Records from 1994 to 2020. Most recent: inspection, 13 July 2020.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 13 July 2020
No resolution recorded
Vessel inspected under subcahpter T may not operate without having on board a valid USCG COI. Vessel annual inspection is overdue.
Action required: 701 - Prior to carriage of passengers/cargo
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 January 2019
Resolved
VSL on LSW route must have (06) red and (06)orange flares. Provide (08) additional red flares.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2019
Resolved 25 January 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 January 2019
Resolved
Fixed Fire Fighting system must be test and service annually by qualified Individual.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2019
Resolved 25 January 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 January 2019
Resolved
VSL must have type i life jackets for every persons on board. VSL have (39) life jackets. Provide additional (03) adult life jackets to meet max number of persons on board (51)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2019
Resolved 25 January 2019
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 23 January 2019
Resolved
Crew drills must be conduct every three months and logged in a vessel log book.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2019
Resolved 25 January 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 23 January 2019
Resolved
Vessel must have valid FCC station license Provide proof of valid FCC station license.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 February 2019
Resolved 25 January 2019
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder Head
Issued 5 April 2018
Resolved
Starboard propulsion engines had internal failures, caused engine to overheated and seized. Conduct repairs IAW engine manufacture instructions. No passenger carry until repairs are complete and attest by attending CG marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 April 2018
Resolved 23 January 2019
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 30 November 2017
Resolved
Master must conduct drills as required by 46 CFR 185.25-10. Provide proof of performed drills.
Due 15 December 2017
Resolved 1 December 2017
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 30 November 2017
Resolved
Emergency Check off list must be post in a conspicuous space accessible to crew and passenger as required by 46 CFR 185.25-1. Post emergency check off list.
Due 15 December 2017
Resolved 2 December 2017
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 30 November 2017
Resolved
Life preserver stowage must be marked as required by 46 CFR 185.30-10. Marked life preserver storage with at least 1 inch letters and figures.
Due 15 December 2017
Resolved 1 December 2017
Navigation › Piloting/Steering › Local Notices to Mariners
Issued 30 November 2017
Resolved
Vessel must carry adequate and up-to-date notice to mariners, a copy of navigation rules and tide tables as required by 46 CFR 185.20-35. Provide missing nautical publications.
Due 15 December 2017
Resolved 1 December 2017
Navigation › Piloting/Steering › Magnetic Compass
Issued 30 November 2017
Resolved
Vessel must be fitted with suitable comapass as required by 46 CFR 184-20-1. Repair in- operatble light on compass.
Due 15 December 2017
Resolved 1 December 2017
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 30 November 2017
Resolved
Each life preserver must have at least 31 square inch of retro reflective material attached on its front and back as required by 46 CFR 180.25-25. Replace old retro reflective material on 17 adult life preservers. Max number of passenger carry is 31.
Due 15 December 2017
Resolved 2 December 2017
Lifesaving › Lifebuoys › Serviceable
Issued 30 November 2017
Resolved
Ring life buoy must be in good and serviceable conditions as required by 46 CFR 180.30-1. Replace damaged ring life buoy.
Due 15 December 2017
Resolved 1 December 2017
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 30 November 2017
Resolved
All vessel shall be provided with hand operated portable fire pump having capacity of at least 5 gallons per minute as required by 46 CFR 181.10-5. Provide hand fire pump.
Due 15 December 2017
Resolved 1 December 2017
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 30 November 2017
Resolved
Vessel engines must have gages to indicate engine cooling discharge temperatures and lubrication oil pressures as required by 46 CFR 182.20-5. Replace inoperable engine oil pressure gages and engine temperature gages on port and starboard engines.
Due 15 December 2017
Resolved 2 December 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 30 November 2017
Resolved
Propulsion machinery shall be proper operating condition and fit for the service for which they are intended as required by 46 CFR 176.25-10. Replace damaged oil line to turbo on starboard engine.
Due 15 December 2017
Resolved 1 December 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 30 November 2017
Resolved
Propulsion machinery shall be proper operating condition and fit for the service for which they are intended as required by 46 CFR 176.25-10. Install missing air filter on port engine.
Due 15 December 2017
Resolved 1 December 2017
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 30 November 2017
Resolved
Propulsion machinery shall be proper operating condition and fit for the service for which they are intended as required by 46 CFR 176.25-10. Repair salt water leaks on starboard engine exhaust.
