← All vessels
PAR-A-DICE
Passenger (Inspected) · Passenger Ship class · Built 1990s · USCG Heartland District (CGD-H) · Other hulls named PAR-A-DICE
PAR-A-DICE is a 1994 passenger vessel (inspected). The Coast Guard has recorded 366 inspections since 1994, most recently in June 2026, along with 486 deficiencies and 6 casualty investigations between 2003 and 2013.
Records from 1994 to 2026. Most recent: inspection, 23 June 2026.
- Built
- 1994
- Last inspected
- 23 June 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Inspections
- 366
- Deficiencies
- 486 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 6 investigations · 2003–2013
Identity
1020343
WCJ6204
402052
Flag
UNITED STATES
366961810
Maury page id
psix-402052
Inspections, by type
…with no type recorded116
Years with a record
32 calendar years (1994–2026)
The 366 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)189.9 ft × 66.0 ft × 12.5 ft
Registered tonnagegross 1,482 / net 1,203
ITC dimensions (L × B × D)189.9 ft × 66.0 ft × 12.5 ft
ITC tonnagegross 4,554 / net 1,366
BuilderATLANTIC MARINE INC · JACKSONVILLE, FL, UNITED STATES · built 1994
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portEAST PEORIA, IL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 27 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it4554 - Convention (Subpart B), Gross Ton
1482 - Regulatory (Subpart C or D), Gross Ton
1366 - Convention (Subpart B), Net Ton
1203 - Regulatory (Subpart C or D), Net Ton
1482 - Regulatory (Subpart C or D), Gross Ton
1366 - Convention (Subpart B), Net Ton
1203 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WCJ6204MMSI 366961810 · active · compulsorily equipped · granted 16 April 2024, expires 13 July 2034 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 366
23 June 2026
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 8413611
9 March 2026
COI Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 8314897
18 December 2025
Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 8276856
8 September 2025
Re-Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 8229431
5 June 2025
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 8155430
11 March 2025
COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 8091718
21 November 2024
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 8038045
5 September 2024
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7996854
13 June 2024
Administrative Inspection · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7958635
25 March 2024
COI Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7874955
25 March 2024
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7889984
19 March 2024
Deadweight Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7889978
16 January 2024
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7849778
14 December 2023
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7834408
7 September 2023
MTSA Verification · Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7786881
30 August 2023
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7781198
14 June 2023
Administrative Inspection · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7714918
11 May 2023
Annual Inspection · Annual Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7685774
28 April 2023
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7680774
8 February 2023
Deficiency Check · Administrative Inspection · COI Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7633971
23 January 2023
Administrative Inspection · Plan Review (Other than "T")
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7626383
21 December 2022
Deficiency Check · Re-Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7611776
17 October 2022
Plan Review (Other than "T") · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7579390
7 September 2022
Administrative Inspection · MTSA Verification · MARPOL Annex VI Survey · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7553435
18 August 2022
MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7537237
15 June 2022
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7478214
17 May 2022
Deficiency Check · Construction Oversight · Plan Review (Other than "T") · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7452825
12 May 2022
Administrative Inspection · Plan Review (Other than "T") · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7449124
6 April 2022
Deficiency Check · Administrative Inspection · In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7425632
23 March 2022
Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7433757
3 March 2022
MTSA Verification · Administrative Inspection · COI Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7404935
18 January 2022
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7381796
16 November 2021
MTSA Verification · Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7351821
20 October 2021
Administrative Inspection · Plan Review (Other than "T")
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7337053
14 September 2021
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7302750
7 July 2021
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7249605
16 June 2021
Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7231534
20 April 2021
Internal Structural Exam · Drydock Exam · Hull Examination
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7231529
9 March 2021
MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7159145
1 December 2020
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7104778
9 September 2020
Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7231525
25 June 2020
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6986698
8 June 2020
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6971484
21 April 2020
Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6942030
21 April 2020
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6942040
19 March 2020
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6929108
14 March 2020
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6927400
13 March 2020
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6925917
22 January 2020
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6895515
8 January 2020
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6885475
23 December 2019
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6881152
9 December 2019
Administrative Inspection · Re-Inspection · MARPOL Annex VI Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6868583
18 November 2019
Administrative Inspection · Deadweight Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6858380
18 October 2019
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6837292
2 October 2019
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6826221
18 September 2019
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6813718
16 September 2019
Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6812810
9 September 2019
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 7104750
5 September 2019
Administrative Inspection · Plan Review (Other than "T") · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6804387
22 August 2019
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6791306
26 June 2019
Administrative Inspection · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6725065
17 June 2019
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6717498
11 March 2019
Deficiency Check · In-Service Inspection · Administrative Inspection · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6642314
11 March 2019
Deficiency Check · In-Service Inspection · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6643021
4 February 2019
COI Inspection · MTSA Verification · Administrative Inspection · Deficiency Check · In-Service Inspection · DAPI Audit · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6619520
12 December 2018
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6595562
27 September 2018
Administrative Inspection · MARPOL Annex VI Survey · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6550704
14 June 2018
MARPOL Annex VI Survey · Deficiency Check · MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6445179
9 April 2018
In-Service Inspection · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6390167
3 April 2018
Plan Review (Other than "T") · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6383934
2 April 2018
In-Service Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6393046
21 March 2018
MARPOL Annex V Examination · MTSA Verification · COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6367529
27 February 2018
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6363148
20 February 2018
Examination of Repairs · Plan Review (Other than "T") · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6390141
5 January 2018
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6333041
14 December 2017
Re-Inspection · MTSA Verification · MARPOL Annex VI Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6325801
31 October 2017
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6299493
13 October 2017
Administrative Inspection · In-Service Inspection · Plan Review (Other than "T") · Construction Oversight
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6297357
2 October 2017
Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6279590
27 September 2017
MTSA Verification · Administrative Inspection · Annual Inspection · Spot Check · MARPOL Annex VI Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6276487
12 July 2017
Spot Check · Examination of Repairs · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6206497
4 July 2017
Deficiency Check · Plan Review (Other than "T") · Welding Related Inspections Qualification Testing · Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6206626
28 June 2017
MARPOL Annex VI Survey · Administrative Inspection · Re-Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6190422
22 June 2017
Administrative Inspection · Examination of Repairs · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6183042
13 April 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6123429
4 April 2017
Spot Check · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6117374
21 March 2017
Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6108739
6 March 2017
Administrative Inspection · Spot Check · Examination of Repairs · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6128755
6 February 2017
Examination of Repairs · Administrative Inspection · Welding Related Inspections Qualification Testing · Spot Check · Plan Review (Other than "T") · Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6093168
19 January 2017
MTSA Verification · Deficiency Check · COI Inspection · Spot Check · MARPOL Annex VI Survey · DAPI Audit
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6073567
14 December 2016
Plan Review (Other than "T") · Examination of Repairs · Administrative Inspection · Construction Oversight · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6058913
14 December 2016
Spot Check · Re-Inspection · MARPOL Annex VI Survey · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6059041
6 October 2016
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6020089
30 September 2016
Spot Check · Plan Review (Other than "T") · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6020648
14 September 2016
Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6000681
1 September 2016
Deficiency Check · Administrative Inspection · Spot Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5989539
29 August 2016
Plan Review (Other than "T") · Spot Check · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5986195
20 August 2016
Deficiency Check · Examination of Repairs · MTSA Verification · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6004364
14 July 2016
Spot Check · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5957006
22 June 2016
Special · Re-Inspection · Deficiency Check · Spot Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5914159
14 June 2016
Administrative Inspection · Special
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5916631
25 May 2016
Administrative Inspection · Examination of Repairs · Damage Survey · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5886526
25 May 2016
Spot Check · Damage Survey · Examination of Repairs
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5888244
26 April 2016
Spot Check · Damage Survey · Administrative Inspection · Plan Review (Other than "T") · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5881927
29 March 2016
Examination of Repairs · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5858452
11 February 2016
Deficiency Check · MARPOL Annex VI Survey · COI Inspection · DAPI Audit · Spot Check · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5813471
8 January 2016
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5797417
9 December 2015
Re-Inspection · Spot Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5779038
9 December 2015
Plan Review (Other than "T") · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5815481
9 December 2015
Administrative Inspection · Spot Check · Underwater Inspection in lieu of Drydock · Hull Examination · Examination of Repairs · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5838220
28 October 2015
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5752503
22 September 2015
Administrative Inspection · Examination of Repairs · Security Breach · Spot Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5727604
9 September 2015
Deficiency Check · MARPOL Annex VI Survey · Re-Inspection · MTSA Verification · Spot Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5238148
12 August 2015
Deadweight Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5213957
11 August 2014
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4952294
26 June 2014
Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4900572
26 June 2014
Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4901739
24 June 2014
Deficiency Check · Re-Inspection · Spot Check · Special
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4899212
5 June 2014
Spot Check · Plan Review (Other than "T") · Construction Oversight · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4933135
3 June 2014
MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4878411
3 May 2014
MTSA Verification · Security Breach, Potential
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4849390
10 March 2014
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4798566
17 July 2012
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4381764
19 June 2012
Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4343844
14 May 2012
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4308449
7 May 2012
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4306916
1 May 2012
Administrative Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4299381
31 January 2012
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4235176
18 January 2012
Plan Review (Other than "T")
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4228281
14 December 2011
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4207135
3 December 2011
Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4201747
3 December 2011
Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4204236
21 September 2011
Re-Inspection · DAPI Audit · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4150001
9 August 2011
Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4110618
8 August 2011
Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4110551
10 January 2011
Administrative Inspection · In-Service Inspection · Commercial Dive Inspection · Hull Examination · Damage Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3924218
10 January 2011
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 4013043
8 December 2010
Administrative Inspection · Deficiency Check · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3912500
7 December 2010
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3905376
7 December 2010
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3921949
1 December 2010
Plan Review (Other than "T") · Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3902107
25 October 2010
Deficiency Check · Administrative Inspection · Examination of Repairs · Construction Oversight · In-Service Inspection · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3879049
22 September 2010
DAPI Audit · Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3853411
5 September 2010
In-Service Inspection · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3863594
15 March 2010
MTSA Verification · COI Inspection · MARPOL Annex VI Survey · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3675511
7 December 2009
In-Service Inspection · Administrative Inspection · Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3644617
2 December 2009
Administrative Inspection · Plan Review (Other than "T") · Construction Oversight · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3643450
7 May 2009
Type not recorded
No type recorded · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3472335
11 March 2009
Deficiency Check · COI Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3426512
11 March 2009
In-Service Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3431821
12 February 2009
Examination of Repairs · Administrative Inspection · Underwater Inspection in lieu of Drydock · Welding Related Inspections Qualification Testing · Hull Examination · In-Service Inspection · Internal Structural Exam · Commercial Dive Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3453684
22 January 2009
Welding Related Inspections Qualification Testing · In-Service Inspection · Plan Review (Other than "T") · Deficiency Check · Construction Oversight · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3411579
17 December 2008
Administrative Inspection · Plan Review (Other than "T")
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3381491
9 December 2008
Deficiency Check · Plan Review (Other than "T") · Annual Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3376640
20 October 2008
Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3348150
16 September 2008
Re-Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3326871
17 July 2008
In-Service Inspection · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3286197
16 June 2008
Deficiency Check · Re-Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3235921
5 March 2008
COI Inspection · Deficiency Check · MTSA Verification · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3159094
26 February 2008
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3154033
17 December 2007
Administrative Inspection · Plan Review (Other than "T") · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3127363
12 December 2007
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3113533
21 November 2007
Plan Review (Other than "T") · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3111165
8 October 2007
In-Service Inspection · Administrative Inspection · Plan Review (Other than "T")
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3081099
5 September 2007
Deficiency Check · Re-Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3050779
24 July 2007
Administrative Inspection
Administrative · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 3014200
20 June 2007
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 2954708
6 March 2007
MTSA Verification
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 2891963
5 March 2007
COI Inspection · In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 2881814
19 September 2006
Re-Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 2741195
4 April 2006
MTSA Verification
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2617227
1 March 2006
Hull Examination · COI Inspection · Internal Structural Exam
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2594016
14 February 2006
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2586200
19 May 2005
Deadweight Survey
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2362484
2 March 2005
Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2302031
14 December 2004
Periodic Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2258902
26 November 2004
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2301327
14 September 2004
