MAURY USCG vessel records Sign in
← All vessels

BIG EASY

BIG EASY is a 1993 industrial vessel. The Coast Guard has recorded 104 inspections since 1993, most recently in September 2007, along with 134 deficiencies — 5 with no resolution recorded —, 2 operational controls and 2 casualty investigations in 2005.

Records from 1993 to 2007. Most recent: inspection, 13 September 2007.

Built
1993
Last inspected
13 September 2007
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8986262 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDC3752
397860
Flag
UNITED STATES
369785000 (licence lapsed)
Maury page id
psix-397860

Inspections, by type

…with no type recorded32
…past their stated due date5
Years with a record 15 calendar years (1993–2007)
The 104 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 19 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 1979.

Documentation record

Tonnage as PSIX records it5379 - Convention (Subpart B), Gross Ton
1613 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDC3752MMSI 369785000 · expired · compulsorily equipped · granted 25 January 2005, cancelled 28 March 2015
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 104

13 September 2007 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3056735
19 May 2006 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2653320
16 May 2006 Permit to Proceed
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2650726
2 February 2006 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2577941
31 January 2006 Underwater Inspection in lieu of Drydock · In-Service Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2577615
12 January 2006 In-Service Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2565589
13 December 2005 Deficiency Check · Plan Review (Other than "T")
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2553440
13 December 2005 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2553785
16 November 2005 Examination of Repairs
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2536418
15 November 2005 Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2535554
15 November 2005 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2574676
22 October 2005 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2519888
17 October 2005 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2516764
4 October 2005 ACP COI Oversight · MTSA/ISPS Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2507408
22 September 2005 COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2498971
26 April 2005 In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2343531
8 March 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2305674
28 January 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2282524
14 January 2005 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2274867
13 October 2004 Permit to Proceed
Administrative · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 2220250
13 October 2004 Hull Examination · Construction Oversight
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2220310
10 August 2004 Uninspected Other
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2161653
27 July 2004 Permit to Proceed
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2140310
12 January 2004 Hull Examination · Administrative Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1993917
6 February 2003 Quarterly Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1734040
30 October 2002 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1696005
14 August 2002 Quarterly Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1653701
13 May 2002 Quarterly Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1608745
17 April 2002 Deadweight Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1600676
26 March 2002 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1652629
20 February 2002 Quarterly Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1481848
4 December 2001 Drydock Extension
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1490104
2 November 2001 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1391732
9 August 2001 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1366514
11 May 2001 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1061856
10 May 2001 Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1074535
15 February 2001 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1454898
17 August 2000 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1456875
10 May 2000 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1397427
31 March 2000 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1048308
20 March 2000 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1047809
16 February 2000 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1467647
10 January 2000 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1404896
17 December 1999 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 812368
3 November 1999 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1452582
25 October 1999 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1423288
17 September 1999 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1120332
3 September 1999 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1365352
25 August 1999 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1372737
13 May 1999 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 794657
11 February 1999 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1444107
29 December 1998 Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 808755
1 December 1998 Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1369036
4 November 1998 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1433422
22 September 1998 Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 800626
17 September 1998 Deadweight Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 800210
12 August 1998 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1426112
8 May 1998 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1381281
19 February 1998 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1364619
6 February 1998 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1109288
13 November 1997 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1402576
20 September 1997 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 119688
17 September 1997 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 158541
22 August 1997 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1454490
14 August 1997 Examination of Repairs
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1394832
14 May 1997 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1400592
11 March 1997 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 189015
21 February 1997 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1462561
18 February 1997 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1103261
17 February 1997 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 49238
10 January 1997 Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1096407
6 January 1997 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 71846
18 November 1996 Deadweight Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 877979
13 November 1996 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1398582
21 August 1996 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1435812
30 July 1996 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1089287
23 July 1996 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 147636
19 June 1996 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 16745
13 June 1996 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1438469
22 May 1996 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1084095
16 May 1996 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 471491
16 May 1996 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 477477
23 February 1996 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 84163
12 February 1996 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1355696
15 December 1995 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 870912
13 November 1995 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1452095
25 September 1995 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 138354
14 September 1995 Re-Inspection · Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1405795
15 June 1995 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1398317
30 March 1995 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 498714
15 March 1995 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1457259
11 February 1995 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 37839
29 January 1995 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 228272
15 November 1994 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1396252
2 August 1994 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1171918
2 August 1994 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1440842
2 June 1994 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1180003
31 May 1994 Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1170758
28 April 1994 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1169243
12 April 1994 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 857771
7 April 1994 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 513092
28 March 1994 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1420877
23 December 1993 Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1160586
1 December 1993 Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1161593

Deficiency record · 134

Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 12 January 2006 Resolved
Provide one fully charged fire extinguisher in lower pump room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 31 January 2006
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 12 January 2006 Resolved
Relocate fire extinguisher mounting bracket located in lower pump room to provide unrestricted deployment of extinguisher.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 31 January 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 January 2006 Resolved
Remove temporary wiring and extension cords located on starboard side forward band stage.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 31 January 2006
Fire Fighting › Structural Fire Protection - General › Deckhouse Construction
Issued 12 January 2006 No resolution recorded
Remove or provide class acceptance of roll down dodger/side screen/curtains located on port and starboard sides of the Gator deck.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 February 2006 — due date passed with no resolution recorded
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 12 January 2006 Resolved
Adjust-service all fire screen doors, on doors that failed to close and latch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 31 January 2006
Engineering › Bilge Water Management System › Piping
Issued 12 January 2006 Resolved
Repair/renew main bilge pump suction pipe on manifold located below aft engine room sink.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 February 2006
Resolved 31 January 2006
Operations/Management › Streamlined Inspection Program › VAP Review and Revision
Issued 12 January 2006 No resolution recorded
Provide MSC plan approval for electrical plans as required by ACP agrement.
