Records from 1993 to 2025. Most recent: inspection, 24 October 2025.
Documentation record
Registered dimensions (L × B × D)33.0 ft × 10.0 ft × 4.0 ft
Registered tonnagegross 8 / net 7
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMARIAN BOAT WORKS · ANCHORAGE, AK, UNITED STATES · built 1993
Hull materialAluminum
PropulsionJet Drive
Hull shapeShip
Hull configurationMonohull
Hailing portSITKA, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationValid · issued 19 May 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it8 - Simplified, Gross Ton
7 - Simplified, Net Ton
5 - Displacement, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 31
24 October 2025
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8258039
10 October 2025
Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8254230
23 July 2025
Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8193130
19 February 2025
Plan Review "T" Boat · Examination of Repairs
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8085334
26 September 2024
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 8013435
26 October 2023
Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7814478
14 July 2023
Deficiency Check · COI Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7735092
19 April 2022
Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7429026
14 October 2021
COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7328623
23 September 2021
Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7319205
29 June 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6993079
24 April 2019
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6690688
28 March 2019
Inclining Experiment
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6651412
3 January 2019
Initial Certification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6605170
26 November 2018
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6587106
14 June 2007
Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2967052
6 April 2005
Administrative Inspection
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2327995
30 July 2004
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 2150440
6 June 2003
Hull Examination · Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1811261
5 June 2002
Annual Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1648582
22 May 2001
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1399684
31 July 2000
COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1395479
29 February 2000
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 815477
30 July 1999
Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1449254
12 June 1998
COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1402719
14 April 1995
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1159810
11 August 1993
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 832199
24 June 1993
MARPOL Annex V Examination · Initial Certification
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1401726
17 June 1993
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1153349
17 June 1993
Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1155652
12 June 1993
Initial Construction-Excluding Oversight · Plan Review "T" Boat
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 832141
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 July 2023
Resolved
A flammable vapor detection system must provide a visual and audible alarm at the operating station. Fuel tank void vapor detector was not alarming at the operating station when tested.
46 CFR 182.480(d)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 July 2023
Resolution: O/O rep installed new vapor detector in the fuel tank space. Test sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 14 July 2023
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Vessels installed vent closure devices were not properly closing when engaged.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 July 2023
Resolution: Ventillation closure devices were repaired and close properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 July 2023
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets. Port forward lifejacket stowage area was not proeprly marked with the correct quantity of PFD's.
46CFR 185.604(f)
Action required: 10 - Deficiency Rectified
Resolved 14 July 2023
Resolution: Life jacket stowage container was relabeled properly.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 14 October 2021
Resolved
An exhaust blower motor may not be installed in a duct,blower motors must be mounted as high above the bilge as practicable. Blower blades must be non sparking with reference to their housings. The two installed blower motors are located inside the ducting. Properly install power ventilation iaw 46 CFR 182.460. Prior to carrying passengers.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 July 2023
Resolution: Exhaust blowers were installed properly.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 14 October 2021
Resolved
Ventilation ducting must be of rigid permanent construction, which does no allow any appreciable vapor flow except through normal openings, and made of the same material as the hull or of non combustible material. The duct must lead as directly as possible from its intake opening to its terminus and be securely fastened and supported. The existing power ventilation ducting in the engine compartment is made of plastic. Properly install ventilation ducting iaw 46 CFR 182.460(h). Prior to carrying passengers.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 July 2023
Resolution: Non combustible ventilation ducting was installed.
Engineering › Diesel Engine (propulsion-reduction gear) › Connecting Rod
Issued 30 July 2004
Resolved
Vessel main engine damaged by internal component. Taken out of service.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2015
Resolution: vessel no longer USCG-inspected
Engineering › Fuel Oil Service System › Piping
Issued 22 May 2001
Resolved
ADEQUATELY MARK FUEL SHUT-OFF VALVES FOR PURPOSE AND DIRECTION IN ACCORDANCE WITH 46 CFR 185.608.
Condition: Unknown
Due 15 July 2001
Resolved 12 February 2015
Resolution: vessel no longer USCG-inspected
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 22 May 2001
Resolved
PROVIDE PLACARD, SIGN OR MARKINGS ON FORWARD EXIT "EMERGENCY EXIT, KEEP CLEAR" IN ACCORDANCE WITH 46 CFR 185.606.
Condition: Unknown
Due 15 July 2001
Resolved 12 February 2015
Resolution: vessel no longer USCG-inspected
Construction/Loadline
Issued 31 July 2000
Resolved
SUBMIT REPAIR PROPOSAL TO ADDRESS REMOVING INSTALLED "CLIPS" AT ALL BULKHEAD TO BOTTOM LONG ATTACHMENT POINTS AND RE-ATTACHING THESE AREAS WITHAN ACCEPTABLE METHOD.