Periodic Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2195513
29 June 2004
Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2118639
29 June 2004
MTSA Verification
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2206572
10 March 2004
COI Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2021834
9 December 2003
Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1962740
15 November 2003
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1950754
3 September 2003
Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1899873
1 July 2003
Deficiency Check
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1831996
25 June 2003
Quarterly Examination
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1826467
8 April 2003
Deficiency Check
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1770909
11 March 2003
COI Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1755545
23 January 2003
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1734368
10 January 2003
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1734264
10 December 2002
Quarterly Examination
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1716815
10 September 2002
Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1673794
4 August 2002
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1679667
12 June 2002
Quarterly Examination
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1629669
10 May 2002
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1668742
16 April 2002
Underwater Inspection in lieu of Drydock
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1606102
20 March 2002
COI Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1494945
15 January 2002
Deficiency Check
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1479692
17 December 2001
Re-Inspection
Physical examination · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 1479195
19 September 2001
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1412388
28 August 2001
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 82137
2 July 2001
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1068503
21 June 2001
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1417320
17 May 2001
Deadweight Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1064454
14 March 2001
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1454911
3 January 2001
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1433770
11 October 2000
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1445700
4 October 2000
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 822642
21 June 2000
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1432345
18 May 2000
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1049814
8 May 2000
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1456829
11 April 2000
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1454912
25 March 2000
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1399323
5 January 2000
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1403015
6 October 1999
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1421740
2 August 1999
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 776131
8 June 1999
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1458645
11 May 1999
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 172142
21 April 1999
Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1470979
25 March 1999
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 808778
25 March 1999
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1446742
23 February 1999
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 796568
7 January 1999
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1386388
11 December 1998
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 808608
28 November 1998
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 145791
28 November 1998
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 806129
24 November 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 806117
20 November 1998
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 806112
22 October 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 803956
6 October 1998
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1418407
2 September 1998
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 59998
8 July 1998
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1467065
23 June 1998
Deadweight Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1419961
21 May 1998
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1126457
8 May 1998
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1125144
30 April 1998
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 792282
23 April 1998
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 14921
8 April 1998
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1406295
3 April 1998
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 788851
11 March 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 785553
11 March 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1121336
2 March 1998
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 122427
17 February 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 776265
16 January 1998
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1446583
10 December 1997
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 678398
16 October 1997
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1442625
19 September 1997
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 75250
10 September 1997
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 43542
15 July 1997
Examination of Repairs
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 779174
10 July 1997
Examination of Repairs
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1114656
10 July 1997
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1457476
9 June 1997
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 213922
18 April 1997
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1104425
11 April 1997
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1459308
13 March 1997
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1107287
12 March 1997
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 185320
12 March 1997
Examination of Repairs
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1103353
10 March 1997
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 120572
23 January 1997
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1456434
16 January 1997
Administrative
Administrative · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1099113
28 November 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 106932
31 October 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 150805
17 October 1996
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1447632
15 October 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 168526
14 October 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 30318
2 October 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 144220
25 September 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 79878
24 September 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1141814
11 September 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 23791
11 September 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 154003
6 September 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 143482
6 September 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 164120
6 September 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 184935
4 September 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 90294
31 August 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 170861
25 August 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2125
23 August 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 7592
21 August 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 51888
10 August 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 152659
7 August 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 137304
6 August 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 104570
31 July 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 92224
26 July 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 101423
19 July 1996
Examination of Repairs
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1087642
18 July 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 7618
18 July 1996
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1383293
17 July 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 172400
12 July 1996
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1090213
30 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 112641
30 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 132597
30 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 134144
29 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 52893
29 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 93271
28 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 14191
28 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 185520
27 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 108961
20 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 102143
20 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 134197
20 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 161521
15 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 122206
1 June 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 8304
17 May 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 51778
12 May 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 84177
11 April 1996
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1437089
6 April 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 118134
19 March 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 122440
13 March 1996
Deadweight Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 885692
6 March 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1383096
6 March 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1447500
24 February 1996
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 136240
15 February 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 884632
15 February 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1182885
15 February 1996
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1446297
19 October 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 884636
19 October 1995
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1435680
25 September 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 46766
22 August 1995
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 882925
22 August 1995
Deadweight Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1183688
5 August 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 72560
18 July 1995
Re-Inspection · Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1425613
9 July 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 177199
15 June 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 46740
12 June 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1443603
8 June 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 58972
12 May 1995
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 929891
9 May 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 31100
26 April 1995
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1174733
21 April 1995
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1172589
12 April 1995
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1431505
26 March 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 2115
15 March 1995
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 865309
26 February 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 38749
26 February 1995
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 163676
25 January 1995
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1435580
27 December 1994
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1405642
23 November 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 678399
4 November 1994
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1172100
30 October 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 25132
30 October 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 89185
19 October 1994
Re-Inspection · Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1444906
10 October 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 31176
15 September 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 158367
14 September 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 83237
15 August 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 31600
15 August 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 80631
11 August 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 36053
10 August 1994
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1179718
23 July 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 31614
22 July 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 60988
18 July 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 64510
8 July 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 116671
7 July 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 45369
22 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 19187
22 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 114185
20 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 80575
20 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 96020
17 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 91531
17 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 140141
16 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 155537
13 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 17032
7 June 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 110241
26 May 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 41447
21 May 1994
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 121808
13 May 1994
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1392059
3 May 1994
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 179052
23 April 1994
Initial Certification · Initial Construction-Excluding Oversight · Hull Examination · Inclining Experiment
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 858752
Deficiency record · 486
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 March 2025
Resolved
The emergency generator room time delay did not function as designed. Replace/repair delay to function as required.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 January 2024
Resolved
Within 24 hours of the Peoria, Illinois River Gauge reaching the 18’ gauge mark and absent any hazardous weather conditions (i.e. ice), the vessel will get underway in the navigation channel to conduct drills and verify proper operation of machinery to the satisfaction of the attending Marine Inspector.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 23 March 2022
Resolved
Prove proper operation of the ECR rudder angle indicator.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 March 2022
Resolved
Ensure the 3rd and 4th decks type 1 pfds have serviceable reflective tape on them.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 8 June 2020
Resolved
Prove the proper operation of the remote manual closure device for both class three watertight doors in the hold deck. During the deadship testing, it was observed that the remote manual closure device requires a crewmember to hold the directional valve at the door to operate, negating the purpose of a remote closure. Vessel may not get underway from the dock prior to correcting deficiency.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 30 March 2020
Resolved
Provide report of annual servicing for all fire suppression/detection systems including portable fire extinguishers, fixed fire suppression systems, fixed fire detection systems, and 3rd/4th deck sprinkler system, prior to carrying passengers for hire.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 30 March 2020
Resolved
Repair or replace the inoperative general alarm klaxon in the 4th deck VIP lounge. The bell type klaxon did not make any noise during the operational test. Klaxon must function as designed prior to carrying passengers for hire.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 30 March 2020
Resolved
New communications wire run cableway between hold deck and main deck must meet applicable fire load rating of A-60 prior to carrying passengers for hire.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 22 January 2020
Resolved
The unused ventilation duct penetrating the 2nd deck slot managers office inboard facing bulkhead is not fitted with any means of closure. Either install a ventilation damper complying with 46 CFR 72.05-50(i) or have a bulkhead insert welded in and insulated to comply with the A-30 boundary requirements.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 December 2019
Resolved
Replace the missing fire ax placard on the Emergency Generator Room door.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2019
Resolved
Replace the low oil pressure safety sensor on the B/T, the safety is alarming outside of the manufacturer's parameters.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 9 December 2019
Resolved
Replace the worn stern, stbd side life ring water light lanyard.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 9 December 2019
Resolved
Ensure the vessel stern life ring lines are not secures to the vessel.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 December 2019
Resolved
Ensure the vessel operator's are familiar with the operation of the AIS system and determine the reason the target vessel names are not appearing on the AIS.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 9 December 2019
Resolved
Update the vessel's electrical lock out log.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 December 2019
Resolved
Repair or replace the stbd rescue boat 360* navigational light.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 9 December 2019
Resolved
Replace the retro on 68 PFD's, the existing retro was previously replaced and was coming loose
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 2 October 2019
Resolved
Prove proper operation of port rescue boat engine.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 2 October 2019
Resolved
Prove proper operation of the STBD rescue boat navigation lights. Install a temporary until navigation lights
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 October 2019
Resolved
Repair bow thruster engine exhaust leak.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019
Resolved
Vessel must route temporary welding power supply to limit electrical hazards in accordance with 46CFR Subchapter J.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 July 2019
Resolved
Prove proper operation of the port generator load shed.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 30 April 2019
Resolved
Prior to 01Septemeber2019, ensure the missing port generator keel cooler anode is replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 March 2019
Resolved
Replace the worn retro of 66 PFD’s.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 12 March 2019
Resolved
Replace the forward small boat sling attachment U-bolt. The U-bolt is not long enough and the nuts are only threaded on approximately half way.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 March 2019
Resolved
Prove proper operation of the port generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 March 2019
Resolved
Prove proper operation of the STBD SSG. Generator is currently non-operational do to a ground issue. The generator will require rewinding by an outside vender.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 11 March 2019
Resolved
Vessel personnel will immediately evacuate all passengers upon loss of shore power. SUMR Command Center will be promptly notified should this situation occur.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 11 March 2019
Resolved
Master shall ensure that the vessel has adequate additional manning and lighting, as necessary, to safely evacuate all the passengers upon loss of shore power.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 11 March 2019
Resolved
Because the service elevator is not under emergency power, ensure that no personnel are transported in this elevator until a SSG is reinstalled and functioning. Cargo may be transported without personnel.
