Records from 2002 to 2019. Most recent: inspection, 19 August 2019.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 24
19 August 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6787975
25 April 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6670304
8 February 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6622634
22 August 2018
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6519749
10 April 2018
Special · Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6389053
27 November 2017
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6302808
15 April 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6126237
15 April 2017
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6128309
9 January 2017
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6068111
5 January 2016
Hull Examination · Administrative Inspection · COI Inspection · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5791497
21 September 2011
Administrative Inspection · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 4162213
17 February 2011
COI Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3947163
9 December 2009
In-Service Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3653011
14 May 2008
Annual Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3200834
18 April 2007
Deficiency Check · Internal Structural Exam · Annual Inspection · Hull Examination
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2889346
22 May 2006
Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2656130
18 May 2006
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2645992
4 May 2004
Annual Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2059295
9 April 2004
Administrative Inspection
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2041030
25 September 2003
Annual Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1927449
15 April 2002
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1605088
19 March 2002
Administrative Inspection
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1494789
6 March 2002
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1495226
29 January 2002
Construction Oversight · COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1480462
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 19 February 2019
No resolution recorded
Prior to resuming vessel operations, company must
demonstrate compliance with new Conditions of Operation listed on Amended COI to the satisfaction of attending Coast Guard marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Engineering › Bilge Water Management System › Pump
Issued 29 November 2017
Resolved
During underway inspection, noise was heard coming from the internals of the Higgins pump. Pump was replaced; issued was corrected on scene.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 November 2017
Resolved 29 November 2017
Resolution: Pump was replaced; issued was corrected on scene.
Electrical › Electrical Distribution System (service) › Fuse
Issued 15 April 2017
Resolved
Determine the cause of the elctrical failure and affect appropriate repairs.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 April 2017
Resolved 17 April 2017
Resolution: Replaced brake system diode pack and 10 amp ignition fuse.
Engineering › Gasoline Engine (propulsion) › Ignition Wire (4 cycle)
Issued 13 January 2016
Resolved
Ignition switch fuse did not kill engine.
Action required: 705 - Other - as specified
Due 13 January 2016
Resolved 13 January 2016
Resolution: Ignition switch rewired to be fuse protected and kill engine.
Engineering › Bilge Water Management System › Pump
Issued 13 January 2016
Resolved
Electric starboard aft bilge pump would not work in manual switch position. Wiring for manual operation was loose. Pump worked in automatic position.
Action required: 705 - Other - as specified
Due 13 January 2016
Resolved 13 January 2016
Resolution: Bilge pump wiring tightened and performed satisfactory in manual switch position.
Engineering › Pressure Vessel › Pressure Gauge
Issued 13 January 2016
Resolved
Pressure vessel gauge was inoperable. Repair or replace with operational gauge.
Action required: 705 - Other - as specified
Due 13 January 2016
Resolved 13 January 2016
Resolution: Replaced gauge with new gauge and tested satisfactory.
Engineering › Pressure Vessel › Marking and Stamping
Issued 9 December 2009
Resolved
Prove proper installation of pressure vessels used for axel housing low air pressurization system.
Action required: 705 - Other - as specified
Due 9 December 2009
Resolved 21 September 2011
Resolution: System modified to reduce maximum pressure to 15 psi or less excluding unfired pressure vessel from requirement.
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 18 May 2006
Resolved
Properly install a main inline fuse in way of your No. 1 battery (FWD)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 June 2006
Resolved 30 May 2006
Electrical › Electric Supply System (service)
Issued 29 January 2002
Resolved
Install overcurrent protection in the secondary battery conductor as required by 46 CFR 183.350(g) and revise and submit for approval electrical plans reflecting modifications. LEGACY COMPONENT DESC: Battery Conductor
Condition: Design Flaw
Due 1 March 2002
Resolved 6 March 2002
Construction/Loadline › Hull
Issued 29 January 2002
Resolved
Submit plans for approval of strut modifications made to vessel in lieu of design previously approved. LEGACY COMPONENT DESC: Bracket
Due 1 March 2002
Resolved 6 March 2002
Stability
Issued 29 January 2002
Resolved
Ensure reference mark is visible from the operators station prior to carrying passengers.
Condition: Design Flaw
Due 1 March 2002
Resolved 6 March 2002
Lifesaving
Issued 29 January 2002
Resolved
Replace expired items in First Aid kit.
Condition: Unknown
Due 1 March 2002
Resolved 6 March 2002
Stability › Watertight Integrity
Issued 29 January 2002
Resolved
Prove proper sealing of watertight door port side.
Condition: Unknown
Due 1 March 2002
Resolved 6 March 2002
Construction/Loadline › Hull
Issued 29 January 2002
Resolved
Prior to carrying passengers submit proof of waterborne test of hull to inspect weld repairs to bottom plate. LEGACY COMPONENT DESC: Bottom Plating
Due 1 March 2002
Resolved 6 March 2002