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 February 2006 — due date passed with no resolution recorded
Lifesaving › Inflatable Buoyant Apparatus › Weak Link
Issued 16 November 2005 Resolved
Three IBAs found with incorrect weak links. Replace with approved weak links. Total passengers/people on board reduced by 303.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 November 2005
Resolved 13 December 2005
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 4 October 2005 Resolved
Install A-60 bulkhead insulation at frame 92 on decks 0 through 2, adjcent to the aft refuge area per SOLAS II-2/Reg 9.2.2.2. See G-MSC plan review letter 16710/P010605 Serial H2-0505090.
Action required: 705 - Other - as specified
Due 31 January 2006
Resolved 3 March 2006
Fire Fighting › Fire Pumps › Arrangement
Issued 4 October 2005 No resolution recorded
Relocate fire pump aft of collision bulkhead as required by G-MSC plan review letter 16710/P010605 Serial H2-0505090 and SOLAS II-1/Reg 39.
Action required: 705 - Other - as specified
Due 31 January 2006 — due date passed with no resolution recorded
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 4 October 2005 No resolution recorded
Replace watertight doors in accomidation spaces with aproved fire screen doors as required by See G-MSC plan review letter 16710/P010605 Serial H2-0505090 para 6.
Action required: 705 - Other - as specified
Due 31 January 2006 — due date passed with no resolution recorded
Lifesaving › Embarkation Appliances/Stations › Side Ropes
Issued 4 October 2005 Resolved
Provide 2 additional slides for total of 4 slides for vessel.
Due 31 October 2005
Resolved 13 December 2005
Electrical › Electric Generation Source (service) › Generator
Issued 4 October 2005 No resolution recorded
Complete non-discretionary electrical plan review as required by ACP oversight plan review MOU signed by lloyds and Sector Miami 02 Jun 05.
Due 31 October 2005 — due date passed with no resolution recorded
Engineering › Steering Gear System
Issued 30 October 2002 Resolved
RUDDER ANGLE INDICATOR IN EOS FOR FLANKING RUDDERS INOP LEGACY COMPONENT DESC: Rudder Angle Indicator
Action required: 705 - Other - as specified
Due 1 January 2003
Resolved 7 November 2002
Resolution: Rreplaced faulty indicator. Sat test completed
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 20 February 2002 Resolved
Inventory cleaning compounds, etc. throughout vessel and ensure proper MSDS sheets are in place
Condition: Improper/Lack of Maintenance
Due 20 March 2002
Resolved 26 March 2002
Resolution: Sighted this date
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 20 February 2002 Resolved
Stow MSDS books in Q.A. office in prominent fashion so that they may be easily located
Condition: Improper Installation
Due 20 March 2002
Resolved 26 March 2002
Resolution: Sighted this date
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 20 February 2002 Resolved
Renew or repair life ring line which had been cut.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 20 February 2002
Resolution: Life ring was renewed
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 20 February 2002 Resolved
Make repairs to fire screen door in cage so that it will close properly
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 20 February 2002
Fire Fighting › International Shore Connection › Nuts
Issued 20 February 2002 Resolved
Provide wrench so that cap may be removed from shore connection in event of emergency
Action required: 705 - Other - as specified
Resolved 20 February 2002
Resolution: Wrench provided for mounting in immediate vicinity of shore connection cap
Electrical › Electrical Distribution System (service)
Issued 20 February 2002 Resolved
Hardwire or remove fans from cages.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 20 February 2002
Resolution: Fans removed.
