07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 September 2024
Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch... Fire pump could not achieve 60 psi (56 psi).
46 CFR 181.10-1(c)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2024
Resolved 1 October 2024
Resolution: Verified 60 psi at pump.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 September 2024
Resolved
All piping, valves,and fittings shall be in accordance with good marine practice and suitable for the purpose intended. Fire main pump seal is leaking.
46 CFR 181.15-5(c)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2024
Resolved 22 October 2024
Resolution: Vessel operator replaced fire pump seal. Sent USCG a video showing no leaks. All Sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 September 2024
Resolved
Exhaust piping shall be led to the point of escape with minimum number of bends or elbows. It shall be gas-tight throughout its length... The exhaust hose after the cooling injection point has multiple hose clamps and silicone RTV sealant as a temp repair.
46 CFR 182.15-20(a)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2024
Resolved 1 October 2024
Resolution: Exhaust hose and corresponding fittings replaced, verified installation.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 September 2024
Resolved
An internal structural examination conducted in compliance... consists of of a complete examination of the vessel's main strength members, hull plating, voids. Inspector's were unable to examine space that contained sewage tank due to excessive water, salt build up. Clean and vent space for re-inspection. Descale STBD fwd bulkhead in fuel tank space where coating is failing for re-inspection.
46 CFR 176.610(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 October 2024
Resolved 1 October 2024
Resolution: Scaling removed from designated area. SAT inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 January 2023
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than small buoyancy compartments, under all practical conditions. Lazerette bilge suction line wasted and ingesting air preventing bilge pump from gaining suction to de-water the space. Repair piping and prove proper operation of the Lazerette bilge suction line to the satisfaction of the attending MI.
46 CFR 182.25-1(a)
Old T-L
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2023
Resolution: Attended vessel and witnessed dewatering of Lazerette space utilizing the bilge manifold Lazerette bilge suction pipe.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 January 2023
Resolved
Shutoff valves, installed so as to close against the fuel flow, shall be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. Emergency fuel shutoff valves leaking fuel from packing gland nut. Repair and prove proper operation to the attending MI.
46 CFR 182.20-40(b)(3)
OLD T-L
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2023
Resolution: Attended vessel and witnessed closing of the emergency fuel shutoff valves with no fuel leaking from packing gland nut.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 26 January 2023
Resolved
Vessel owners or operators must ensure their vessels are operating in compliance with this part. Vessel failed to fully comply with the requirements contained in 33 CFR 104.140 and the approved Alternative Security Program by removing vessel from the list of covered vessel's listed on letter VS-331669-2842533 due to request for change of service from K-Existing (Old T-L) to Old T-L carrying no more than 150 passengers. Vessel passenger carriage reduced to no more 150 passengers until final Coast Guard approval of service change request.
33 CFR 104.115(a)
Action required: 705 - Other - as specified
Resolved 17 January 2024
Resolution: Vessel's change of service has been approved.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 January 2023
Resolved
Cables entering boxes or fittings shall be protected from abrasion, and shall conform with the following requirements: openings through which conductors enter shall be adequately closed and the cable armor shall be secured to the box or fitting. Generator distribution panel not closed in way of the bottom panel through which conductors enter. Additionally, the cable armor for the conductor wiring from the generator to the distribution panel and the distribution panel to the transformer are not secured the box or fitting. Secure as described above to the satisfaction of the attending MI.
46 CFR 183.10-20(f)(1-2) Old T-L
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 February 2023
Resolved 9 February 2023
Resolution: Received photograph of the the cable armor for the conductor wiring from the generator to the distribution panel and the distribution panel to the transformer secured to the box or fitting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 January 2023
Resolved
Where flexibility is necessary, a section of flexible metallic hose may be used. Nonmetallic hose may be used for wet exhaust systems provided it is especially adapted to resist the action of oil, acid, and heat, and has a wall thickness sufficient to prevent collapsing or panting, and is double clamped where practicable. Port generator exhaust hose collapsing. Replace hose to the satisfaction of the attending MI.
46 CFR 119.430(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 February 2023
Resolved 9 February 2023
Resolution: Received photograph of the port generator exhaust hose replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 26 January 2023
Resolved
ll electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Starboard side engine room light lighting fixture is not mounted to the overhead. Mount light fixture to the satisfaction of the attending MI.