Due 15 December 2017
Resolved 1 December 2017
Engineering › Fuel Oil Service System › Ventilation
Issued 2 October 2017
Resolved
Diesel tank vent screen shall be corrosion resistant wire of at least 30 x 30 mesh as required by 46 CFR 182.20-35. Install missing screen on tank vents.
Due 15 December 2017
Resolved 2 December 2017
Communications › Alarms/Indicators › Bilge Alarm
Issued 2 October 2017
Resolved
Bilge alarms shall be proper operating condition and fit for the service for which they are intended as required by 46 CFR 176.25-40. Repair inoperable bilge alarm in starboard engine room.
Due 15 December 2017
Resolved 2 December 2017
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 9 September 2016
Resolved
Each life jacket must be marked with type I retro reflective material as required by 16 CFR 185.604. Replace all identified old and faded retro reflective material. Number of persons carry is reduced to 43 until (08) adult lifejackets are provided with proper retro reflective material.
Due 23 September 2016
Resolved 9 September 2016
Navigation › Piloting/Steering › Magnetic Compass
Issued 9 September 2016
Resolved
Vessel must be fitted with a suitable magnetic compass designed for marine use as required by 46 CFR 184.402. Replace damaged compass.
Due 23 September 2016
Resolved 22 September 2016
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 September 2016
Resolved
Vessel must have navigation lights that are in compliance with Inland navigation rules as required by 46 CFR 182.420. Repair inoperable mast light.
Due 23 September 2016
Resolved 9 September 2016
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 September 2016
Resolved
Provide proof of required servicing for FGFE and portable CO2 fire extinguisher as required by 46 CFR 176.810.
Due 23 September 2016
Resolved 9 September 2016
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 September 2016
Resolved
Repair salt water leak on port engine cooling system as required by 46 CFR 176.804.
Due 23 September 2016
Resolved 22 September 2016
Engineering › Lubricating Oil Service System › Hose
Issued 9 September 2016
Resolved
Install chafing gear on STBD reduction gear oil supply as required by 46 CFR 176.804.
Due 23 September 2016
Resolved 22 September 2016
Engineering › Sea-water System (primary cooling) › Pump
Issued 9 September 2016
Resolved
Tighten lose drive belt on port engine as required by 46 CFR 176.804
Due 23 September 2016
Resolved 22 September 2016
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 9 September 2016
Resolved
Repair inoperable engine temperature gauge on STBD engine as required by 46 CFR 182.410
Due 23 September 2016
Resolved 22 September 2016
Engineering › Fuel Oil Service System › Valve
Issued 9 September 2016
Resolved
Fuel shutoff station must be marked in clearly legible letter at 1 inch high as required by 46 CFR 185.608
Due 23 September 2016
Resolved 22 September 2016
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 9 September 2016
Resolved
Installation and location must be to the satisfactory of the OCMI as required by 46 CFR 181.520. Replace all identified wasted mounting brackets.
Due 23 September 2016
Resolved 22 September 2016
Communications › Alarms/Indicators › Bilge Alarm
Issued 9 September 2016
Resolved
A visual and audible alarm must be provided at the operation station to indicate high water level in unmanned spaces as required bu 46 CFR 182.530
Due 23 September 2016
Resolved 9 September 2016
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 8 September 2015
Resolved
All navigation lights must be in serviceable condition and operates normal. Found running light inoperable. 46 CFR 183.420
Due 11 September 2015
Resolved 12 September 2015
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 8 September 2015
Resolved
Ring life buoy must have 60' lifeline that is floatable, non kinking and in dark color. Found deteriorated white color life line. 46 CFR 180.70
Due 11 September 2015
Resolved 12 September 2015
Fire Fighting › Fire Bucket › Stenciling
Issued 8 September 2015
Resolved
Fire buckets must be marked " FIRE BUCKET". Faded / washed out fire buckets marking. 46 CFR 181.610
Due 11 September 2015
Resolved 12 September 2015
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 8 September 2015
Resolved
Pre-engineered FGFE system must be in serviceable condition and operates normal. During testing of the system in normal and override modes, port & STBD engines failed to stop. 46 CFR 181.420
Due 11 September 2015
Resolved 12 September 2015
Engineering › Fuel Oil Service System › Valve
Issued 8 September 2015
Resolved
