MCV PRECISION is a 1967 offshore supply vessel. The Coast Guard has recorded 75 inspections since 1993, most recently in February 2024, along with 201 deficiencies and 31 operational controls.

Records from 1993 to 2024. Most recent: inspection, 27 February 2024.

Built
1967
Last inspected
27 February 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

6708678 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
392811
Flag
CAMBODIA
—
Maury page id
psix-392811

Inspections, by type

…with no type recorded57
Years with a record 15 calendar years (1993–2024)
The 75 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it1083 - Convention (Subpart B), Gross Ton
499 - Regulatory (Subpart C or D), Gross Ton
638 - Convention (Subpart B), Net Ton
333 - Regulatory (Subpart C or D), Net Ton
1186 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 75

27 February 2024 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7870875
12 June 2006 PII Safety Exam · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2677699
27 February 2006 Ballast Water Examination · ISM Exam · MARPOL Annex I Examination · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2587284
22 February 2006 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2589844
14 February 2006 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2584785
29 October 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2524530
29 August 2005 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2478289
24 August 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2472970
11 July 2005 Random ISPS/MTSA/PSC
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2422879
18 June 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2394139
5 May 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2349871
4 May 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2404847
25 April 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2341913
4 April 2005 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2325906
4 April 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2326185
29 March 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2322615
1 March 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2301498
26 February 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2299728
26 January 2005 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2333369
22 January 2005 In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2333353
21 January 2005 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2333131
19 January 2005 In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2277317
15 January 2005 ISPS II Exam · Ballast Water Examination · NPV Safety Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2274806
14 December 2004 NPV Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2259026
22 November 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2246644
19 November 2004 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2244162
29 July 2004 Random ISPS/MTSA/PSC
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2148753
28 July 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2151200
23 July 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2142685
25 May 2004 Deficiency Check · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2077443
22 May 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2075590
19 May 2004 Type not recorded
No type recorded · GROUP MIAMI · USCG Southeast District (CGD-SE) · Activity 2072217
11 April 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2041709
31 March 2004 Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2034587
16 January 2004 MARPOL Annex I Examination · Annual Inspection · MARPOL Annex V Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1986378
19 December 2003 In-Service Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1966799
25 March 2002 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1597364
19 February 2002 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1487539
25 January 2002 Administrative Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1481376
28 August 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 292793
3 May 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 289567
5 February 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 287029
2 February 2001 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 288997
8 August 2000 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 280944
19 May 1999 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 428665
21 January 1999 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 424770
20 January 1999 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 727427
14 November 1998 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 422843
22 September 1998 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 420680
20 February 1998 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 413042
15 January 1998 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 411891
15 December 1997 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 410982
26 September 1997 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 408322
13 September 1997 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 407697
12 May 1997 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 403653
19 September 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 522912
31 August 1996 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 394910
17 January 1995 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 374345
12 September 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 370501
12 September 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1429903
16 August 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 695017
25 June 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 115899
16 June 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 695018
15 June 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 367785
31 May 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 517247
6 May 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 487767
6 May 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1422366
16 April 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 470581
11 April 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 695019
5 April 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 457692
21 August 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 472641
8 August 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 539575
5 August 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 695024
2 August 1993 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 486786
30 July 1993 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 359970

Deficiency record · 201

Deck/Cargo › Ballast › Tank
Issued 12 June 2006 Resolved
Vessel main cargo hold is flooding with sea water from the port and starboard ballast water tanks. Vessel is required to immediately order divers and submit the report to US Coast Guard, Sector Miami. A tank sounding and draft reading log is required to be maintained not more than every 30 minutes until the soure of flooding is located.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 June 2006
Resolved 14 June 2006
Resolution: Received sat diving report. Vessel to make repairs.
Personnel › Certificates/Documents/Licenses › Medical Fitness Document
Issued 15 May 2006 Resolved
Provide medical certificate for A.B. Fax copy to Sector Miami office.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2006
Resolved 15 May 2006
Resolution: Medical certificate was received.
Navigation › Piloting/Steering › Marine Charts
Issued 15 May 2006 Resolved
Vessel does not have a chart correction log book. Provide log book and record of corrections.
Action required: 705 - Other - as specified
Due 29 May 2006
Resolved 27 February 2024
Resolution: 27FEB2024: Due to age of open deficiencies, I have cleared them to clean up Sector Miami Open Deficiencies List. No activities since 2006 from activity # 2677699. Inactivated vessel due to no activity for 18 years.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 27 February 2006 Resolved
GMDSS was not functional. No evidence that report was sent from the vessel to designated person ashore. Vessel departed Haiti to US with this condition.
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 27 February 2006 Resolved
The # 1 Ships service generator is inoperable. It was not reported by the ship to the company.
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 27 February 2006 Resolved
Master and Chief Engineer unable to locate the list of essential equipment required in the safety management manual.
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 27 February 2006 Resolved
Annual CCSSC Safety survey was completed with 10 plus deficiencies noted in the report. Discrepancies noted in the report were not recorde as non conformities in the ship's safety management system.
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Operations/Management › Vessel Safety Management › External Certification/Verification/Control
Issued 27 February 2006 Resolved
USCG completed ISM examination. Vessel is required to conduct an audit. It is recommendedthat this is an external audit completed by a third party.
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Communications › Radio Communications › Satellite Communications Capability
Issued 27 February 2006 Resolved
GMDSS is inoperable- shore fax system CCSSC 6.1.2
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Engineering › Generator (propulsion/auxiliary-electric) › Generator Voltage Regulator Circuitry
Issued 27 February 2006 Resolved
SS GENERATOR #1 is inoperable.
