996
Resolved
Provide emergency shut-downs for thermal fluid heater.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Lifesaving
Issued 10 April 1996
Resolved
Provide sufficient air purifying respirators and cartridges for entire crewfor two days.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Fire Fighting
Issued 10 April 1996
Resolved
Replace brass dirt traps in fixed CO2 system with approved piping.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Lifesaving
Issued 10 April 1996
Resolved
Remount liferaft to allow manual launching.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Deck/Cargo
Issued 10 April 1996
Resolved
Provide documentation attesting to explosion-proof design of cargo pump room ventilation fan/motor.
Condition: Unknown
Due 10 April 1996
Resolved 10 April 1996
Lifesaving
Issued 13 July 1995
Resolved
STENCIL PFD STORAGE LOCKERS AND REMOVE LOCKS. 46CFR94.42-1
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
REPLACE PUSH-ON HOSES ON CARGO PUMP HYDRAULIC CONTROL UNIT.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
PROVIDE SUITABLE MEANS FOR LAUNCHING L/R. 46CFR44.15-10
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Fire Fighting
Issued 13 July 1995
Resolved
INSTALL CO2 BRANCH LINE DIRT TRAPS. 46CFR95.15-15
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
PROPERLY RIG RING BOUY LINES. 46CFR94.43-15
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Engineering
Issued 13 July 1995
Resolved
REPLACE PORT FUEL VENT FLAME SCREEN. 56.50-85
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Engineering
Issued 13 July 1995
Resolved
PROVIDE CONTAINMENT AROUND FUEL DRUMS. 46CFR32.95-1 33CFR155.320
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Accommodation/Occupational Safety
Issued 13 July 1995
Resolved
PROVIDE CLOSURES FOR VENTILATION INLETS TO MACHINERY SPACE. 46CFR95.15-35
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
REPAIR THERMAL FLUID HEATER AND DEMONSTRATE SAFETIES. 46CFR61.30
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
REPLACE/REPAIR 4 BROKEN PFD LIGHTS. 46CFR94.42-1
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
REMOVE LOCKS THAT PROHIBIT ACCESS TO CO2 ROOM. 46CFR95.15-20
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Construction/Loadline
Issued 13 July 1995
Resolved
SUBMIT PLANS FOR BILGE SYSTEM FOR BOW/STERN RAKES. 46CFR56.50-50
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
STENCIL EMERGENCY SHUTOFF AND DEMONSTRATE OPERATION._x001C_ 33CFR155.780
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
INSTALL GUARD ON CARGO PUMP COUPLING. 46CFR58.01-20
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
CALIBRATE CARGO DISCHARGE PRESSURE GUAGES. 46CFR32.05-5
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
HYDROTEST CARGO PIPING. 33CFR156.170
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
REPLACE EPIRB WITH THE PROPER ONE. _x001C_ 46CFR94.05-5
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
PROVIDE SUITABLE LIGHTING FOR LIFERAFT LAUNCH AREA. 46CFR94.50-10
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
CONDUCT ANNUAL SERVICE OF RAFT. 46CFR94.05-5
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Accommodation/Occupational Safety
Issued 13 July 1995
Resolved
CLEAN METAL CHIPS FROM SWITCHBOARD BASE.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
REMOVE INSULATION IN OVERHEAD 6 INCHESFROM THEMAL FLUID HEATER OUTLET.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Fire Fighting
Issued 13 July 1995
Resolved
VERIFY OPERATION OF CO2 DISCHARGE VALVE IN COFFERDAM.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Accommodation/Occupational Safety
Issued 13 July 1995
Resolved
PROVIDE POSITIVE PRESSURE VENTILATION IN WORKSHOP/MACHINERY ROOM._x001C_ NVIC5-92/465.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Construction/Loadline
Issued 13 July 1995
Resolved
PROVIDE PLUGS FOR CONTAINMENT AREAS IN ACORDANCE WITH 33CFR155.310
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Engineering
Issued 13 July 1995
Resolved
INSULATE THERMAL HTR EXHAUST LINE. 46CFR56.50-1
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Fire Fighting
Issued 13 July 1995
Resolved
PROVIDE CO2 DIAGRAM AND OPERATING INSTRUCTIONS._x001C_ 46CFR95.15-10
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Deck/Cargo
Issued 13 July 1995
Resolved
REPAIR COPPER LINES IN STUFFING TUBES. MAIN DECK MACHINERY.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
REMOVE JOB BOX FROM HAZARDOUS AREA.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Lifesaving
Issued 13 July 1995
Resolved
INSULATE TURBO EXHAUST ON GENERATOR DIESEL
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Electrical
Issued 13 July 1995
Resolved
REPAIR POWER CORD HANGER IN AFT RAKE.
Condition: Unknown
Due 13 July 1995
Resolved 13 July 1995
Fire Fighting
Issued 10 February 1995
Resolved
VESSEL IS RESTRICTED FROM USING THE THERMAL FLUID HEATER DURING AN OIL RECOVERY OPERATION AND IS LIMITED TO THE CARRIAGE OF GRADE "E" AND LOWER CARGOES UNTIL THE FIXED CO2 SYSTEM PLANS HAV BEEN REVIEWED BY THIS OFFICE.
Condition: Unknown
Due 10 February 1995
Resolved 10 February 1995
Construction/Loadline
Issued 10 February 1995
Resolved
PROVIDE FUEL OIL CONTAINMENT AROUND FUEL TANKS ON VESSEL STERN IN ACCORDANCE WITH 46CFR32.95-1.
Condition: Unknown
Due 10 February 1995
Resolved 10 February 1995
Construction/Loadline
Issued 10 February 1995
Resolved
PROVIDE MACHINERY SUPPLY AND EXHAUST SHUTOFFS IN ACCORDANCE WITH 46CFR 34.15-35.
Condition: Unknown
Due 10 February 1995
Resolved 10 February 1995