← All vessels
CAPE VICTORY
Freight Ship · Ro-Ro Cargo Ship class · Built 1980s · USCG Southwest District (CGD-SW) · Other hulls named CAPE VICTORY
CAPE VICTORY is a 1984 freight ship. The Coast Guard has recorded 84 inspections since 1994, most recently in February 2026, along with 181 deficiencies — 5 with no resolution recorded — and 1 casualty investigation in 2011.
Records from 1994 to 2026. Most recent: inspection, 19 February 2026.
- Built
- 1984
- Last inspected
- 19 February 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 181 recorded · 5 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2011
Identity
992284
8211306 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
KAEY
387205
Flag
UNITED STATES
303923000 (licence lapsed)
Maury page id
psix-387205
Inspections, by type
…with no type recorded11
Years with a record
31 calendar years (1994–2026)
The 84 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 1981.
Documentation record
Registered dimensions (L × B × D)567.7 ft × 86.9 ft × 52.7 ft
Registered tonnagegross 22,425 / net 7,142
ITC dimensions (L × B × D)567.7 ft × 86.9 ft × 52.7 ft
ITC tonnagegross 22,425 / net 7,142
BuilderITALCANTIERI · GENOA, ITALY · built 1984
Hull materialSteel
PropulsionDiesel Direct
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNORFOLK, VA
Trade endorsementsRegistry
DocumentationValid · issued 13 February 2026 · expires 28 February 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it22425 - Convention (Subpart B), Gross Ton
7142 - Convention (Subpart B), Net Ton
7142 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
KAEYMMSI 303923000 · expired · compulsorily equipped · granted 9 December 1993, cancelled 9 December 1998
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 84
19 February 2026
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8312731
8 October 2025
ACP Annual Oversight · MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8239971
10 December 2024
ACP COI Oversight · MTSA/ISPS Verification · Re-Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8042123
4 December 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8043209
15 October 2024
ACP Drydock Oversight
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8019240
19 September 2024
Permit to Proceed
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8005971
18 September 2023
ACP Annual Oversight · Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7804258
19 May 2023
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7692300
18 October 2022
Periodic Inspection · ACP Periodic Oversight · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7579465
3 October 2022
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7570787
23 September 2022
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7583436
21 July 2022
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7512601
11 January 2022
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7378451
19 October 2021
Annual Inspection · Deficiency Check · MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7335570
16 March 2021
ACP Additional Oversight – Risk Assessment
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7158794
16 March 2021
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7241431
2 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7105120
24 September 2020
MTSA/ISPS Verification · ACP Annual Oversight · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7063542
16 June 2020
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6978261
17 September 2019
COI Inspection · Administrative Inspection · Re-Inspection · MTSA/ISPS Verification · ACP COI Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6814369
23 July 2019
ACP Drydock Oversight · Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6759943
24 March 2019
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6648053
29 October 2018
Ballast Water Examination · MTSA Verification · Annual Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6569057
29 September 2018
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6551283
23 July 2018
In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6564614
21 March 2018
ACP Additional Oversight – Risk Assessment
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6376467
21 March 2018
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6381174
7 August 2017
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6235732
31 July 2017
MTSA/ISPS Verification · Annual Inspection · ACP Annual Oversight · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6214229
11 May 2017
Excursion Permit · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6142035
27 July 2016
Annual Inspection · MTSA/ISPS Verification · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5939345
14 March 2016
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5832877
20 August 2015
MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5213790
5 June 2014
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4870645
24 July 2012
MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4382837
14 September 2011
MTSA/ISPS Verification · ACP COI Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4144014
10 August 2011
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4111418
5 August 2011
Excursion Permit · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4104027
12 October 2010
ACP Annual Oversight · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3865098
1 December 2008
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3371900
6 November 2008
ACP Annual Oversight · Ballast Water Examination · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3349619
10 October 2007
MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3066518
21 May 2007
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2933878
23 August 2006
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2748618
18 August 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2751932
12 September 2005
Annual Inspection · MTSA/ISPS Verification
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2487151
1 October 2004
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2228443
2 September 2004
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2182290
1 July 2004
Hull Examination · COI Inspection · Internal Structural Exam · MTSA/ISPS Verification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2117602
3 June 2004
MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2087535
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996165
16 January 2004
In-Service Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1985580
25 August 2003
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1913104
19 April 2002
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1605827
12 March 2002
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1493311
17 January 2002
Administrative Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1479569
19 October 2001
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1076380
22 June 2001
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1410594
11 May 2001
Excursion Permit
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1472271
3 June 2000
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1050865
20 April 2000
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1393415
12 April 2000
COI Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1386766
15 July 1999
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1388841
13 June 1999
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1444146
16 September 1998
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1397081
18 June 1998
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1460203
20 May 1998
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1458523
4 May 1998
COI Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1460189
2 July 1997
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1392749
12 July 1996
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1099700
12 July 1996
Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1419627
18 June 1996
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 884143
28 November 1995
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1414541
22 February 1995
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 848061
27 September 1994
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1174333
17 September 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 463949
2 September 1994
Initial Certification
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1447502
25 August 1994
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 861846
22 July 1994
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 182241
8 July 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 82530
8 July 1994
Initial Certification · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 861482
1 July 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 866392
30 June 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 119164
11 June 1994
Deadweight Survey · Inclining Experiment
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1403800
Deficiency record · 181
01 - Certificates & Documentation › 013 - Documents › Unattended Machinery Spaces (UMS) Evidence
Issued 8 October 2025
No resolution recorded
All automatic, remotely controlled, or monitored vital systems addressed in 46 CFR Part 62 must have
approved Design Verification and Periodic Safety test procedures (PSTP) available onboard for testing prior to
issuance of the initial COI. Vessel using revision "H" of PSTPs, which has not been approved; revision"H" reflects the most current equipment, however the latest approve revision onboard was PSTP revision "E".