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Lifesaving › Inflatable Liferafts › Float Free
Issued 27 February 2006 Resolved
Hydrostatic releases on bothe bot liferafts are expired. CCSSC 5.2.3
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Communications › Radio Communications › EPIRB
Issued 27 February 2006 Resolved
Hydostatic release on epirb IS EXPIRED. CCSSC 5.2.3
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Construction/Loadline › Structures › Deck Plating
Issued 27 February 2006 Resolved
Deck located under the emergency generater is wasted. CCSSC 2.4.1
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Navigation › Piloting/Steering › Maneuvering Information Fact Sheet
Issued 27 February 2006 Resolved
Missing ships manuervering characteristics CCSSC 2.4.1
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Lifesaving › Rocket Parachute Flares › General
Issued 27 February 2006 Resolved
All rocket parachute flares are expired. CCSSC 6.1.2
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Communications › Radio Communications › Satellite Communications Capability
Issued 27 February 2006 Resolved
NAVTEX is not operational. CCSSC 6.1.2
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Navigation › Piloting/Steering › Marine Charts
Issued 27 February 2006 Resolved
MISSING Chart correction log CCSSC 6.1.2
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Navigation › Piloting/Steering › Local Notices to Mariners
Issued 27 February 2006 Resolved
MISSING current editions of NOTICE TO MARINERS
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Navigation › Piloting/Steering › US Coast Pilot
Issued 27 February 2006 Resolved
MISSING current edition of all nautical pubs
Action required: 705 - Other - as specified
Due 27 February 2006
Resolved 15 May 2006
Operations/Management › Port and Waterways Safety › Notice of Arrival, General
Issued 17 February 2006 Resolved
Vessel submittted an ANOA to the NVMC on 10FEB2006 at 1630. The ANOA had the wrong operator information. The owner information was placed in the operator part of the ANOA
Action required: 705 - Other - as specified
Due 17 February 2006
Resolved 17 February 2006
Operations/Management › Port and Waterways Safety › Notice of Hazardous Condition
Issued 17 February 2006 Resolved
Vessel's GMDSS was inoperable before and after entering port. Vessel entered US waters and did not inform the USCG of the hazardous condition that the inoperable GMDSS caused.
Action required: 705 - Other - as specified
Due 17 February 2006
Resolved 17 February 2006
Operations/Management › Vessel Safety Management › External Certification/Verification/Control
Issued 11 July 2005 Resolved
VESSELS INTERIM ISM SAFETY MANAGEMENT CERTIFICATE EXPIRED 05JUN05 AND VSL DID NOT HAVE A PLAN TO OBTAIN FULL TERM CERTFICATE
Action required: 15 - Rectify deficiencies by next port
Resolved 29 August 2005
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 11 July 2005 Resolved
VESSELS INTERIM (ISM) DOCUMENT OF COMPLIANCE EXPIRED ON 05JUN05 WITH NO PLAN TO OBTAIN FULL COMPLIANCE
Action required: 15 - Rectify deficiencies by next port
Resolved 29 August 2005
Documentation › Certificates/Documents › Minimum Safe Manning Document
Issued 11 July 2005 Resolved
VESSELS MINIMUM SAFE MANNING CERTIFICATE EXPIRED 19JUNE05 74 SOLAS V-14.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 August 2005
Personnel › Certificates/Documents/Licenses › STCW Certificate, Navigation Watch Rating
Issued 11 July 2005 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 15 - Rectify deficiencies by next port
Resolved 15 May 2006
Personnel › Training › Fire Fighting Advanced
Issued 11 July 2005 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 15 - Rectify deficiencies by next port
Resolved 15 May 2006
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 4 April 2005 Resolved
STBD FUEL OIL VENT CONTAINMENT IS MISSING DRAIN PLUG. THREADING WILL NOT FIT AND STRIPPED.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 4 April 2005 Resolved
Excessive oily water in the bilge. Provide receipt of disposal to an approved reception facility and fax receipt to USCG
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 4 April 2005 Resolved
Lower stern navigation light not operational.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Personnel › Certificates/Documents/Licenses › Medical Fitness Document
Issued 4 April 2005 Resolved
Number two oiler named Camas Mata Jorge has expired medical fitness document.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Engineering › Fuel Oil Service System › Piping
Issued 4 April 2005 Resolved
Diesel fuel piping on port side leading to emergency generator was found broken in a 20 ft section and plugged up. Make proper repairs to piping.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Deck/Cargo › Cargo Transfer (solid) › General
Issued 4 April 2005 Resolved
Wire rope on ships crane is kinked and frayed above the headache ball (hook). Make proper repairs or replacement
Due 18 April 2005
Resolved 8 April 2005
Navigation › Piloting/Steering › US Coast Pilot
Issued 4 April 2005 Resolved
Replace outdated navigation publications with current editions.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Navigation › Piloting/Steering › Marine Charts
Issued 4 April 2005 Resolved
Replace outdated old edition nautical charts with the present editions and make proper updated corrections.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 4 April 2005 Resolved
GMDSS inonoperable and crew was unfamiliar with its use
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 4 April 2005 Resolved
Ships fireplan does not reflect international shore connection. -Master marked it on the spot but it is not approved by adminstration/ class
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Documentation › Certificates/Documents › Cargo Ship Safety Certificate
Issued 4 April 2005 Resolved
CCSSC certificate expired
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Documentation › Certificates/Documents › International Load Line Certificate
Issued 4 April 2005 Resolved
ILLC expired
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Documentation › Certificates/Documents › Cargo Ship Safety Radio Certificate
Issued 4 April 2005 Resolved
CSRC expired
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 4 April 2005 Resolved
Inadequate amounts of food and provisions onboard
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Documentation › Safety Management System › Reports and Analysis Procedures
Issued 4 April 2005 Resolved
No records of safety board meetings as required by ISM code and ships SMS reports not completed IAW with ships SMS manual chapter 10 pertaining to reporting requirements to DPA
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2005
Deck/Cargo › Cargo Stowage › General
Issued 21 January 2005 Resolved
Repair broken hatch on main deck, forward port side, leading to #2 cargo hold to the satisfaction of flag state or class society and provide report to USCG.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 January 2005
Resolution: Hatch repaired and tested for watertightness.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 19 January 2005 Resolved
Provide documenttation that Global Marine Bureau Inc. is a recognized organization IAW IMO resolution A.739(18).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 January 2005
Resolution: Letter of Authorization provided stating that GMB is a recognized organization under vessel''''s flag.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 19 January 2005 Resolved
Provide documentation that Global Marine Bureau Inc. is a licensed business in the state of Florida.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 January 2005
Resolution: Documentation was submitted stating that GMB is not licensed in Florida as it is an authorized international classification society with offices overseas.