Fire Fighting › Portable CO2 Fire Extinguisher › Approval
Issued 21 March 2018
Resolved
Replace the old CO2 type (B-II) portable fire extinguishers with U/L approved 2-A's in the gamming areas, slot office supplies, and the port pontoon room as per table 46CFR76.50-10(a), ensure the vessel's fire control plan is permanently updated.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 21 March 2018
Resolved
Prove proper closing of the second deck stern, fire screen door.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 21 March 2018
Resolved
Install directional open arrows on the escape scuttles.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 21 March 2018
Resolved
Replace the deteriorated reto on 28 PFD’s (resolved)
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 14 December 2017
Resolved
Renew the damaged reto on the 56 third deck PFD’s that were identified and set aside.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 14 December 2017
Resolved
Prove proper operation of vent closures #312 and 303, the closures shut but didn’t reopen all the way.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 27 September 2017
Resolved
Verify proper latching of the 3rd deck, aft, port exterior door. The door closed but didn’t latch.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 27 September 2017
Resolved
Verify proper operation of F/S door #11. The door did not close, the latch appeared to hang up on the carpet.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 27 September 2017
Resolved
Ensure the new retro on the PFD’s, which had previously been replaced, is CG or SOLAS approved.
Lifesaving › Lifebuoys › Approval
Issued 27 September 2017
Resolved
Replace or prove the vessel’s life rings are CG approved (the approval numbers are worn off).
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 27 September 2017
Resolved
Prove proper operation of vent closure #225.
Electrical › Electrical Distribution System (service) › Wiring
Issued 27 September 2017
Resolved
Secure the loose wires in the overhead of the stbd pontoon room.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 27 September 2017
Resolved
Replace or repair the damaged structural insulation inside the cart cage.
Lifesaving › Rescue Boat Equipment › Electric Torch
Issued 27 September 2017
Resolved
Install a 360* white navigational light on the stbd rescue boat.
Lifesaving › Launching Appliances › Davit
Issued 4 July 2017
Resolved
Repair the failed (fractured) port rescue boat davit vertical support pipe.
Fire Fighting › Automatic Sprinkler System › Piping
Issued 28 June 2017
Resolved
Properly repair the broken bolt flange retaining clip on the sprinkler pump housing. The sprinkler pump is still operational.
Electrical › Electric Generation Source (service) › Generator
Issued 28 June 2017
Resolved
Ensure proper operation of the stbd generator reverse power relay (RPR).
Lifesaving › Rescue Boat › Propulsion Engine
Issued 4 April 2017
Resolved
Prove proper operation of the port rescue boat engine.
Navigation › Collision/Grounding Avoidance › Radar
Issued 4 April 2017
Resolved
2. Determine the reason the RADAR shuts down when the G/A bell is sounded while operating on E-power and repair as necessary. This problem does not exist while operating on normal ships power.
Engineering › Engine Controls (Electric/Electronic) › Actuator
Issued 15 March 2017
Resolved
Prove proper operation of the bridge main console stbd shaft RPM gauge.
Engineering › Compressed Air System (start air) › Valve
Issued 15 March 2017
Resolved
Replace the broken air system pressure gauge
Lifesaving › Launching Appliances › Winch
Issued 14 December 2016
Resolved
Prove proper operation of the stbd rescue boat winch. The winch failed (stop) when the boat was being placed back in the cradle. After that, the winch motor operated erratically but is not dependable.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 14 December 2016
Resolved
Prove proper operation of the 3nd deck vent closure (port side forward).
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 14 December 2016
Resolved
Replace one damaged PFD in the third deck locker or reduce the locker count. The vessel maintains an excess amount of PFD's so the COI passenger count is not affected.
Fire Fighting › Automatic Sprinkler System › Pump
Issued 14 September 2016
Resolved
Ensure proper operation of the sprinkler system jockey pump.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 1 September 2016
Resolved
Ensure the life ring, strobe lights have the proper batteries installed.
Fire Fighting › Fire Main › Valves
Issued 1 September 2016
Resolved
Repair the leaking fire main riser valve, stbd stern location.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 1 September 2016
Resolved
Ensure proper operation of the port boat davit light.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 1 September 2016
Resolved
Adjust the EOS, stbd, shaft, RPM gauge, it is operating approx 100 rpm slow.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 20 August 2016
Resolved
Prove proper operation of the port rescue boat, the priming bulb is cracked and will not prime.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 20 August 2016
Resolved
Prove proper operation of the 2nd deck vent closures, #207, 213 and 225. The vents close but do not open up very much.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 20 August 2016
Resolved
Properly adjust (one dogg was dragging on the top of the ladder rail) and label (open direction arrow) the G/R and E/R escape scuttles. The scuttles still function.
Operations/Management › Vessel Activity › Underway
Issued 23 June 2016
Resolved
Within 24 hours of the Peoria, Illinois River Gauge reaching the 18’ gauge mark and absent any hazardous weather conditions (i.e. ice), the vessel will get underway in the navigation channel to conduct drills and verify proper operation of machinery to the satisfaction of the attending Marine Inspector. The vessel’s next underway date will remain 30JUNE2017.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 22 June 2016
Resolved
Properly repair and or adjust the aft (1st-3rd deck) stern fire screen doors.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 16 March 2016
Resolved
Repair or replace the fire detection system, probe type, HAD support bracket, located over the inboard generator. The HAD was tested and still functions.
Lifesaving › Rescue Boat › Hull (rigid)
Issued 16 March 2016
Resolved
Repair the fracture in the port rescue boat upper stbd bow area. Fracture is above the waterline at the deck edge (gunwale).
Engineering › Diesel Engine (auxiliary) › Air Cleaner
Issued 9 December 2015
Resolved
Clean or replace the bow thruster natural air intake filter.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 9 December 2015
Resolved
Prove proper operation of the 4th deck, forward, portside exterior door latch.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 9 December 2015
Resolved
Prove proper operation of F/S doors # 3, 8, 10 and 23 lower latches. The latches are either loose or not latching.
Fire Fighting › Structural - A Class Divisions › Door Frames
Issued 9 December 2015
Resolved
Prove proper operation of the 1st and 2nd deck stern, exterior door, lower latches.
Fire Fighting › Structural - A Class Divisions › Flammable Liquids Storage Spaces
Issued 9 December 2015
Resolved
Properly insulate the forward, liquor room, upper bulkhead stiffeners IVO the new ROX penetration.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 9 December 2015
Resolved
Ensure the 3rd deck portside PFD locker has the proper amount of PFDs as reflected on the locker count. There were 3 PFDs missing.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 9 December 2015
Resolved
Post a “Keep Clear” sign on the main deck side of the engine room EGRESS scuttle.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 9 December 2015
Resolved
Post a “Emergency Escape” sign on the main deck side of the engine room EGRESS scuttle.
Communications › Public Address System › Amplifier
Issued 9 September 2015
Resolved
Prove proper operation of the stern exterior P/A system speakers (not load enough when the E-gen is running.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 9 September 2015
Resolved
Properly secure the carpet threshold in the slot office.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 9 September 2015
Resolved
Properly label the E/R and G/R installed Halon system control valves so then reflect the posted operating instruction nomenclature.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 9 September 2015
Resolved
Prove proper operation of vent closure 220.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 24 June 2014
Resolved
Prove proper operation of the OWS.
Engineering › Bilge Water Management System › Valve
Issued 24 June 2014
Resolved
Prove proper operation of the engineroom 2" bilge pick-up check valve.
Electrical › Electric Generation Source (service) › Panelboard
Issued 24 June 2014
Resolved
Prove proper operation of the STBD generator jacket water temperature gauge in the EOS.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 24 June 2014
Resolved
Prove proper operation of FSD #1 and 16.
Fire Fighting › Fire Pumps › Pressure
Issued 24 June 2014
Resolved
Conduct PMS on the engineroom fire pump duplex strainer.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 24 June 2014
Resolved
Repair the Bow Thruster exhaust leak.
Communications › Public Address System › Loudspeaker
Issued 24 June 2014
Resolved
Prove proper operation of the 1st deck aft external P/A speakers.
Fire Fighting › Fire Hoses › Length
Issued 24 June 2014
Resolved
As per the COI, ensure the 4th deck fire stations have 75' hoses on them.
Electrical › Electrical Distribution System (emergency) › Panelboard
Issued 10 March 2014
Resolved
Prove proper operation of the bridge navigational light panel failure alarm.
Electrical › Electric Generation Source (service) › Panelboard
Issued 10 March 2014
Resolved
Prove proper operation of the stbd generator reverse power relay.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 March 2014
Resolved
Prove proper operation of primary stern light.
Electrical › Electric Supply System (service) › Battery Installation
Issued 19 June 2012
Resolved
Prove proper operation of the 24 volt system alarm.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 19 June 2012
Resolved
Prove proper operation of the E-lights 1st deck (1E0505 and 3rd deck (3A-1118) .
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 19 June 2012
Resolved
Prove proper operation of the vessel's OWS.
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 14 May 2012
Resolved
Determine cause of bow thruster high jacket water temp alarm.
Electrical › Lighting (service) › Lighting Fixture
Issued 14 May 2012
Resolved
Verify proper operation of the port and stbd main engine tach gauge illuminations (on bridge and stbd bridge wing).
Engineering › Steering Gear System › Power Unit
Issued 14 December 2011
Resolved
Prove proper operation of the #2 steering pump overload alarm. Pump still operates.
Electrical › Electric Generation Source (emergency) › Generator
Issued 14 December 2011
Resolved
Prove proper operation of the emergency generator battery charger.
Fire Fighting › Automatic Sprinkler System › Testing Switches (Alarm/Sprinklers)
Issued 14 December 2011
Resolved
Properly adjust the sprinkler system zone #3 tamper alarm.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 14 December 2011
Resolved
Prove proper operation of the #4 F/S door.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 14 December 2011
Resolved
Repair or replace the 1st deck, stbd side, aft exit door. (a new door is already on order with a 4-6 week shipping time).
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 21 September 2011
Resolved
Prove proper operation of the port rescue boat engine.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 21 September 2011
Resolved
Secure the loose deck plate by the B/T room entrance.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 21 September 2011
Resolved
Clean or replace the overhead E-light in the main deck crew access entrance.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 21 September 2011
Resolved
Prove proper operation of the beer chiller unit defrost cycle.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 21 September 2011
Resolved
Cover the exposed beer chiller unit defrost controller.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 21 September 2011
Resolved
Prove proper operation of the emergency generator overcrank safety.