46 CFR 183.01-15(a)
Old T-L
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 February 2023
Resolved 9 February 2023
Resolution: Received photograph of the starboard side engine room light lighting fixture mounted to the engine room overhead.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 May 2022
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including test of machinery alarms including bilge high level alarms. Vessel's crew was unable to conduct a satisfactory function test of the "Neutral Safety Throttle Only" Periodic Safety Test Procedure (PSTP). The Owner/Operator shall ensure that the crew can perform a satisfactory function test of the "Neutral Safety Throttle Only" PSTP to the satisfaction of the attending USCG Marine Inspector. If the crew cannot perform a satisfactory test of the "Neutral Safety Throttle Only" PSTP due to the current installation of the engines and controls the "Neutral Safety Throttle Only" PSTP shall be revised accordingly and submitted to the Marine Safety Center for review and approval. Once approved, a satisfactory test of the revised "Neutral Safety Throttle Only" PSTP will need to be completed to the satisfaction of the attending USCG Marine Inspector. 46CFR115.804(i)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2022
Resolved 9 June 2022
Resolution: Received an email from MSC with MSC letter E2-2201776 attached. This letter outlines that the company submitted a copy of the revised PSTPs, dated May, 2022, to MSC for review. MSC has approved these revised PSTPs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 December 2021
Resolved
Materials used in piping systems must meet the requirements of this subpart and be otherwise acceptable to the cognizant OCMI. The pipe fitting above the through hull valve that leads to the air conditioning system is fractured and shall be replaced. 46CFR182.700
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2021
Resolved 17 December 2021
Resolution: Attended vessel and verified that the fractured elbow in the piping system was replaced appropriately.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 17 December 2021
Resolved
Each vessel must carry a certificate with a valid endorsement while subject to the Bridge-to-Bridge Act. Vessel is a power-driven vessel of 20 meters or over in length and is required to have a valid Bridge-to-Bridge Act Certificate. Vessel does not have a valid Bridge-to-Bridge Act Certificate. 47CFR80.1005
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2021
Resolved 24 January 2022
Resolution: Received and uploaded a copy of the vessel's Bridge to Bridge Certificate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 December 2020
Resolved
The installation requirements for machinery are contained in applicable regulations in subchapter F (Marine Engineering of this chapter.
Attending MI observe the outboard port main engine turbo oil drain line actively leaking during engine operation.
Attending MI observed the outboard port generator fuel return line fitting leaking while the engine was static and the centerline generator fuel supply line actively leaking during engine operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2020
Resolved 18 February 2021
Resolution: Connection fitting was replaced in-kind and no leak was detected after running the equipment for 10 minutes.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 9 December 2020
Resolved
Fill pipes for fuel tanks must be so arranged that overflow of liquid or vapor cannot escape to the inside of the vessel. The 02 fuel fill pipes on the starboard side of the Tank Compartment are wasted. Provide a repair proposal to the satisfaction of the Marine Inspector to ensure fuel vapors do not escape into the compartment, and the main deck is made watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2020
Resolved 18 February 2021
Resolution: The 02 fuel fill pipes were repaired IAW the approved repair proposal.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 9 December 2020
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provision for a seaworthy hull. The forward watertight bulkhead of the Tank Compartment in way of the starboard winch box has corrosion which penetrates through the entire plate. Investigate the extent of the corrosion, and submit a repair proposal to the satisfaction of the Marine Inspector to restore the watertight integrity of the transverse bulkhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 December 2020
Resolved 18 February 2021
Resolution: The forward watertight bulkhead of the Tank Compartment in way of the starboard winch box was repaired IAW the approved repair proposal.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2020
Resolved
In systems and applications where flexible hoses are permitted to be clamped; double hose clamping is required where practicable.
The nonmetallic hose for raw water suction for both generators contained a single hose clamp.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2021
Resolved 18 February 2021
Resolution: Double hose clamps were installed on the raw water suction of both generators.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 9 December 2020
Resolved
The design of all exhaust systems must ensure minimum risk of injury to personnel. Protection must be provided in compliance with §116.970 of this chapter at such locations where persons or equipment might come in contact with an exhaust pipe.
Forward exhaust support stanchion for port outboard main engine exhaust not insulated. Aft exhaust support stanchion for port outboard main engine insulation loose and requires tensioning.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2021
Resolved 18 February 2021
Resolution: The forward exhaust support stanchion for the port outboard main engine exhaust has been insulated and the aft exhaust support stanchion for the port outboard main engine insulation has been properly installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2020
Resolved
Where flexibility is necessary, a section of flexible metallic hose may be used. Nonmetallic hose may be used for wet exhaust systems provided it is especially adapted to resist the action of oil, acid, and heat, and has a wall thickness sufficient to prevent collapsing or panting, and is double clamped where practicable.
