Records from 1993 to 2024. Most recent: inspection, 16 May 2024.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 45
16 May 2024
Deficiency Check · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7901311
6 October 2023
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7804630
18 August 2023
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7763403
19 January 2023
Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7614866
30 August 2022
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7510332
20 October 2021
Type not recorded
No type recorded · Station Cortez · USCG Southeast District (CGD-SE) · Activity 7336704
20 July 2021
Annual Inspection · DAPI Audit
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7261922
12 January 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7123467
7 August 2020
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7018050
6 May 2019
COI Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6677677
17 January 2019
Administrative Inspection · In-Service Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6613383
10 August 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6504361
16 January 2018
Internal Structural Exam · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6332072
15 June 2017
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6176745
26 May 2017
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6132859
2 March 2016
Annual Inspection · Hull Examination · DAPI Audit · Internal Structural Exam · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5825723
23 October 2014
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5008677
12 June 2014
COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4883901
26 March 2014
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4818177
22 February 2012
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4249215
22 February 2010
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3673738
17 March 2008
Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3181924
17 March 2008
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3182208
30 March 2007
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2890599
28 April 2006
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2632548
5 April 2006
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2615631
10 May 2005
Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2352830
26 April 2004
Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2053041
12 April 2004
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2042779
23 April 2003
Annual Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1778946
17 April 2002
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1605177
11 March 2002
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1492673
24 April 2001
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1395697
6 April 2000
Re-Inspection · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1442994
28 March 2000
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1397380
1 April 1999
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1446747
21 April 1998
Hull Examination · Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1428940
15 April 1997
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1456470
25 September 1996
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1438489
22 April 1996
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1398444
5 April 1995
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1431499
17 March 1995
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1355137
5 May 1994
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1453035
18 June 1993
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 844134
25 May 1993
Plan Review "T" Boat · Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1141859
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 16 May 2024
Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible on board the vessel to determine the presence of alcohol in the system of each individual who was directly involved in the SMI.
Vessel representative could not provide testing devices on board the vessel.
46CFR185.212
46CFR4.06-15(a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 May 2024
Resolved 23 May 2024
Resolution: Vessel rep provided picture of current, non expired, alcohol swabs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 May 2024
Resolved
Each life preserver carried on a vessel engaged in an ocean, coastwise, or Great Lakes service must have a personal flotation device light that is approved under subpart 161.012.
MI observed six life preservers with no lights attached and eight other life preservers without batteries installed in the attached lights.
Total persons on board is reduced to 46.
46CFR180.25(a)
Action required: 705 - Other - as specified
Due 16 May 2024
Resolved 3 June 2024
Resolution: Lights and batteries were replaced. Maximum persons on board raised to 57.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 May 2024
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall... examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather deck.
MI observed an approximate one inch diameter hole in the weather deck located port side penetrating into the aft end of the engine room.
46CFR176.25-5(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2024
Resolved 3 June 2024
Resolution: Penetration properly sealed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 16 May 2024
Resolved
A hatch exposed to the weather must be watertight.
MI observed the flush deck hatches located above the lazarette and forward void space were unable to seal the openings watertight due to wasted gaskets and unmovable dogs.
46CFR179.360(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2024
Resolved 4 June 2024
Resolution: New flush deck hatches installed.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 16 May 2024
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate.
MI observed the float free arrangement for the vessel's EPIRB incapable of storing the EPIRB due to missing cover. EPIRB is being stored inside wheelhouse.
46CFR180.64
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2024
Resolved 3 June 2024
Resolution: EPRIB mount replaced and installed.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 16 May 2024
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: Charts of large enough scale to make safe navigation possible.
Vessel did not have paper charts for its intended voyages on board.
46CFR184.420(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2024
Resolved 3 June 2024
Resolution: Charts purchased and on board vessel.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 16 May 2024
Resolved
Rails or equivalent protection shall be installed near the periphery of all weather decks accessible to passengers and crews.
MI observed the railing on the second deck starboard side aft of the wheelhouse door to be loose around the mounting base to the deck.
46CFR177.35-1(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2024
Resolved 3 June 2024
Resolution: Railing properly secured to the deck.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 May 2024
Resolved
Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway.