Remote fuel shut off valves must be marked properly. Found marking for fuel sgut off valves paint over. 46 CFR 185.608
Due 11 September 2015
Resolved 12 September 2015
Communications › Alarms/Indicators › Bilge Alarm
Issued 8 September 2015
Resolved
All bilge high level alarms must operates properly. Found (03) inoperable bilge high level alarms on port hull space. 46 CFR 182.530
Due 11 September 2015
Resolved 12 September 2015
Electrical › Electric Supply System (service) › Battery Installation
Issued 8 September 2015
Resolved
All batteries must be stored in corrosion resistant tray. Found emergency battery stored under control counsel without tray. 46 CFR 183.354
Due 11 September 2015
Resolved 12 September 2015
Electrical › Electric Supply System (service) › Cable
Issued 8 September 2015
Resolved
All battery cable terminal must be made of permanent type connector. Found twisted wire conductor on the battery. 46 CFR 183.350
Due 11 September 2015
Resolved 12 September 2015
Electrical › Electric Generation Source (service) › Panelboard
Issued 8 September 2015
Resolved
Distribution panels must be protected from wet and corrosive environment. Found a partially missing electrical panel cover. 46 CFR 183.220
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 September 2015
Resolved 12 September 2015
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 8 September 2015
Resolved
Portable light must be provide at the operating station. No portable lights on board. 46 CFR 183.432
Due 11 September 2015
Resolved 12 September 2015
Navigation › Piloting/Steering › Magnetic Compass
Issued 29 August 2014
Resolved
Found magnetic compass not mounted at the operator station. 46CFR184.402. Properly mount vessel compass.
Due 9 September 2014
Resolved 12 September 2014
Fire Fighting › Portable CO2 Fire Extinguisher › Location
Issued 29 August 2014
Resolved
Found two portable CO2 stored in storage box. 46CFR520. Install portable CO2 in a clearly visible and ready to use location with proper mounting brackets.
Due 9 September 2014
Resolved 12 September 2014
Engineering › Diesel Engine (propulsion-reduction gear) › Emergency shutdown
Issued 29 August 2014
Resolved
Found STBD engine with inoperable shut own switch at operator station. 46CFR184.620. Repair shutdown switch.
Due 9 September 2014
Resolved 12 September 2014
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 29 August 2014
Resolved
Found STBD engine jacket water discharge temperature gauge not operable. 46CFR182.410(b). Repair temperature gauge.
Due 9 September 2014
Resolved 12 September 2014
Engineering › Fuel Oil Service System › Hose
Issued 29 August 2014
Resolved
Found diesel fuel hose with extra length routed through the bilge. 46CFR182.455(b) (3). Re-route fuel hose and secure against excessive movement and vibrations.
Due 9 September 2014
Resolved 12 September 2014
Communications › Alarms/Indicators › Bilge Alarm
Issued 29 August 2014
Resolved
Found inoperable bilge high level alarms for steering space and engine room. 46CFR182.530. Repair bilge high level alarm system.
Due 9 September 2014
Resolved 12 September 2014
Stability › Water on Deck › General
Issued 29 August 2014
Resolved
Found old deck drain hose (not cap) to holding tank space. 46CFR171.117. Remove and permanently seal or cap old drain hose.
Due 9 September 2014
Resolved 12 September 2014
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 21 July 2011
Resolved
Repair in-operable port and STBD side lights.
Due 27 July 2011
Resolved 22 July 2011
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 21 July 2011
Resolved
Repair deteriorated hoses on jacket water heat exchanger for port & STBD engines.
Due 27 July 2011
Resolved 22 July 2011
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 21 July 2011
Resolved
Install missing hose clamps on engine room port bilge pump discharge hose.
Due 27 July 2011
Resolved 22 July 2011
Lifesaving › Hand Flares › Quantity
Issued 23 September 2010
Resolved
Found vessel with only (05) flares on board. Provide additional flare to have total (06) flares on board.
Due 4 October 2010
Resolved 24 September 2010
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 23 September 2010
Resolved
Found (01) adult life jacket with worn out retroreflector. Renew retroreflector.
Due 4 October 2010
Resolved 24 September 2010
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 September 2010
Resolved
Found first aid kit without asprin. Provide asprin.
Due 4 October 2010
Resolved 24 September 2010
Fire Fighting › Portable CO2 Fire Extinguisher › Pressure
Issued 20 September 2010
Resolved
Found (01) B-I portable fire fighting extinguisher with low pressure. Servvice B-I.