Attending MI sighted a missing hose clamp on the inboard port main engine exhaust flexible hose at the aft engine room bulkhead transition.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2021
Resolved 18 February 2021
Resolution: Missing hose clamp on the inboard port main engine exhaust flexible hose has been installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 December 2020
Resolved
Vessels shall be inspected for compliance with the standards required by this subchapter. For items not covered by standards in this subchapter, inspection shall be in accordance with standards acceptable to the Officer in Charge, Marine Inspection, as good marine practice.
Attending MI sighted the fire extinguisher for the number five fire station placarding on the aft port side of the passenger accommodation space but no fire extinguisher. The fire extinguisher was relocated to the aft starboard side of the passenger accommodation space. Vessel must move fire stations dedicated placard to appropriate fire station location.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2021
Resolved 18 February 2021
Resolution: Fire station placard has been moved to the approrioate location.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 9 December 2020
Resolved
Each vessel must be provided with a visual and audible alarm at the operating station to indicate a high water level in each normally unmanned spaces.
The Void #1 high water indicator light illuminates in tandem with high water lights from other spaces.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2021
Resolved 18 February 2021
Resolution: Void #1 high water indicator light has been rewired and now does not illuminate in tandem with the other high water indicator lights.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 9 December 2020
Resolved
A self-propelled vessel must meet the applicable requirements for main and auxiliary steering apparatus in subchapter F (Marine Engineering) and J (Electrical Engineering) of this chapter.
The rudder angle indicator electrical box connected to the rudder post is not properly sealed to protect again water intrusion.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2021
Resolved 18 February 2021
Resolution: The wires inside the rudder angle indicator box has been rewired so that the box may be fully sealed. A full rudder angle indicator test was performed between the bridge and the rudder room. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 December 2020
Resolved
A vessel with installed toilet facilities must have a marine sanitation device that complies with 33 CFR part 159.
The stbd MSD drain line fitting has failed and the drain line is no longer connected to the system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2021
Resolved 18 February 2021
Resolution: The stbd MSD drain line fitting has been replaced in-kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 February 2020
Resolved
All machinery must be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure and personnel injury. Main engine sea water pipe has leak on a threaded flange prior to the sea water valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2020
Resolution: Threaded flange was removed and cleaned up. Witnessed proper installation and operation of watertight sea water pipe connection while engine was running.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 February 2020
Resolved
All machinery must be installed and maintained in such a manner as to afford adequate protection against fire, explosion, machinery failure and personnel injury. Fuel leak on outboard generator pooling diesel in the bilge. Repair or isolate prior to passengers.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2020
Resolved 10 March 2020
Resolution: Fuel line connection tightened and verified that the fuel was not leaking.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 February 2020
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Missing double hose clamps on multiple r/w hoses to include outboard generator.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2020
Resolved 10 February 2020
Resolution: Verified double hose clamps on all raw water hoses.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 February 2020
Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Flexible sea water suction line on inboard generator for wet exhaust collapsed possibly due to clogged sea water strainer.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2020
Resolved 10 February 2020
Resolution: Verified properly installed non-collapsing hose.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 10 February 2020
Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. Demonstrate proper operation of bilge high water level audible alarm for the Void # 1 space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2020
Resolved 10 March 2020
Resolution: Satisfactorily witnessed that the audible alarm for the bilge high level in Void #1.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 February 2020
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Demonstrate proper operation of both machanically driven bilge pumps.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 March 2020
Resolved 10 March 2020
Resolution: Satisfactorily witnessed opeational demonstration og both machanically driven bilge pumps.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 December 2019
Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Replace port outboard shaft no later than January 31, 2020. Port outboard shaft was found to have pit beyond allowable wastage limits. Vessel may continue to operate excluding the outboard port shaft.
Action required: 705 - Other - as specified
Due 31 January 2020
Resolved 16 January 2020
Resolution: Verified new shaft and prop in place. Shaft is in kind replacement. All sat.
Operations/Management › Drills/Instruction › Making Voice Radio Distress Call
Issued 8 January 2018
Resolved
Update Emergency Broadcast Placard Instructions with vessels correct call sign.