Fire Fighting
Issued 2 November 2001 Resolved
Demonstrate operation and alarms on sprinkler system.
Condition: Unknown
Due 5 December 2001
Resolved 28 November 2001
Electrical
Issued 2 November 2001 Resolved
Demonstrate alarms and shutdowns in accordance with automation test procedures.
Condition: Unknown
Due 9 November 2001
Resolved 11 December 2001
Resolution: Witnessed proper tests
Engineering
Issued 2 November 2001 Resolved
Prove proper operation of high tempjacket water alarm on bow thruster engine.
Condition: Unknown
Due 5 December 2001
Resolved 28 November 2001
Fire Fighting
Issued 2 November 2001 Resolved
Refill fixed Halon fire extinguishing system bottles. Vessel shall remain on shore power until item is corrected.
Condition: Unknown
Due 16 November 2001
Resolved 11 December 2001
Resolution: Bottles weighed and re-installed - all sat
Unknown
Issued 17 August 2000 Resolved
MISSING DEBRIS SCREEN ON PORT SIDE BLOWER IN GENERATOR SPACE.
Condition: Unknown
Due 17 August 2000
Resolved 17 August 2000
Unknown
Issued 17 August 2000 Resolved
MISSING BOTTOM LATCH ON DOUBLE FIRE SCREEN DOORS.
Condition: Unknown
Due 17 August 2000
Resolved 17 August 2000
Unknown
Issued 17 August 2000 Resolved
UNSUPPORTED WIRE RUNS IN MACHINERY SPACES.
Condition: Unknown
Due 17 August 2000
Resolved 17 August 2000
Unknown
Issued 17 August 2000 Resolved
DEAD END WIRES REMAIN IN DECK AND BULKHEAD PENETRATIONS THROUGHOUT MACHINERY SPACE.
Condition: Unknown
Due 17 August 2000
Resolved 17 August 2000
Lifesaving
Issued 17 August 2000 Resolved
GENERAL ALARM LIGHT IN GENERATOR SPACE NOT REVOLVING.
Condition: Unknown
Due 17 August 2000
Resolved 17 August 2000
Fire Fighting
Issued 16 February 2000 Resolved
Repair sprinkler system fire pump seal.
Condition: Unknown
Due 16 February 2000
Resolved 16 February 2000
Fire Fighting
Issued 16 February 2000 Resolved
Install damper for the emergency generator compartment air exhaust.
Condition: Unknown
Due 16 February 2000
Resolved 16 February 2000
Fire Fighting
Issued 16 February 2000 Resolved
Reconfigure the bow thruster room door to allow the door to open outward toprevent entrapment of personnel.
Condition: Unknown
Due 16 February 2000
Resolved 16 February 2000
Construction/Loadline
Issued 16 February 2000 Resolved
Prove proper operation of the oily water seperator.
Condition: Unknown
Due 16 February 2000
Resolved 16 February 2000
Electrical
Issued 16 February 2000 Resolved
Install approved shore tie recepticles for all data and eletrical cables.
Condition: Unknown
Due 16 February 2000
Resolved 16 February 2000
Fire Fighting
Issued 16 February 2000 Resolved
Post operating procedures for manual operation of the halon system and procedures to operate the CO2 system in the emergency generator space.
Condition: Unknown
Due 16 February 2000
Resolved 16 February 2000
Accommodation/Occupational Safety
Issued 3 November 1999 Resolved
Replace missing/torn insect screening on potable water vent located at portside aft to the satisfaction of the attending marine inspector and the cog-nizant OCMI.
Condition: Unknown
Due 5 November 1999
Resolved 10 November 1999
Fire Fighting
Issued 3 November 1999 Resolved
Replace missing inserts for Rox Blocks on deck behind forward slots on 01 deck to the satisfaction of the attending marine inspector and to the cog- nizant OCMI.
Condition: Unknown
Due 5 November 1999
Resolved 10 November 1999
Accommodation/Occupational Safety
Issued 3 November 1999 Resolved
Replace missing cap to the sewage overboard discharge line on aft port sidedischarge station to the satisfaction of the attending marine inspector andthe cognizant OCMI.
Condition: Unknown
Due 5 November 1999
Resolved 10 November 1999
Accommodation/Occupational Safety
Issued 3 November 1999 Resolved
Ensure all trash, food stuffs and standing water are removed from under allbar and deli counters to the satisfaction of the attending marine inspectorand the cognizant OCMI.