ACP Single Supplement, 3.1.14
74SOLAS II-1/31
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 8 October 2025
No resolution recorded
All exposed metal parts of electrical machines or equipment which are not intended to be "live" but are liable to become "live" under fault conditions, shall be earthed (grounded); and all electrical apparatus shall be so constructed and so installed that danger of injury in ordinary handling shall not exist. Multiple motor controllers and electric motors identified with missing or broken ground wire in engine room.
74SOLAS II-I/27(a)(i)(1)
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 8 October 2025
No resolution recorded
Wiring shall be supported in such a manner as to avoid chafing or other injury. Shaft seal oil level sensor wiring exposed and improper termination.
74SOLAS II-1/27(a)(2)(vi)
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 8 October 2025
No resolution recorded
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. When in ROS status, vessel has minimum crew and maneuverability. Prior to activation, vessel must conduct fire and abandon ship drills, lower lifeboats into the water, and put all safety gear at location to the satisfaction of the attending Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 8 October 2025
No resolution recorded
Before the ship leaves port, all life-saving appliances
shall be in working order and ready for immediate use.
When in ROS status, vessel has minimum crew and
maneuverability. Prior to activation, vessel must
conduct fire and abandon ship drills, lower lifeboats
into the water, and put all safety gear at location to
the satisfaction of the attending Marine Inspector.
SOLAS 74 III/26(a)(ii)
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 December 2024
Resolved
Fire fighting systems and appliances shall be kept in good working order. Marine inspector observed a ruptured pipe in the firemain line IVO frame 21 of the embarkation deck ramp.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 10 December 2024
Resolved
The International Load Line Certificate shall not be delivered to the ship until the officer or surveyor acting under the provisions of article 13 of the present convention has certified that the marks are correctly and permanently indicated on the ship's sides. Marine inspector observed missing authority mark while walking along side vessel
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 19 October 2022
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Crew was unable to start the port life boat.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 19 October 2022
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. All four line throwing appliances on the vessel are expired.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 19 October 2022
Resolved
Emergency lighting at every boat station on deck and
oversides, in all alleyways, stairways and exits, in the
main machinery space and main generation space, on the
navigating bridge and in the chart room shall be
adequate for a period of 6 hours. Vessel's emergency
lighting did not function in various locations
throughout the vessel to include: officers galley,
escape trunk outside of engine room and all lifesaving
appliance embarkation areas.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 October 2022
Resolved
The Administration shall be satisfied that adequate arrangements are in place to ensure that the performance of equipment in chapter V is maintained. Various navigation light bulbs are burned out with no spares
available on-board the vessel.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 19 October 2022
Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part I. Each completed operation shall be signed by the officer or officer in charge of the operations concerned and each completed page shall be signed by the master of ship. Vessels ORB has 6 pages that were not being signed by the master of ship.