Electrical › Electric Supply System (service) › Cable
Issued 15 January 2005 Resolved
Remove or repair all improperly spliced and bare wiring throughout vessel and remove all non-approved extension cords.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 4 April 2005
Engineering › Freshwater Generation System › Pump
Issued 15 January 2005 Resolved
Repair potable water pump.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 January 2005
Resolution: Pump has been repaired.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 15 January 2005 Resolved
Wasted containment at starboard fuel oil vent.
Condition: Improper/Lack of Maintenance
Due 15 February 2005
Resolved 4 April 2005
Operations/Management › Pollution › Control of Discharge of Oil
Issued 15 January 2005 Resolved
Repair leaks in hydraulic line on port side forward (t-shirts were wrapped around joints).
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 January 2005
Resolution: Joints in line have been repaired.
Navigation › Piloting/Steering › Marine Charts
Issued 15 January 2005 Resolved
Charts for intended voyage must be updated.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 January 2005
Resolution: Charts have been updated.
Construction/Loadline › Penetrations › Gasket
Issued 15 January 2005 Resolved
All external water-tight doors must be repaired; hatch gaskets and wasted door sections must be replaced.
Condition: Improper/Lack of Maintenance
Due 15 February 2005
Resolved 21 January 2005
Resolution: External doors and gaskets have been repaired.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 January 2005 Resolved
Repair/replace anchor and stern lights.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2005
Resolution: Lights have been repaired.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 15 January 2005 Resolved
Replace all dry-rotted lines on lifebuoys.
Condition: Unknown
Due 15 February 2005
Resolved 21 January 2005
Resolution: Lines on lifebuoys have been repaired.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 15 January 2005 Resolved
Repair pilot ladder (rung broke during boarding).
Condition: Damaged By Earlier Event
Due 15 February 2005
Resolved 21 January 2005
Resolution: Pilot ladder replaced with new one.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 15 January 2005 Resolved
Replace non-working lamps in staterooms.
Condition: Unknown
Due 15 February 2005
Resolved 21 January 2005
Resolution: Lamps replaced.
Fire Fighting › Nozzles › Type
Issued 15 January 2005 Resolved
Replace all nozzles with SOLAS-approved vari-nozzles.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 January 2005
Resolution: Nozzles replaced.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 15 January 2005 Resolved
Replace missing globes on superstructure lighting.
Condition: Unknown
Due 15 February 2005
Resolved 4 April 2005
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 15 January 2005 Resolved
Replace expired hydrostatic release on port side life raft.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 January 2005
Resolution: Hydro release has been replaced.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 15 January 2005 Resolved
Repair/replace inoperable emergency lighting in passsageways.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 January 2005
Resolution: Emergency lighting has been repaired.
Engineering › Diesel Engine (propulsion-direct drive) › Turbocharger
Issued 9 June 2004 Resolved
There is oil in the main engine turbo charger. Repair all seals in turbo charger. Prove proper operation prior to departure. LEGACY COMPONENT DESC: Turbocharger
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 June 2004
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 9 June 2004 Resolved
Vessel Documents and crew liscenses must be checked by USCG marine inspector prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 June 2004
Resolved 29 June 2004
Construction/Loadline › Structures › Superstructure
Issued 9 June 2004 Resolved
Repair framing to ventilation (wire mesh) on stbd side to forepeak prior to 09 July 2004.
Due 9 July 2004
Resolved 29 July 2004
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 June 2004 Resolved
Replace spliced wire on flying bridge, wire is leading to a deck light prior to 09 July 2004.
Due 9 July 2004
Resolved 29 July 2004
Construction/Loadline › Structures › Scuttle
Issued 9 June 2004 Resolved
Stbd settling tank access cover is missing several bolts. Replace bolts by 09 July 2004.