MI observed the wire for the bilge pump in the forward engine room having a twisted connection near the pump.
46CFR183.220(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2024
Resolved 3 June 2024
Resolution: Wiring connection properly fixed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 May 2024
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable.
MI observed the port engine cooling water flexible hose secured to the engine with only one hose clamp. Additionally, MI observed both port and starboard sewage discharge flexible hoses missing second hose clamps at the through hull valves.
46CFR182.410(d)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2024
Resolved 3 June 2024
Resolution: Double clamps installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 May 2024
Resolved
Remote fuel shutoff stations shall be marked in at least 1-inch letters indication purpose of the valve and direction of operation.
MI observed the port side remote fuel shutoff station missing the required label.
46CFR185.30-20(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2024
Resolved 3 June 2024
Resolution: Label installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 October 2023
Resolved
Flammable items not otherwise covered by the regulations of this subchapter, such as rechargeable batteries, including lithium ion batteries utilized for commercial purposes, must be handled, stored, and operated in a way that mitigates the risk of hazardous conditions.
Vessel shall develop plan to the satisfaction of attending USCG Marine Inspector.
46 CFR 185.364
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 November 2023
Resolved 3 June 2024
Resolution: Plan for the recharging of batteries, including lithium ion batteries was posted onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 August 2023
Resolved
All vessels except non-self-propelled vessels shall be provided with suitable steering apparatus.
MI observed steering ram return line was cracked and leaking hydraulic fluid.
46 CFR 182.30-1
Action required: 17 - Rectify deficiencies prior to departure
Due 18 August 2023
Resolved 22 August 2023
Resolution: Vessel POC submitted pictures of repaired hydraulic return line.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 18 August 2023
Resolved
Each launching appliance and each survival craft and rescue boat on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway.
MI observed top stowed lifefloat was torn.
46 CFR 185.700(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Life float was repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 18 August 2023
Resolved
Specifications for lifesaving equipment items required
to be of an approved type have been promulgated and are
contained in Subchapter Q. Lifefloats must meet
46 CFR 160.027.
MI observed retro reflective tape was worn.
46 CFR 180.05-1(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Vessel rep put on new retro reflective tape.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 18 August 2023
Resolved
Each life float must be equipped with an operable water light.
MI observed bottom life float water light was inoperable.
46 CFR 180.15-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: New water light installed and was operable.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 18 August 2023
Resolved
When life floats are stowed in tiers, the separate units must be kept apart by spacers.
MI observed that the (02) life floats were stowed without spacers.
46 CFR 180.20-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Life float spacers were added.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 18 August 2023
Resolved
Remote fuel shutoff stations shall be marked in at least
1-inch letters indicating purpose of the valve and direction of operation.
MI observed remote fuel shutoff stations were not marked.
46 CFR 185.30-20(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Remote fuel shutoff placard added.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 August 2023
Resolved
Each life preserver carried on a vessel engaged in an ocean, coastwise, or Great Lakes service must have a personal flotation device light that tis approved under subpart 161.012.
MI observed 20 adult life jackets were missing lights.
46 CFR 180.25-20(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Vessel rep procured and installed 20 new life jacket lights.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 August 2023
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the
International and Inland Navigation rules.
MI observed both port and starboard navigation light lens were corroded, not allowing light to be seen. Restricted to day time operations.
46 CFR 183.420
Action required: 705 - Other - as specified
Due 18 August 2023
Resolved 1 December 2023
Resolution: Vessel rep installed new port/stbd navigation lights.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 18 August 2023
Resolved
Primary consideration shall be given to the provision of a seaworthy hull, protection against fire, means of escape in case of sudden unexpected casualty.
MI observed that the forward void ladder was not secured.
46 CFR 177.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Forward void ladder was fastened properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 August 2023
Resolved
Each lighting fixture must have a guard or be made of high strength material when it is subject to damage.
MI observed mast head light was not shielded.
46 CFR 183.410(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Vessel rep installed new mast head light.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 18 August 2023
Resolved
A visual and audible alarm must be provided at the operating station to indicate high water level in the required spaces.
MI observed that the audible bilge alarm was inoperable.
