Records from 1998 to 2005. Most recent: inspection, 28 September 2005.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Operations/Management › Pollution › Compliance with Transfer Procedures
Issued 16 February 2005
Resolved
Oil transfer procedures not in compliance with 33 cfr 155.750
Condition: Unknown
Due 15 March 2005
Resolved 28 September 2005
Resolution: Verified the vessel had posted line diagrams and position of responsibilities for oil transfer procedures.
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 16 February 2005
Resolved
Fireman's Outfit breathing apparatus not inspected in two years.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 March 2005
Resolved 4 March 2005
Lifesaving › Lifeboat Equipment › Food Ration
Issued 16 February 2005
Resolved
Lifeboat Rations compromised.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 February 2005
Resolved 4 March 2005
Lifesaving › Liferaft Equipment
Issued 12 September 2003
Resolved
Properly secure port and stbd. Liferafts for sea. Securing blocks on both (wood) wasted which created slack in securing line.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 September 2003
Construction/Loadline › Structures › Transverse Bulkhead
Issued 12 September 2003
Resolved
Repair cracked weld port side inboard forward at forecastle house.
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Verified repairs to the satisfaction as indiucated in NKK Class Report 04PS0518 dated 12/16/2004
Construction/Loadline › Structures › Deck Plating
Issued 12 September 2003
No resolution recorded
Have class review and accedpt diamond plate on bulkwark stiffeners port side main deck outboard forecastle or renew as original.
Action required: 15 - Rectify deficiencies by next port
Due 15 February 2005 — due date passed with no resolution recorded
Resolution: Cleared to the satisfaction of Class as indicated in NKK Class report 04PS0518 dated 12/15/2004.
Construction/Loadline › Structures › Superstructure
Issued 12 September 2003
Resolved
Forecastle deck houst structure: Renew all vertical stiffeners, gauge overhead and fwd bulkhead and renew all steel wasted below maximum allowance by class society.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Cleared to the satisfaction of Class as indicated in NKK Class report 04PS0518 dated 12/15/2005
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 12 September 2003
Resolved
Renew fwd mooring breast line and stern mooring line. Both fraying.
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Construction/Loadline › Penetrations › Gasket
Issued 12 September 2003
Resolved
Renew gasket on paint locker overhead hatch with proper gasket material.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Construction/Loadline › Penetrations › Gasket
Issued 12 September 2003
Resolved
Renew gasket port and stbd fwd hatch to cargo generators, main deck.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 12 September 2003
Resolved
Provide securing mechanism for pollution containment drain plugs throughout vessel.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 12 September 2003
Resolved
Properly secure breaker panel cover in cargo machinery room and provide blanks for opening in panel.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 12 September 2003
Resolved
Update fire control plan to reflect tow liferafts and three VHF emergency radios.
Condition: Improper/Lack of Maintenance
Due 15 March 2005
Resolved 28 September 2005
Resolution: Verified vessel had updated fire control plan to include reflective tow liferafts and VHF emergency radios.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 12 September 2003
Resolved
Cut off and grind to deck, 3 tripping hazards (old table legs) in officers mess room.
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Electrical › Electrical Distribution System (service) › Cable
Issued 12 September 2003
Resolved
Remove all household electric cords throughout ship in heads and replace with marine grade cable.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Accommodation/Occupational Safety › Washroom/Toilet › Hot and Cold Running Water
Issued 12 September 2003
Resolved
Provide or demonstrate hot water works throughout accommodation spaces on ship.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Lifesaving › Lifeboat › Embarkation/Disembarkation Capabilities
Issued 12 September 2003
Resolved
Port and stbd lifeboats: provide proper stud length for connection between boat release hook and the steel structural connecting members (port boat aft connection/ stbd boat forward connection) Tighten all 4 nuts for boats safety lever connectors.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 12 September 2003
Resolved
Replace wasted float ball in stbd lifeboat drain.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Lifesaving › Lifeboat › Seating
Issued 12 September 2003
Resolved
Properly mark seating in both lifeboats to reflect boats rated maximum capacity.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Construction/Loadline › Structures › Superstructure
Issued 12 September 2003
Resolved
Replace missing two weathertight door/hatches on aft bulkhead of house on bridge deck, port and stbd side.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Fire Fighting › Firemans Outfit › Lifeline
Issued 12 September 2003
Resolved
Provide fire proof lifelines for all fireman's outfits.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Electrical › Lighting (service) › Switch
Issued 12 September 2003
Resolved
Provide cover at light switch in dry provision store room.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 15 February 2005
Resolution: Completed.