Condition: Improper/Lack of Maintenance
Due 8 February 2018
Resolved 8 January 2018
Resolution: Vessel correct call sign added to Emergency Broadcast Placard.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 6 November 2017
Resolved
Make draft marks contrasting colors.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 January 2018
Resolved 8 January 2018
Resolution: Draft marks painted contrasting colors.
Engineering › Bilge Water Management System › Piping
Issued 6 November 2017
Resolved
Properly mount bilge suction piping in way of #2 void space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2018
Resolved 6 July 2018
Resolution: Received picture of bilge suction piping properly mounted.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 6 November 2017
Resolved
Replace worn inboard shaft cutlass bearings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 20 December 2017
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 6 November 2017
Resolved
Clean and make shafts, props, and rudders available for inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 December 2017
Resolved 4 December 2017
Resolution: All props, rudders, and shafts cleaned made available for inspection; all sat.
Construction/Loadline › Penetrations › Pipe Flange
Issued 6 November 2017
Resolved
Renew piping for CHT tank at deck connection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2018
Resolved 5 July 2018
Resolution: Piping blanked off.
Engineering › Freshwater System (jacketwater cooling) › Valve
Issued 6 November 2017
Resolved
Remove seachest screens and make thru-hull penetrations available for inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 4 December 2017
Resolution: All screens removed for inspection; all sat.
Construction/Loadline › Hull › Hull Plating
Issued 6 November 2017
Resolved
Make winch boxes located in tank space watertight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 8 January 2018
Resolution: Winchboxes sealed and watertight.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 6 November 2017
Resolved
Properly seal and make vapor tight all insulation located in tank space in accordance with fire protection standards.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 8 January 2018
Resolution: Insulation installed IAW fire protection standards.
Construction/Loadline › Penetrations › Valve Flange
Issued 6 November 2017
Resolved
Reweld nipple portside for CHT piping.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2018
Resolved 5 July 2018
Resolution: Piping blanked off.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 6 November 2017
Resolved
Replace worn engine exhaust hoses.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2018
Resolved 5 July 2018
Resolution: Exhaust hose renewed to original.
Construction/Loadline › Penetrations › Valve Flange
Issued 6 November 2017
Resolved
Renew floor drain located starboard side lazarete.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 February 2018
Resolved 5 July 2018
Resolution: Floor drain replaced in kind.
Fire Fighting › Combustible Materials › Insulation
Issued 6 November 2017
Resolved
Provide specs for carpet replacement.
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 8 January 2018
Construction/Loadline › Hull › Hull Plating
Issued 6 November 2017
Resolved
Submit plans for approval to crop and renew wasted hull plating in way of transom.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2017
Resolved 4 December 2017
Resolution: Plans approved and wasted transom hull plating renewed in accordance with approved plans.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 6 November 2017
Resolved
Submit plans for approval to renew all wasted shaft/stern tubes. Upon approval of plans crop and renew to the satisfaction of an attending Coast Guard Marine Inspector prior to credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 December 2017
Resolved 12 December 2017
Resolution: Plans submitted and approved. Wasted shaft/stern tubes renewed to the satisfaction of an attending MI.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 29 November 2016
Resolved
Replace missing structural fire protection in the tank room to A-0.
Condition: Improper/Lack of Maintenance
Due 5 December 2016
Resolved 5 December 2016
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 29 November 2016
Resolved
Update the fire control plan to indicate (SFP) requirement. Deck between the tank room and public space to A-0 and the deck between the engine space and the public space A-60.
Condition: Placed in Improper Service
Due 5 December 2016
Resolved 5 December 2016
Engineering › Steering Gear System › Rudder Stock
Issued 28 November 2016
Resolved
Make repairs to the port outboard rudder to ensure rudder movement at helm command.
Condition: Improper/Lack of Maintenance
Due 30 November 2017
Resolved 20 December 2017
Resolution: Proper repairs made during drydock and tested sat.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Exhaust Manifold
Issued 28 November 2016
Resolved
Make repair to the leaking stbd exhaust pipe located in the lazarette and prove.
Due 28 November 2016
Resolved 29 November 2016
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 28 November 2016
Resolved
Remove from service the holed port sewage tank (isolate and gas free).
Condition: Improper/Lack of Maintenance
Due 28 November 2016
Resolved 29 November 2016
Construction/Loadline › Hull › Hull Plating
Issued 28 November 2016
Resolved
Prove the watertight integrity of the lazarette in way of the wasted vent box and other unapproved penetrations and exhaust rerouting.