Due 9 July 2004
Resolved 29 July 2004
Construction/Loadline › Structures
Issued 25 May 2004 Resolved
Several holes found on the ship:a.) ballast piping in the # 2 cargo hold is wasted.b.) Bulk head by masters cabin is wasted, inproper insallation of AC .d) Bulkhead by main passageway.e.) 2 holes in hull port side fwd above water line. f).Holes in overhead by galley. ALL DEFS PRIOR TO CARGO OPS. LEGACY COMPONENT DESC: Superstructure
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Electrical › Lighting (service)
Issued 25 May 2004 Resolved
Lighting fixtures: a.) All lighting in cargo hold needs tubes replaced. b.) The galley needs to remove or replace tube lighting fixtures. PRIOR TO CARGO OPS. LEGACY COMPONENT DESC: Lighting Fixture
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Electrical › Electric Supply System (service)
Issued 25 May 2004 Resolved
Permantly and properly repair all dead ended wiring in: a.) the galley, b.) the flying bridge (lighting fixtures), c.) The emergency generator room. d.) Stearing room. Permarntly and properly repair all dead end wiring. Prior to Cargo OPS. LEGACY COMPONENT DESC: Cable
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Fire Fighting › Miscellaneous Items
Issued 25 May 2004 Resolved
All fire stations are either missing the spanner wrench or hose nozzle. Prior to Caro OPS
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Deck/Cargo › Mooring/Anchoring
Issued 25 May 2004 Resolved
Anchor tube housing is wasted and holed inside of the paint locker. Permantly repair anchor tube. PRIOR TO CARGO OPS. LEGACY COMPONENT DESC: Anchor
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Electrical › Electrical Distribution System (service)
Issued 25 May 2004 Resolved
Repair electrical shore connection. Prior to cargo ops. LEGACY COMPONENT DESC: Shore Connection Box
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Engineering › Generator (propulsion/auxiliary-electric)
Issued 25 May 2004 Resolved
Emergency GEN. fuel hose is improper. Replace with fuel rated hose or piping. Prior to cargo ops. LEGACY COMPONENT DESC: fuel hose
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Accommodation/Occupational Safety › Refrigeration (stores)
Issued 25 May 2004 Resolved
Freezer in stearing compartment not properly mounted. Prior to Cargo OPS. LEGACY COMPONENT DESC: Not properly mounted
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Deck/Cargo › Holds/Tanks
Issued 25 May 2004 Resolved
Aft deck behind stearing gear shows evidence of wasted tank top. (ballast or tank top). Prior to cargo OPS. LEGACY COMPONENT DESC: wasted tank top
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Construction/Loadline › Structures
Issued 25 May 2004 Resolved
Have flag state address compressed wood with wooden stiffeners in stearing gear compartment. Is the covering proper for a machinery space. LEGACY COMPONENT DESC: Machinery Space Opening
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Electrical › Electrical Distribution System (service)
Issued 25 May 2004 Resolved
Main swbd gate cannot be closed . Find way to close gate or install panels on back of swbd. LEGACY COMPONENT DESC: Switchboard
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Construction/Loadline › Structures
Issued 25 May 2004 Resolved
Overhead in way of swbd wasted LEGACY COMPONENT DESC: Overhead
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Engineering › Fuel Oil Service System
Issued 25 May 2004 Resolved
Remote fuel oil shutoff frozen open. Prior to cargo ops. LEGACY COMPONENT DESC: Valve
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Engineering › Bilge Water Management System
Issued 25 May 2004 Resolved
Bildges are high with oily water. Discharge to a shoreside facility.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Engineering › Bilge Water Management System
Issued 25 May 2004 Resolved
Hose in middle of bilge piping that runs to the aft of the bilge. Replace with piping. LEGACY COMPONENT DESC: Piping
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Fire Fighting › Fire Pumps
Issued 25 May 2004 Resolved
Fire pump leaks. repair leaks.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Pollution Prevention/Response › Prevention Equipment
Issued 25 May 2004 Resolved
OWS not functional. Repair OWS LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Engineering › Diesel Engine (propulsion-direct drive)
Issued 25 May 2004 Resolved
There is oil in the MDE's turbo. Repair all seals. Prove proper operation LEGACY COMPONENT DESC: Turbocharger
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Accommodation/Occupational Safety › Sleeping Accommodations
Issued 25 May 2004 Resolved
Hatch gasket is worn not allowing a seal. LEGACY COMPONENT DESC: Hatch
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Engineering › Diesel Engine (auxiliary)
Issued 25 May 2004 Resolved
Port GEN has several components needing maintenance. Prove proper operation. Prior to cargo ops.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2004
Electrical › Electric Supply System (service)
Issued 16 January 2004 Resolved
Repair Lighting fixture in Forward Cargo hold.
Due 28 March 2004
Resolved 31 March 2004
Construction/Loadline › Structures
Issued 16 January 2004 Resolved
Repair Port hole on door leading into aft superstructure. LEGACY COMPONENT DESC: Door
Due 28 March 2004
Resolved 31 March 2004
Electrical › Electric Supply System (service)
Issued 16 January 2004 Resolved
Cover open spaces on Navigation Light Panel
Due 28 March 2004
Resolved 31 March 2004
Construction/Loadline › Hull
Issued 19 December 2003 Resolved
Large/deep inset IWO (in way of) the forward starboard peak tank. Have class survey and repair as need to the satisfaction of Class. Prior to Next US Port after drydock. LEGACY COMPONENT DESC: Hull Plating
Action required: 15 - Rectify deficiencies by next port
Resolved 19 December 2003
Engineering › Fuel Oil Service System
Issued 19 December 2003 Resolved
Improper drain hose to fuel system. Remove hose and hard pipe properly to satisfaction of the attending USCG Marine Inspector. Prior to next US Port after drydock.
Action required: 15 - Rectify deficiencies by next port
Resolved 19 December 2003
Engineering
Issued 19 December 2003 Resolved
Hole in Starboard side sea chest vent line. Make permanent and proper repairs to the satisfaction of the attending USCG Marine Inspector. After drydock.
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Fire Fighting › Fire Main
Issued 19 December 2003 Resolved
Improper repairs on fire main in engine room (port side forward). . Make permanent and proper repairs to the satisfaction of the attending USCG Marine Inspector after drydock. LEGACY COMPONENT DESC: Condition
Action required: 15 - Rectify deficiencies by next port
Resolved 19 December 2003
Electrical › Electric Generation Source (service)
Issued 19 December 2003 Resolved
Dead-ended and improper wiring to control box after of port generator. Make permanent and proper repairs to the satisfaction of the attending USCG Marine Inspector after drydock. LEGACY COMPONENT DESC: Generator Cable
Action required: 15 - Rectify deficiencies by next port
Resolved 19 December 2003
Electrical › Electric Generation Source (service)
Issued 19 December 2003 Resolved
Improper wiring on both the main generators. Make permanent and proper repairs to the satisfaction of the attending USCG Marine Inspector after drydock LEGACY COMPONENT DESC: Generator Cable
Action required: 15 - Rectify deficiencies by next port
Resolved 19 December 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 19 December 2003 Resolved
Deck plating in engine room has missing or wasted framing, deck plated not secured properly. Make permanent and proper repairs to the satisfaction of the attending USCG Marine Inspector after drydock.