Condition: Unknown
Due 5 November 1999
Resolved 10 November 1999
Electrical
Issued 3 November 1999 Resolved
Reinstall circuit breaker cover onto hot water tank in 02 deck deli to the satisfaction of the attending marine inspector and the cognizant OCMI.
Condition: Unknown
Due 5 November 1999
Resolved 10 November 1999
Fire Fighting
Issued 3 November 1999 Resolved
Ensure all weather deck fire doors latch properly and prove proper opera- tion of the same to the satisfaction of the attending marine inspector and the cognizant OCMI.
Condition: Unknown
Due 3 November 1999
Resolved 3 November 1999
Lifesaving
Issued 3 November 1999 Resolved
Post life raft launching instructions at life raft launching stations to the satisfaction of the attending marine inspector and the cognizant OCMI.
Condition: Unknown
Due 3 December 1999
Resolved 10 November 1999
Engineering
Issued 3 November 1999 Resolved
Submi a copy of the vessel's automation test procedures for CG approval.
Condition: Unknown
Due 3 November 1999
Resolved 3 November 1999
Lifesaving
Issued 3 November 1999 Resolved
Provide second paddle/ore for rescue boat and properly lable the same with the name of the vessel to the satisfaction of the attending marine inspec- tor and the cognizant OCMI.
Condition: Unknown
Due 5 November 1999
Resolved 10 November 1999
Construction/Loadline
Issued 25 October 1999 Resolved
PROVIDE PROPOSAL FOR REPAIR OF PITTING IN WAY OF BOW THRUSTER TUBE BY 01APR99 WITH COMPLETION OF SUBSEQUENT REPAIR UPON APPROVAL NOT LATER THEN 15MAY99, OR PRIOR TO CONDUCTING UNDERWAY SERVICE.
Condition: Unknown
Due 25 October 1999
Resolved 25 October 1999
Fire Fighting
Issued 25 August 1999 Resolved
Repair all fire damper pull cords.
Condition: Unknown
Due 25 August 1999
Resolved 25 August 1999
Fire Fighting
Issued 25 August 1999 Resolved
Repair all fire door latching devices.
Condition: Unknown
Due 25 August 1999
Resolved 25 August 1999
Accommodation/Occupational Safety
Issued 13 May 1999 Resolved
INSTALL CLOSED CONTAINER FOR MARGARITA MIX IN BEVERAGE LOCKER.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Engineering
Issued 13 May 1999 Resolved
PROVE PROPER OPERATION OF MURPHY ALARM PANEL FOR #1 SSDG IN ENGINE CONTROL ROOM.
Condition: Unknown
Due 7 July 1999
Resolved 7 July 1999
Electrical
Issued 13 May 1999 Resolved
INSTALL "E"S ON THE EMERGENCY LIGHTS.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Lifesaving
Issued 13 May 1999 Resolved
INSTALL RETROREFLECTIVE TAPE ON LIFE BUOYS ON THE STERN OF THE VESSEL.
Condition: Unknown
Due 7 July 1999
Resolved 7 July 1999
Navigation
Issued 13 May 1999 Resolved
ROVE PROPER OPERATION OF RUDDER ANGLE INDICATOR ON PILOT HOUSE MAIN STEERING CONSOLE.
Condition: Unknown
Due 7 July 1999
Resolved 7 July 1999
Electrical
Issued 13 May 1999 Resolved
INSTALL EMERGENCY LIGHTING IN THE FORPEAK PORT AND STBD SIDES. SUFFICIENT LIGHTING SHOULD BE PROVIDED SO THAT THE SPACE IS ADEQUATELY LIT WHEN ON EMERGENCY POWER.
Condition: Unknown
Due 7 July 1999
Resolved 7 July 1999
Engineering
Issued 13 May 1999 Resolved
SUBMIT AUTOMATION TEST PROCEDURES TO COGNIZANT OCMI FOR APPROVAL.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Electrical
Issued 13 May 1999 Resolved
REPAIR EXHAUST LEAK IN WAY OF OUTBOARD TURBOCHARGER ON #2 SSDG.
Condition: Unknown
Due 13 May 1999
Resolved 13 May 1999
Unknown
Issued 4 November 1998 Resolved
REPLACE AND PROVE PROPER OPERATION OF BOTH AIR RECEIVER SAFETY VALVES
Condition: Unknown
Due 4 December 1998
Resolved 17 December 1998
Lifesaving
Issued 4 November 1998 Resolved
REMOVE HEAT TAPE FROM SEWAGE LINE.