01 - Certificates & Documentation › 013 - Documents › Garbage record book
Issued 19 October 2022
Resolved
Each completed page of the Garbage Record Book shall be signed by the master of ship. Vessel’s Garbage Record Book most current completed page was not signed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 October 2022
Resolved
All electrical apparatus shall be so constructed and so installed that the danger of injury in ordinary handling shall not exist. Vessel has exposed wires on the #2 Piston C/W Pump.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Equipment (including exemption)
Issued 19 October 2022
Resolved
A certificate called a Cargo Ship Safety Certificate may be issued after an initial or renewal survey to a cargo ship that complies with the relevant requirements. Vessel's Form E is showing an incorrect number of liferafts listed. Prior to sailing foreign vessel must have a correct CSSE Certificate on board.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 19 October 2022
Resolved
Structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these divisions shall be kept in good order so as to ensure their required performance if a fire occurs. In both the LP CO2 Room and the emergency generator room the vessel is utilizing two different penetration materials for a single cable run.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 19 October 2022
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. When in ROS status, vessel has minimum crew and maneuverability. Prior to activation, vessel must conduct fire and abandon ship drills, lower lifeboats into the water, and put all safety gear at location to the satisfaction of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 October 2022
Resolved
The company should identify equipment the operational failure of which may result in hazardous situations. The SMS should provide for specific measures aimed at promoting the reliability of such equipment. Vessel’s SMS system requires the calibration of critical gauges. This calibration is currently overdue by 90 days and while conducting a machinery walk through noted a broken gauge on the No 1 Ballast Pump for reading PSIG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 October 2021
Resolved
All exposed metal parts of electrical machines or equipment which are not intended to be “live” but are liable to become “live” under fault conditions, shall be earthed (grounded); and all electrical apparatus shall be so constructed and so installed that the danger of injury in ordinary handling shall not exist. Vessel is showing a ground on the 440VAC switchboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 October 2021
Resolved
Accumulator batteries shall be suitably housed, and compartments used primarily for their accommodation shall be properly constructed and efficiently ventilated. Vessel’s battery box for the GMDSS equipment is rusted out with various holes on the bottom edges.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 21 October 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations and to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel has two portable accommodation modules (PAM). Both have multiple holes in modules completely through to the deck. Furniture is not secured within and one head is out of commission. PAM’s can not be occupied by personnel until repaired.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 October 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations and to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Knife-edge on window leading into the Technician’s Room is so severely deteriorated that no seal is formed.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 21 October 2021
Resolved
Every crew member shall participate in at least one abandon ship drill and one fire drill every month. When a new crew is engaged, these drills shall be held before sailing. When vessel becomes activated must conduct drills to the satisfaction of the attending marine inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 21 October 2021
Resolved
All lifeboats shall be monthly turned out from their stowed position, without any persons on board if weather and sea conditions so allow. Vessel is moored stbd-side-to and unable to lower stbd lifeboat. Prior to activation vessel must exercise lifeboats to the satisfaction of the attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 October 2021
Resolved
Fire extinguishing appliances in new and existing cargo ships shall be kept in good order and available for immediate use at all times during the voyage. Vessel’s fire pump would not immediately turn on upon testing. After various attempts vessel was able to start and test fire pump.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 19 October 2021
Resolved
Before the ship leaves port and at all times during the voyage, all lifesaving appliances shall be in working order and ready for immediate use. Vessel is unable to make any announcements to the entire ship due to a non functioning public address system.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 March 2021
Resolved
The general principle governing the provision of lifeboats, life rafts and buoyant apparatus in a ship to which this chapter applies is that they shall be readily available in case of emergency. Vessel's STBD lifeboat propeller shaft packing was found sticking and binding, resulting in engine stall. Vessel's crew provided water flow lubrication through the cutlass bearing, causing lifeboat to operate satisfactory, as designed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 September 2020
Resolved
The purpose of this Chapter is to require the fullest practicable degree of fire protection, fire detection and fire extinction in ships. The following basic principles underlie the Regulations in this Chapter and are embodied in the Regulations as appropriate, having regard to the type of ships and the potential fire hazard involved: containment and extinction of any fire in the space of origin.
Fuel leaks discovered on #3 Ship Service Diesel Generator, while in operation, on external piping for #2 & #3 cylinders.
74 SOLAS (Unamend) II-2/2(e)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 September 2020
Resolved
All exposed metal parts of electrical machines components which are not intended to be "live" but are liable to become "live" under fault conditions, shall be earthed (grounded); and all electrical apparatus shall be so constructed and so installed that danger of injury in ordinary handling shall not exist.
Main switchboard 220V L3 phase ground detection system not functioning to manufacturer's specifications.
74 SOLAS (Unamend) II-1/27(a)(i)(1)
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 24 September 2020
Resolved
Every oil fuel pipe from a storage, settling or daily service tank situated above the double bottom shall be fitted with a cock or valve capable of being closed from outside the space concerned in the event of a fire arising in the space in which such tanks are situated.
Incinerator Main Diesel Oil (MDO) tank remote operated valve failed to close upon remote activation.
74 SOLAS (Unamend) II-2/54(c)
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 24 September 2020
Resolved
Plans and alterations shall be kept up to date, any alterations being recorded thereon as soon as practicable.
Structural fire protection, on bulkheads in machinery space supply ventilation rooms, is severely dilapidated and/or missing.
74 SOLAS (Uamaned)II-2/4
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 September 2020
Resolved
All electrical apparatus shall be so constructed and so installed that danger of injury in ordinary and so installed that danger of injury in ordinary handling shall not exist.
SSDG #3 wires exposed near DG HT JW pumps.
74 SOLAS (Unamend) II-1/27(a)(i)(1)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 September 2020
Resolved
All electrical apparatus shall be so constructed and so installed that danger of injury in ordinary and so installed that danger of injury in ordinary handling shall not exist.