Action required: 15 - Rectify deficiencies by next port
Resolved 19 December 2003
Accommodation/Occupational Safety › Cooking Systems
Issued 19 December 2003 Resolved
Stove in galley sitting on wood and not properly mounted. Make permanent and proper repairs to the satisfaction of the attending USCG Marine Inspector after drydock.
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Navigation › Piloting/Steering
Issued 19 December 2003 Resolved
Provide and properly post on bridge an up to date Deviation Table for magnetic compass to the satisfaction of the attending USCG Marine Inspector after drydock. LEGACY COMPONENT DESC: Deviation Table/Graph
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Navigation › Collision/Grounding Avoidance
Issued 19 December 2003 Resolved
Provide paper for the depth sounder and prove proper operation to the satisfaction of the attending USCG Marine Inspector after drydock. LEGACY COMPONENT DESC: Echo-sounding Device Recorder
Action required: 15 - Rectify deficiencies by next port
Resolved 19 December 2003
Navigation › Collision/Grounding Avoidance
Issued 19 December 2003 Resolved
Replace lens on stern towing nav light. Make permanent and proper repairs to the satisfaction of the attending USCG Marine Inspector. LEGACY COMPONENT DESC: Navigation Lights
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Navigation › Piloting/Steering
Issued 19 December 2003 Resolved
Provide paper for the Navtex and prove proper operation to the satisfaction of the attending USCG Marine Inspector.
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Communications › Radio Communications
Issued 19 December 2003 Resolved
Prove proper operation of the 2182Mz receiver to the satisfaction of the attending USCG Marine Inspector.
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Documentation › Manuals/Policy Documentation
Issued 19 December 2003 Resolved
Proved Class approved copy of the SOPEP, Transfer procedures and Cargo Securing Manual prior to loading Cargo to the satisfaction of the attending USCG Marine Inspector.
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Construction/Loadline › Hull
Issued 19 December 2003 Resolved
Vessel is overdue for dry docking and hull survey. Provide an approved dry docking and hull survey, to the satisfaction of the attending USCG Marine Inspector
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Documentation › Certificates/Documents
Issued 19 December 2003 Resolved
Provide valid SOLAS certificate for the vessel and STCW/Mariners papers for the crew prior to Departing next US Port.
Action required: 15 - Rectify deficiencies by next port
Resolved 18 February 2004
Operations/Management › Drills/Instruction
Issued 19 December 2003 Resolved
Complete a full Port State Control Exam to include crew drills upon completing dry dock and prior to loading any cargo.
Action required: 705 - Other - as specified
Resolved 18 February 2004
Construction/Loadline › Hull
Issued 25 March 2002 Resolved
Have Class address dry-dock dates. Vsl is due for dry-dock in April 2002.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2004
Construction/Loadline › Hull
Issued 25 March 2002 Resolved
Have Class address wasted anchor foundation.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 March 2004
Construction/Loadline › Structures
Issued 25 March 2002 Resolved
Have Class adress wasted forward mast.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 March 2004
Engineering › Fuel Oil Storage/Transfer System
Issued 25 March 2002 Resolved
Have Class address soft patches on on fuel line for #1 generator, forward. LEGACY COMPONENT DESC: Piping
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 February 2004
Engineering
Issued 25 March 2002 Resolved
Have Class address fuel leaks into ballast water tank, portside aft (frames 20-42)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 March 2004
Pollution Prevention/Response › Prevention Equipment
Issued 25 March 2002 Resolved
Relabe/stencil MSD tank vent to reflect as such (venat labelled as ballast tank) LEGACY COMPONENT DESC: Marine Sanitation Device, Type 1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 March 2004
Documentation
Issued 25 March 2002 Resolved
Provide a Surveyors report attesting to clearance of all defs as well as outstanding items of class.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 February 2004
Documentation › Certificates/Documents
Issued 19 February 2002 Resolved
Provide manning in accordance with Safe Manning Document and STCW. LEGACY COMPONENT DESC: Minimum Safe Manning Document
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 February 2002
Electrical › Electrical Distribution System (service)
Issued 28 January 2002 Resolved
Repair back panel to engine control room switchboard (exposed wires/fuses etc...). LEGACY COMPONENT DESC: Switchboard
Action required: 705 - Other - as specified
Due 28 February 2002
Resolved 28 January 2002
Personnel › Manning/Qualifications
Issued 25 January 2002 Resolved
Provide valid licenses for all crew members IAW the Minimum Safe Manning document. LEGACY COMPONENT DESC: Minimum Safe Manning
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 25 January 2002
Resolved 28 January 2002
Resolution: Vessel manned IAW safe manning document.
Lifesaving › Lifejacket/PFD (Type I)
Issued 25 January 2002 Resolved
Provide lifejackets IAW CCSSC 4.11 (light) and CCSSC certificate (quantity-19 total). LEGACY COMPONENT DESC: Lights
Action required: 17 - Rectify deficiencies prior to departure
Due 25 January 2002
Resolved 28 January 2002
Fire Fighting › Fire Pumps
Issued 25 January 2002 Resolved
Show proof of proper operation of main and emergency fire pumps (no water flowing to bow when using main). Emergency fire pump would not start/run. LEGACY COMPONENT DESC: Pressure
Action required: 17 - Rectify deficiencies prior to departure
Due 25 January 2002
Resolved 28 January 2002
Lifesaving
Issued 28 August 2001 Resolved
Replace reflective tape on all lifesaving equipment with SOLAS type tape where needed.
Condition: Unknown
Due 28 October 2001
Resolved 28 January 2002
Documentation
Issued 28 August 2001 Resolved
Start making entries to Oil Record book.
Condition: Unknown
Due 28 October 2001
Resolved 28 January 2002
Navigation
Issued 28 August 2001 Resolved
Update deviation card for compass.