Due 4 October 2010
Resolved 24 September 2010
Electrical › Electrical Distribution System (service) › Switch
Issued 20 September 2010
Resolved
Found expose wires on batteries switch. Make a rproper electrical connection on battery switch to conseal conductor.
Due 4 October 2010
Resolved 24 September 2010
Construction/Loadline › Hull › Longitudinal Frame
Issued 20 September 2010
Resolved
Found rot wood frame in way of starboard engine room cover. Repair damaged wood frame.
Due 4 October 2010
Resolved 24 September 2010
Electrical › Lighting (service) › Lighting Fixture
Issued 20 September 2010
Resolved
Found out of service light fixtures in both hulls. Remove all out of service light fixtures and wires.
Due 4 October 2010
Resolved 24 September 2010
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 20 September 2010
Resolved
Found missing hose clamps of port and starboard exhaust hoses. Install hose clamps.
Due 4 October 2010
Resolved 24 September 2010
Electrical › Electrical Distribution System (service) › Fuse
Issued 20 September 2010
Resolved
Found out of service fuse boxs in bothe engine rooms. Remove old fuse boxs and wires.
Due 4 October 2010
Resolved 24 September 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 September 2010
Resolved
Found dead end wires on port engine starter. Remove all dead end wires.
Due 4 October 2010
Resolved 24 September 2010
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 20 September 2010
Resolved
Found both engine room fireboys without service tags. Provide a proof of service completed on fireboys.
Due 4 October 2010
Resolved 24 September 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 September 2010
Resolved
Found port engine's starter with temporary wire connection. Make permanent wire connection on starter.
Due 4 October 2010
Resolved 24 September 2010
Electrical › Electrical Distribution System (service) › Junction Box
Issued 20 September 2010
Resolved
Found junction box without cover in port tank space. Install junction box cover.
Due 4 October 2010
Resolved 24 September 2010
Construction/Loadline › Hull › Collision Chock
Issued 20 September 2010
Resolved
Found a hole bottom of collision bulkhead port hull. Reseal the hole.
Due 4 October 2010
Resolved 24 September 2010
Engineering › Sea-water System (primary cooling) › Piping
Issued 20 September 2010
Resolved
Found hole nonmetallic hoses from heat exchanger to exhaust on both engines. Replace both hoses.
Due 5 October 2010
Resolved 29 September 2010
Lifesaving › Lifebuoys › Serviceable
Issued 16 June 2008
Resolved
Replace worn lifebuoy.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 July 2008
Resolution: Lifebuoy replaced.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 16 June 2008
Resolved
Place on board current copy of light list for area vessel operates in.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 July 2008
Resolution: Current copy on board.
Navigation › Piloting/Steering › Local Notices to Mariners
Issued 16 June 2008
Resolved
Place on board current local notice to mariners.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 June 2008
Navigation › Piloting/Steering › Marine Charts
Issued 16 June 2008
Resolved
Place on board current chart or make corrections to existing chart.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 June 2008
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 16 June 2008
Resolved
Place on board current copy of tidal current tables.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 July 2008
Resolution: Current copy on board.
Navigation › Piloting/Steering › US Coast Pilot
Issued 16 June 2008
Resolved
Place on board current copy of US Coast Pilot.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 July 2008
Resolution: Current copy on board.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 16 June 2008
Resolved
Ensure abandon ship drills are recorded after every drill.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 July 2008
Resolution: Drills are conducted and recorded after every drill.
Communications › Alarms/Indicators › Bilge Alarm
Issued 16 June 2008
Resolved
Prove proper operation of starboard forward bilge alarm.
Action required: 705 - Other - as specified
Due 16 June 2008
Resolved 16 June 2008
Communications › Alarms/Indicators › Bilge Alarm
Issued 16 June 2008
Resolved
Prove proper operation of starboard mid bilge alarm.
Action required: 705 - Other - as specified
Due 16 July 2008
Resolved 16 June 2008
Communications › Radio Communications › VHF Radiotelephone
Issued 16 June 2008
Resolved
Prove proper operation of VHF radio.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 June 2008
Resolution: Radio was replaced.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 11 September 2007
Resolved
Found fitting on the deck rail for the bow exit broken. Make permanent repairs.
Due 11 October 2007
Resolved 1 November 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 11 September 2007
Resolved
Found operator unable to provide annual servicing report for the fixed fire fighting system. Prove system has been serviced.
Due 14 December 2007
Resolved 9 January 2008
Resolution: System annual service completed January 9, 2008.