Documentation › Manuals/Policy Documentation
Issued 22 September 2002
Resolved
Instructions for onboard maintenance of lifesaving applicances not present in non-adherence with SOLAS 74 (amended) III/19 & 52.
Due 22 October 2002
Resolved 28 September 2002
Resolution: Corrected.
Lifesaving › Lifeboat
Issued 22 September 2002
Resolved
Stbd lifeboat rottmer releasing gear deteriorated in non-adherence with SOLAS 74 (amended) III/20.
Condition: Improper/Lack of Maintenance
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Lifesaving › Lifeboat
Issued 22 September 2002
Resolved
Port and stbd lifeboat upper sling plate fasteners deteriorated in non-adherence with SOLAS 74 (amended) III/20
Condition: Improper/Lack of Maintenance
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Lifesaving › Lifeboat Equipment
Issued 22 September 2002
Resolved
Port lifeboat mast sheave frozen in non-adherence with SOLAS 74 (amended) III/20
Due 22 October 2002
Resolved 28 September 2002
Resolution: Corrected.
Lifesaving › Lifeboat Equipment
Issued 22 September 2002
Resolved
Port lifeboat mast fractured giving rise to concerns about fitness for service in non-adherence with SOLAS 74 (amended) III/20.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Lifesaving › Launching Appliances
Issued 22 September 2002
Resolved
Port aft lifeboat davit and stbd forward davit exhibit plate deterioration at base in non-adherence with SOLAS 74 (amended) III/20.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Lifesaving › Lifeboat Equipment › Electric Torch
Issued 22 September 2002
Resolved
Port lifeboat electric torch (flashlight) faulty in non-adherence with SOLAS 74 (amended) III/20.
Due 22 October 2002
Resolved 28 September 2002
Resolution: Corrected.
Lifesaving › Launching Appliances
Issued 22 September 2002
Resolved
Port aft davit hand rails deteriorated in non-adherence with SOLAS 74 (amended) III/20.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Lifesaving › Lifeboat Equipment
Issued 22 September 2002
Resolved
Port lifeboat hand pump lower hose deteriorated in non-adherence with SOLAS 74 (amended) III/20.
Due 22 October 2002
Resolved 28 September 2002
Resolution: Corrected.
Engineering › Generator (propulsion-electric)
Issued 22 September 2002
Resolved
No. 2 ship's service generator has an excessive fuel pump leak in non-adherence with SOLAS 74 (amended) I/1.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: Corrected.
Accommodation/Occupational Safety › Occupational Safety
Issued 22 September 2002
Resolved
No deck electrically resistant matting in way of boiler electrical panel in non-adherence with SOLAS 74 (amended) II-1/45.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Construction/Loadline › Structures
Issued 22 September 2002
Resolved
Lower level stbd side engineroom vent damper inoperable in non-adherence with SOLAS 74 (amended) I/11.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Lifesaving › Inflatable Liferafts
Issued 22 September 2002
Resolved
Port and stbd liferaft painter auxiliary lines tied to vessel with no weak link in non-adherence with SOLAS 74 (amended) III/20/
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: Corrected.
Lifesaving › Embarkation Appliances/Stations
Issued 22 September 2002
Resolved
Port lifeboat embarkation ladder deteriorated at securing eyes in non-adherence with SOLAS 74 (amended) III/20.
Due 22 October 2002
Resolved 28 September 2002
Resolution: Corrected.
Accommodation/Occupational Safety
Issued 22 September 2002
Resolved
Unsecured, open containers of flammable liquids in paint locker create undue hazard in non-adherence with SOLAS 74 (amended) II-2.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: Corrected.
Operations/Management
Issued 22 September 2002
Resolved
Third officer not familiar with vessel safety management system as evidenced by his failure to sign page one of the vessel specific procedure manual in non-adherence with SOLAS 74 (amended) IX.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: Corrected.