Junction box for #2 ballast pump is cracked, having an exposed portion.
74 SOLAS (Unamend) II-1/27(a)(i)(1)
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 24 September 2020
Resolved
After any survey of the ship under Regulations 7, 8, 9 or 10 of this Chapter has been completed, no change shall be made in the structural arrangements, machinery equipment, etc. covered by the survey without the sanction of the Administration.
Visual alarm light positioned in the lower fwd level of of the machinery space is out.
Push button for fire alarm in fire control room is missing cover glass.
Low hydraulic oil light indicator at local steering control station is out.
74 SOLAS (Unamend) I/11
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 24 September 2020
Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory.
The company shall establish procedures to ensure that the ship is maintained in conformity with the provisions of the company. In meeting these requirements, the company shall ensure that: inspections are held at appropriate intervals, any non-conformity is reported, with its possible cause, if known, appropriate corrective action is taken, records of these activities are maintained.
PSTP's state that the SSDG's are to shutdown upon the jacket water reaching 92.3 degrees Celsius. While using dry-well to heat JW shutdown RTD's, shutdown failed to activate for all 3 SSDG's.
74 SOLAS (14) IX/3.1
ISM Code Part A/10.1 + 10.2
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 24 September 2020
Resolved
Every crew member shall participate in at least one abandon ship and one fire drill every month and a drill shall take place within 24 hours for a 25% crew change.
Conduct abandon ship and fire drill in the presence of CG MI's.
74 SOLAS (14) III/19.3.2
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 18 September 2019
Resolved
PA system inoperable.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 18 September 2019
Resolved
#11 and #14 cargo fan pneumatic rams for dmapner opening are inoperable.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 18 September 2019
Resolved
Noted an L2 ground fault on the emergency diesel generator switchboard
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 18 September 2019
Resolved
A-60 insulation at frame 42 starboard engine room separated from frame.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 18 September 2019
Resolved
#3 port double bottom man hole cover not watertight.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 September 2019
Resolved
Main engine exhaust gas temperature sensor inoperable. Alarm was faded alarm list.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 18 September 2019
Resolved
#1 HFO purifier leaking and lagging soaked through.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 18 September 2019
Resolved
Diesel oil purifier has a leak at the flanged connection.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 18 September 2019
Resolved
#2 Ships service generator has a fuel leak.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 18 September 2019
Resolved
Port steering gear has a phase failure alarm and is unable to clear.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 18 September 2019
Resolved
The A-60 door leading to the Tech Room will not close and latch.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 18 September 2019
Resolved
The window knife edge for the Tech Room is wasted through.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 September 2019
Resolved
Noted portable fire extinguishers placed in the wrong brackets, brackets too large for the installed extinguishers.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 18 September 2019
Resolved
Fire alarm panel on the bridge has 8 zones and only 6 are labeled.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 18 September 2019
Resolved
Retroreflective material on both lifeboats requires replacement.
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 18 September 2019
Resolved
There is no power to the bridge wings for the signaling lamp. The lamp can only be utilized on the battery pack.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 18 September 2019
Resolved
Float light batteries expired. Corrected on the spot.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 27 November 2018
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. De-lamination and water saturation of the fiberglass on sections of the floors of both lifeboats has occurred.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 November 2018
Resolved
At each inspection for certification and periodic inspection, the marine inspector shall conduct such tests and inspections of the main propulsion and auxiliary machinery and its associated equipment, including the fluid control systems, as he feels necessary to check safe operations. Technical publications for the completion of machinery testing were not available onboard the vessel, and such testing could not be completed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 October 2018
Resolved
Complete ABS listed conditions of class # 1015, 1010, 1007, 1004, 1003 prior to continuation of CG inspection.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 29 October 2018
Resolved
Fire extinguishing appliances in new and existing passenger ships and cargo ships shall be kept in good order and available for immediate use at all times during the voyage. Bridge fire alarm panel is showing an unexplained "trouble" alarm in Zone 9.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 October 2018
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: Structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these divisions. A-60 fire door for the emergency generator space on the starboard side did not close and latch properly.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 October 2018
Resolved
Every company should develop, implement and maintain a safety management system which includes the following functional requirements: Instructions and procedures to ensure safe operation of ships and protection of the environment in compliance with relevant international and flag state legislation. Mandate external ISM audit based on findings from deficiencies # 1 (lifesaving maintenance program) and 2 (lack of technical publications) listed above.