Condition: Unknown
Due 25 November 1998
Resolved 15 December 1998
Accommodation/Occupational Safety
Issued 4 November 1998 Resolved
REMOVE TRASH FROM BEHIND THE SLOT MACHINES IN THE GAMING SPACES.
Condition: Unknown
Due 4 December 1998
Resolved 15 December 1998
Electrical
Issued 4 November 1998 Resolved
INSTALL ADDITIONAL EMERGENCY LIGHT IN AFT STARBOARD MAIN DECK POWERED FROM THE EMERGENCY GENERATOR.
Condition: Unknown
Due 4 December 1998
Resolved 15 December 1998
Electrical
Issued 4 November 1998 Resolved
INSTALL BATTERY POWERED FLOOD LAMP AT PORT AFT MAIN DECK DOOR.
Condition: Unknown
Due 25 December 1998
Resolved 15 December 1998
Electrical
Issued 4 November 1998 Resolved
CONNECT DEAD END WIRES IN 4" BOX OVER BILGE PUMPS.
Condition: Unknown
Due 4 December 1998
Resolved 15 December 1998
Fire Fighting
Issued 4 November 1998 Resolved
RE-MOUNT BRACKET FOR JOCKEY PUMP PIPING.
Condition: Unknown
Due 4 December 1998
Resolved 15 December 1998
Lifesaving
Issued 4 November 1998 Resolved
INSTALL ADDITIONAL ENGINEER CALL AND GENERAL ALARM LIGHTS IN GENERATOR ROOM.
Condition: Unknown
Due 4 December 1998
Resolved 15 December 1998
Electrical
Issued 4 November 1998 Resolved
RENEW HEAVILY CORRODED POSTS ON B/T STARTING BATTERY OR RENEW BATTERY.
Condition: Unknown
Due 4 December 1998
Resolved 15 December 1998
Electrical
Issued 4 November 1998 Resolved
CORRECT GROUNG IN 500HVA CASION DISTRIBUTION.
Condition: Unknown
Due 4 December 1998
Resolved 15 December 1998
Construction/Loadline
Issued 12 August 1998 Resolved
Replace existing engine-room escape scuttles with something easily used by single person and capable of meeting Structural Fire Protection regs. (existing ones are non-hinged and weigh 98 lbs.)
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Electrical
Issued 12 August 1998 Resolved
Investigate and correct exhaust leak on #2 ship service generator.
Condition: Unknown
Due 26 August 1998
Resolved 26 August 1998
Fire Fighting
Issued 12 August 1998 Resolved
Install pressure relief valves on discharge side of fire pumps IAW 46 CFR 76.10-5(d)
Condition: Unknown
Due 12 August 1998
Resolved 12 August 1998
Engineering
Issued 19 February 1998 Resolved
Prove proper operation of the oily water separator.
Condition: Unknown
Due 6 March 1998
Resolved 13 March 1998
Engineering
Issued 19 February 1998 Resolved
Install and prove proper operation of a remote fuel oil shutdown valve for the bow thruster engine.
Condition: Unknown
Due 6 March 1998
Resolved 13 March 1998
Construction/Loadline
Issued 22 August 1997 Resolved
PROVE PROPER OPERATION OF THE OPEN/CLOSE INDICATOR FOR WATERTIGHT DOOR #2 REMOTE CLOSURE DEVICE.
Condition: Unknown
Due 15 September 1997
Resolved 16 October 1997
Engineering
Issued 14 August 1997 Resolved
Vessel may operate dockside, until permanent repairs to stbd shaft completed. Fore and aft watertight doors to remain closed. Maintain watchon upper plug to ensure it remains leak free. Same requirements appy to port shaft.
Condition: Unknown
Due 7 September 1997
Resolved 24 September 1997
Electrical
Issued 14 May 1997 Resolved
RENEW COVERPLATE FOR AIR CONDITIONER CONTROLLER IN MEN'S HEAD.
Condition: Unknown
Due 1 June 1997
Resolved 23 June 1997
Accommodation/Occupational Safety
Issued 14 May 1997 Resolved
ENSURE CLEANLINESS AND GOOD HOUSEKEEPING PRACTICES ARE FOLLOWED IN AREAS BEHIND BARS AND SINKS ON ALL LEVELS.
Condition: Unknown
Due 1 June 1997
Resolved 23 June 1997
Fire Fighting
Issued 21 February 1997 Resolved
Make repairs to fire screen door which failed to properly latch in the following locations: 02 deck aft, and main deck starboard exterior.