Fire Fighting › Ventilation Systems › Ducts
Issued 7 December 2010
Resolved
Prove proper operation of UPS room fire damper vent.
Fire Fighting › Ventilation Systems › Operating Controls
Issued 7 December 2010
Resolved
Provide operating instructions for UPS room fire damper vent.
Fire Fighting › Ventilation Systems › Ducts
Issued 7 December 2010
Resolved
Prove proper operation of exhaust fire damper IWO 3rd deck mantrap stbd side.
Electrical › Electric Generation Source (emergency) › Generator
Issued 7 December 2010
Resolved
Repair or replace Emergency Generator oil pressure gauge.
Electrical › Electric Generation Source (service) › Generator
Issued 7 December 2010
Resolved
Update Generator test procedures Reverse Power Relay sync switch position to 1 Generator / 2 Generator position.
Electrical › Electrical Distribution System (emergency) › Circuit Breaker
Issued 1 December 2010
Resolved
Because of discrepancies between the currently installed breaker size and conductor amperage capacity, have a Naval Architect or Licensed Professional Electrical Engineer conduct a complete electrical analysis (breaker size, amp draw, conductor size, breaker identification and approval...) on all three emergency distribution panels (E-1, E-2, E-3).
Electrical › Electrical Distribution System (emergency) › Circuit Breaker
Issued 1 December 2010
Resolved
Submit that Emergency panels (3) electrical system analysis along with the purposed revised electrical plans to MSC for approval.
Communications › Public Address System › Amplifier
Issued 1 December 2010
Resolved
Submit the entire new P/A system installation package which resulted in the identification of the electrical panel discrepancies to MSC for approval. No additional P/A system components will be added, installed, modified or energized until MSC approval is received and verification by this unit. The new system in its current partially installed configuration may be utilized and functions normally.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 October 2010
Resolved
Prior to energizing any modified, altered or existing electrical circuits supplying the vessel's third deck bathrooms, submit electrical calculations or technical details to verify that the modifications will not affect passenger safety. Submittal may be through MSC or the local OCMI.
Fire Fighting › Combustible Materials › Facings/Mouldings/Decorations/Veneers
Issued 25 October 2010
Resolved
Prior to allowing passengers access to the vessel's third deck bathrooms, submit fire load calculations or technical details to verify the modifications have not increased the vessel's fire load to an unsafe level. Submittal may be through MSC or the local OCMI.
Accommodation/Occupational Safety › Washroom/Toilet › Number Per Persons
Issued 25 October 2010
Resolved
Ensure the Coast Guard has access to inspect all modifications and alterations on the vessel's bathroom remodel prior to sealing off or closing bulkhead and ceiling accesses.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 15 March 2010
Resolved
Submit the new Generator Reverse Power Relay Test Procedure to MSC for approval.
Engineering › Generator (propulsion/auxiliary-electric) › Busway
Issued 15 March 2010
Resolved
Ensure proper operation of the port generator RPR breaker.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 15 March 2010
Resolved
Install a Battery Alarm Relay Box for the generator battery system.
Electrical › Electrical Distribution System (emergency) › Ground Detection
Issued 15 March 2010
Resolved
Determine the cause for the in balance in the Emergency Generator C phase ground indicator light.
Engineering › Steering Gear System › Power Unit
Issued 15 March 2010
Resolved
Prove proper operation of the #1 steering pump run indicator light.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 15 March 2010
Resolved
Ensure proper operation of all engine room console engine gauges.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 7 December 2009
Resolved
Prove proper operation of vessel E-light as per work list.
Electrical › Lighting (service) › Lighting Fixture
Issued 7 December 2009
Resolved
Cover the exposed florescent light inside the crew elevator.
Communications › Public Address System › Loudspeaker
Issued 7 December 2009
Resolved
Prove proper operation of the 3rd deck exterior, and the 1st deck stbd speaker stern P/A speakers.
Construction/Loadline › Penetrations › Weld
Issued 20 March 2009
Resolved
Prior to conducting any future repairs or modifications for the vessel’s electrical system submit a detailed plan on how the new Roc’s blocks penetrations will be used and adequately tested to verify watertight integrity.
Electrical › Electrical Distribution System (service) › Busway
Issued 20 March 2009
Resolved
Prior to conducting any future repairs or modifications for the vessel’s electrical system submit a detailed plan on how the existing engineroom slag burned wires will be tested .
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 March 2009
Resolved
Prior to running any wires through any deck penetrations submit a detailed plan on when and how the wires will be ran and any testing to be performed to verify wire integrity.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 March 2009
Resolved
Prior to making any modifications, submit a detailed plan on how the elevator electrical wire will be relocated to facilitate insertion of the new 2nd deck electrical panel.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 20 March 2009
Resolved
Prior to any hot work, ensure the vessel’s internal procedures are followed as per the vessel’s hot work permit.
Electrical › Electrical Distribution System (service) › Shore Connection Box
Issued 11 March 2009
Resolved
Prove proper operation of the Ship shore tie connection.
Electrical › Electric Generation Source (service) › Power Requirement
Issued 11 March 2009
Resolved
Once the vessel's shore tie connection is reestablished, make the SSG's available for testing and inspection.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 11 March 2009
Resolved
Prove proper operation of the vessels 10 E-lights as per work list.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 11 March 2009
Resolved
Establish a set of operating procedures for the passenger and crew elevator fireman's bypass switch.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 11 March 2009
Resolved
Determine source and repair the crew elevator leak.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 11 March 2009
Resolved
Post Emergency generator room CO2 operating instructions.
Fire Fighting › Ventilation Systems › Ducts
Issued 11 March 2009
Resolved
Prove proper operation of the port side large hold vent closure (provide access for inspection).
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 11 March 2009
Resolved
Replace the Retro on 230 PFD’s.
Construction/Loadline › Penetrations › Pipe Flange
Issued 23 January 2009
Resolved
Ensure all new and old cable penetrations (rox blocks) are properly insulated as per NVIC 9-97.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 23 January 2009
Resolved
Prior to 01May2009, ensure the vessel’s fire control plan is updated to reflect the new 1st and 3rd deck cash cage configuration changes.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 9 December 2008
Resolved
Properly repair the bow thruster fuel oil and exhaust leak.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 9 December 2008
Resolved
Properly secure the E/G over speed box.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 9 December 2008
Resolved
Properly adjust vent closures 313, 314, and 308.
Electrical › Electric Generation Source (emergency) › Switch
Issued 9 December 2008
Resolved
Prove proper operation of the E/G high water temperature shutdown sensor.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 9 December 2008
Resolved
Close off the holes in the overhead draft stop by vent closure # 338.
Navigation › Collision/Grounding Avoidance › Radar
Issued 9 December 2008
Resolved
Prove proper operation of the vessel’s RADAR.
Fire Fighting › Means of Escape › Doorways
Issued 9 December 2008
Resolved
Prove proper operation of F/S door #11.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 16 September 2008
Resolved
Find the vessel's approved test procedures and properly test the port generator RPR.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 16 September 2008
Resolved
Access the stern, 1st deck vents for inspection.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 16 September 2008
Resolved
Prove proper operation of the OWS.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 September 2008
Resolved
Fire stop wire run in the floor of the E-gen room
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 16 September 2008
Resolved
Repair vent screen, #5, port side and repair or replace the #1 port side vent closure.
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 16 September 2008
Resolved
Properly label all exterior E-lights.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 16 September 2008
Resolved
Properly label all class A-fire screen doors.
Electrical › Electric Generation Source (service) › Generator
Issued 16 June 2008
Resolved
Prior to 24JUN08, prove proper operation of the #2 SSG. When paralleled the generator would not properly take and maintain the load when the reverse power relay was activated on the #1 SSG.
Electrical › Electric Generation Source (service) › Generator
Issued 16 June 2008
Resolved
Prior to 24JUN08, verify the cause of the fault indicator light on the #1 SSG and repair as necessary.
Fire Fighting › Combustible Materials › Insulation
Issued 16 June 2008
Resolved
Repair as necessary the leaking liquor line where in penetrates the hard count void deck.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 16 June 2008
Resolved
Properly mount the sprinkler room fire axe.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 16 June 2008
Resolved
Properly secure the air tanks in the liquor store room.
Construction/Loadline › Penetrations › Pipe Flange
Issued 5 March 2008
Resolved
Renew 4th Deck stuffing tube, 2nd from the bow portside.
Lifesaving › Rescue Boat › Carriage Requirement
Issued 5 March 2008
Resolved
Ensure the Rescue boats batteries have a changing system installed.
Communications › Radio Communications › VHF Radiotelephone
Issued 5 March 2008
Resolved
Ensure each licensed Master has a FCC Registered Radio Operators permit or higher license.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 March 2008
Resolved
Ensure all overhead wires in the bridge are properly installed.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 5 March 2008
Resolved
Prior to 20 May 08, provide proof that all the slot machine breakers are not overloaded.
Fire Fighting › Fixed Halon Fire Extinguishing System › Piping
Issued 5 March 2008
Resolved
Prior to 04APR08, provide proof that the E/R and G/R flexible piping for the Halon System has been hydrostatically tested with in the last 5 years.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 5 March 2008
Resolved
Replace time delay for E-Gen CO2 system to ensure that it goes off @ 30 seconds.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 17 December 2007
Resolved
Update fire control plan to reflect vessel changes.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 12 December 2007
Resolved
Properly adjust FSD #11.
Engineering › Steering Gear System › Pump
Issued 12 December 2007
Resolved
Establish written testing procedures for the steering system.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 12 December 2007
Resolved
Prove proper operation of the E-light located in the port pontoon room.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 12 December 2007
Resolved
Properly mount the outlets under the second deck bar.
Lifesaving › Rescue Boat Equipment › Bulb (electric torch spare)
Issued 12 December 2007
Resolved
Properly repair the port rescue boat stern light.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 September 2007
Resolved
Properly mount the electrical junction box, second deck, aft, stbd side stern locker.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 5 September 2007
Resolved
Repair or replace the third deck, aft, portside, FSD.
Fire Fighting › Firemans Outfit › Axe
Issued 5 September 2007
Resolved
Replace the 1st deck, aft, stbd side, fire ax bracket.
Fire Fighting › Structural - B Class Divisions › Doors
Issued 5 September 2007
Resolved
Properly adjust the Bow Thruster Room FSD.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 5 September 2007
Resolved
Properly adjust vent closures # 329, 330, 321 and 326.
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 5 September 2007
Resolved
Prove proper operation of the generator RPR, OWS alarms and steering pump alarms.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 5 September 2007
Resolved
Determine source of and repair the fuel oil leak on the bow thruster engine.