Electrical › Lighting (service) › Lighting Fixture
Issued 11 September 2007
Resolved
Found port bow light cover missing. Install cover.
Due 11 October 2007
Resolved 1 November 2007
Documentation › Certificates/Documents › Certificate of Inspection
Issued 11 September 2007
Resolved
Found original Certificate of Inspection not on board the vessel. Prove that the original certificate is kept on board the vessel.
Due 11 October 2007
Resolved 1 November 2007
Electrical › Electrical Distribution System (service) › Switch
Issued 11 September 2007
Resolved
Found the starboard engine shutdown control inoperable. Prove proper operation of engine shutdowns.
Due 11 October 2007
Resolved 1 November 2007
Engineering › Diesel Engine (propulsion-direct drive) › Camshaft
Issued 16 June 2003
Resolved
Stbd engine RPM gauge inoperable. Vsl to replace/repair gauge to the satisfaction of the attending USCG Marine Inspector not later than 23 June 2003.
Due 23 June 2003
Resolved 20 August 2004
Resolution: COMPLETED
Documentation › Certificates/Documents › FCC SSL
Issued 16 June 2003
Resolved
USCG licensed operator failed to have FCC Marine Operators Permit in non-adherence with 47 CFR 80. Operator shall obtain proper FCC Marine Operators Permit not later than 16 July 2003. LEGACY COMPONENT DESC: FCC Marine Operators Permit
Due 16 July 2003
Resolved 20 August 2004
Resolution: COMPLETED
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 16 June 2003
Resolved
Vessel's lifejackets (PFDs) require renewal of deteriorated retroreflective material not later than 23 June 2003.
Due 23 June 2003
Resolved 20 August 2004
Resolution: COMPLETED
Construction/Loadline › Structures › Ventilators
Issued 16 June 2003
Resolved
Vessel missing two of four required ventilation covers. Vessel shall place onboard additional two ventilation covers to the satisfaction of the attending USCG Marine Inspector not later than 23 June 2003. LEGACY COMPONENT DESC: Engineroom Ventilation Covers
Due 23 June 2003
Resolved 20 August 2004
Resolution: COMPLETED
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 16 June 2003
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Due 23 June 2003
Resolved 20 August 2004
Resolution: COMPLETED
Lifesaving › Lifebuoys › Stowage
Issued 16 June 2003
Resolved
LF/LB stowage fails to meet 46 CFR 180.130(a)(3) in that they are not stowed in a position readily accessible to the crew. Vsl shall design & install appropriate access ladder; minimun tread width 16 inches, steps not more than 12 inches apart. Plan submission required per 46 CFR 176.700.
Due 8 July 2003
Resolved 20 August 2004
Resolution: COMPLETED
Construction/Loadline
Issued 5 March 2001
Resolved
Restore to original the fiberglass bonding angle joining the transverse deck beams to the cross over deck on the forward most beam in the starboardforward compartment and the second beam aft of the forward bulkhead in the starboard #2 compartment.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Construction/Loadline
Issued 5 March 2001
Resolved
Make vapor tight the forward bulkhead in the port engine room.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Engineering
Issued 5 March 2001
Resolved
Prove the operation of all emergency fuel oil tank shut off valves.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Engineering
Issued 5 March 2001
Resolved
Prove the operation of the remote shut-down for the starboard engine from the helm.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Construction/Loadline
Issued 5 March 2001
Resolved
Prove the operation of the high level bilge alarms in the starboard engine room, the starboard #2 compartment, and the port #3 compartment.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Construction/Loadline
Issued 5 March 2001
Resolved
Provide a portable bilge pump for the vessel.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Lifesaving
Issued 5 March 2001
Resolved
Stencil the vessel's name on the port buoyant apparatus.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Fire Fighting
Issued 5 March 2001
Resolved
Provide a USCG approved B-I portable fire extinguisher and mount at the operating station.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Fire Fighting
Issued 5 March 2001
Resolved
Service all portable fire extinguishers.