Condition: Unknown
Due 14 August 2000
Resolved 9 August 2000
Construction/Loadline
Issued 31 July 2000
Resolved
INSTALL BILGE HIGH LEVEL ALARM IN ENGINE SPACE WITH VISUAL AND AUDIBLE ALARM AT OPERATING STATION.
Condition: Unknown
Due 14 August 2000
Resolved 9 August 2000
Unknown
Issued 31 July 2000
Resolved
INSTALL NEW PLASTIC WRAPPED FLOATATION IN UNDER DECK AREAS.
Condition: Unknown
Due 14 August 2000
Resolved 9 August 2000
Engineering › Fuel Oil Service System › Ventilation
Issued 31 July 2000
Resolved
Install or have available covers for air intakes to gasoline engine.
Condition: Unknown
Due 1 June 2001
Resolved 12 February 2015
Resolution: vessel no longer USCG-inspected
Engineering
Issued 31 July 2000
Resolved
RE-INSTALL FUEL TANK WITH ADDITIONAL BRACING UNDERNEATH TANK AND ADDITIONALHOLD-DOWN BRACKETS ALONG UPPER EDGES.
Condition: Unknown
Due 14 August 2000
Resolved 9 August 2000
Lifesaving
Issued 31 July 2000
Resolved
INSTALL FLAMMABLE VAPOR DETECTION SYSTEM WITH SENSOR IN ENGINE SPACE BILGE AND VISUAL AND AUDIBLE ALARM AT OPERATOR STATION.
Condition: Unknown
Due 14 August 2000
Resolved 9 August 2000
Electrical › Electrical Distribution System (service) › Switch
Issued 31 July 2000
Resolved
Install system to interlock exhaust blower in gasoline engine space to ignition switch.
Condition: Unknown
Due 1 June 2001
Resolved 12 February 2015
Resolution: vessel no longer USCG-inspected
Engineering
Issued 30 July 1999
Resolved
PROVE PROPER OPERATION OF ALL ENGINE GAUGES INCLUDING TEPERATURE AND RPM GAUGES.
Condition: Unknown
Due 15 September 1999
Resolved 4 November 1999
Construction/Loadline
Issued 30 July 1999
Resolved
REPLACE AFT DECKING COVERING ENGINE SPACES AND VOIDS- ROTTED WOOD.
Condition: Unknown
Due 15 September 1999
Resolved 4 November 1999
Accommodation/Occupational Safety
Issued 30 July 1999
Resolved
PROVE PROPER OPERATION OF WINDSHIELD WIPERS.
Condition: Unknown
Due 15 September 1999
Resolved 4 November 1999
Lifesaving
Issued 30 July 1999
Resolved
MARK NAME OF VESSEL ON RING BUOY.
Condition: Unknown
Due 30 July 1999
Resolved 30 July 1999
Deck/Cargo
Issued 30 July 1999
Resolved
PROVIDE ANCHOR LINE OF SUITABLE SIZE AND LENGTH.
Condition: Unknown
Due 15 September 1999
Resolved 4 November 1999
Engineering
Issued 30 July 1999
Resolved
REPAIR OR REPLACE CONTROL CABLES FOR BOTH MAIN ENGINES TO FREE UP OPERATION.
Condition: Unknown
Due 30 July 1999
Resolved 30 July 1999
Construction/Loadline
Issued 30 July 1999
Resolved
PROVE PROPER OPERATION OF BILGE PUMPS, INCLUDING HIGH WATER ALARMS.
Condition: Unknown
Due 15 September 1999
Resolved 4 November 1999
Lifesaving
Issued 30 July 1999
Resolved
CONDUCT UNDERWAY DRILLS AND OPERATIONAL TEST OF MAIN ENGINES, STEERING AND ELECTRICAL SYSTEMS.
Condition: Unknown
Due 30 July 1999
Resolved 30 July 1999
Fire Fighting
Issued 12 June 1998
Resolved
INSTALL FUME DETECTOR IN ENGINE COMPARTMENT.
Condition: Unknown
Due 12 July 1998
Resolved 20 October 1998
Construction/Loadline
Issued 12 June 1998
Resolved
INSTALL HIGH WATER ALARM. ALARM MUST BE AUDIBLE AND VISUAL AT THE CONTROL STATION.
Condition: Unknown
Due 12 July 1998
Resolved 20 October 1998
Documentation
Issued 12 June 1998
Resolved
RENEW ALASKA STATE REGISTRATION.
Condition: Unknown
Due 12 June 1998
Resolved 20 October 1998