Construction/Loadline › Penetrations › Valve Flange
Issued 5 September 2007
Resolved
Properly adjust the Bow Thruster Room, forward sea chest, remote shut off valves.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 20 June 2007
Resolved
Prove proper operation of FSD #24.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 June 2007
Resolved
Properly wire vent motor #15.
Communications › Internal Communications System › Sound-powered Telephone
Issued 20 June 2007
Resolved
Prove proper operation of the bridge SPP.
Lifesaving › Embarkation Appliances/Stations › Handholds
Issued 20 June 2007
Resolved
Permanently install a MOB recovery ladder.
Fire Fighting › Ventilation Systems › Ducts
Issued 20 June 2007
Resolved
Properly adjust vent closures # 5, 7, 8, 13, 17, 18, 19, 20, 304, 322 and 331.
Fire Fighting › Ventilation Systems › Ducts
Issued 20 June 2007
Resolved
Properly adjust vent closures # 202, 203, 205, 7, and 12.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 5 March 2007
Resolved
Post operating instructions for the bow thruster installed CO2 fire suppression system.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 5 March 2007
Resolved
Remove vent louvers to provide access to all hold deck automatic and manual ventilation dampers to verify proper operate.
Electrical › Electric Generation Source (emergency) › Switch
Issued 5 March 2007
Resolved
Ensure the emergency generator safeties and alarms annunciate in the engine control room.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 5 March 2007
Resolved
Ensure adequate second deck transitional lighting.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 5 March 2007
Resolved
Determine source and resolve the gaming panel ground.
Stability › Watertight Integrity › General
Issued 19 September 2006
Resolved
Install approved hard rubber gaskets on all WTD's and adjust as necessary to ensure watertight integrity. Properly label WTD's 1 and 1A.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 19 September 2006
Resolved
Properly service the CO2 fire extinguisher in the surveillance room or remove from the vessel if in excess of the required amount.
Engineering › Pressure Vessel › Coast Guard Symbol
Issued 19 September 2006
Resolved
Remove non -approved pressure vessel canister (if operating pressure is in excess of 15psi) or properly install and approved pressurized system in the liquor storage room.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 19 September 2006
Resolved
Ensure all EOS console engine control gauges function properly.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 19 September 2006
Resolved
Relocate existing or install a new 2nd deck exit sign that is obstructed by the overhead chandelier.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 19 September 2006
Resolved
Install a lighted exit sign at the 2nd deck main passenger entrance.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 19 September 2006
Resolved
properly clean and sanitize all cash cages and bars.
Electrical › Electric Generation Source (service) › Conductor
Issued 19 September 2006
Resolved
Properly install the vessel's exterior, bow electrical box.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 19 September 2006
Resolved
Prove proper operation of the vessel's depth sounder.
Lifesaving › Embarkation Appliances/Stations › Handholds
Issued 19 September 2006
Resolved
Provide a boarding/egress ladders to assist in transferring any potential MOB victim from the rescue boat to the vessel or facility.
Navigation › Collision/Grounding Avoidance › Radar
Issued 1 March 2006
Resolved
Repair or replace inoperable radar.
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 March 2006
Resolved
Submit slot machine specifications to ensure surge load for slots do not exceed maximum amperage of circuits IAW IEEE 45, NEC, and 46CFR Subchapter "J"
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 March 2006
Resolved
Ensure all wiring under slot machines was installed IAW 46CFR Subchapter "J", IEEE 45, and NEC requirements.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 1 March 2006
Resolved
Install permanent power supply for promotions table on third deck IAW 46 CFR Subchapter "J", IEEE 45, and NEC requirements.
Fire Fighting › Means of Escape › Blocked
Issued 1 March 2006
Resolved
Submit proposal to relocate all items obstructing all fire fighting equipment and emergency egress areas.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Pressure
Issued 1 March 2006
Resolved
Demonstrate proper operation of sprinkler system.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 1 March 2006
Resolved
Conduct test of CO2 fixed fire fighting system.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 1 March 2006
Resolved
Conduct test of halon fixed fire fighting system.
Fire Fighting › Automatic Sprinkler System › Pressure Tank
Issued 1 March 2006
Resolved
Submit ultra sonic testing report on sprinkler tank and provide. Provide the attending Coast Guard Marine Inspector with report from NBIC if any repairs are needed, and hydro test sprinkler tank to 1 1/4 MWP or if repairs were needed test to 1 1/2 MWP, then properly coat and seal sprinkler tank.
Fire Fighting › Ventilation Systems › Smoke Extraction System
Issued 1 March 2006
Resolved
Submit proposal to address the ability to operate fire dampers that can not be reached/pulled due to height, then conduct an operational test of the dampers.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 1 March 2006
Resolved
Submit proposal to repair sagging overhead which is obstructing sprinkler heads on the fourth deck.
Operations/Management › Drills/Instruction › Not Conducted
Issued 1 March 2006
Resolved
Conduct emergency evacuation drill no later than 06APR06.
Operations/Management › Drills/Instruction › Not Conducted
Issued 1 March 2006
Resolved
Complete machinery testing and outstanding items that were not completed(were unable) due to machinery overhaul.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device Recorder
Issued 1 March 2006
Resolved
Repair transducer on echo depth sounder after hull dive is complete.
Lifesaving › Rescue Boat › Construction
Issued 1 March 2006
Resolved
Replace stern light on port side rescue boat.
Lifesaving › Rescue Boat › Construction
Issued 1 March 2006
Resolved
Repair and properly organize wiring to the port side rescue/life boat navigation lights.
Stability › Watertight Integrity › General
Issued 1 March 2006
Resolved
Submit proposal for temporary repairs to 2 holes in deck for the telephone/equipment room.
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 1 March 2006
Resolved
Ensure all trashcans on vessel are made of non-combustible materials.
Communications › Audible Communications › SPD (Other)
Issued 1 March 2006
Resolved
Make proposal to provide a battery back-up for the vessel's public announcement system when vessel is transitioning to emergency power from main power.
Electrical › Electric Generation Source (emergency) › Generator
Issued 1 March 2006
Resolved
Clean battery box in emergency generator room.
Electrical › Electric Generation Source (emergency) › Generator
Issued 1 March 2006
Resolved
Clean oil out of "V" on emergency generator and check area for leaks.
Electrical › Electric Generation Source (service) › Generator
Issued 14 February 2006
Resolved
3 exciter bolts sheered and brass shavings found in motor oil. Generator secured.
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 March 2005
Resolved
Conduct underway drills prior to getting underway.
Construction/Loadline › Structures › Door
Issued 2 March 2005
Resolved
Provide for proper gasket sealing surfaces on all QAWTDs
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 2 March 2005
Resolved
Ensure RAIs between bridge and ER control are within 1 degree of error.
Communications › Internal Communications System › Sound-powered Telephone
Issued 2 March 2005
Resolved
repair/rerplace sound powered phone in muffler room
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 2 March 2005
Resolved
Clean outlet and cover in 1st deck cash cage
Fire Fighting › Means of Escape › Doorways
Issued 2 March 2005
Resolved
provide for proper operation of firescreen door # 16. Keep door closed until repaired to close properly.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 14 December 2004
Resolved
Install drip shields around on exterior plugs for aerators.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 14 December 2004
Resolved
Recharge/replace discharged fire extinguisher in rescue boat
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 14 December 2004
Resolved
enable anchor to be lowered without interference.
Documentation › Logs/Records › Logbook (official)
Issued 14 December 2004
Resolved
Maintain proper bridge and training logs IAW 46CFR199.180 (h)
Fire Fighting › Means of Escape › Blocked
Issued 14 December 2004
Resolved
Remove excess carts in soft count to enable easy egress
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 14 December 2004
Resolved
Remove excess combustibles from liquor locker
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 14 December 2004
Resolved
provide for proper panel clearance/working distance IAW NEC in V V room
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 14 December 2004
Resolved
Provide additional RCPTs in gaming agent office
Construction/Loadline › Structures › Door
Issued 14 December 2004
Resolved
adjust closing speeds on Sliding WTDs to between 20 & 40 seconds
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 14 December 2004
Resolved
Remove or place on GFCI ckt; outlets under bars on all decks.
Fire Fighting › Ventilation Systems › Ducts
Issued 14 December 2004
Resolved
Enable for proper closing of fire damper in surveilance office
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 14 December 2004
Resolved
remove plastic trash can from 2nd deck cash cage annex
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 December 2004
Resolved
indicate on electrical diagrams in-line fuses in circuits on all decks between the aft heads. Provide for connections in proper connection box or place circuits on circuit breakers and indicate on electrical diagrams.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 14 December 2004
Resolved
Provide E-light by the 1st deck fire screen door
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 14 December 2004
Resolved
Renew batteries in crews lounge E-light STBD FWD
Fire Fighting › Means of Escape › Doorways
Issued 14 December 2004
Resolved
fire screen doors 5, 14 & 15 close too fast for safe egress of passengers, adjust closing speed.
Operations/Management › Drills/Instruction › Activating General Alarm
Issued 14 December 2004
Resolved
General alarms in 1st deck main atrium, 1st deck mens head, 2nd deck main atrium FWD port & 2nd deck womens heads need adjustment so they can be clearly heard.