Condition: Unknown
Due 5 March 2001
Resolved 5 March 2001
Lifesaving
Issued 17 April 2000
Resolved
Provide and install proper type of weak link for the port buoyant apparatus.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Accommodation/Occupational Safety
Issued 17 April 2000
Resolved
Make repairs to the MSD tank inspection plate.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Accommodation/Occupational Safety
Issued 17 April 2000
Resolved
Repair/replace the existing railing in way of the port/stbd passenger entrances and the bow entrance.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Construction/Loadline
Issued 17 April 2000
Resolved
Make vapor tight the port and stbd engine rooms.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Lifesaving
Issued 17 April 2000
Resolved
Provide and attach a 60 foot buoyant lifeline to the ring buoy.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Lifesaving
Issued 17 April 2000
Resolved
Repair all cracks on the port and stbd buoyant apparatuses.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Construction/Loadline
Issued 17 April 2000
Resolved
Raise the port and stbd collision bulkheads to the height of the raise weathertight hatch, which provides a communal entrance to the compartments forward and aft of the collision bulkhead.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Lifesaving
Issued 17 April 2000
Resolved
Provide 3 additional child life jackets for the vessel. Vessel may not carry more than 3 children weighing less than 90 pounds until completion.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Lifesaving
Issued 17 April 2000
Resolved
Provide an additional red flare and watertight container for the storage ofthe distress signals.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Lifesaving
Issued 17 April 2000
Resolved
Conduct and log quarterly fire and man-overboard drills.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Lifesaving
Issued 17 April 2000
Resolved
Provide U.S. Coast Guard approved or equivalent first aid kit.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Navigation
Issued 17 April 2000
Resolved
Properly mount and make watertight the port running light and mast head light.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Navigation
Issued 17 April 2000
Resolved
Prove the operation of the anchor light.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Fire Fighting
Issued 17 April 2000
Resolved
Service all portable fire extinguishers.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Navigation
Issued 17 April 2000
Resolved
Prove the operation of the VHF radio.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Engineering
Issued 17 April 2000
Resolved
Prove the operation of the stbd fuel tank emergency shut-off valve and stencil the method of operation.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Electrical
Issued 17 April 2000
Resolved
Provide 2 flashlights for the vessel.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Construction/Loadline
Issued 17 April 2000
Resolved
Prove the operation of the port, forward compartment bilge pump.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Construction/Loadline
Issued 17 April 2000
Resolved
Prove the operation of the port, forward compartment bilge pump.
Condition: Unknown
Due 17 April 2000
Resolved 17 April 2000
Construction/Loadline
Issued 7 May 1999
Resolved
Install a valve handle on the port, center compartment, electric bilge pumpoverboard shutoff valve.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Construction/Loadline
Issued 7 May 1999
Resolved
Double hose clamp all electric bilge pump discharge hoses.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Construction/Loadline
Issued 7 May 1999
Resolved
Provide securing devices for the port and stbd engine compartment hatch covers.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Documentation
Issued 7 May 1999
Resolved
Provide a valid FCC Safety Radio Certificate for the vessel.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Engineering
Issued 7 May 1999
Resolved
Prove the operation of the port fuel tank emergency shutoff valve.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Construction/Loadline
Issued 7 May 1999
Resolved
Install indicating devices at the operating station to signify the operation of all electric bilge pumps.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Construction/Loadline
Issued 7 May 1999
Resolved
Replace the gasket on both engine compartment hatch covers.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Engineering
Issued 7 May 1999
Resolved
Prove the operation of the port engine kill switch at the operating station.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Lifesaving
Issued 7 May 1999
Resolved
Install both buoyant apparatus in a float free arrangement.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Documentation
Issued 7 May 1999
Resolved
Provide a valid FCC Safety Radio Certificate for the vessel.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Navigation
Issued 7 May 1999
Resolved
Provide an updated tide table for the vessel.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Engineering
Issued 7 May 1999
Resolved
Replace the fixed metallic piping for the cooling water line between the intercooler and aftercooler on the stbd engine.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Fire Fighting
Issued 7 May 1999
Resolved
Prove the operation of the fixed fire fighting system alarms and safeties.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Construction/Loadline
Issued 7 May 1999
Resolved
Prove the operation of the high level bilge alarms.