Condition: Unknown
Due 28 October 2001
Resolved 28 August 2001
Unknown
Issued 28 August 2001 Resolved
Prior to loading and departure submit to Coast Guard Annual Exam.
Condition: Unknown
Due 28 August 2001
Resolved 29 August 2001
Documentation
Issued 28 August 2001 Resolved
Get Flag Adminstation approval to store paint in forward port Bosn stores.
Condition: Unknown
Due 28 October 2001
Resolved 31 March 2004
Documentation
Issued 28 August 2001 Resolved
Prior to loading and departure man vessel IAW the Safe Manning Document.
Condition: Unknown
Due 28 August 2001
Resolved 29 August 2001
Documentation
Issued 28 August 2001 Resolved
Prior to bunkering in U.S. waters provide complete oil transfer procedures with qualified designated person in charge and required crew members.
Condition: Unknown
Due 28 August 2001
Resolved 29 August 2001
Unknown
Issued 28 August 2001 Resolved
Prior to loading and departure provide class/flag report stating the vesselmeets all regulations and laws that apply including CCSSC and provide an annual endorsement for CCSSC, IOPP, and LL certs.
Condition: Unknown
Due 28 August 2001
Resolved 29 August 2001
Documentation
Issued 2 February 2001 Resolved
Man subject vessel in accordance with the Safe Manning Certificate. The subject vessel sailed short from Haiti to Miami. Missing One Ordinary Seaman and One Engineering Officer.
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Construction/Loadline
Issued 2 February 2001 Resolved
Prove proper operation of the Oil Water Seperator. Oil content meter indicated >15ppm but failed to divert the oil/water flow to the slop tank.
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Engineering
Issued 8 August 2000 Resolved
PROVIDE STATEMENT THAT ONLY ONE COMPRESSOR IS NEEDED FOR SUPPLYING STARTINGAIR OR REPAIR SECOND AIR COMPRESSOR.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Engineering
Issued 8 August 2000 Resolved
REPAIR FUEL OIL PURIFIER.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Engineering
Issued 8 August 2000 Resolved
PROVE PROPER OPERATION OF MAIN DIESEL ENGINE.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
REPLACE ALL WASTED HINGES, SECURING DEVICES, HOLED AND WASTED HATCH COVERS TO ALL MAN HATCHES AND DOORS.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
REPLACE MISSING SECURING DEVICES FOR MAIN HATCH COVERS OR INSTALL SATISFACTORY BATTEN DEVICES.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
PROVIDE REPORT ON THE ACCEPTABILITY OF HATCH COAMING LIP WHERE WHEEL ROLLERS LAND (HOLED IN SEVERAL AREAS).
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
PROVIDE REPORT AS TO THE SERVICEABILITY AND CONDITION OF HATCH COVERS.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
REPLACE WASTED BALLAST WATER AIR PIPES ON MAIN DECK.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Deck/Cargo
Issued 8 August 2000 Resolved
REPLACE WASTED OIL CONTAINMENT BOX SECTIONS.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
REPAIR BULKHEAD TO PAINT LOCKER (HOLED).
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Accommodation/Occupational Safety
Issued 8 August 2000 Resolved
PROVIDE SANITARY DRAINS AND PROVE SEWAGE SYSTEM MEETS 33 C.F.R. 159 AND ILO-147.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
MAKE INSERTS TO WASTED SECTIONS OF SIDESHELL FRAMING IN MAIN CARGO HOLD. SPECIAL AREAS NOTED WERE IN WAY OF TWEEN DECK AND TANK TOP.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
REPAIR WASTED BALLAST AIR (VENTILATION) PIPES LOCATED IN MAIN CARGO HOLD.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Accommodation/Occupational Safety
Issued 8 August 2000 Resolved
ENSURE ONBOARD SEWAGE IS HELD IN TANK WITH ADEQUATE CAPACITY OR PROVIDE PORTABLE TOILET FACILITIES WHILE IN PORT TAMPA.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Documentation
Issued 8 August 2000 Resolved
PROVIDE THE FOLLOWING CREDENTIALS IN ACCORDANCE WITH THE MINIMUM MANNING DOCUMENT PRIOR TO DEPARTURE: (1) FIRST ENGINEER, (2) ABLE SEAMEN, (2) OILERS/MOTORMEN.
Condition: Unknown
Due 28 November 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
PROVE SATISFACTORY OUTPUT IF PORT FIRE/GENERAL SERVICE/BALLAST PUMP AND REPLACE GAUGE IF INACCURATE.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Engineering
Issued 8 August 2000 Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR AND ALARMS.
Condition: Unknown
Due 16 April 2001
Resolved 16 April 2001
Accommodation/Occupational Safety
Issued 8 August 2000 Resolved
PROVIDE HOT AND COLD RUNNING WATER TO MEET ILO-147.
Condition: Unknown
Due 3 May 2001
Resolved 3 May 2001
Accommodation/Occupational Safety
Issued 8 August 2000 Resolved
REPLACE STBD SEWAGE OVERBOARD VALVE IN LOWER LEVEL ENGINE ROOM (SEA VALVE).
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Construction/Loadline
Issued 8 August 2000 Resolved
REPLACE ALL WASTED AND HOLED SEAWATER PIPING IN PORT AND STARBOARD ENGINE ROOM MANIFOLD FOR FIRE/GENERAL SERVICE/BALLAST.
Condition: Unknown
Due 8 August 2000
Resolved 28 November 2000
Fire Fighting
Issued 19 May 1999 Resolved
Repair all leaks/holes in the fire main and test infront of a USCG Marine Inspector IAW CCSSC Chapt. III, prior to loading and departure.
Condition: Unknown
Due 22 June 1999
Resolved 22 June 1999
Construction/Loadline
Issued 19 May 1999 Resolved
Make determination on how water got into the FWD cargo hold and if leaks orholes are found, properly repair them, IAW ILLC 66, prior to loading and departure.
