Records from 1994 to 1995. Most recent: inspection, 27 January 1995.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation
Issued 27 January 1995
Resolved
PROVIDE ONBOARD A COPY OF AUTHORIZED CARGOES LISTED IN THE BUREAU VERITAS APPROVED P&A MANUAL. ALSO, RESOLVE OUTSTANDING CLASS RECOMMENDATIONS IN REGARDS TO THE P&A MANUAL PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 28 February 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Deck/Cargo
Issued 27 January 1995
Resolved
PRIOR TO LOADING CAUSTIC SODA IN POINT COMFORT, TX, OBTAIN APPROVAL FROM FLAG STATE AUTHORITY. -- CERTIFICATE OF FITNESS SHALL REFLECT AUTHORIZATIONOF CARRIAGE OF CAUSTIC SODA. -- SUBCHAPTER O ENDORSEMENT SHALL BE UPDATED PRIOR TO NEXT U.S. VOYAGE.
Condition: Unknown
Due 31 January 1995
Resolved 1 February 1995
Fire Fighting
Issued 28 April 1994
Resolved
PROVIDE FOAN ANALYSIS REPORT PRIOR TO LOADING AT NEXT U. S. PORT.
Condition: Unknown
Due 28 April 1994
Resolved 28 April 1994
Deck/Cargo
Issued 26 March 1994
Resolved
REMOVE TEMPORARY PATCHES AND MAKE PERMANENT REPAIRS TO FRACTURES/HOLES IN MAIN CARGO LINES LOCATED IN PUMPROOM PRIOR TO CONDUCTING CARGO OPS.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Fire Fighting
Issued 26 March 1994
Resolved
PROVE ADEQUATE AMOUNT OF FOAM ON BOARD PRIOR TO ENTERING ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Navigation
Issued 26 March 1994
Resolved
CALIBRATE RUDDER ANGLE INDICATORS TO SHOW CONSISTANT RUDDER ANGLE BETWEEN BRIDGE AND STEERING GEAR ROOM PRIOR TO ENTERING ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Deck/Cargo
Issued 26 March 1994
Resolved
PROPERLY LABEL THE HIGH LEVEL ALARM INDICATOR ON THE DECK PRIOR TO CONDUCTING CARGO OPS.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Navigation
Issued 26 March 1994
Resolved
INSTALL A RUDDER ANGLE INDICATOR IN AUXILIARY STEERING PRIOR TO ENTERING ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Unknown
Issued 26 March 1994
Resolved
MAKE PERMANENT REPAIRS TO MSD PRIOR TO ENTERING ANY U. S. PORT. DEMONSTRATE PROPER OPERATION OF MSD UPON ENTRY ANY U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Engineering
Issued 26 March 1994
Resolved
REPLACE FLAME SCREEN ON FORWARD PORT BUNKER TANK PRIOR TO ENTERING ANY_x001C_ U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Lifesaving
Issued 26 March 1994
Resolved
REPLACE ALL FRAYED AND WASTED LINES ON THE RING BUOYS UPON ENTERING ANY _x001C_ U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Fire Fighting
Issued 26 March 1994
Resolved
PLACE SPANNERS AT ALL FIRE STATIONS PRIOR TO ENTERING ANY U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Fire Fighting
Issued 26 March 1994
Resolved
SERVICE THE FIRE EXTINGUISHERS IN THE PUMP ROOM PRIOR TO CONDUCTING CARGO_x001C_ OPERATIONS.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Documentation
Issued 26 March 1994
Resolved
PROVIDE MOST RECENT DRYDOCK SURVEY REPORT UPON ENTRY INTO ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Deck/Cargo
Issued 26 March 1994
Resolved
BLANK OFF ALL CARGO PIPE MANIFOLDS PRIOR TO ENTERING ANY U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Fire Fighting
Issued 26 March 1994
Resolved
REPAIR FUEL REGULATING VALVE ON EMERGENCY FIRE PUMP PRIOR TO ENTERING ANY U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Lifesaving
Issued 26 March 1994
Resolved
REPLACE ORANGE SMOKE FLARE ON STARBOARD BRIDGE WING UPON ENTERING ANY_x001C_ U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Electrical
Issued 26 March 1994
Resolved
ELIMINATE SPLICE IN ELECTRIC LINE LEADING TO THE LIGHT FIXTURE IN THE PAINTLOCKER PRIOR TO ENTERING ANY U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Fire Fighting
Issued 26 March 1994
Resolved
SERVICE WATERSPRAY NOZZEL IN PAINT LOCKER PRIOR TO ENTERING ANY U. S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Lifesaving
Issued 26 March 1994
Resolved
ESTABLISH THE REQUIRED NUMBER OF EMERGENCY FIRE FIGHTING LOCKERS WITH THE REQUIRED GEAR IN THE REQUIRED AREAS PRIOR TO ENTERING ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Fire Fighting
Issued 26 March 1994
Resolved
PROVE ADEQUATE PRESSURE AND COVERAGE OF FIRE MAIN UPON ENTERING ANY U. S. _x001C_PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Lifesaving
Issued 26 March 1994
Resolved
PROVE PROPER OPERATION OF WATER LIGHT ATTACHED TO RINGBUOY ON PORT SIDE NEAR THE STACK UPON ENTERING ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Deck/Cargo
Issued 26 March 1994
Resolved
REPAIR/REPACK CARGO TANK VALVE REACH RODS PRIOR TO CONDUCTING CARGO OPS.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Navigation
Issued 26 March 1994
Resolved
PLACE ON BOARD CURRENT, CORRECTED EDITIONS OF U.S.TIDE TABLES, TIDE CURRENTTABLES, U.S. COAST PILOT, NAVIGATION RULES, 46CFR PARTS 1-40 AND PARTS _x001C_ 140-155 AND 33 CFR PARTS 125-199 UPON ENTERING ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Lifesaving
Issued 26 March 1994
Resolved
PROVIDE EVIDENCE THAT ALL SCBA'S AND AIR BOTTLES HAVE BEEN SERVICED UPON ENTRY OF ANY U.S. PORT.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994
Fire Fighting
Issued 26 March 1994
Resolved
SERVICE FOAM NOZZELS IN CARGO PUMPROOM PRIOR TO CONDUCTING CARGO OPS.
Condition: Unknown
Due 26 March 1994
Resolved 26 March 1994