Engineering › Freshwater System (jacketwater cooling) › Pump
Issued 21 March 2018
Resolved
Install machinery guards on high water jacket pump
Engineering › Freshwater System (jacketwater cooling) › Pump
Issued 21 March 2018
Resolved
3 pieces of machinery located at frame 41 needing machinery guards
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 21 March 2018
Resolved
Replace all loose wiring located in Emergency generator room and engine room
Engineering › Lubricating Oil Service System › Purifier
Issued 21 March 2018
Resolved
Oil purifier room needs to be clean of excessive amounts of build up oil on bulkheads and in the bilge; All 835's were given to be done within 30 days after issuing date.
Construction/Loadline › Penetrations › Bottom Plug
Issued 21 March 2018
Resolved
Vessel failed to maintain Class A fire protection by way of deck penetration in the radio room.
Lifesaving › Inflatable Buoyant Apparatus › Serviceable
Issued 21 March 2018
Resolved
Vessel failed to maintain life saving appliances in good working order, i.e. life buoy makings and retro. Water lights not working.
Construction/Loadline › Structures › Door
Issued 21 March 2018
Resolved
Vessel failed to maintain the required Class A fire boundary on door D-50-A
Deck/Cargo › Mooring/Anchoring › Brake
Issued 21 March 2018
Resolved
Vessel brake pads on mooring winch found near failure, pads should be replaced prior to vessel movement.
Operations/Management › Drills/Instruction › Not Conducted
Issued 31 July 2017
Resolved
Conduct fire, abandon ship and security drills to the satisfaction of attending Marine Inspector. 46 CFR 199.180
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 31 July 2017
Resolved
Lifesaving appliances were on board but not on station. All lifesaving appliances must be placed on station to the satisfaction of attending MI.
Operations/Management › Drills/Instruction › Not Conducted
Issued 20 August 2015
Resolved
Conduct Abandon Ship, Fire and Security Drills in the pretense of a CG marine inspector.
Operations/Management › Drills/Instruction › Not Conducted
Issued 14 September 2011
Resolved
Prior to activation, conduct a satisfactory fire and boat drill.
Lifesaving › Lifeboat › Inherent Buoyancy
Issued 6 November 2008
Resolved
Remove all the water from the foam under the deck in the port lifeboat to the satisfaction of the cargo ship safety equipment certificate issuing authority (ABS). Provide report stating that the water has been completely removed and verification of the suitability of the lifeboat's structural integrity to [name withheld], TX.
Operations/Management › Drills/Instruction › Not Conducted
Issued 10 October 2007
Resolved
Upon manning for vessel activation, conduct fire and abandon ship drills in presence of USCG Marine Inspector.
Fire Fighting › Grease Extraction Hood › General
Issued 14 September 2005
Resolved
Provide certification and inspection report for galley hood.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 14 September 2005
Resolved
Provide full crew and conduct fire and abandon ship drills in presence of Coast Guard inspector.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 14 September 2005
Resolved
update/review and submit to Coast Guard for approval new fire control and safety plan.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 14 September 2005
Resolved
Repair fire door in vicinity of incenerator room and engine room.
Communications › Alarms/Indicators › Fire Alarm
Issued 14 September 2005
Resolved
Repair emergency fire pump indicator light on bridge.
Navigation › Piloting/Steering › Marine Charts
Issued 12 September 2005
Resolved
Provide updated navigational pubs and charts.
Engineering › Pressure Vessel › Relief Valve
Issued 12 September 2005
Resolved
Prove proper operation of (2) start air receiver safety relief valves.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 13 August 2004
Resolved
Prior to operating the vessel, have both portable fire extinguishers and fixed fire extinguishing systems serviced as required by 46 CFR 91.25-20, and operationally tested.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 13 August 2004
Resolved
Prove proper operation of the main deck sprinkler system. The vessel is not to carry vehicles on the main deck until the sprinkler system has been properly repaired and tested.
Communications › Alarms/Indicators › Bilge Alarm
Issued 13 August 2004
Resolved
Prove proper operation of steering compartment bilge-high water alarm.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 13 August 2004
Resolved
Prove proper operation of OWS. All oily bilge waste must be retained on board in holding tanks until the OWS has been properly repaired.
Fire Fighting › Ventilation Systems › Ducts
Issued 13 August 2004
Resolved
Prove proper operation of ventilation louvers for engine room.
Electrical › Lighting (service) › Lighting Fixture
Issued 13 August 2004
Resolved
Prove all deck lighting throughout vessel.
Lifesaving › Lifebuoys › Serviceable
Issued 13 August 2004
Resolved
Provide retro-reflective material and markings for lifebuoys, as necessary, throughout vessel.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 13 August 2004
Resolved
Properly mount lifebuoy waterlight on starboard bridge wing.
Electrical › Electric Supply System (service) › Cable
Issued 13 August 2004
Resolved
Properly secure wires in overhead of hydraulic room port side aft.
Construction/Loadline › Penetrations › Weld
Issued 13 August 2004
Resolved
Make proper repairs to wire penetration in deck of hydraulic room port side aft.