Fire Fighting › Fire Pumps
Issued 22 September 2002
Resolved
Fire/ballast pump in non-adherence with SOLAS &4 (amended) I/11 in that the packing requires replacement/renewal.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Engineering
Issued 22 September 2002
Resolved
Main engine cooling pump in non-adherence with SOLAS 74 (amended) I/11 in that the packing requires replacement/renewal.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Accommodation/Occupational Safety
Issued 22 September 2002
Resolved
Vacuum pump ran by the emergency fire pump is without a safety guard in non-adherence with SOLAS 74 (amended ) II-1/26.1 and ILO 147.
Due 22 October 2002
Resolved 23 November 2002
Resolution: Cleared based on NKK report.
Operations/Management
Issued 22 September 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: Corrected.
Operations/Management
Issued 22 September 2002
Resolved
Third Officer failed to meet duties and responsibility provisions of the vessel specific procedure manual; to wit, failed to maintain the vessel's lifesaving equipment, in non-adherence with SOLAS 74 (amended) IX/5.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: Corrected.
Electrical › Lighting (service)
Issued 22 September 2002
Resolved
Explosion prooof light outside of paint room without cover in non-adherence with SOLAS 74 (amended) I/11.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2002
Resolution: Corrected.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System
Issued 22 September 2002
Resolved
Instructions to operate paint locker sprinkler system, which requires manual opening of valve, not posted in non-adherence with SOLAS 74 (amended) II-2/18.7.
Due 22 October 2002
Resolved 28 September 2002
Resolution: Corrected.
Operations/Management › Vessel Safety Management
Issued 22 September 2002
Resolved
Vessel failed to maintain its Safety Management System in non-adherence with SOLAS 74 (amended) IX/5.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: External ISM Audit conducted by ABS on 27-28 Sep 02. Ten minor non-conformities noted. Conditional SMC to expire 28 Dec 02 issued.
Electrical › Lighting (service)
Issued 22 September 2002
Resolved
Multiple explosion proof lights missing covers in cargo transfer area below cargo holds in non-adherence with SOLAS 74 (amended) II-2/57(iv).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2002
Resolution: Certificate issuing authority, NKK, authorized vsl to blank off electrical lighting without globes.
Electrical › Lighting (service)
Issued 22 September 2002
Resolved
Multiple explosion proof light covers cracked in blow pump room in non-adherence with SOLAS 74 (amended) II-2/57(iv).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2002
Resolution: Corrected.
Deck/Cargo › Cargo Transfer (solid)
Issued 22 September 2002
Resolved
Stbd No. 1 cargo flow control gate aeration panel leaks cargo in non-adherence with SOLAS 74 II-2/2.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2002
Resolution: Corrected.
Deck/Cargo › Cargo Transfer (solid)
Issued 22 September 2002
Resolved
Port No. 4 cargo flow control gate aeration panel leaking cargo in non-adherence with SOLAS 74 II-2/2.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2002
Resolution: Corrected.
Stability › Watertight Integrity
Issued 22 September 2002
Resolved
Subdivision access panel at frame no. 84 missing in non-adherence with ICLL 66 Annex 1/15.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 September 2002
Resolution: Corrected.
Electrical › Electric Supply System (service)
Issued 22 September 2002
Resolved
Exposed wiring in cargo pumproom and other areas in non-adherence with SOLAS 74 II-2/57(iv).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2002
Resolution: Corrected.
Fire Fighting › Firemans Outfit
Issued 22 September 2002
Resolved
Each of the two firesuits which are aboard are deteriorated, significantly reducing the personal safety of fire response personnel, in non-adherence with SOLAS 74 II-2/17.2.
Due 27 September 2002
Resolved 28 September 2002
Resolution: Corrected.