46 CFR 182.530(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Vessel rep installed new audible/visual display for high water alarm.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 August 2023
Resolved
Ring life buoys must be marked with the vessel name, and have Type I retroreflective material.
MI observed ring life buoy vessel name was illegible, and retroreflective was worn.
46 CFR 185.605
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2023
Resolved 1 December 2023
Resolution: Vessel rep installed new retro reflective tape.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 18 August 2023
Resolved
An interconnected detection and alarm system must be installed on board all vessels operating on a coastwise or oceans route and consist of multiple-station smoke detectors listed by an NRTL, or independent laboratory accepted by the Commandant according to 46 CFR subpart 159.010, as meeting UL 217 (incorporated by reference, see 46 CFR 175.600).
Vessel does not have interconnected fire detection and alarm system installed on board.
46 CFR 181.450
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 September 2023
Resolved 16 May 2024
Resolution: MIs verified installation and operation of interconnected fire detection and alarm system.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 30 August 2022
Resolved
Each survival craft on a vessel must be inspected monthly, using the manufacturer's instructions to make sure it is complete and in good order. MI found no log of inspection for life float.
46 CFR 185.722
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 10 October 2022
Resolution: Owner created inspection log and sent a picture of the log.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 30 August 2022
Resolved
Each ing life buoy must be marked in clearly legible block capital letters with the vessel's name. MI found the ring life buoy without proper markings.
46 CFR 185.604(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 13 September 2022
Resolution: Owner supplied picture with marking on life ring.
10 - Safety of Navigation › N/A - No Subsystem › Life-saving signals
Issued 30 August 2022
Resolved
Each floating waterlight, on a vessel carrying only one ring buoy, must be attached to the lanyard with a corrosion-resistant clip. MI found floating waterlight attached to life ring life buoy with a knot.
46 CFR 180.70(d)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 13 September 2022
Resolution: Owner supplied picture of clip installed on lifering
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 August 2022
Resolved
Each life jacket carried on a vessel on oceans route must have a life jacket light approved in accordance with § 161.012 in subchapter Q of this chapter. MI found 22 life jackets with extinguished life jacket lights. The vessel is restricted to carrying no more than 35 passengers.
46 CFR 180.75(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 13 September 2022
Resolution: Owner supplied picture of new lights for lifejackets
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 30 August 2022
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. MI found the mast head light extinguished. The vessel is limited to daylight without reduced visibility operations.
46 CFR 183.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 August 2022
Resolved 18 October 2022
Resolution: Owner sent proof of repair.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 August 2022
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. MI found one type of life jacket onboard without proper donning instructions posted.
46 CFR 185.516(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 13 September 2022
Resolution: Owner provided picture of new placard installed on vessel.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 30 August 2022
Resolved
The Certificate of Inspection must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. MI found COI not posted.
46 CFR 176.302
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 15 September 2022
Resolution: Posted COI
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 30 August 2022
Resolved
The stability letter must be posted under glass or other suitable transparent material, such that all pages are visible, at the operating station of the vessel. MI found the stability letter not posted.
46 CFR 176.306
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 15 September 2022
Resolution: Posted stability letter
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 30 August 2022
Resolved
On a vessel of not more than 65 feet in length carrying more than 49 passengers the minimum capacity of the fire pump must be 50 gallons per minute at a pressure of not less than 60 psi at the pump outlet. MI found the fire pump inoperable. Operator must maintain three fire buckets on board in accordance with 46 CFR 181.610 and passenger count is restricted to no more than 49 passengers.
46 CFR 181.300 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 25 October 2022
Resolution: Operator renewed fire/bilge pump clutch and repaired pump housing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 August 2022
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing machinery failure and personnel injury. MI found the starboard side reduction gear to drive shaft coupler missing hardware.
46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 18 October 2022
Resolution: Owner sent proof of repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 August 2022
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing machinery failure and personnel injury. MI found the port side MDE wet exhaust leaking.
46 CFR 182.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 25 October 2022
Resolution: Operator removed residual salt, reinstalled hose and clamp, no further leak identified.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 30 August 2022
Resolved
At each inspection for certification and at every other vessel inspection all observed hazardous situations must be corrected and must be in satisfactory condition. MI found the engine room access ladder bottom step loose.