Condition: Improper/Lack of Maintenance
Due 31 January 2017
Resolved 3 January 2017
Engineering › Bilge Water Management System › Piping
Issued 28 November 2016
Resolved
Make permanent repair to the bilge system in way of the temp repair.
Condition: Improper/Lack of Maintenance
Due 3 January 2017
Resolved 3 January 2017
Fire Fighting › Fire Main › Condition
Issued 28 November 2016
Resolved
Make permanent repairs to the deteriorated and leaking fire main system.
Condition: Improper/Lack of Maintenance
Due 28 November 2016
Resolved 29 November 2016
Construction/Loadline › Hull › Hull Plating
Issued 28 November 2016
Resolved
Seal the port winch box located in the engine space rigged for ventilation.
Condition: Placed in Improper Service
Due 5 December 2016
Resolved 5 December 2016
Construction/Loadline › Penetrations › Valve Flange
Issued 28 November 2016
Resolved
Provide a positive stop valve for the through hull penetration located in the lazarette (port side).
Condition: Placed in Improper Service
Due 3 January 2017
Resolved 3 January 2017
Accommodation/Occupational Safety › Ventilation › General
Issued 28 November 2016
Resolved
Remove unapproved power ventilation from the lazarette or provide plans for approval.
Condition: Placed in Improper Service
Due 3 January 2017
Resolved 3 January 2017
Engineering › Bilge Water Management System › Piping
Issued 28 November 2016
Resolved
Remove unapproved bilge systems throughout the vessel or provide plans for approval.
Condition: Placed in Improper Service
Due 3 January 2017
Resolved 3 January 2017
Engineering › Diesel Engine (auxiliary) › Waste Heat Recovery
Issued 28 November 2016
Resolved
Make repairs to the leak in the port genset cooling water overflow tank and prove.
Condition: Damaged By Earlier Event
Due 31 January 2017
Resolved 23 January 2017
Construction/Loadline › Penetrations › Gasket
Issued 28 November 2016
Resolved
Prove proper installation of cable penetration in way of loose cables in the engine room.
Condition: Improper/Lack of Maintenance
Due 31 January 2017
Resolved 23 January 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 28 November 2016
Resolved
Replace the deteriorated after cooling hose in way of the starboard outboard MDE.
Condition: Improper/Lack of Maintenance
Due 3 January 2017
Resolved 3 January 2017
Electrical › Electrical Distribution System (service) › Cable
Issued 28 November 2016
Resolved
Repair and provide chafing in way of the warn electrical cable (stbd genset & fire pump).
Condition: Improper Installation
Due 3 January 2017
Resolved 3 January 2017
Engineering › Bilge Water Management System › Piping
Issued 28 November 2016
Resolved
Make repair to the leaking forepeak bilge suction line located in the tank room.
Condition: Improper/Lack of Maintenance
Due 28 February 2017
Resolved 23 February 2017
Construction/Loadline › Hull › Hull Plating
Issued 28 November 2016
Resolved
Make repairs to the deteriorated winch box located in the tank room.
Condition: Improper/Lack of Maintenance
Due 3 January 2017
Resolved 3 January 2017
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 28 November 2016
Resolved
Provide life jacket donning instructions for the 2nd deck.
Condition: Improper Installation
Due 3 January 2017
Resolved 3 January 2017
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 28 November 2016
Resolved
Repair or replace life jackets in way of delaminating retro.
Condition: Improper/Lack of Maintenance
Due 3 January 2017
Resolved 3 January 2017
Navigation › Piloting/Steering › Marine Charts
Issued 28 November 2016
Resolved
Provide up-to-date charts for all operating areas as noted on the COI
Condition: Improper Installation
Due 3 January 2017
Resolved 3 January 2017
Construction/Loadline › Structures › Air Pipe
Issued 28 November 2016
Resolved
Repair/renew all vent closures found inoperable.
Condition: Improper/Lack of Maintenance
Due 3 January 2017
Resolved 3 January 2017
Lifesaving › Lifebuoys › Serviceable
Issued 28 November 2016
Resolved
Make repair or replace P&S ring buoys in way of the deteriorated plug, life lines, and retro.
Condition: Improper/Lack of Maintenance
Due 5 December 2016
Resolved 5 December 2016
Construction/Loadline › Penetrations › Pipe Flange
Issued 28 November 2016
Resolved
Renew the wasted coupling for the raw water intake (sewage sys.) located in the lazarette
Condition: Improper/Lack of Maintenance
Due 31 October 2017
Resolved 3 January 2017