Lifesaving
Issued 29 October 1999
Resolved
Have port and stbd lifeboat hull damage permanently repaired to satisfaction of class society (including self-bailing mechanisms)._x001C_ SOLAS 74, III/9
Condition: Unknown
Due 2 November 1999
Resolved 22 September 2002
Fire Fighting
Issued 29 October 1999
Resolved
Make permanent repairs to holed firemain to satisfaction of class society._x001C_SOLAS 74 (amended) II-2/21
Condition: Unknown
Due 2 November 1999
Resolved 22 September 2002
Deck/Cargo
Issued 29 October 1999
Resolved
Have class surveyor approve use of main ship's service generator for cargo operations._x001C_ SOLAS 74 (amended) II-2/21
Condition: Unknown
Due 2 November 1999
Resolved 22 September 2002
Lifesaving
Issued 22 October 1999
Resolved
STBD LIFEBOAT ENGINE COVER EXCESSIVELY WASTED._x001C_ SOLAS 74 III/9
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Fire Fighting
Issued 22 October 1999
Resolved
FIREMAIN HAS NUMEROUS LEAKS THROUGHOUT SYSTEM._x001C_ SOLAS 74 (AMENDED) II-2/21
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Lifesaving
Issued 22 October 1999
Resolved
STBD LIFEBOAT DRAIN FLOAT VALVE UNABLE TO OPERATE PROPERLY ALLOWING LIFEBOAT TO TAKE ON WATER WHEN DEPLOYED._x001C_ SOLAS 74 III/4
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Engineering
Issued 22 October 1999
Resolved
PROVIDE PROOF THAT OILY WASTE IS DISCHARGED TO MARPOL APPROVED INCINERATOR OR SHORE-BASES RECEPTION FACILITY._x001C_ MARPOL 73/78 I/9
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Navigation
Issued 22 October 1999
Resolved
PROVIDE PROOF OF SHORE-BASED MAINTENANCE FOR GMDSS._x001C_ SOLAS 74 (AMENDED) IV/15
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Engineering
Issued 22 October 1999
Resolved
REPLACE/REPAIR PACKING GLANDS ON #1 AND #2 GENERAL SERVICE PUMPS._x001C_ SOLAS 74 (AMENDED) I/11
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Fire Fighting
Issued 22 October 1999
Resolved
ALL INSPECTED FIRE HOSES WERE FOUND TO BE NON-SERVICEABLE._x001C_ SOLAS 74 (AMENDED) II-2/21
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Deck/Cargo
Issued 22 October 1999
Resolved
CARGO PUMP ROOM COOLING WATER PIPING LEAKS EXCESSIVELY._x001C_ SOLAS (AMENDED) II-2/21
Condition: Unknown
Due 1 November 1999
Resolved 29 October 1999
Fire Fighting
Issued 22 October 1999
Resolved
REPAIR/REPLACE FIRE DOORS FOR ENGINE CONTROL ROOM._x001C_ SOLAS 74 II-2/37
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Fire Fighting
Issued 22 October 1999
Resolved
NUMEROUS PORTABLE FIRE EXTINGUISHERS HAVE CRACKED HOSES (UNUSABLE)_x001C_ SOLAS 74 (AMENDED) II-2/21
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Lifesaving
Issued 22 October 1999
Resolved
PORT AND STBD LIFEBOATS HAVE HOLES IN HULL AT THE POINT WHERE LIFEBOATS SITIN THE DAVIT CRADLE._x001C_ SOLAS 74 III/9
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Lifesaving
Issued 22 October 1999
Resolved
VESSEL'S CREW UNABLE TO SATISFACTORILY CONDUCT ABANDON SHIP DRILL._x001C_ SOLAS 74 (AMENDED) III/18
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Lifesaving
Issued 22 October 1999
Resolved
STBD LIFEBOAT ENGINE - ROTATING EQUIPMENT HAZARD (FLYWHEEL UNCOVERED)._x001C_ SOLAS 74 III/9
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Engineering
Issued 22 October 1999
Resolved
FUEL LEAKING FROM FUEL MANIFOLD ON EMERGENCY FIRE PUMP._x001C_ SOLAS 74 (AMENDED) I/11
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Engineering
Issued 22 October 1999
Resolved
BILGE SUCTION HOSE ON BILGE PUMP MANIFOLD DETERIORATED._x001C_ SOLAS 74 (AMENDED) I/11
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Deck/Cargo
Issued 22 October 1999
Resolved
EXCESSIVE OIL ON DECK OF CARGO PUMP ROOM AND ADJACENT MAIN DECK._x001C_ MARPOL 73/78 I/9
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Fire Fighting
Issued 22 October 1999
Resolved
EQUIPMENT (INTERNATIONAL SHORE CONNECTION) NOT STOWED IN ACCORDANCE WITH FIRE CONTROL PLAN. _x001C_ SOLAS 74 (AMENDED) II-2/20
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Fire Fighting
Issued 22 October 1999
Resolved
ENSURE ALL FIRE NOZZLES ARE FITTED WITH GASKETS._x001C_ SOLAS 74 (AMENDED) II-2/21
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Engineering
Issued 22 October 1999
Resolved
OIL ON DECK, OILY RAGS, AND OILY WASTE-FILLED DRUMS NEAR MAIN DIESEL GENERATOR IN ENGINE ROOMS._x001C_ SOLAS 74 (AMENDED)I/11_x001C_