Engineering › Reduction Gearing/Clutches › Shaft
Issued 14 December 2004
Resolved
provide rails or screens for engine shaft areas
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 14 December 2004
Resolved
Install lagging on turbos and exhaust of SSDGs
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 14 December 2004
Resolved
Replace crankcase breather hoses
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 14 December 2004
Resolved
repipe OWS so that discharge is into oily waste tank vice sewage tank
Fire Fighting › Means of Escape › Enclosed Stairway
Issued 14 December 2004
Resolved
provide for proper elevator fail-safe operation
Engineering › Gasoline Engine (auxiliary) › Overspeed Device
Issued 14 December 2004
Resolved
Provide for proper operation of SSDG overspeed trips
Engineering › Bilge Water Management System › Pump
Issued 14 December 2004
Resolved
Remove sump pumps from ER
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 14 December 2004
Resolved
provide for proper hydro of pressure vessels
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 14 December 2004
Resolved
provide alarm specification sheets for all engines
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 14 December 2004
Resolved
provide lagging on Egen turbo and manifold
Engineering › Pressure Vessel › Relief Valve
Issued 14 December 2004
Resolved
Provide relief valve for potable water system tank
Electrical › Electric Generation Source (service) › Power Requirement
Issued 14 December 2004
Resolved
Provide for proper load shedding between generators and between generators and shore power
Engineering › Compressed Air System (control) › Compressor
Issued 14 December 2004
Resolved
provide proof of proper operation of relief valves on air compressors
Communications › Audible Communications › SPD (Other)
Issued 14 December 2004
Resolved
Provide for PA system in ER
Electrical › Electric Generation Source (service) › Panelboard
Issued 14 December 2004
Resolved
Calibrate KW meters for all SSDGs
Operations/Management › Drills/Instruction › Not Conducted
Issued 14 December 2004
Resolved
Conduct underway drills prior to carrying passengers
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 14 December 2004
Resolved
provide for proper alarms on the bow-thruster alarm system
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 14 December 2004
Resolved
provide for lagging on the bow thruster exhaust elbow near oil line
Electrical › Electric Supply System (service) › Cable
Issued 14 December 2004
Resolved
Cover exposed 24V cable to bopw thruster starter
Electrical › Electric Generation Source (emergency) › Panelboard
Issued 14 December 2004
Resolved
Clean Egen SWBD
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 14 December 2004
Resolved
Repair dead end cable, loose bolt & brackets in SWBD
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 December 2004
Resolved
Bring overhead wiring up to IEEE45 standards and NEC standards
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 14 December 2004
Resolved
Remove oily sorbents from SSDG bilges
Engineering › Bilge Water Management System › Not Operational
Issued 14 December 2004
Resolved
Remove oily water from bilges
Engineering › Diesel Engine (propulsion-reduction gear) › Turbocharger
Issued 14 December 2004
Resolved
Repair loose hasp closures on air intakes in way of turbos
Engineering › Steering Gear System › Interlock
Issued 14 December 2004
Resolved
Prove proper operation of limit switches on rudders
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 December 2004
Resolved
Remove electric power strips and extentsion cords in overhead and relocate supplies in overheads
Electrical › Electrical Distribution System (service) › Cable
Issued 14 December 2004
Resolved
Properly dead end or remove electrical cables not in use
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 14 December 2004
Resolved
Properly pack all wire runs/penetrations through main vertical zone boundaries
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 14 December 2004
Resolved
Provide updated, corrected fire plan, post throughout the vessel
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 14 December 2004
Resolved
Ensure all electrical panels in overheads are properly covered and closed
Electrical › Electrical Distribution System (service) › Cable
Issued 14 December 2004
Resolved
Properly secure armored covering for electrical cable for motor controller on 3rd deck landing
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 14 December 2004
Resolved
Repack port shaft
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (hydraulic)
Issued 22 September 2004
Resolved
repasir leak on diesel starter on Port SSDG
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 22 September 2004
Resolved
Provide for proper testing of all jacket water sensors on engines
Fire Fighting › Ventilation Systems › Operating Controls
Issued 22 September 2004
Resolved
Provide for accessibility of fire damper throughout the vessel.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 29 June 2004
Resolved
Investigate and repair visual indicators for water tight doors in pilothouse.
Construction/Loadline › Structures › Deck Plating
Issued 29 June 2004
Resolved
Move rox-box near the Caribean Club Stud Table on second deck. Presently it is under chairs and has portions of the rox-box knocked out.
Navigation › Collision/Grounding Avoidance
Issued 25 June 2003
Resolved
Make proper repairs to vessels navigational lighting alarm system. Alarmed failed to sound when power was lost. LEGACY COMPONENT DESC: Navigation Lights
Operations/Management › Equipment Service/Testing
Issued 12 March 2003
Resolved
Provide written procedures for testing of CO2/halon system, mechanical alarms of MDE's and generators. LEGACY COMPONENT DESC: Firefighting/Mechanical Systems
Construction/Loadline › Structures
Issued 12 March 2003
Resolved
Repair damage to insulation on bulkhead where axe was used to make holes in bulkhead. LEGACY COMPONENT DESC: Transverse Bulkhead
Electrical › Lighting (emergency)
Issued 12 March 2003
Resolved
Provide emergency lighting in designated areas on Coast Guard worklist. LEGACY COMPONENT DESC: Battery Operated Lantern
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 16 April 2002
Resolved
Repair exhaust leak in center aft void prior to 16MAY02. LEGACY COMPONENT DESC: Piping (exhaust)
Fire Fighting › Means of Escape
Issued 20 March 2002
Resolved
Provide label for emergency escape from beer cooler. LEGACY COMPONENT DESC: Doorways
Electrical › Lighting (emergency)
Issued 19 March 2002
Resolved
Provide battery powered emergency lights throughout vessel as per Coast Guard marine inspector list. LEGACY COMPONENT DESC: Lighting Fixture
Electrical › Electrical Distribution System (service)
Issued 19 March 2002
Resolved
Update panel cards on electrical panels throughout vessel. LEGACY COMPONENT DESC: Distribution Panel Bus
Fire Fighting › Means of Escape
Issued 19 March 2002
Resolved
Provide second escape route from hard count. LEGACY COMPONENT DESC: Doorways
Accommodation/Occupational Safety › Ventilation
Issued 19 March 2002
Resolved
Provide an air quality assessment in the hard count room. LEGACY COMPONENT DESC: Air quality assessment
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 19 March 2002
Resolved
Increase housekeeping throughout vessel. LEGACY COMPONENT DESC: Recreation Space
Engineering › Fuel Oil Storage/Transfer System
Issued 19 March 2002
Resolved
Repair fuel leak in fuel line in the auxiliary machinery space. LEGACY COMPONENT DESC: Piping
Fire Fighting › Structural Fire Protection - General
Issued 19 March 2002
Resolved
Install door closure for door in bow thruster room. LEGACY COMPONENT DESC: Accommodation Space Protection
Fire Fighting › Structural Fire Protection - General
Issued 17 December 2001
Resolved
Provide insulation in overhead of ceiling on 3rd deck where rox boxes and work on A-60 bulkhead was conducted. LEGACY COMPONENT DESC: Accommodation Space Protection
Fire Fighting › Structural Fire Protection - General
Issued 17 December 2001
Resolved
Provide packing in stuffing tubes on lower level of elevator shaft. LEGACY COMPONENT DESC: Structural Bulkhead Construction
Electrical
Issued 21 June 2001
Resolved
Permanently mount all junction boxes under tables on main deck to include filling all holes in rox-boxes on main deck.
Lifesaving
Issued 11 October 2000
Resolved
REPLACE PORT AND STARBOARD RESCUE BOAT WINCH CABLES AS PER MANUFACTURER'S SPECS. TEST INSTALLATION TO 110% WORKING LOAD.
Lifesaving
Issued 11 October 2000
Resolved
REPAIR VIDEO CAMERA ON RESCUE BOAT DECK TO ALLOW WHEELHOUSE TO VIEW LAUNCHING OPERATIONS OF RESCUE BOATS.
Electrical
Issued 25 March 2000
Resolved
REPLACE GENERATOR BREAKER AND CONDUCT ALL TESTS FOR PARALLEL OPERATION AND #1 GEN SHUTDOWNS.
Lifesaving
Issued 25 March 2000
Resolved
REPAINT STENCILING ON LIFERINGS AS NECESSARY.
Electrical
Issued 25 March 2000
Resolved
REPAIR BURNT E-LIGHT IN THE STARBOARD FORWARD PONTOON ROOM.
Engineering
Issued 21 April 1999
Resolved
PRIOR TO SAILING OR 30 APRIL 00 CONDUCT INSPECTION OF ALL SHAFT CUTLASS BEARINGS AND REPLACE AS NEEDED TO BRING BEARINGS WITHIN PROPER TOLERANCES AS PER DISCUSSIONS WITH ST. LOUIS, MO. OCMI.
Engineering
Issued 30 April 1998
Resolved
TIGHTEN ALL FUEL LINE UNIONS FOR BOW THRUSTER HEAD TANK TO STOP PEAKAGE OF DIESEL FUEL.
Fire Fighting
Issued 30 April 1998
Resolved
RE-ADJUST FIRE SCREEN DOORS TO ENSURE GAP BETWEEN DOORS DOES NOT EXCEED 1/8" & 1/2" ON BOTTOM: (2 SETS) LEADING ONTO BALCONY (3RD DECK); FIRE SCREEN DOORS (1 SET) LOCATED STARBOARD SIDE OF MAIN DECK.
Fire Fighting
Issued 30 April 1998
Resolved
CORRECT ALARM FOR LIQUOR STORAGE ROOM (PILOTHOUSE PANEL SHOWS "TROUBLE" ANDCANNOT BE SILENCED).
Electrical
Issued 8 April 1998
Resolved
COMPLETE PERMANENT INSTALLATION OF SIGN BASE FOR "BIG HIT" CIRCLE OF SLOT MACHINES.
Lifesaving
Issued 8 April 1998
Resolved
SECURE COVER TO VOID LOCATE IN AFT BULKHEAD OF STBD STACKHOUSE.
Engineering
Issued 8 April 1998
Resolved
TIGHTEN UNION ON EMERGENCY GENERATOR FUEL LINE FROM DAY TANK.
Lifesaving
Issued 8 April 1998
Resolved
POST PFD DONNING INSTRUCTION ON PFD LOCKERS #7 & #8.
Lifesaving
Issued 8 April 1998
Resolved
REPLACE 3 RING BUOYS WITH CUT GUSSET LINES (OR REMOVE FROM VESSEL AS EXTRA RING BUOYS ARE PROVIDED).
Accommodation/Occupational Safety
Issued 8 April 1998
Resolved
REPLACE MISSING COVER TO INACTIVE OUTLET BEHIND 2ND DECK ATM.
Fire Fighting
Issued 8 April 1998
Resolved
RE-ADJUST FIRE SCREEN DOORS TO ENSURE GAP BETWEEN DOORS AND BOTTOM SILLS DOES NOT EXCEED 1/2" ON THE BOTTOM AND 1/8" INCH BETWEEN DOORS AS PER 46 CFR 72.05-25.
Engineering
Issued 8 April 1998
Resolved
TIGHTEN FUEL LINE FITTINGS FOR BOW THRUSTER HEAD TANK TO STOP LEAKING OF DIESEL FUEL.
Electrical
Issued 8 April 1998
Resolved
INSTALL OUTLET COVERS AND SECURE COMPUTER WIRING IN SLOT CLUB SPACES.
Engineering
Issued 8 April 1998
Resolved
ADJUST PULL CABLE ON FUEL OIL SHUTOFF TO ENSURE COMPLETE CLOSURE OF VALVE.
Lifesaving
Issued 8 April 1998
Resolved
REPLACE/REPAIR DOOR HANDLE TO MEN'S RESTROOM IN CREW LOUNGE AREA.
Construction/Loadline
Issued 8 April 1998
Resolved
REMOVE EXPANDED METAL COVERING FROM AROUND BILGE ALARM SENSOR IN COAT ROOM FORWARD OF CREW LOUNGE.
Electrical
Issued 8 April 1998
Resolved
ENSURE CIRCUIT BOARD DIRECTORIES ARE ACCURATE THROUGHOUT VESSEL.
Lifesaving
Issued 8 April 1998
Resolved
REMOVE DUCT TAPE AND INSTALL APPORPRIATE CARPET EDGING ON CARPET LOCATED INSURVEILLANCE ROOM.