Engineering
Issued 22 June 2001
Resolved
Submit automation test procedures to the CG Marine Safety Center for reviewand approval.
Fire Fighting
Issued 22 June 2001
Resolved
Prior to sailing conduct fire drill with crew and conduct annual weight andoperational test fo starboard life boat.
Engineering
Issued 22 June 2001
Resolved
Install oil content meter IAW the manufactures instructions. All workmanship and testing must be completed to the satisfaction of the attending CG marine inspector.
Lifesaving
Issued 22 June 2001
Resolved
Renew/reservice hydrostatic release unit for EPIRB prior to 07/19/01.
Electrical
Issued 22 June 2001
Resolved
Pior to activation, prove proper operation of reverse power relays on the #2 and #3 SSG._x001C_ _x001C_ _x001C_
Fire Fighting
Issued 22 June 2001
Resolved
Prior to activation, inventory and replace all expired medicines in hospital space.
Lifesaving
Issued 12 April 2000
Resolved
Provide one (1) smoke signal, three (3) hand flares and one (1) parachute flare for starboard lifeboat.
Fire Fighting
Issued 12 April 2000
Resolved
Replace CO2 operating cables, both main valve and selector valve control for emergency generator room.
Fire Fighting
Issued 12 April 2000
Resolved
Replace batteries for the fire alarm panel.
Electrical
Issued 12 April 2000
Resolved
Repair transitional lighting in main deck passageway to Aux. boiler room.
Electrical
Issued 12 April 2000
Resolved
Replace missing globe & guard on explosion proof light in paint locker.
Electrical
Issued 12 April 2000
Resolved
Renew/Repair RPM gauge on Number 2 ship service diesel generator.
Construction/Loadline
Issued 12 April 2000
Resolved
Adjust and prove stern ramp door is watertight.
Construction/Loadline
Issued 12 April 2000
Resolved
Adjust and prove watertight door in guilotine door is watertight.
Lifesaving
Issued 12 April 2000
Resolved
Conduct fire & boat drills prior to activation.
Navigation
Issued 12 April 2000
Resolved
Repair GMDSS sitor screen and prove proper operation.
Lifesaving
Issued 12 April 2000
Resolved
Install life rafts and make ready for inspection.
Fire Fighting
Issued 12 April 2000
Resolved
Renew discharge pressure gauge on the emergency fire pump.
Lifesaving
Issued 12 April 2000
Resolved
Provide 15 fathom lines for one ring buoy on each side of vessel.
Fire Fighting
Issued 12 April 2000
Resolved
Remove paint or replace gaskets on all ventilation cover closures.
Navigation
Issued 12 April 2000
Resolved
Remove paint from Navigation light lens covers.
Lifesaving
Issued 12 April 2000
Resolved
Provide shackles for rigging on port fwd Jacobs ladder.
Lifesaving
Issued 12 April 2000
Resolved
Provide retro-reflective tape marking for both lifeboats IAW A.658(16).
Lifesaving
Issued 12 April 2000
Resolved
Repair handle on port side pilot boarding hatch door assembly.
Lifesaving
Issued 12 April 2000
Resolved
Provide four prime ejector cartridges for lin-throwing appliane.
Fire Fighting
Issued 12 April 2000
Resolved
Replace missing pair of gloves for main deck fire locker.
Construction/Loadline
Issued 12 April 2000
Resolved
Repair watertight door from engine room to steering room (door will not seal).
Lifesaving
Issued 13 June 1999
Resolved
CONDUCT FIRE AND BOAT DRILLS WHEN FULLY MANNED AND PRIOR TO ACTIVATION/SAILING.
Documentation
Issued 13 June 1999
Resolved
REPLACE ALL FIRE AND SAFETY PLANS WITH NEW PLANS DEPICTING LEGENDS.
Lifesaving
Issued 13 June 1999
Resolved
REMOVE ALL FLAMMABLES FROM UNAUTHORIZED ZONE 1 LOCATIONS.
Engineering
Issued 13 June 1999
Resolved
RENEW J/W TEMP GAUGE LOCATED ON #2 GENERATOR
Engineering
Issued 13 June 1999
Resolved
RENEW DRY ROTTED L/O HOSES LOCATED ON #2 GENERATOR CENTRIFUGAL FILTER.
Engineering
Issued 13 June 1999
Resolved
INSTALL VALVE HAND WHEEL ON J/W VALVE OVER #3 GENERATOR.
Electrical
Issued 13 June 1999
Resolved
RENEW HYDRAULIC HOSE LOCATED ON EMERGENCY GENERATOR STARTING SYSTEM. HOSE IS CHAFFING DUE TO LOCATION AND RUNNING UNDER FOUNDATION.
Engineering
Issued 13 June 1999
Resolved
INSTALL PROTECTIVE LAGGING AROUND TURBOCHARGER AND EXHAUST PIPING ON EMERGENCY GENERATOR.
