Records from 1994 to 2011. Most recent: operational control imposed, 28 December 2011.
Inspection history · 21
28 December 2011
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4212276
5 December 2009
ISPS I Exam · NPV Safety Exam · MARPOL Annex I Examination · Ballast Water Examination · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3640079
3 December 2009
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3644394
2 December 2009
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3640078
4 May 2009
PII Safety Exam · ISPS I Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3467286
4 May 2009
Type not recorded
No type recorded · Station Little Creek · USCG East District (CGD-E) · Activity 3468678
1 May 2009
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3465103
1 May 2009
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3465469
3 April 2006
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2615800
1 March 2006
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2593780
28 November 2003
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1955684
18 October 2003
Annual Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1931226
25 February 2002
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1489331
7 January 2002
Annual Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1474460
1 April 2000
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 276430
13 June 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 429659
1 August 1997
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 406129
21 April 1996
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 390238
8 March 1996
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 388564
3 November 1994
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 371943
3 November 1994
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1175673
Lifesaving › Launching Appliances › Winch Brake
Issued 28 December 2011
Resolved
0630-Launch arrangement for survival craft-Each lifeboat shall be provided with an appliance capable of launching and recovering the lifeboat. During lowering of port side lifeboat, the davit brake failed to stop the boat from lowering. - SOLAS 2009 cons. III/16
Action required: 17 - Rectify deficiencies prior to departure
Due 28 December 2011
Resolved 31 December 2011
Resolution: Received, reviewed and accepted class report from LR stating the deficiency was rectified. The lifeboat winch''s ratchet bearing needs to be replaced. Replacement parts were unobtainable. Flag has been notified. See narrative for details.
Navigation › Voyage Data Recorder › Simplified Voyage Data Recorder (SVDR)
Issued 28 December 2011
Resolved
1599-Other (navigation)-Ships when engaged on international voyages shall be fitted with a VDR which may be a simplified voyage data recorder. Ships SVDR displayed an error code of microphone failure. SVDR technical publication requires a service tech to repair. -SOLAS 2009 cons. V/20.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 December 2011
Resolved 31 December 2011
Resolution: Received, reviewed and accepted class report from LR stating the deficiency was rectified. Radio Holland serviced the S-VDR. The technician replaced the malfunctioning microphone was replaced with a new one. See narrative for details.
Engineering › Lubricating Oil Service System › Vent Pipe
Issued 28 December 2011
Resolved
9900-Other (not clearly hazardous)-After survey of ship no change shall be made to equipment covered by the survey. Ships crew made modification to cylinder oil day tank vent line. Crew stated modification was made to transfer low sulphur cylinder oil to day tank when entering SECA area. SOLAS 2009 cons. I/11.
Action required: 15 - Rectify deficiencies by next port
Due 30 December 2011
Resolved 25 October 2012
Resolution: Vessel provided report of repair of modification to cylinder oil day tank vent line.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 28 December 2011
Resolved
0899-Other (accident prevention)-Each transfer pipe system including each metallic hose must not leak under static liquid pressure at least 1.5 times maximun allowable working pressure. Tests shall be conducted annually. Ship was unable to provide documentation of annual hydrostatic testing. 33 CFR 156.170
Action required: 703 - Prior to bunkering operations
Due 28 December 2011
Resolved 25 October 2012
Resolution: Vessel provided hydrstatic test report of system.
Stability › Watertight Integrity › General
Issued 28 December 2011
Resolved
After survey of the ship no change shall be made to the equipment covered by the survey. Ships crew had wired open a drain valve which drained from the steering space to the engine room. SOLAS 2009 cons. I/11.
Due 28 December 2011
Resolved 28 December 2011
Resolution: Crew removed wire from drain valve. Chief engineer and captain have plans to discuss installing a bilge alarm in steering space.
Lifesaving › Lifeboat › Propulsion Engine
Issued 28 December 2011
Resolved
0615-Rescue boats-At all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The engine for the ships designated rescue boat did not start. Crew stated battery was drained because engine's air pre-heater was left in the "ON" position. SOLAS 2009 cons. III/20.
Due 28 December 2011
Resolved 28 December 2011
Resolution: Crew turned air pre-heater off, charged battery , then started rescue boat successfully.