Condition: Unknown
Due 28 February 1997
Resolved 20 March 1997
Engineering
Issued 10 January 1997 Resolved
Repair/replace #2 Ships Service Generator. Prove operation of generator and all safety devices prior to carrying passengers away from the dock.
Condition: Unknown
Due 10 January 1997
Resolved 10 January 1997
Electrical
Issued 13 November 1996 Resolved
Prove proper operation of the reverse power relay for the No. 2 ship's service diesel generator.
Condition: Unknown
Due 16 January 2002
Resolved 16 January 2002
Resolution: Item re-cleared due to MISLE transition
Electrical
Issued 13 November 1996 Resolved
Replace or renew E-labling on exterior emergency lights where painted and/or taped over on the 02 and 03 decks.
Condition: Unknown
Due 30 November 1996
Resolved 17 December 1996
Fire Fighting
Issued 13 November 1996 Resolved
Prove proper operation of fire screen door that does not completely close located aft/center on 02 deck ([name withheld]).
Condition: Unknown
Due 30 November 1996
Resolved 17 December 1996
Fire Fighting
Issued 13 November 1996 Resolved
Clean accumulated dust and debris from all dirty sprinkler system heads throughout the vessel.
Condition: Unknown
Due 30 November 1996
Resolved 17 December 1996
Accommodation/Occupational Safety
Issued 21 August 1996 Resolved
Install sanitary caps on liquor rack receptacles where bottles are missing.
Condition: Unknown
Due 30 September 1996
Resolved 30 September 1996
Accommodation/Occupational Safety
Issued 21 August 1996 Resolved
Modify installation of all hot water heaters by vertically lifting and remounting heaters behind serving area stations.
Condition: Unknown
Due 30 September 1996
Resolved 30 September 1996
Electrical
Issued 21 August 1996 Resolved
Install proper type electrical outlet below dishwasher located within Emerald deck serving bar area.
Condition: Unknown
Due 30 September 1996
Resolved 30 September 1996
Construction/Loadline
Issued 13 June 1996 Resolved
RENEW GASKET ON WATER TIGHT DOOR #1.
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Construction/Loadline
Issued 13 June 1996 Resolved
RENEW INSULATION BLOCKS IN CABLE TRANSIT LOCATED IN AFT, STBD, OVERHEAD CORNER OF M.I.S. EQUIPMENT ROOM.
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Accommodation/Occupational Safety
Issued 13 June 1996 Resolved
RENEW WOOD SUPPORTS AND CLEAN BENEATH VENDING MACHINES LOCATED IN FORWARD CREW LOUNGE.
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Electrical
Issued 13 June 1996 Resolved
PROPERLY INSTALL SURGE SUPPRESSOR BOX ON SIDE OF ELECTRICAL PANEL IN GENERATOR SPACE.
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Electrical
Issued 13 June 1996 Resolved
PROVE OPERATION OF FORWARD GENERATOR SPACE EMERGENCY LIGHTING FIXTURE.
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Accommodation/Occupational Safety
Issued 22 May 1996 Resolved
Provide adequate modifications to all strip lighting (emergency lighting) on main interior starway in order to remove tripping hazard; strip lightingis located on horizontal edge of each step and is raised thus posing a tripping hazard.
Condition: Unknown
Due 22 May 1996
Resolved 22 May 1996
Fire Fighting
Issued 12 February 1996 Resolved
Prove proper operation of remote station release of Fire Screne Door #13 and latching of FSD #8, 3, & 12.
Condition: Unknown
Due 14 March 1996
Resolved 14 March 1996
Electrical
Issued 12 February 1996 Resolved
Properly install and secure electric cable on center table of Emerald leveldeck and repair weather proof outlet box on bow near mooring windlass and repair outlet cover on Diamond level STBD side aft nearest fire sta. #12.
Condition: Unknown
Due 14 March 1996
Resolved 14 March 1996
Fire Fighting
Issued 12 February 1996 Resolved
Conduct hydro test or make sprinkler system reservoir available for visual inspection.
Condition: Unknown
Due 14 March 1996
Resolved 14 March 1996
Electrical
Issued 13 November 1995 Resolved
Identify and repair grounds on main & emergency switchboards.
Condition: Unknown
Due 27 November 1995
Resolved 14 December 1995
Accommodation/Occupational Safety
Issued 13 November 1995 Resolved
Install additional PFD placarding on casino tables to refelct actual PFD count and update and submit Fire & Safety Plan to Marine Safety Center for approval or adjust respectively PFDs counts to be consistent with Fire and Safety Plan.
Condition: Unknown
Due 27 November 1995
Resolved 14 December 1995
Electrical
Issued 13 November 1995 Resolved
Identify problem, repair and prove proper operation of both ship service generator Reverse Power Relays.
