Records from 2016 to 2026. Most recent: inspection, 31 July 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)50.0 ft × 16.0 ft × 6.0 ft
Registered tonnagegross 32 / net 25
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEVANS BOAT REPAIR INC · CRISFIELD, MD, UNITED STATES · built 2001
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portLA PARGUERA, PR
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 January 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it25 - Simplified, Net Ton
32 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
31 July 2026
Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8451540
1 August 2025
Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8192628
21 October 2024
Deficiency Check · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8022479
7 October 2024
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 8015928
11 June 2024
Deficiency Check · Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7932673
21 August 2023
Deficiency Check · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7774057
2 August 2023
Annual Inspection · Administrative Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7762255
4 May 2022
Hull Examination · Internal Structural Exam
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7444648
2 May 2022
COI Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7475916
9 September 2021
Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7308436
1 September 2021
Administrative Inspection
Administrative · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7301742
12 November 2020
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 7093937
10 June 2020
Annual Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6973807
12 September 2019
Annual Inspection · Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6811329
23 October 2018
Hull Examination · Internal Structural Exam
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6567981
3 August 2018
Annual Inspection · Examination of Repairs
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6496806
2 May 2017
COI Inspection
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6134147
13 September 2016
Deficiency Check · Drydock Exam
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 6000341
3 August 2016
Annual Inspection · Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 5968500
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 7 October 2024
Resolved
A vessel must comply with the applicable requirements for any radio, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Renew all radio certs.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2024
Resolved 21 October 2024
Resolution: The vessel owner also sent proof of the vessel acquiring its radio certificate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 October 2024
Resolved
Installation of nozzles, flanges or other fittings for pipe connections to the tanks must be acceptable to the cognizant [name withheld] fuel tank level sensing unit.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2024
Resolved 21 October 2024
Resolution: Attending MI received photo evidence showing the removal of the fuel tank sending units and their replacements with a fuel neck with cap.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 11 June 2024
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. The vessel TEASER was due for drydock 31MAY2024 and shall not operate commercially until credit drydock is granted by OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 July 2024
Resolved 18 June 2024
Resolution: Commenced dry dock
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 2 August 2023
Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Vessel's machinery space bulkheads, fore and aft, had multiple penetrations that were not watertight. Bulkheads must be made watertight to the satisfaction of an attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 August 2023
Resolved 21 August 2023
Resolution: Attending MI witnessed the sealing of all openings on the vessels water tight bulkhead.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 2 May 2022
Resolved
Each survival craft, rescue boat, and launching appliance must be visually inspected to ensure its readiness for use. Repair tares and replace reflective tape in accordance with manufacturer’s instructions. 46CFR185.720
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 August 2023
Resolution: Life float was serviced and repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 September 2021
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. Label fuel shut off valves.46CFR185.608
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 September 2021
Resolution: Attending MI received evidence that the deficiency was corrected.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 9 September 2021
Resolved
Each portable fire extinguisher on a vessel must be of an approved type. Replace 02 brackets for 10:B:C extinguishers.
46CFR181.500
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 September 2021
Resolution: Attending MI received evidence that the deficiency was corrected.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 September 2021
Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction. Tighten up middle handrail for swim platform.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 September 2021
Resolution: Attending MI received evidence that the deficiency was corrected.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 September 2021
Resolved
Except for engine exhausts, each inlet or discharge pipe that penetrates the hull below a line drawn parallel to and at least 150 millimeters (6 inches) above the deepest load waterline must have means to prevent water from entering the vessel. Cap old generator water outlet at the stern whit suitable metal valve or cap
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 September 2021
Resolution: Attending MI received evidence that the deficiency was corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 September 2019
Resolved
Install protective guards around belts for both main propulsion engines.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2019
Resolved 9 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 12 September 2019
Resolved
Various overhead light fixtures inoperative (forward cabin and aft deck).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 October 2019
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 12 September 2019
Resolved
Ensure abanndon ship drills and man overboard drills are documented in accordance with 46 CFR 185.520
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 October 2019
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 12 September 2019
Resolved
Ring life buoy was missing Type I retro reflective tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 October 2019
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 12 September 2019
Resolved
Provide and make available life float for inspection. New netting material was ordered and will be installed.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 October 2019
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 May 2017
Resolved
Obtain valid CG approved first aid kit
Action required: 705 - Other - as specified
Due 16 May 2017
Resolved 4 May 2017
Resolution: Obtained valid CG approved first aid kit
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 2 May 2017
Resolved
Replace both inboard starboard MDE engine bed mounts
Action required: 705 - Other - as specified
Due 2 June 2017
Resolved 4 May 2017
Resolution: Replaced both inboard starboard MDE engine bed mounts
Communications › Audible Communications › Horn/Whistle
Issued 2 May 2017
Resolved
Prove proper operation of ships sound signaling device
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 4 May 2017
Resolution: Proved proper operation of ships sound signaling device
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 2 May 2017
Resolved
Obtain valid DOT approved alcohol screening device
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 4 May 2017
Resolution: Obtained valid DOT approved alcohol screening device
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 2 May 2017
Resolved
Obtain proof of 2016 MIS report submission
Action required: 705 - Other - as specified
Due 9 May 2017
Resolved 3 May 2017
Resolution: Provided proof of 2016 MIS report submission
Communications › Radio Communications › VHF Radiotelephone
Issued 3 August 2016
Resolved
Obtain and satisfactorily install a VHF Radio with DSC.
Action required: 705 - Other - as specified
Due 10 August 2016
Resolved 9 August 2016
Resolution: Obtained and satisfactorily installed a VHF Radio with DSC.