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Navigation
Issued 22 October 1999
Resolved
DAYLIGHT SIGNALLING LAMP INOPERATIVE._x001C_ SOLAS IV/11
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Lifesaving
Issued 22 October 1999
Resolved
STBD LIFEBOAT SHEAVES (ROLLERS) STUCK._x001C_ SOLAS 74 III/4
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Lifesaving
Issued 22 October 1999
Resolved
PROVIDE PROOF FALLS END-FOR-ENDED OR REPLACE FALLS BY NOVEMBER 1, 1999._x001C_ SOLAS 74 (AMENDED) III/19.3
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Fire Fighting
Issued 22 October 1999
Resolved
VESSEL'S CREW UNABLE TO SATISFACTORILY CONDUCT FIRE DRILL._x001C_ SOLAS 74 (AMENDED) III/18
Condition: Unknown
Due 2 November 1999
Resolved 2 November 1999
Fire Fighting
Issued 22 October 1999
Resolved
HAVE CLASS SOCIETY PROVIDE DOCUMENTATIN INDICATING TYPE OF FIRE-FIGHTING EQUIPMENT REQUIRED FOR PAINT LOCKER._x001C_ SOLAS 74 (AMENDED) I/11
Condition: Unknown
Due 1 November 1999
Resolved 22 September 2002
Engineering
Issued 20 October 1999
Resolved
Make permanent repairs to the soft patch on the starboard generator coolingwater overboard piping.
Condition: Unknown
Due 23 November 1999
Resolved 22 September 2002
Construction/Loadline
Issued 20 October 1999
Resolved
Restore to original the overhead, including the transverse deck stringers, in the cargo machinery room directly above the starboard cargo machinery generator.
Condition: Unknown
Due 23 November 1999
Resolved 22 September 2002
Construction/Loadline
Issued 20 October 1999
Resolved
Prove the operation of the grey water overboard valves (stop-check type) located on the port side, lower level engine room.
Condition: Unknown
Due 23 November 1999
Resolved 22 September 2002
Fire Fighting
Issued 30 May 1999
Resolved
Ensure all fire hose boxes located throughout the ship have operable door latches. SOLAS 74 (amend) II-2/21.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Lifesaving
Issued 30 May 1999
Resolved
Vessel imroperly storing flammable liquids in deck store space. Vessel is required to store paints and thinners in a space designated for flammble liquid storage. Vessel is to provide written proof from flag state that forecastle is adequate for paint locker.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Engineering
Issued 30 May 1999
Resolved
Replace holed flame screen for stbd aft fuel tank SOLAS 74 (amend) I/11.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Construction/Loadline
Issued 30 May 1999
Resolved
Paint deck line marking in a contrasting color to the hull. ICLL 66
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Lifesaving
Issued 30 May 1999
Resolved
Install waterlight and replace reflective tape to pilot station lifering. SOLAS 74 (amend) I/11
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Provide a non-conductive mat in front of main distribution panel in engine room. SOLAS 74 II-1/27
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Construction/Loadline
Issued 30 May 1999
Resolved
Make permanent repairs in lieu of soft patches to emergency generator raw water pipe located on 02 deck overhead. SOLAS 74 (amend) I/11
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Lifesaving
Issued 30 May 1999
Resolved
Remove excess paint from port and starboard life boat cheek blocks to facilitate proper lifeboat lowering. SOLAS 74 amended III/19
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Install protective covers on all deck lights. SOLAS II-1/27
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Repair emergency deck lighting, starboard boat deck is broken. SOLAS 74 II-1/27
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Accommodation/Occupational Safety
Issued 30 May 1999
Resolved
Clean galley range exhaust vent. SOLAS 74 (amend) II-2/25
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Lifesaving
Issued 30 May 1999
Resolved
Replace port lifeboat gripe bridle ring. SOLAS 74 amended I/11
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Lifesaving
Issued 30 May 1999
Resolved
Post launching instructions for port liferaft. SOLAS 74 amended III/9
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Protective guard to stbd lifeboat embarkation light broken. SOLAS 74 II- 1/27.