Lifesaving
Issued 13 June 1999
Resolved
REPLACE ALL DEFECTIVE AND NON-SOLAS LIGHTS WITH APPROVED SOLAS LIGHTS.
Lifesaving
Issued 13 June 1999
Resolved
REPLACE OUTDATED ITEMS IN FIRST AID KIT ON STBD LIFEBOAT.
Engineering
Issued 13 June 1999
Resolved
RENEW F/O PRESSURE GAUGE LOCATED ON #2 GENERATOR
Engineering
Issued 13 June 1999
Resolved
RENEW J/W TEMP GAUGE LOCATED ON #1 GENERATOR
Engineering
Issued 13 June 1999
Resolved
RENEW DRY ROTTED L/O HOSE LOCATED ON #1 GENERATOR CENTRIFUGAL FILTER.
Fire Fighting
Issued 13 June 1999
Resolved
CHECK ALL FIRE STATIONS AND PROVIDE SPANNER WRENCHES WHERE NEEDED.
Engineering
Issued 13 June 1999
Resolved
INSTALL COVER FOR EXHAUST THERMOCOUPLE ON #1 GENERATOR
Engineering
Issued 13 June 1999
Resolved
RENEW F/O FILTER DIFFERENTIAL GAUGE ON #1 GENERATOR
Engineering
Issued 13 June 1999
Resolved
RENEW AIR PRESSURE GAUGE LOCATED ON #1 GENERATOR
Deck/Cargo
Issued 16 September 1998
Resolved
PROVIDE APPROVED PLANS FOR THE DECK SOCKET BACK-UP STRUCTURE.
Electrical
Issued 16 September 1998
Resolved
PROVIDE APPROVED PLANS FOR THE ELECTRICAL MODIFICATIONS.
Deck/Cargo
Issued 16 September 1998
Resolved
PROVIDE APPROVED PLANS FOR THE PIPING MODIFICATIONS.
Fire Fighting
Issued 16 September 1998
Resolved
PROVIDE UPDATE/CORRECTED FIRE CONTROL (SAFETY) PLAN TO USCG MSO MOBILE FOR REVIEW.
Documentation
Issued 20 May 1998
Resolved
NO CG APPROVED PLANS FOR INSTALLATION OF AN ADDITIONAL EVAPORATOR SYSTEM. MSC MUST REVIEW AND APPROVE PLANS FOR INSTALLATION OF THIS SYSTEM IAW NAVIC4-94.
Lifesaving
Issued 4 May 1998
Resolved
PROVIDE COVER FOR BATTERY BANK NEAR ENG CONTROL ROOM
Lifesaving
Issued 4 May 1998
Resolved
REPAIR COWLING ON ENG ROOM RECIRC FAN
Accommodation/Occupational Safety
Issued 4 May 1998
Resolved
REPAIR TOILET IN ENG ROOM AND PROVE PROPER OPERATION
Lifesaving
Issued 4 May 1998
Resolved
PRIOR TO ACTIVATION AND/OR GETTING U/W, CONDUCT FIRE & BOAT DRILL IN THE PRESENCE OF A MARINE INSPECTOR.
Electrical
Issued 4 May 1998
Resolved
REMOVE PLASTIC WIRE TIES AND REPLACE WITH PROPER MATERIAL FOR ALL WIRE RUNSIN ENG SPACES NLT 04MAY99 IAW 46 CFR 120.340(B)(4)
Fire Fighting
Issued 4 May 1998
Resolved
REPAIR FIRE DAMPENERS IN EDG ROOM AND PROVE PROPER OPERATION.
Lifesaving
Issued 4 May 1998
Resolved
CONDUCT LIFEBOAT WEIGHT TESTS PRIOR TO 12JUL98
Electrical
Issued 4 May 1998
Resolved
REPAIR #2 SHIP SERVICE AIR COMPRESSOR UNLOADER ASSEMBLY AND PROVE PROPER OPERATION.
Engineering
Issued 4 May 1998
Resolved
REPAIR/REPLACE RELIEF VALVE ON #1 START AIR RECEIVER TO RELIEVE BEFORE MAWP
Fire Fighting
Issued 4 May 1998
Resolved
REPAIR/REPLACE EMERG FIRE & BILGE PUMP AND PROVE OPERATION
Lifesaving
Issued 4 May 1998
Resolved
REMOVE BOX OF USED BATTERIES AND PAINT LOCKER ITEMS FROM ENG ROOM
Lifesaving
Issued 4 May 1998
Resolved
REPLACE REEFER ROOM INDICATOR LIGHTS AND PROVE PROPER OPERATION
Engineering
Issued 4 May 1998
Resolved
PROVIDE/INSTALL MECHANICAL PLUGS FOR ALL CONTAINMENT.
