Inspection history · 20
28 April 2026
Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8357591
19 May 2025
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8130108
31 May 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7924375
5 April 2024
Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7892179
30 May 2023
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7700453
12 August 2022
Type not recorded
No type recorded · Maritime Safety & Security Team San Francisco (91105) · Activity 7532080
2 May 2022
Annual Inspection · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7445074
17 May 2021
Administrative Inspection · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7196997
15 June 2020
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6977768
30 April 2020
Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6950008
16 May 2019
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6686097
21 May 2018
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6531085
27 April 2018
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6398774
5 December 2017
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6342453
11 September 2017
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6310497
1 May 2017
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6148869
7 April 2017
Liferaft Servicing
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6139993
7 April 2017
Liferaft Servicing
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6139998
24 May 2016
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6126500
12 May 2016
Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5909542
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 May 2025
Resolved
Vital systems are those sytems that are vital to a vessels survivability and safety. The sea water supply hoses for the generator cooling system are degraded with deep cracks necessitating replacement.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 May 2025
Resolved
Fuel hose installations greater than 30 inches in length must meet the SAE J-1942 standard and have fittings meeting the SAE J-1475 standard. The installed generator fuel system has a hose greater than 30 inches that is not J-1942 and is assembled with push on fittings. The remaining fuel hoses that are less than 30 inches and assembled with push on fittings must meet the installation standards listed in 46 CFR 182.720(e)(v). To include proper hose material and double hose clamping
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 19 May 2025
Resolved
Machinery spaces protected by a fixed fire system must be vapor tight. The forward engine room bulkhead wire runs on the port and stbd side, along with hose penetrations must be made vapor tight.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 May 2025
Resolved
Each life ring buoy must be clearly marked with the vessels name. Mark life buoys with vessels name.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 May 2025
Resolved
Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway. The permanently installed battery charger is powered by a portable power cord that was worn and not making a proper connection. Provide a permanent wiring solution for the installation in accordance with 46 CFR 183
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 23 June 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 May 2025
Resolved
Each life jacket carried on a vessel on oceans or coastwise route, must have a life jacket light approved in accordance with 46 CFR 161.012. 6 adult life jackets were without lights. The vessel is restricted to 18 persons when on a oceans or coastwise voyage.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2025
Resolved 28 May 2025
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 30 May 2023
Resolved
All radiotelephones must contain the MMSI and integral GPS capabilities or must be connected to an electronic position-fixing device. All VHF radios must have the MMSI programmed and linked to GPS.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 June 2023
Resolved 21 June 2023
Resolution: Corrected.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 10 May 2022
Resolved
Expired meds in first aid kit. Replaced.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 10 May 2022
Resolved 10 May 2022
Resolution: Corrected on the spot.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 May 2022
Resolved
(4) inoperable lifejacket water lights. Repaired.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 10 May 2022
Resolved 10 May 2022
Resolution: Corrected on the spot.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 May 2021
Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the waterlight around the body of the ring life buoy. The lanyards on both life buoys have dry rotted and needs to be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 August 2022
Resolution: Lines replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 May 2021
Resolved
Flexible nonmetallic hose may be used in non-vital water and pneumatic systems, subject to the limitations of paragraph (d)(1) through (d)(4) of this section. The material specification must show that the rigid nonmetallic material possesses characteristics adequate for its intended service and environment and must be approved for use by the cognizant [name withheld] (2) hoses on the sewage supply line and saltwater wash down were dry rotted and needs to be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 August 2022
Resolution: Hoses replaced
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 16 June 2020
Resolved
Renew hydrostatic release for EPIRB. Vessel restricted to three (03) NM from shore or make EPIRB float free.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 June 2020
Resolution: Hydro renewed.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 16 June 2020
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 May 2021
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 16 June 2020
Resolved
Update first aid equipment.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 June 2020
Resolution: Updated.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 21 May 2020
Resolved
Complete a Coast Guard Certificate of Inspection renewal exam prior to carrying passengers
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 June 2020
Resolution: Completed COI Renewal Inspection
Documentation › Certificates/Documents › Stability Letter
Issued 10 May 2017
Resolved
Vessel required to post stability letter
Due 10 May 2017
Resolved 10 May 2017
Resolution: Stability letter posted.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 10 May 2017
Resolved
Required to provide updated lightlist.
Due 10 May 2017
Resolved 10 May 2017
Navigation › Piloting/Steering › US Coast Pilot
Issued 10 May 2017
Resolved
Required to provide updated coast pilot.
Due 10 May 2017
Resolved 10 May 2017
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 1 May 2017
Resolved
Post emergency instructions placard.
Due 10 May 2017
Resolved 10 May 2017
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 24 May 2016
Resolved
The FireBoy system only shuts down the starboard engine. Demonstrate satisfactory shut down of both engines, as well as manual override.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2016
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 24 May 2016
Resolved
Provide fire fighting servicing documents to marine inspector.
Due 26 May 2016
Resolved 25 May 2016
Resolution: Servicing docs were provided to attending marine inspector.
Engineering › Bilge Water Management System › Pump
Issued 24 May 2016
Resolved
Starting engine-driven fire and bilge pumps took multiple attempts. Add additional labeling or instruction for easier valve alignment.
Due 31 May 2016
Resolved 25 May 2016
Resolution: Labeling/identification added to valves for ease of operation by all crewmembers.
Documentation › Certificates/Documents › FCC SSL
Issued 24 May 2016
Resolved
FCC Call Sign on station license does not match other documentation on board vessel and emergency radio broadcast placard is missing. The Station license displays the incorrect Vessel Official Number. Correct all FCC documents.
Due 24 June 2016
Resolved 20 February 2018
Resolution: Station license is now corrected.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 24 May 2016
Resolved
Port side ring buoy's water light line is less than 3 feet long and is too short to attach around the body of the ring buoy. Replace wotj UV-resistant 3-6' water light line.
Due 31 May 2016
Resolved 25 May 2016
Resolution: Replaced water light line.
Electrical › Electrical Distribution System (service) › Cable
Issued 24 May 2016
Resolved
The starter cable in the engine room on the starboard side is not marine grade (it's welding cable). Replace with cable suitable for marine application.
Due 24 June 2016
Resolved 25 May 2016
Resolution: Starter cable replaced
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 12 May 2016
Resolved
There is not a sufficient means of separating the fire-protected engine room space from the large generator space forward of the engine room. Engine room is not gas tight. Submit plans to Sector Anchorage prior to making alterations.
Due 12 June 2016
Resolved 24 August 2016
Resolution: Installed flapper system between engine room and generator space with remote activation on deck.