Condition: Unknown
Due 22 June 1999
Resolved 22 June 1999
Construction/Loadline
Issued 19 May 1999 Resolved
Properly remove all excess water from FWD cargo Hold IAW ILLC 66, prior to loading and departure. (do not pump into river)
Condition: Unknown
Due 22 June 1999
Resolved 22 June 1999
Navigation
Issued 19 May 1999 Resolved
Prove proper operation of GMDSS and provide GMDSS Certificates for both deck Officers, IAW SOLAS Chapt. IV, prior to loading and departure.
Condition: Unknown
Due 22 June 1999
Resolved 22 June 1999
Fire Fighting
Issued 21 January 1999 Resolved
PROVIDE PROPER DOCUMENTATION THAT THE VESSEL DOES NOT NEED A FIXED CO2 SYSTEM IN ACCORDANCE WITH THE CERTIFICATE OF COMPLIANCE ISSUED BY THE CLASSIFICATION SOCIETY. CCSSC III / 3.10
Condition: Unknown
Due 19 May 1999
Resolved 19 May 1999
Fire Fighting
Issued 21 January 1999 Resolved
REPAIR / RENEW AS ORIGINAL DETERIORATED SECTION OF FIREMAIN PIPING IN WAY_x001C_ OF THE CHECK VALVE ON THE LOWER LEVEL ENGINEROOM OVERHEAD. RENEW THE CHECK VALVE IF NECESSARY. CCSSC III /3.4.1
Condition: Unknown
Due 20 May 1999
Resolved 22 June 1999
Engineering
Issued 21 January 1999 Resolved
PROPERLY MARK THE SLUDGE TANK SIGHT GUAGE SO THAT IT INDICATES THE AMOUNT OF OIL IN THE TANK. MARPOL 73/78 ANNEX I / 117
Condition: Unknown
Due 19 May 1999
Resolved 19 May 1999
Documentation
Issued 21 January 1999 Resolved
PROPERLY INDICATE THE 2.5m3 TANK ON THE VESSELS IOPP CERTIFICATE AND PROVIDE A STATEMENT FROM THE CLASSIFICATION SOCIETY THAT NO 43m3 TANK IS USED FOR THE COLLECTION OF OILY WATER RESIDUE. MARPOL 73/78 ANNEX I / 5.
Condition: Unknown
Due 19 May 1999
Resolved 19 May 1999
Engineering
Issued 21 January 1999 Resolved
REPAIR / RENEW AS ORIGINAL TEMPORARY REPAIR ON THE MAIN ENGINE COOLING PIPING. CCSSC I / 1.11
Condition: Unknown
Due 19 May 1999
Resolved 19 May 1999
Fire Fighting
Issued 21 January 1999 Resolved
RENEW / REPAIR DETERIORATED FIRE MAIN PIPING TO FIRE PLUG ON FOREWARD _x001C_ PORT SIDE. CCSSC III / 3.4.1_x001C_
Condition: Unknown
Due 20 May 1999
Resolved 22 June 1999
Navigation
Issued 14 November 1998 Resolved
PROVIDE UPDATED US COAST PILOT PRIOR TO NEXT US PORT.
Condition: Unknown
Due 23 November 1998
Resolved 23 November 1998
Navigation
Issued 14 November 1998 Resolved
PROVIDE UPDATED U.S. CHARTS 11412 & 11417 PRIOR TO RETURN TO COTP TAMPA ZONE.
Condition: Unknown
Due 23 November 1998
Resolved 23 November 1998
Lifesaving
Issued 14 November 1998 Resolved
PROVIDE 12 PARACHUTE FLARES PRIOR TO NEXT US PORT.
Condition: Unknown
Due 23 November 1998
Resolved 23 November 1998
Electrical
Issued 22 September 1998 Resolved
PRIOR TO DEPARTURE CLASS TO VERIFY EMERGENCY GENERATOR STARTING CAPABILTY.
Condition: Unknown
Due 23 September 1998
Resolved 29 September 1998
Engineering
Issued 22 September 1998 Resolved
PRIOR TO DEPARTURE CLASS TO VERIFY ALARM ON OILY WATER SEPERATOR.
Condition: Unknown
Due 23 September 1998
Resolved 29 September 1998
Lifesaving
Issued 15 January 1998 Resolved
Prior to departure, provide proof of purchase for liferaft hydrostatic release.
Condition: Unknown
Due 15 January 1998
Resolved 19 January 1998
Navigation
Issued 15 January 1998 Resolved
Prior to 15FEB98, provide updated navigation publications.
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Lifesaving
Issued 15 January 1998 Resolved
Prior to 15FEB98, provide instructions for maintenance and operation of allfirefighting and lifesaving appliances.
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Navigation
Issued 15 January 1998 Resolved
Prior to 15FEB98, provide proper day-light signalling lamp.
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Lifesaving
Issued 15 January 1998 Resolved
Prior to 15FEB98, provide proper rescue boat and liferaft configuration in accordance with the CCSSC.
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Lifesaving
Issued 15 January 1998 Resolved
Prior to 15FEB98, provide operational lifebuoy quick release._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Fire Fighting
Issued 15 January 1998 Resolved
Prior to 15FEB98, amend fire control plan to address location of the international shore connection.
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Construction/Loadline
Issued 15 January 1998 Resolved
Prior to 15FEB98, renew knife edge on port forward and center amidships vertical access trunks.
Condition: Unknown
Due 20 February 1998
Resolved 20 February 1998
Documentation
Issued 13 September 1997 Resolved
Provide on board for review, a Caribbean Cargo Ship Safety Code Certificate, Flag Administration initial survey report, and ship's information book. CCSSC 1.10
Condition: Unknown
Due 15 December 1997
Resolved 15 December 1997
Lifesaving
Issued 13 September 1997 Resolved
Prior to departure, renew the expired combo smoke/light ring buoy distress signal on the starboard bridge wing.