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Repair replace receptacle box, port bridge wing. SOLAS 74 II-1/27
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Repair/replace deck lighting junction box, port bridge wing. SOLAS 74 II- 1/27
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Install protective guards on overhead lighting in crews accomodation spaces. SOLAS 74 amended II-1/27
Condition: Unknown
Due 20 October 1999
Resolved 20 October 1999
Electrical
Issued 30 May 1999
Resolved
Repair/replace stbd stack deck illumination light. SOLAS 74 II-1/27
Condition: Unknown
Due 23 November 1999
Resolved 27 October 1999
Fire Fighting
Issued 30 May 1999
Resolved
Prove operation of fire hydrant located on portside main deck amidships_x001C_ and forward. SOLAS 74 (amend) I/11
Condition: Unknown
Due 23 November 1999
Resolved 27 October 1999
Navigation
Issued 30 May 1999
Resolved
Vessel missing Coast Pilot for Guam area. 33 CFR 164.72.
Condition: Unknown
Due 23 November 1999
Resolved 27 October 1999
Lifesaving
Issued 30 May 1999
Resolved
Prove operation of lights for immersion suits. SOLAS 74 (amend) III/33
Condition: Unknown
Due 23 November 1999
Resolved 27 October 1999
Engineering
Issued 30 May 1999
Resolved
Demonstrate proper operation of vent closures for fuel/lube oil tanks. SOLAS 74 amended I/11.
Condition: Unknown
Due 23 November 1999
Resolved 27 October 1999
Engineering
Issued 19 November 1998
Resolved
Fuel oil and Lube oil tank vents have worn or damaged flame screens. Vsl is to correct in accordance with Solas 74 unamended I/11, prior to next U.S. port or prior to next bunkering operations.
Condition: Unknown
Due 2 July 1999
Resolved 13 June 1999
Engineering
Issued 19 November 1998
Resolved
Fuel oil and Lube oil tank vents do not have fixed containment or enclosed deck area around vents. Vsl is to correct in accordance with 33 CFR 155.320(a)(2), prior to next U.S. port or prior to next bunkering operations.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 19 November 1998
Resolved
Starboard lifeboat embarkation ladder is broken. Vsl is to repair/replace ladder in accordance with Solas 74 unamended III/19(a)(i), prior to next U.S. port.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 19 November 1998
Resolved
Pulley for fwd davit of stbdside lifeboat frozen. Vsl is to correct in accordance with Solas 74 unamended III/36(l), prior to next U.S. port.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Documentation
Issued 19 November 1998
Resolved
[name withheld] and Second Engineer hold improper certification for Kilowatt rating of Vsl. Vsl is to correct in accordance with STCW 95 annex Ch. III/2.1, prior to being allowed to depart port.
Condition: Unknown
Due 21 November 1998
Resolved 25 November 1998
Lifesaving
Issued 19 November 1998
Resolved
Lifejacket light found to be inoperable (1st Engineer). Vsl has corrected.
Condition: Unknown
Due 20 December 1998
Resolved 25 November 1998
Lifesaving
Issued 19 November 1998
Resolved
Repair hull damage to port/stbd lifeboats. Vsl is to correct in_x001C_ accordance with Solas 74 amended III/19.2, prior to next U.S. port.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 19 November 1998
Resolved
Limit switch on port/stbd lifeboats need servicing. Vsl is to correct in accordance with SOLAS 74 unamended III/36(k), prior to next U.S. port.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Fire Fighting
Issued 19 November 1998
Resolved
SCBA tanks were empty or partially empty. Vsl is to correct in accordance with SOLAS 74 unamended II-2/14(ii), prior to next U.S. port.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 19 November 1998
Resolved
Drain valves on port/stbd lifeboats are broken. Vsl is to correct in accordance with SOLAS 74 amended III/11(ii), prior to next U.S. port.
Condition: Unknown
Due 31 May 1999
Resolved 31 May 1999
Lifesaving
Issued 19 November 1998
Resolved
Placards showing lifeboat location are missing. Vsl has corrected.
Condition: Unknown
Due 20 November 1998
Resolved 22 December 1998