Engineering › Fuel Oil Service System › Piping
Issued 5 December 2009
Resolved
1420 - Cleanliness of engine room - During the course of the inspection, the PSCO noted fuel and lube oil leaks throughout the engine room that were not being maintained. Numerous rags, buckets, and plastic bins had been wired?wedged into place as a catchment system thus creating an unsafe environment in accordance with MSC Circular 647. - SOLAS2004 Cons. II-1/26, MSC Circular 647
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2009
Resolved 3 June 2010
Resolution: Vessels enginroom has been cleaned and leaks have been secured to the satisfation of Class.
Engineering › Sea-water System (primary cooling) › Pump
Issued 5 December 2009
No resolution recorded
1499 - Other (prop and auxiliary machinery) - The packing for the majority of the ballast water and salt water cooling pumps were leaking excessively. The condition appears to be ongoing as the bases of several pumps exhibit excessive corrosion. Class to attest to the proper repair of all above mentioned pumps. - SOLAS 2004 cons. II-1/26
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2009 — due date passed with no resolution recorded
Resolution: Repairs have been made to the satisfaction of class.
Fire Fighting › Fire Pumps › Pressure
Issued 14 May 2009
Resolved
The vessels emergency fire pump can not provide adequate suction and pressure, posing a risk to the crew in the event of a fire. Recitfy to the satisfaction of the USCG. SOLAS 81 AMEND. II-2/4.3.3.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2009
Resolution: Verified proper operations. Deficiency cleared.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 14 May 2009
Resolved
The crew could not show proper operation of the OWS, posing a threat to the environment. Rectify to the satisfaction of class. MARPOL ANNEX I/14.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2009
Resolution: Recieved class report attesting to crew recieving training in proper operation of the OWS.
Documentation › Certificates/Documents › IOPP Certificate
Issued 14 May 2009
Resolved
The vessels IOPP certificate supplement does not correctly identify the maximum throughput of the OWS system. Rectify to the satisfaction of class. MARPOL ANNEX I/6.4.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2009
Resolution: Recieved class report attesting to correction made to IOPP supplement to reflect correct maximum OWS throughput.
Fire Fighting › Fire Main › Condition
Issued 1 March 2006
Resolved
Fire main piping on deck leaking at #5 cargo hold, by #7 cargo hold near fire station, and at the expansion coupling by #3 cargo hold.
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 3 April 2006
Resolution: Received Class report attesting to repairs
Deck/Cargo › Holds/Tanks › Hatch
Issued 1 March 2006
Resolved
Repair hydraulic leak on the hatch cover motor return line on at the #5 cargo hold. Leak is a potential pollution and safety risk.
Action required: 705 - Other - as specified
Due 1 April 2006
Resolved 3 April 2006
Resolution: Received class report attesting to repairs
Fire Fighting › Portable Foam Applicators
Issued 18 October 2003
Resolved
Missing portable foam applicator from upper level in engine room. Vessel has new applicator on order. LEGACY COMPONENT DESC: Nozzle
Due 18 November 2003
Resolved 28 November 2003
Resolution: Ship received new Portable Foam Applicator.
Pollution Prevention/Response
Issued 7 January 2002
Resolved
MSD not properly labeled. 33 CFR 159.55 Must provide appropriate nameplate on MSD no later than 07 FEB 2002. To satisfaction of [name withheld]: MSD
Due 7 February 2002
Resolved 25 February 2002
Resolution: Noted proper nameplate affixed to MSD.
Fire Fighting
Issued 8 March 1996
Resolved
RENEW/REPAIR DETERIORATED FOAM FIRE EXTINGUISHER NOSES #25, 26 AND 27 LOCATED IN THE ENGINE ROOM. SOLAS 74 (AMENDED) II-2/21
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Lifesaving
Issued 8 March 1996
Resolved
RENEW LIFELINE TO LIFEBOATS ENSURING LINE IS OF A BUOYANT MATERIAL SOLAS 74(AMENDED) III/41.7.3
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Fire Fighting
Issued 8 March 1996
Resolved
RENEW/REPAIR (4) DETERIORATED/HOLED FIRE HOSES ON MAIN DECK. SOLAS 74 (AMENDED) II-2/21
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996