Condition: Unknown
Due 27 November 1995
Resolved 14 December 1995
Electrical
Issued 13 November 1995 Resolved
Repair opening in electrical stuffing box between bow thruster room and bowvoid.
Condition: Unknown
Due 27 November 1995
Resolved 14 December 1995
Accommodation/Occupational Safety
Issued 13 November 1995 Resolved
Properly secure C02 bottles in beverage equipement room.
Condition: Unknown
Due 27 November 1995
Resolved 14 December 1995
Electrical
Issued 13 November 1995 Resolved
Remove orange extension cord in MIS equipment room._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 November 1995
Resolved 14 December 1995
Electrical
Issued 15 June 1995 Resolved
Properly install cables through two stuffing boxes located in adjoining bulkhead between MIS equipment room and MIS office.
Condition: Unknown
Due 16 January 2002
Resolved 16 January 2002
Resolution: Item re-cleared due to MISLE transition
Electrical
Issued 15 June 1995 Resolved
Mount electrical and telephone outlets on Ruby level blackjack pit.
Condition: Unknown
Due 16 January 2002
Resolved 16 January 2002
Resolution: Item re-cleared due to MISLE transition
Construction/Loadline
Issued 15 June 1995 Resolved
Properly adjust PRT side forepeak watertight door to prevent metal to metalcontact.
Condition: Unknown
Due 15 June 1995
Resolved 15 June 1995
Electrical
Issued 15 November 1994 Resolved
Replace all missing light fixture guards on observation deck.
Condition: Unknown
Due 7 December 1994
Resolved 6 January 1995
Electrical
Issued 15 November 1994 Resolved
Prove proper operation of #2 Ship Service Generator Revers Power Relay. Until such time as proper operation of #2 SSG is proven, vessel shal carry one additional licensed engineer who sholl maintain a watch at generator control panel.
Condition: Unknown
Due 1 December 1994
Resolved 6 January 1995
Construction/Loadline
Issued 2 August 1994 Resolved
recharge hydraulic accumulators for Class 3 WTDs.
Condition: Unknown
Due 2 August 1994
Resolved 2 August 1994
Fire Fighting
Issued 2 August 1994 Resolved
demonstrate proper operation of fire screen door #10.
Condition: Unknown
Due 2 August 1994
Resolved 2 August 1994
Electrical
Issued 28 March 1994 Resolved
Provide hardwired power feed to T.V. amp in emergency generator room and clean up installation.
Condition: Unknown
Due 16 January 2002
Resolved 16 January 2002
Resolution: Item re-cleared due to MISLE transition
Construction/Loadline
Issued 28 March 1994 Resolved
Renew gasket on escape scuttle located by elevators.
Condition: Unknown
Due 28 March 1994
Resolved 28 March 1994
Construction/Loadline
Issued 28 March 1994 Resolved
Provide acces to power WTD return valves and mark same, also provide correct direction labeling.
Condition: Unknown
Due 28 March 1994
Resolved 28 March 1994
Construction/Loadline
Issued 28 March 1994 Resolved
Demonstrate remote manual operation of power WTD's.
Condition: Unknown
Due 28 March 1994
Resolved 28 March 1994
Electrical
Issued 28 March 1994 Resolved
Clear ground fault on 300 KVA distribution.
Condition: Unknown
Due 28 March 1994
Resolved 28 March 1994
Fire Fighting
Issued 28 March 1994 Resolved
Modify existing fire damper handles to provide proper access.
Condition: Unknown
Due 28 March 1994
Resolved 28 March 1994
Unknown
Issued 28 March 1994 Resolved
Demonstrate proper operation of ship service air compressor relief valves.
Condition: Unknown
Due 28 March 1994
Resolved 28 March 1994
Electrical
Issued 1 December 1993 Resolved
CORRECT THE 112.5 KVA TRANSFORMER GROUND (IN THE EMERGENCY GENERATOR ROOM).
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Navigation
Issued 1 December 1993 Resolved
PROVIDE AN INDICATING LIGHT FOR THE SOUND POWER PHONE IN THE EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
PROVIDE ON BOARD A CORRECTED TONNAGE CERTIFICATE.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
PROVIDE ON BOARD A CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Engineering
Issued 1 December 1993 Resolved
AMEND THE FUEL OIL TRANSFER PROCEDURES TO INCLUDE THE CARGO (FUEL) INFORMATION AS DESCRIBED IN 33CFR154.310(A)(5)(II); AND, THE PROCEDURES ANDDUTY ASSIGNMENTS FOR TENDING THE VESSEL'S MOORINGS DURING THE TRANSFER OF OIL; AND INTERNAL TRANSFER OPERATION WITHIN THE VESSEL.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Accommodation/Occupational Safety
Issued 1 December 1993 Resolved
PROVIDE ALL REQUIRED VESSEL MARKINGS AS APPLICABLE AS PER 46CFR SUBPART_x001C_ 78.47.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Lifesaving
Issued 1 December 1993 Resolved
PROVIDE AN ELECTRICALLY NONCONDUCTIVE MAT FOR THE EMERGENCY GENERATOR SWITCHBOARD.