Fire Fighting
Issued 8 April 1998
Resolved
RELOCATE VENT DAMPER SIGN INSIDE OF BOAT OPERATION MANAGER OFFICE TO ENSUREVISIBLE AT ALL TIMES AND ACCURATELY DEPICTS LOCATION OF MANUAL DAMPER.
Fire Fighting
Issued 8 April 1998
Resolved
REPLACE MISSING/BROKEN "PANIC" HARDWARE ON ALL AFT FIRE SCREEN DOORS LEADING TO EXTERIOR DECKS.
Electrical
Issued 8 April 1998
Resolved
REPLACE MELTED EXIT SIGN LENS FOR SIGN ABOVE FOWARD DOOR ON 2ND DECK.
Accommodation/Occupational Safety
Issued 8 April 1998
Resolved
CORRECT UNSANITARY CONDITION OF ALL FOOD/DRINK SERVICE STATIONS.
Accommodation/Occupational Safety
Issued 8 April 1998
Resolved
CORRECT TRIP HAZARD IN IST DECK LADIES RESTROOM WHERE CARPET MEETS TILE FLOORING.
Electrical
Issued 8 April 1998
Resolved
PERMANENTLY INSTALL ELECTRICAL JUNCTION BOX INSIDE OF THE "BIG HIT" CIRCLE OF SLOT MACHINES.
Lifesaving
Issued 8 April 1998
Resolved
SECURE THE TOP STEP DECK PLATE IN THE BOW THRUSTER ROOM.
Lifesaving
Issued 8 April 1998
Resolved
REMOVE TALL CIGARETTE ASH CAN FROM STAIRTOWER AND FROM BETWEEN FIRE SAFETY DOORS.
Electrical
Issued 8 April 1998
Resolved
REPLACE MISSING LIGHT COVER FOR LIGHT BY 1ST DECK ATM.
Lifesaving
Issued 8 April 1998
Resolved
RE-INSTALL INSULATION TO OVERHEAD LOCATED AMIDSHIPS IN PORT PONTOON ROOM.
Electrical
Issued 8 April 1998
Resolved
PROPERLY SECURE LOOSE ELECTRICAL WIRING LOCATED AMIDSHIPS IN THE PONTOON ROOM.
Construction/Loadline
Issued 8 April 1998
Resolved
REPLACE MISSING T-HANDLE FOR BILGE SUCTION VALVE IN PORT PONTOON ROOM.
Construction/Loadline
Issued 8 April 1998
Resolved
FABRICATE AND MOUNT BRACKET FOR BILGE SYSTEM T-HANDLE IN STARBOARD PONTOON ROOM.
Lifesaving
Issued 8 April 1998
Resolved
REPLACE MISSING CEILING TILE IN F.I.D. PASSAGEWAY.
Electrical
Issued 8 April 1998
Resolved
PROPER INSTALL ELECTRICAL WIRE CONNECTION (JUNCTION BOX) IN OVERHEAD OF F.I.D. PASSAGEWAY.
Electrical
Issued 8 April 1998
Resolved
ENSURE ALL ELECTRICAL INSTALLATIONS FOR "SHELL" LIGHTS IN STAIRTOWER USED PROPER THROUGH BULKHEAD FITTINGS.
Electrical
Issued 8 April 1998
Resolved
REPLACE NYLON WIRE TIES (SUPPORTS) WITH APPROVED METAL SUPPORTS AND REPLAE MISSING LIGHT COVER IN 1ST DECK BAR AREA.
Engineering
Issued 8 April 1998
Resolved
REPLACE NYLON WIRE TIES (CABLE SUPPORTS) TO APPROVED METAL SUPPORTS ON POWER LINE FOR EXPANSION TANK GAGE.
Electrical
Issued 8 April 1998
Resolved
REPLACE ALL ELECTRICAL OUTLET COVERS IN HARD COUNT ROOM WITH METAL COVERS TO REDUCE BREAKAGE FROM CARTS.
Electrical
Issued 8 April 1998
Resolved
PROPERLY SECURE E-LIGHT IN VAULT ROOM AND REMOVE TEMPORARY NYLON STRAP.
Unknown
Issued 8 April 1998
Resolved
REMOVE IMPROPERLY INSTALLED ANTENNA WIRE FROM ENGINEROOM ENTRANCE.
Electrical
Issued 8 April 1998
Resolved
REPLACE ALL OUTLET COVERS WITH METAL COVERS TO REDUCE BREAKAGE BY CARTS.
Electrical
Issued 8 April 1998
Resolved
INSTALL PROPER WIRE CONNECTION IN BATTERY BOX LOCATED ON FORWARD BULKHEAD OF ENGINEROOM.
Engineering
Issued 8 April 1998
Resolved
DOUBLE CLAMP ALL CONNECTION ON HOSE/PIPING CONNECTIONS FOR DAY TANKS ON ALLENGINES.
Fire Fighting
Issued 8 April 1998
Resolved
CORRECT ALARM ON FIRE PANEL TO SILENCE FOR LIQUOR STORAGE ROOM; AND CORRECTIMPROPER "TROUBLE" LIGHTS DURING ALARM.
Electrical
Issued 8 April 1998
Resolved
VERIFY ALL E-LIGHTS MARKED (SOME "Es" MISSING/PAINTED OVER) AND REPAIR EXTINGUISHED E-LIGHTS LOCATED ON AFT 2ND DECK (OUTSIDE).
Lifesaving
Issued 8 April 1998
Resolved
PROPERLY NUMBER ALL WATER TIGHT DOORS (THERE WERE 2 - #4 DOORS) AND ENSURE PILOTHOUSE CONTROL PANEL ACCURATELY REPLACES NUMBERING.
Construction/Loadline
Issued 8 April 1998
Resolved
PROVE SATISFACTORY OPERATION OF BILGE SYSTEMS.
Electrical
Issued 8 April 1998
Resolved
REPLACE IMPROPER LIGHT FIXTURES (NO COVERS) WITH APPROVED FIXTURES IN EGD OFFICE.
Construction/Loadline
Issued 11 March 1998
Resolved
VESSEL OPERATORS TO SUBMIT TO THE OCMI, A NAVAL ARCHITECT'S REPORT ON THE CAUSE OF THE STRESSED HULL PLATING: EFFECT ON HULL INTEGRITY; AND CORRECTIVE MEASURES TO MITIGATE CONDITION.
Construction/Loadline
Issued 11 March 1998
Resolved
VESSEL TO REMAIN DOCKSIDE UNTIL ISSUES PERTAINING TO STRESSED HULL PLATING IS RESOLVED TO THE SATISFACTION OF THE [name withheld].LOUIS, MO
Lifesaving
Issued 17 February 1998
Resolved
REDUCE TOTAL PERSONS ALLOWED FROM 1800 TO 1350 UNTIL 1ST, 3RD, AND 4TH DECKRENOVATIONS ARE COMPLETE.
Electrical
Issued 16 October 1997
Resolved
PROPERLY MOUNT POWER WIRE FOR GUEST SERVICE OFFICE COMPUTER.
Navigation
Issued 16 October 1997
Resolved
FABRICATE BREAKDOWN FOR LIGHT CONFIGURATION TO DISPLAY PROPER NAV. RULES OFTHE ROAD.
Lifesaving
Issued 16 October 1997
Resolved
REMOVE PLASTIC BUCKET FROM EMERGENCY GENERATOR ROOM
Unknown
Issued 16 October 1997
Resolved
REMOVE SIGNS FROM STAIRTOWERS
Unknown
Issued 16 October 1997
Resolved
REMOVE CHAIR FROM THIRD DECK F/S
Construction/Loadline
Issued 16 October 1997
Resolved
REMOVE CLIP ON HATCH COAMING AND COVER TO LAZARETTE
Unknown
Issued 16 October 1997
Resolved
RELOCATE CO2 WARNING SIGN TO BOWTHRUSTER DOOR
Unknown
Issued 16 October 1997
Resolved
LOCATE CO2 BOTTLES IN BOW THRUSTER ROOM 2 INCHES OFF THE DECK.
Electrical
Issued 16 October 1997
Resolved
PROPERLY SECURE PORTSIDE FORWARD SECOND DECK LOOSE ELECTRICAL WIRE
Fire Fighting
Issued 16 October 1997
Resolved
PROVE PROPER OPERATION OF FIRE DAMPERS, STBD PONTOON ROOM
Lifesaving
Issued 16 October 1997
Resolved
REMOVE DOLLY, WIRE REEL AND RATING CARDS FROM PASSAGEWAY IN MAIN HOLD
Lifesaving
Issued 16 October 1997
Resolved
REPAIR LOCK, PORT DOOR LEADING INTO MAIN HOLD
Fire Fighting
Issued 16 October 1997
Resolved
PROPERLY MOUNT METAL SWEEP TO REDUCE EXCESSIVE GAP BETWEEN SECOND DECK AFT FIRE SCREEN DOORS.
Fire Fighting
Issued 16 October 1997
Resolved
REMOVE MATTING FROM SECOND DECK DC LOCKER.
Lifesaving
Issued 16 October 1997
Resolved
PROPERLY SECURE RESCUE BOAT COVER.
Electrical
Issued 16 October 1997
Resolved
PROVIDE COVER FOR ELECTRICAL OUTLET FOR RESCUE BOAT
Navigation
Issued 16 October 1997
Resolved
CLEAN LENS ON ALL NAV LIGHTS
Electrical
Issued 16 October 1997
Resolved
PROVIDE GLOBES FOR EXTERIOR LIGHTS.
Unknown
Issued 16 October 1997
Resolved
REMOVE AIR HOSES FROM DECK IN EMERGENCY GENERATOR ROOM.
Fire Fighting
Issued 16 October 1997
Resolved
PROVIDE 2" OF CLEARANCE BETWEEN BOTTOM OF CO2 BOTTLE AND DECK
Unknown
Issued 16 October 1997
Resolved
INSTALL METAL BLANKS ON ALL FIRE DOORS THAT HAVE HAD LOCK SETS REMOVED _x001C_
Lifesaving
Issued 16 October 1997
Resolved
INSTALL AND TEST ALARM FOR WTD ON PORT SIDE PONTOON ROOM.
Construction/Loadline
Issued 16 October 1997
Resolved
INSTALL/REPAIR ALL WEATHERTIGHT SLIDING DOOR LOCKS, BOW/ENG/AMIDSHIP.
Electrical
Issued 16 October 1997
Resolved
SECURE LOOSE ELECTRICAL OUTLET, PORT SIDE BOW
Unknown
Issued 16 October 1997
Resolved
CLEAN SECOND DECK MONEY CAGE AND AREAS BEHIND BARS
Engineering
Issued 10 July 1997
Resolved
MAKE PERMANENT REPAIRS TO BOW THRUSTER. REPAIRS TO BE APPROVED AND INSPECTED BY CG INSPECTOR PRIOR TO GETTING U/W.