Lifesaving
Issued 4 May 1998
Resolved
LOWER STBD L/B TO WATER'S EDGE, RELEASE, AND START ENGINE.
Electrical
Issued 4 May 1998
Resolved
REPAIR THREE EMERG LIGHTS IN EDG ROOM_x001C_
Engineering
Issued 4 May 1998
Resolved
REPAIR F/O LEAK ON F/O TANK FOR EDG.
Lifesaving
Issued 4 May 1998
Resolved
PROVIDE EMERGENCY INSTRUCTIONS FOR EDG OPERATION
Construction/Loadline
Issued 4 May 1998
Resolved
REPAIR HOLES IN BULKHEAD NEAR AUX BOILER FLAT.
Lifesaving
Issued 4 May 1998
Resolved
PROVIDE/POST MUSTER LIST AT PORT LIFEBOAT EMBARKATION DECK
Fire Fighting
Issued 4 May 1998
Resolved
REPAIR/REPLACE EMERG FIRE PUMP DISCHARGE PRESSURE GAUGE
Lifesaving
Issued 4 May 1998
Resolved
PROVIDE LOCKING PIN ON EMBARKATION GATE FOR PORT L/B
Construction/Loadline
Issued 4 May 1998
Resolved
INSTALL FOREPEAK HATCH GASKET
Lifesaving
Issued 4 May 1998
Resolved
PROVIDE ADEQUATE WATER RATIONS FOR BOTH L/B
Construction/Loadline
Issued 4 May 1998
Resolved
REPAIR HOLE IN STBD INCINERATOR DIESEL OIL TANK CONTAINMENT
Electrical
Issued 2 July 1997
Resolved
PROVIDE ELECTRICAL OUTLET COVER AT LOCATION OUTSIDE CO2 LOW PRESSURE TANK ROOM.
Electrical
Issued 2 July 1997
Resolved
OBTAIN PROCEDURE FROM MANUFACTURER FOR OVERSPEED TEST PROCEDURES.
Electrical
Issued 2 July 1997
Resolved
REPLACE BATTERIES IN FLASHLIGHT LOCATED IN ELEVATOR
Electrical
Issued 2 July 1997
Resolved
PROVIDE PROPER STENCIL/WARNING FOR EMERGENCY STOVE DISCONNECT SWITCH
Electrical
Issued 2 July 1997
Resolved
PROVIDE LIGHT BULBS, IDENTIFY AND PROPERLY STENCIL ALL EMERGENCY LIGHTING.
Lifesaving
Issued 2 July 1997
Resolved
RENEW LIFE JACKETS (PFD'S) AS NEEDED
Engineering
Issued 2 July 1997
Resolved
PROVE PROPER OPERATION OF PRESSURE RELIEF VALVES ON ALL PRESSURE VESSELS INAIR START SYSTEM.
Engineering
Issued 2 July 1997
Resolved
REPLACE AND PROVE PROPER OPERATION OF CROSSOVER VALVE BETWEEN COLD START AND AIR START RECEIVERS
Fire Fighting
Issued 2 July 1997
Resolved
REPAIR ELECTRICAL SIREN FOR CO2 RELEASE IN LOWER VEHICLE STORAGE
Navigation
Issued 2 July 1997
Resolved
PROVE PROPER OPERATION OF STEERING PUMP INDICATOR ON ALARM PANEL IN BRIDGE
Navigation
Issued 2 July 1997
Resolved
PROVE PROPER OPERATION OF EMBARKATION LIGHT ON PORT PILOT STATION
Navigation
Issued 12 July 1996
Resolved
PROVE PROPER OPERATION OF STEERING GEAR ALARM PANELS ON BRIDGE.
Engineering
Issued 28 November 1995
Resolved
REPLACE 435 PSI SAFETY TO COLD START 160 PSI MAWP RECEIVER WITH ONE OF PROPER SIZE.
Unknown
Issued 28 November 1995
Resolved
PROVIDE HAND RELIEVING GEAR TO INSTALLED SAFETIES ON SHIP'S SERVICE AND CONTROL AIR RECEIVERS
Engineering
Issued 28 November 1995
Resolved
PROVIDE DOCUMENTATION ON TESTING AND MARKING FOR "COLD START" AND "SHIP'S WHISTLE" AIR RECEIVERS.
Construction/Loadline
Issued 28 November 1995
Resolved
RENEW/REPLACE WATERTIGHT GASKET TO MAIN CARGO HATCH/SLIDING COVER.
Electrical
Issued 28 November 1995
Resolved
REPLACE BROKEN BREAKER HANDLE TO MAIN SWITCH BOARD REFER CONTAINER OUTLET.
Unknown
Issued 28 November 1995
Resolved
REPLACE LOWER FLAME SIGHT GLASS TO INCINERATOR.
Casualty record · 1
10 August 2011Routine · role: Involved in a Marine Casualty · activity 4111418
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.