46 CFR 176.830(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 13 September 2022
Resolution: Owner supplied picture of repaired ladder.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 August 2022
Resolved
Vessels of less than 65 feet carrying more than 49 passengers are required to have one fixed power pump and one portable hand pump. MI found the power bilge dewatering pump inoperative. Vessel may operate restricted to no more than 49 passengers provided that all installed submersible electric bilge pumps are maintained in operable condition in accordance with 46 CFR 182.520(e).
46 CFR 182.25-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 September 2022
Resolved 25 October 2022
Resolution: Operator renewed fire/bilge pump clutch and repaired pump housing.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 30 August 2022
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. MI found the life float worn and damaged. Provide repair proposal.
46 CFR 180.175(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2022
Resolved 22 November 2022
Resolution: Owner sent proof of repair.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Procedure for inspection, reporting and correcting unsafe conditions and for investigating a
Issued 30 August 2022
Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford adequate precaution against hazards that might endanger the vessel and the persons being transported. MI witnessed crew attempt unconscious man overboard recovery using only rope ladder that was insufficient. Provide man overboard procedure and equipment improvement proposal to facilitate unconscious man overboard recovery.
46 CFR 185.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2022
Resolved 16 February 2023
Resolution: Operator got a rescue ladder / platform.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 30 August 2022
Resolved
If the vessel carries more than one life float or buoyant apparatus in a group with each group secured by a single painter, each life float must be individually attached to the painter. MI found life float not attached via painter.
Action required: 10 - Deficiency Rectified
Due 30 August 2022
Resolved 30 August 2022
Resolution: Corrected on the spot by adding knot to painter.
Communications › Radio Communications › VHF Radiotelephone
Issued 26 May 2017
Resolved
Provide GPS input to VHF radio. 46CFR184.502
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 9 June 2017
Operations/Management › Equipment Service/Testing › EPIRB
Issued 26 May 2017
Resolved
Replace missing NOAA registration decal and afix to EPIRB.
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 9 June 2017
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 11 March 2016
Resolved
Provide proof of crew enrollment in company drug testing program.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 March 2016
Resolved 14 March 2016
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 11 March 2016
Resolved
Provide (4) additional adult type 1 life-jackets, vessel is restricted to nmt 53 persons, when operating on limited coastwise routes or lesser.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 March 2016
Resolved 14 March 2016
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 11 March 2016
Resolved
Show proof of required current navigation publications.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 March 2016
Resolved 14 March 2016
Fire Fighting › Fire Pumps › Capacity
Issued 11 March 2016
Resolved
Show proof of proper operation of installed fire-pump.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 March 2016
Resolved 14 March 2016
Communications › Alarms/Indicators › Bilge Alarm
Issued 11 March 2016
Resolved
Properly repair/replace (visual) bilge alarm indicator, for the aft compartment.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 14 March 2016
Resolved 14 March 2016
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 11 March 2016
Resolved
Conduct satisfactory man-overboard drill
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 March 2016
Resolved 14 March 2016
Engineering › Bilge Water Management System › Valve
Issued 7 March 2016
Resolved
Properly install positive shut-off valves to all (3) electric bilge pump discharge lines, at the hull penetration IAW 46 CFR 182.520(e)(7).
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 11 March 2016
Resolved 11 March 2016
Communications › Radio Communications › EPIRB
Issued 12 June 2014
Resolved
Register EPIRB
Condition: Placed in Improper Service
Due 12 June 2014
Resolved 24 June 2014
Resolution: EPIRB was registered
Communications › Radio Communications › EPIRB
Issued 12 June 2014
Resolved
Renew battery
Condition: Placed in Improper Service
Due 12 June 2014
Resolved 24 June 2014
Resolution: Battery was renewed
Engineering › Steering Gear System › Hydraulic Hose
Issued 12 June 2014
Resolved
Repair hydraulic leak on steering control system under control console.
Condition: Improper/Lack of Maintenance
Due 12 June 2014
Resolved 12 June 2014
Resolution: Corrected on the spot.