Condition: Unknown
Due 15 September 1997
Resolved 15 September 1997
Fire Fighting
Issued 13 September 1997 Resolved
Prior to departure, provide documentation from the vessel's [name withheld] indicating that the crew can conduct a satisfactory fire drill & then repeat the drill for the USCG.
Condition: Unknown
Due 13 September 1997
Resolved 16 September 1997
Construction/Loadline
Issued 13 September 1997 Resolved
Prior to returning to U.S. waters, provide documentation from the vessel's classification society (HINSIB) addressing the material condition of the steel cargo hatch cover gasket channels.
Condition: Unknown
Due 15 December 1997
Resolved 15 December 1997
Documentation
Issued 13 September 1997 Resolved
Prior to departure provide on board for review , documentation from the vessel's [name withheld] indicating that they accept the home (Lituania) Flag Administration issued certificates of all the required (Minimum Safe Manning Document) officers on board.
Condition: Unknown
Due 15 September 1997
Resolved 15 September 1997
Lifesaving
Issued 13 September 1997 Resolved
Prior to returning to U.S. waters provide for review, written instructions from the Company to the vessel's master containing policies & procedures for crew familiarization of the vessel.
Condition: Unknown
Due 15 December 1997
Resolved 15 December 1997
Lifesaving
Issued 31 August 1996 Resolved
Prior to departure, provide a medical report for the mate's injuried left arm.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Documentation
Issued 31 August 1996 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Engineering
Issued 31 August 1996 Resolved
Prior to bunkering and or transfering fuel or oil, post oil transfer procedures in accordance with 33 C.F.R. 155.720.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Accommodation/Occupational Safety
Issued 31 August 1996 Resolved
Prior to departure, provide on board a waste management plan.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Documentation
Issued 31 August 1996 Resolved
Prior to departure,provide on board for review a valid Radio Telephoney Certificate.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Navigation
Issued 31 August 1996 Resolved
Prior to departure, provide a clapper for the ship's bell.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Engineering
Issued 31 August 1996 Resolved
Prior to departure & fueling the emergency generator's day tank, make permanent repairs to the damage fuel line supply piping on the port side outboard of cargo hatch coaming number 1.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Lifesaving
Issued 31 August 1996 Resolved
Prior to departure, provide documentation from vessel's classification society attesting to the conditon of the vessel's lifeboat, lifeboat equipment, and davits.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Engineering
Issued 31 August 1996 Resolved
Prior to bunkering, provide plugs for fixed fuel oil containment boxes.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Fire Fighting
Issued 31 August 1996 Resolved
Prior to laoding cargo, prove proper operation of the vessel's two fire pumps.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Construction/Loadline
Issued 31 August 1996 Resolved
Prior to departure, replace gasket material for watertight door located on starboard side for engineroom escape trunk.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Deck/Cargo
Issued 31 August 1996 Resolved
Prior to departure, prove proper operation of the vessel's anchor ground tackle. The anchors can not be weighed due to burned out contact switch incontroller box.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Lifesaving
Issued 31 August 1996 Resolved
Prior to departure, provide on board a 406 MHz EPIRB.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Lifesaving
Issued 31 August 1996 Resolved
Prior to departure, proivde on board an additional radar transponder for a total of 2 transponders in accordance with the vessel's Radio Safety Certificate.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Construction/Loadline
Issued 31 August 1996 Resolved
Prior to departure, make repairs to closure devices in way of the 3 foot by3 foot cargo hold access hatch located forward of the number cargo hatch coaming on the main deck.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Construction/Loadline
Issued 31 August 1996 Resolved
Prior to departure, make repairs to closure devices on watertight door starboard side, main deck, to galley.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Fire Fighting
Issued 31 August 1996 Resolved
Prior to loading cargo, provide on board sufficient & compatible nozzles for all fire stations.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Documentation
Issued 31 August 1996 Resolved
Prior to departure, have issuing agency provide vessel's current name on the International Tonnage Certificate.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Documentation
Issued 31 August 1996 Resolved
Prior to departure, provide correct load line markings on sides of vessel.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Documentation
Issued 31 August 1996 Resolved
Prior to departure, provide for review a corrected copy of the vessel's Cargo Ship Safety Certificate.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Navigation
Issued 31 August 1996 Resolved
Prior to departure, provide on board corrected local charts.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Accommodation/Occupational Safety
Issued 31 August 1996 Resolved
Prior to departure, provide on board a garbage log.
Condition: Unknown
Due 31 August 1996
Resolved 31 August 1996
Navigation
Issued 17 January 1995 Resolved
VESSEL HAD A OUTDATED INLAND NAVIGATION RULES PUBLICATION.
Condition: Unknown
Due 19 January 1995
Resolved 19 January 1995
Unknown
Issued 15 June 1994 Resolved
VSL WAS ISSUED COTP ORDER #003-94 FOR INOPERABLE MSD. VESSEL DID NOT COMPLY WITH COTP ORDER-> SPECIFIC CITE: 33 CFR, PART 160.105
Condition: Unknown
Due 15 September 1994
Resolved 15 September 1994
Lifesaving
Issued 15 June 1994 Resolved
OILY WATER SEPARATOR DID NOT WORK. SPECIFIC CITE: 33 C.F.R. 155.360(a)
Condition: Unknown
Due 15 September 1994
Resolved 15 September 1994
Documentation
Issued 15 June 1994 Resolved
OIL RECORD BOOK WAS NOT ONBOARD VESSEL
Condition: Unknown
Due 15 September 1994
Resolved 15 September 1994
Deck/Cargo
Issued 15 June 1994 Resolved
SPECIFIC CITE 33 CFR 155.320(b): VSL DID NOT HAVE SUFFICIENT CONTAINMENT_x001C_ SURROUNDING FUEL OIL FILL PIPE
Condition: Unknown
Due 15 September 1994
Resolved 15 September 1994

Ownership record