Condition: Unknown
Due 7 May 1999
Resolved 7 May 1999
Lifesaving
Issued 8 April 1998
Resolved
Obtain and maintain six (6) smoke and six (6) flare distress signals for the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Unknown
Issued 8 April 1998
Resolved
Obtain an approved first aid kit for the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Lifesaving
Issued 8 April 1998
Resolved
Stensil/mark the vessel's name on the ring buoy.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Navigation
Issued 8 April 1998
Resolved
Prove the operation of the compass light. Vessel is restricted to daylightoperations until completion of this requirement.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Lifesaving
Issued 8 April 1998
Resolved
Update the vessel's Emergency Instruction List.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Unknown
Issued 8 April 1998
Resolved
Log all man overboard and fire fighting drills conducted on the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Fire Fighting
Issued 8 April 1998
Resolved
Provide and install a B-I fire extinguisher for use at the operting station.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Fire Fighting
Issued 8 April 1998
Resolved
Service the vessel's installed Halon system.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Navigation
Issued 8 April 1998
Resolved
Prove the operation of the anchor light.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Lifesaving
Issued 8 April 1998
Resolved
Generate and post an Emergency Broadcast placard for the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Navigation
Issued 8 April 1998
Resolved
Provide updated and adequate publications and charts for the vessel's are of operation.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Electrical
Issued 8 April 1998
Resolved
Electrically bond the fuel fill piping from the deck connection to the tanktop.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Engineering
Issued 8 April 1998
Resolved
Prove the proper operation of the port fuel shutoff valve.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Lifesaving
Issued 8 April 1998
Resolved
Replace the retro reflective tape on the bouyant apparatus as appropriate.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Lifesaving
Issued 8 April 1998
Resolved
Replace the grab lines on the port bouyant apparatus.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Documentation
Issued 8 April 1998
Resolved
Obtain a valid FCC Operators permit for the masters of the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Documentation
Issued 8 April 1998
Resolved
Post the vessels current stability letter onboard the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Documentation
Issued 8 April 1998
Resolved
Post the vessels current Certificate of Inspection.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Documentation
Issued 8 April 1998
Resolved
Post valid Certificate of Documentation for the vessel onboard.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Engineering
Issued 8 April 1998
Resolved
Prove the proper operation of the starboard engine tachometer.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Documentation
Issued 8 April 1998
Resolved
Obtain a valid FCC Safety Radiotelephony certificate for the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Fire Fighting
Issued 8 April 1998
Resolved
Prove the operation of the manual activation of the port and starboard Halon systems.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Electrical
Issued 8 April 1998
Resolved
Provide two (2) flashlights for use as portable lighting on the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Engineering
Issued 8 April 1998
Resolved
Replace the flame screens on the fuel oil vents.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Construction/Loadline
Issued 8 April 1998
Resolved
Provide a portable bilge pump with a sufficient length of suction hose for use on the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Lifesaving
Issued 8 April 1998
Resolved
Obtain and post a life jacket donning placard for all styles of life jackets on the vessel.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Lifesaving
Issued 8 April 1998
Resolved
Replace the retro reflective tape on the vessel's ring buoy.
Condition: Unknown
Due 8 April 1998
Resolved 8 April 1998
Engineering
Issued 15 December 1997
Resolved
Install machinery guards around both port and stbd shafts.
Condition: Unknown
Due 15 December 1997
Resolved 15 December 1997
Construction/Loadline
Issued 15 December 1997
Resolved
Install light or other visual means at control point of bilge pumps to indicate operation.
Condition: Unknown
Due 15 December 1997
Resolved 15 December 1997
Lifesaving
Issued 14 April 1997
Resolved
Replace 100' painters and provide proper weaklinks of proper breaking strength; line to be arranged to pay out freely.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Fire Fighting
Issued 14 April 1997
Resolved
Obtain and install marine type approved brackets for all portable fire extinguishers.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Fire Fighting
Issued 14 April 1997
Resolved
Permenantly maintain three buckets of at least 2.5 gallon capacity with lanyard and label "FIRE BUCKET' on each.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Lifesaving
Issued 14 April 1997
Resolved
Obtain waterlights and 18' lanyard for each buoyant apparatus.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Lifesaving
Issued 14 April 1997
Resolved
Obtain and install one Type I EPIRB.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Lifesaving
Issued 14 April 1997
Resolved
Install batteries in approved battery boxes now aboard vessel.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Lifesaving
Issued 14 April 1997
Resolved
Obtain and post PFD donning instruction placards for type utilized aboard vessel.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Lifesaving
Issued 14 April 1997
Resolved
Obtain and label with vessel's name, 2 adult sized PFD's to bring vessel complement total of 52.
Condition: Unknown
Due 14 April 1997
Resolved 14 April 1997
Documentation
Issued 11 March 1994
Resolved
Contact cognizant OCMI for completion of COI exam.
Condition: Unknown
Due 11 March 1994
Resolved 11 March 1994