Electrical › Lighting (service) › Lighting Fixture
Issued 2 February 2010
Resolved
Secure lighting fixture in steering space
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 February 2010
Electrical › Electric Generation Source (service) › Conductor
Issued 1 February 2010
Resolved
Reattach grounding wire on stbd suction in engine space.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 February 2010
Engineering › Bilge Water Management System › Valve
Issued 28 March 2007
Resolved
Prove proper operation of fixed bilge pump suction from #4/lazarette space to the satisfaction of the attending marine inspector.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 March 2007
Resolution: Verified proper operation of fixed bilge system in #4 lazarette space.
Fire Fighting › Fixed Fire Detection System › Approval
Issued 28 March 2007
Resolved
Prove that the fire detection system is electronically supervised.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 30 April 2007
Resolved 30 March 2007
Resolution: Test completed satisfactory of fire detection system.
Electrical › Lighting (service) › Lighting Fixture
Issued 10 May 2005
Resolved
Permanently repair light fixture in engine room overhead.
Condition: Damaged By Earlier Event
Due 10 June 2005
Resolved 11 May 2005
Resolution: Owner repaired lighting fixture in engine room overhead.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 10 May 2005
Resolved
Stencil name of vessel on lifebuoy.
Condition: Unknown
Due 10 June 2005
Resolved 11 May 2005
Resolution: Owner put name of vessel on new life buoy.
Lifesaving › Lifebuoys › Serviceable
Issued 10 May 2005
Resolved
Replace grab line around lifebuoy.
Condition: Unknown
Due 10 June 2005
Resolved 11 May 2005
Resolution: Owner installed new life buoy on vessel.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 10 May 2005
Resolved
Install three foot lanyard and clip on lifebuoy water light.
Condition: Improper Installation
Due 10 June 2005
Resolved 11 May 2005
Resolution: Owner installed lanyard and clip on lifebuoy water light.
Engineering
Issued 6 April 2000
Resolved
PROVIDE MACHINERY GUARDS IN WAY OF BOTH MAIN ENGINES IN ACCORDANCE WITH 46 CFR 177.960.
Condition: Unknown
Due 6 May 2000
Resolved 15 May 2000
Construction/Loadline
Issued 25 May 1993
Resolved
REPAIR LEAK AT BILGE MANIFOLD IN THE ENGINE ROOM AND PROVE PROPER OPERATIONOF FIXED BILGE SYSTEM PRIOR TO THE CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Construction/Loadline
Issued 25 May 1993
Resolved
MARK VALVES AND POST DIAGRAM FOR BILGE MANIFOLD IN ENGINE ROOM.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Electrical
Issued 25 May 1993
Resolved
INSTALL PROPERLY RATED UL MARINE APPROVED MAIN BREAKER IN THE SHORE TIE CIRCUIT AS ACCEPTABLE TO THE LOCAL OCMI.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Engineering
Issued 25 May 1993
Resolved
DOUBLE CLAM ALL FLEXIBLE FUEL HOSES.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Documentation
Issued 25 May 1993
Resolved
PROVIDE AND POST CURRENT FCC STATION LICENSE FOR VESSEL.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Construction/Loadline
Issued 25 May 1993
Resolved
REMOVE VALVES FROM BOTH MSD TANK VENTS AND INSTALL 30X30 MESH FLAME SCREEN.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Engineering
Issued 25 May 1993
Resolved
INSTALL PROPER 30X30 MESH FLAME SCREENS IN BOTH FUEL TANK VENTS.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Accommodation/Occupational Safety
Issued 25 May 1993
Resolved
PROVIDE AND POST A COPY OF THE VESSELS EMERGENCY CHECK-OFF LIST.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Construction/Loadline
Issued 25 May 1993
Resolved
RELOCATE BILGE VALVE AND COLLISION BULKHEAD PENETRATION TO AS LOW AS PRACTICAL IN THE SPACE AS ACCEPTABLE TO THE LOCAL OCMI.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Documentation
Issued 25 May 1993
Resolved
PROVIDE AND POST CURRENT FCC RADIOTELEPHONEY CERTIFICATE.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993
Accommodation/Occupational Safety
Issued 25 May 1993
Resolved
PROVIDE A COPY OF THE VESSELS WRITTEN WASTE DISPOSAL PLAN.
Condition: Unknown
Due 25 May 1993
Resolved 25 May 1993