Records from 2016 to 2025. Most recent: inspection, 14 April 2025.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)237.1 ft × 54.0 ft × 21.3 ft
Registered tonnagegross 2,317 / net 836
ITC dimensions (L × B × D)237.1 ft × 54.0 ft × 21.3 ft
ITC tonnagegross 2,317 / net 836
BuilderTIDEWATER EQUIPMENT CORP · CHESAPEAKE, VA, UNITED STATES · built 1993
Hull materialSteel
PropulsionUnknown
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNORFOLK, VA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 August 2025 · expires 30 September 2026
Service, as the file records itIndustrial Vessel
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2317 - Convention (Subpart B), Gross Ton
836 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page
13 inspections, each with its date, unit and type; 8 deficiencies with the resolution recorded against each; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Inspection history · 13
14 April 2025
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 8111543
14 February 2024
Deficiency Check · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7861285
27 November 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7829980
18 July 2023
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7746025
16 June 2022
Drydock Exam · Internal Structural Exam · Periodic Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7479112
2 August 2021
Administrative Inspection · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7275140
19 August 2020
Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7035128
8 April 2019
COI Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6655338
16 July 2018
Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6481287
2 March 2018
Examination of Repairs · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6405481
21 February 2017
Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6091615
16 February 2017
Internal Structural Exam · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6067139
13 June 2016
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5906362
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 February 2024
Resolved
Valves installed on the outside of the oil tanks must be made of steel, ductile cast iron ASTM A 395 (incorporated by reference; see 46 CFR 56.01-2), or a ductile nonferrous alloy having a melting point above 1,700 degrees F and must be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located. Diesel fuel oil shut off valve is disconnected from the remote actuated reach rod. Do not operate engine prior to repair. 46 CFR 56.50-60(d)(1)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 23 February 2024
Resolution: Fuel Shut-off valve was reattached to the reach rod and was functional in the presence of the MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 February 2024
Resolved
Valves installed on the outside of the oil tanks must be made of steel, ductile cast iron ASTM A 395 (incorporated by reference; see 46 CFR 56.01-2), or a ductile nonferrous alloy having a melting point above 1,700 degrees F and must be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located. The vessel does not have a correct size T-handle tool to actuate the diesel fuel oil remote shut off valve on the weather deck. Do not operate engine prior to repair. 46 CFR 56.50-60(d)(1)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 23 February 2024
Resolution: Proper tool was placed on board vessel and was able to actuate the valve, satisfactory function test was witnessed by the MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 February 2024
Resolved
Valves installed on the outside of the oil tanks must be made of steel, ductile cast iron ASTM A 395 (incorporated by reference; see 46 CFR 56.01-2), or a ductile nonferrous alloy having a melting point above 1,700 degrees F and must be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located. Diesel fuel oil isolation valve has a minor leak. 46 CFR 56.50-60(d)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 23 February 2024
Resolution: Fuel Valve was replaced and was no longer leaking during operational test witnessed by the MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 February 2024
Resolved
Any other hydraulic or pneumatic system on board that, in the judgment of the Commandant, constitutes a hazard to the seaworthiness of the ship or the safety of personnel either in normal operation or in case of failure. The hydraulic oil tank has a minor leak on a side tank cover. 46 CFR 58.30-1(a)(14)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2024
Resolved 23 February 2024
Resolution: Operator informed MI that the gasket was replaced. MI was able to verify leak was no longer occuring from that plate.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 2 August 2021
Resolved
Fuel oil fill transfer pipe containment was missing the plug.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 3 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 August 2020
Resolved
Repalce spring terminal battery for waterlight with screw terminal battery.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2020
Resolution: A new battery was placed in service.
Construction/Loadline › Hull › Bottom Plating
Issued 2 March 2018
Resolved
Found cracks and significant insets on hopper bottom opening due to damage taken during dredging operations. Repair proposal and repair inspections will be to the satisfaction of the attending marine inspector. Vessel is to not conduct dredging operations until repairs have been completed and approved by the Coast Guard.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2018
Resolved 20 April 2018
Resolution: All repairs completed to the satisfaction of the attending Marine Inspector.
Engineering › Pressure Vessel › Piping
Issued 16 February 2017
Resolved
Hydraulic oil observed in starboard wing void #2. Piping systems must be suitable for the service intended. Press up piping for inspection by CGMI prior to conducing cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 February 2017
Resolved 21 February 2017
Resolution: Rep hydrostatically tested hydraulic lines up to 3000psig. No leaking observed.