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Documentation
Issued 1 December 1993 Resolved
SUBMIT FOR APPROVAL AND SATISFY ANY COMMENTS FROM THE COAST GUARD MARINE SAFETY CENTER FOR THE ENGINE EXHAUST PIPING, REL&A DWG 2967-P75.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Accommodation/Occupational Safety
Issued 1 December 1993 Resolved
REPAIR THE MOTORIZED FAN, 01 DECK AFT, DUE TO EXCESSIVE NOISE.
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Documentation
Issued 1 December 1993 Resolved
SUBMIT TO THE OFFICER IN CHARGE, MARINE INSPECTION, JACKSONVILLE, FLORIDA, AN AS BUILT FIRE & SAFETY PLAN, REL&A DWG 2967-A57.
Condition: Unknown
Due 16 December 1993
Resolved 16 December 1993
Documentation
Issued 1 December 1993 Resolved
SUBMIT FOR APPROVAL AND SATISFY ANY COMMENTS FROM THE COAST GUARD MARINE SAFETY CENTER FOR THE SPRINKLER SYSTEM DRAWINGS FP-1, FA-1, AND FA-2.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
SUBMIT FOR APPROVAL AND SATISFY ANY COMMENTS FROM THE COAST GUARD MARINE SAFETY CENTER FOR THE LIGHTING DECK PLAN REL&A DWG 2967-E25.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
SUBMIT FOR APPROVAL AND SATISFY ANY COMMENTS FROM THE COAST GUARD MARINE SAFETY CENTER FOR THE GENERAL ALARM ARRANGEMENT, REL&A DWG 2967-E51.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
SUBMIT FOR APPROVAL AND SATISFY ANY COMMENTS FROM THE COAST GUARD MARINE SAFETY CENTER FOR THE INTERNAL COMMUNICATIONS PLAN.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
RESUBMIT THE OUTBOARD PROFILE & HOLD ARRANGEMENT, REL&A DWG 2967-A19, TO REFLECT THE AS BUILT CONDITION TO THE COAST GUARD MARINE SAFETY CENTER.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
RESUBMIT FOR APPROVAL TO THE COAST GUARD MARINE SAFETY CENTER THE EMERGENCYEVACUATION PLAN, REL&A DWG 2967-A50, TO REFLECT THE AS BUILT CONDITION.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
RESUBMIT FOR APPROVAL THE FIRE BOUNDARY DIAGRAM, REL&A DWG 2967-A51, TO THECOAST GUARD MARINE SAFETY CENTER TO SHOW THE AS BUILT CONDITION.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
PROVIDE PROOF OF ACCEPTANCE BY COMMANDANT (G-MVI-4) OF CREW SPACES BELOW THE DEEPEST LOAD LINE. (SEE G-MSC LTR H2-30646 OF 11AUG93.)
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Construction/Loadline
Issued 1 December 1993 Resolved
SUBMIT TO THE MARINE SAFETY CENTER THE MODIFICATIONS TO THE FIXED BALLAST PIPING SYSTEM FOR APPROVAL.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Documentation
Issued 1 December 1993 Resolved
SUMBIT FOR APPROVAL AND SATISFY COMMENTS FROM THE COAST GUARD MARINE SAFETYCENTER FOR THE COMPRESSED AIR PIPING, REL&A DWG. 2967-P80.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Fire Fighting
Issued 1 December 1993 Resolved
INSTALL A CONDUIT SUPPORT BRACKET FOR THE HALON PULL BOXES IN THE ENGINEROOM VESTIBULE.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993
Accommodation/Occupational Safety
Issued 1 December 1993 Resolved
PROVE OPERATION OF THE PASSENGER ELEVATOR PHONE SYSTEM.
Condition: Unknown
Due 1 December 1993
Resolved 1 December 1993

Casualty record · 2

15 November 2005Routine · role: Subject to Marine Inspection · activity 2574676
13 December 2005Routine · role: Involved in a Marine Casualty · activity 2553785
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.