Lifesaving
Issued 10 July 1997
Resolved
RETROREFLECTIVE TAPE MISSING FROM 2 LIFE BUOYS ON WEATHER DECKS. CORRECTEDPRIOR TO DEPARTURE.
Lifesaving
Issued 10 July 1997
Resolved
RESCUE BOATS NOT NUMBERED. CORRECTED PRIOR TO DEPARTURE.
Lifesaving
Issued 11 April 1997
Resolved
REPAIR EXTINGUISHED EXIT SIGN OVER DOOR ON STBD SIDE OF 4TH DECK
Lifesaving
Issued 11 April 1997
Resolved
REMOUNT/REMOVE PICTURE MOUNTED BY DOOR ON STBD SIDE OF 4TH DECK CASINO TO REMOVE OBSTRUCTION OF EXIT.
Electrical
Issued 11 April 1997
Resolved
REPLACE OUTLET/RECEPTACLE COVERS IN 2ND DECK CAGE, ATRIUM (STBD BLKHD), 3RDDECK CAGE.
Lifesaving
Issued 11 April 1997
Resolved
RESECURE TOP STAIR TREAD EDGE IN 2ND DECK BAR.
Lifesaving
Issued 11 April 1997
Resolved
REPAIR CLOSURE DEVICE TO STBD LIFE JACKET LOCKER ON 3RD DECK AFT.
Lifesaving
Issued 11 April 1997
Resolved
MARK "E" ON EXIT SIGN OVER STAIRWELL DOOR LEADING FROM 4TH DECK CASINO.
Fire Fighting
Issued 11 April 1997
Resolved
PLACE SIGN ON CASINO OFFICE DOOR INDICATING THAT A MANUAL FIRE DAMPER IS LOCATED INSIDE.
Lifesaving
Issued 11 April 1997
Resolved
REPAIR LATCHING DEVICES FOR EMPLOYEE STAIRTOWER FIRE DOORS ON HOLD, 1ST & 2ND DECKS.
Lifesaving
Issued 11 April 1997
Resolved
REPAIR LATCHING DEVICE FOR DOOR HOLDER TO FSD #13.
Fire Fighting
Issued 11 April 1997
Resolved
CALIBRATE FIRE PUMP DISCHARGE GAUGES.
Engineering
Issued 11 April 1997
Resolved
CALIBRATE PRESSURE VESSEL (AIR START) PRESSURE GAUGES.
Electrical
Issued 11 April 1997
Resolved
MOUNT TELEPHONE JACKS IN CABINETS FOR TELEPHONES IN PASSENGER & FREIGHT ELEVATORS.
Lifesaving
Issued 11 April 1997
Resolved
LABEL VENT CLOSURES FOR AIR HANDLERS ON 5TH DECK (REFUGE DECK).
Navigation
Issued 11 April 1997
Resolved
REPAIR LANYARD FOR BREAKDOWN NAVIGATION LIGHTS.
Electrical
Issued 11 April 1997
Resolved
REPAIR BOW SOUND POWERED TELEPHONE.
Engineering
Issued 11 April 1997
Resolved
REPAIR/REPLACE PRESSURE VESSEL (AIR START) RELIEF VALVES.
Fire Fighting
Issued 11 April 1997
Resolved
MOUNT PORTABLE FIRE EXTINGUISHER IN STBD RESCUE BOAT.
Electrical
Issued 11 April 1997
Resolved
TEST AND PROVE OPERATION OF HIGH WATER TEMP ALARM FOR STBD SHIP SERVICE GENERATOR.
Navigation
Issued 11 April 1997
Resolved
CORRECT SHIELD FOR MASTHEAD LIGHT TO MEET RULES OF THE ROAD REQUIREMENTS.
Lifesaving
Issued 11 April 1997
Resolved
UPDATE FIRE SAFETY PLAN TO REFLECT CURRENT EQUIPMENT STOWAGE LOCATIONS.
Lifesaving
Issued 11 April 1997
Resolved
REPLACE AND DATE ALL BATTERIES FOR WATERLIGHTS.
Electrical
Issued 11 April 1997
Resolved
PROVIDE EXPOSED WIRING PROTECTION FOR ALL CABLES IN THE CAGE AREAS ALONG THE BACK WALLS OF THE CAGES
Electrical
Issued 11 April 1997
Resolved
REPLACE BROKEN/MISSING LIGHT GLOVES ON 4TH DECK AND BOW.
Lifesaving
Issued 11 April 1997
Resolved
INSTALL LOCKING DEVICE FOR ESCAPE HATCH LEADING FROM STBD BRIDGE WING TO REFUGE AREA.
Lifesaving
Issued 11 April 1997
Resolved
REPLACE AND TEST ALL HEAT DETECTOR SENSORS
Lifesaving
Issued 11 April 1997
Resolved
CLEAN THE FOLLOWING AREAS TO REMOVE FIRE HAZARDS: SLOT BASES, BEHIND COOLERS & UNDER/IN CABINETS IN BAR AREAS, ATMS AND ALL EQUIPMENT IN CAGES.
Lifesaving
Issued 11 April 1997
Resolved
CLEAN THE 2ND DECK BAR AREA (UNDER COUNTER) TO REMOVE HEALTH HAZARD.
Lifesaving
Issued 11 April 1997
Resolved
REMOVE PORTABLE HEATER FROM IGB OFFICE.
Lifesaving
Issued 11 April 1997
Resolved
REMOVE WOODEN LADDERS FROM SURVEILLANCE/UPS CLOSET.
Electrical
Issued 11 April 1997
Resolved
REPAIR TELEPHONE WIRE CONDUIT IN HARD COUNT.
Lifesaving
Issued 11 April 1997
Resolved
REMOVE CLEANING CHEMICALS STORED UNDER 2ND DECK BAR TO REMOVE HEALTH/FIRE HAZARD.
Engineering
Issued 12 March 1997
Resolved
MAKE PERMANENT REPAIRS TO PORT GENERATOR ACTUATOR, REPAIRS TO BE APPROVED AND INSPECTED BY CG INSPECTOR PRIOR TO GETTING UNDERWAY.
Engineering
Issued 19 July 1996
Resolved
MAKE PERMANENT REPAIRS TO PORT CLUTCH PACKING, REPAIRS TO BE APPROVED AND INSPECTED BY CG INSPECTOR PRIOR TO GETTING UNDERWAY.
Fire Fighting
Issued 11 April 1996
Resolved
INSTALL AUTOMATIC FIRE DAMPERS ON VENTS IN BOW THRUSTER ROOM (CO2 ACTIVATION).
Engineering
Issued 11 April 1996
Resolved
REPLACE HIGH WATER TEMPERATURE SENSOR FOR STBD MDE.
Lifesaving
Issued 11 April 1996
Resolved
REPLACE MISSING "E" LABELS ON "E" LIGHTS.
Fire Fighting
Issued 11 April 1996
Resolved
INSTALL HEAT ACTUATOR FOR CO2 SYSTEM IN BOW THRUSTER ROOM.
Fire Fighting
Issued 11 April 1996
Resolved
INSTALL A CO2 SYSTEM TO PROTECT THE LIQUOR DISTRIBUTION ANDSTORAGE SPACE INTHE HOLD DECK.
Fire Fighting
Issued 11 April 1996
Resolved
REPLACE HEAT/SMOKE SENSOR IN DETECTOR SYSTEM FOR SSG SPACES AND TEST IN PRESENCE OF CG INSPECTOR.
Electrical
Issued 11 April 1996
Resolved
REPAIR POWER LINE (24V) TO EOC GROWLER (LIGHT/BELL INOP).
Lifesaving
Issued 18 July 1995
Resolved
REMOVE TV ANTENNAE FROM UPPER REFUGE DECK.
Electrical
Issued 18 July 1995
Resolved
REMOVE EXCESS WIRING FROM "BIG HIT" SLOT MACHINE INSTALLATION.
Unknown
Issued 18 July 1995
Resolved
PRIOR TO ADDITIONAL WEIGHT CHANGES, CONDUCT A NEW LIGHTSHIP SURVEY.
Lifesaving
Issued 18 July 1995
Resolved
REPLACE SLIT RING BUOY ON 2ND DECK AFT.
Fire Fighting
Issued 12 April 1995
Resolved
PROPERLY LABEL THE COMBINATION SHUTDOWN BUTTON FOR ENGINEROOM POWER VENTILATION AND THE FUEL OIL SERVICE PUMP.
Electrical
Issued 12 April 1995
Resolved
PROVIDE WIRING DIAGRAMS FOR ALL MOTOR CONTROLS THROUGHOUT VESSEL AS REQUIRED BY 46CFR111.70-(h)(2).
Engineering
Issued 12 April 1995
Resolved
INSTALL A RELOTELY OPERATED (REACH ROD/PULL WIRE) FUEL OIL SHUT-OFF FOR THEBOW THRUSTER ENGINE.
Fire Fighting
Issued 12 April 1995
Resolved
PROVIDE A SIGN BY THE BOW THRUSTER HALON CONTROLS INDICATING THE REQUIREMENT TO SECURE THREE (3) MANUAL FIRE DAMPERS TO BOW THRUSTER SPACE.
Lifesaving
Issued 12 April 1995
Resolved
REPAIR AND PROVE OPERATION OF EMERGENCY TELEPHONE IN PASSENGER ELEVATOR.
Engineering
Issued 12 April 1995
Resolved
REPLACE AND TEST PRESSURE VESSEL (AIR RECEIVERS) RELIEF VALVES.
Fire Fighting
Issued 12 April 1995
Resolved
DISCONNECT HEAT ACUATOR FOR BOW THRUSTER HALON SYSTEM TO RENDER MANUALLY OPERATED DUE TO LACK OF AUTOMATIC FIRE DAMPERS.
Fire Fighting
Issued 12 April 1995
Resolved
INSTALL A REMOTELY OPERATED (REACH ROD/PULL CABLE) MANUAL FIRE DAMPER FOR THE POWER VENTILATION AIR DUCT IN THE BOW THRUSTER ROOM.
Accommodation/Occupational Safety
Issued 12 April 1995
Resolved
CAP DRAIN PIPE FOR OLD ICE MACHINE ON AFT 3RD DECK.
Electrical
Issued 12 April 1995
Resolved
REPLACE PLASTIC WIRE TIES IN 2ND DECK CREW LOCKER ON STBD SIDE.
Fire Fighting
Issued 12 April 1995
Resolved
PROVIDE METAL FIRE STOPS AND REMOVE CARPET UNDER THE 3 FIRE DOORS LEADING INTO THE CREW STAIRTOWER; 1 DOOR LEADING TO THE BREAK ROOM STAIRWAY; AND 1 DOOR LEADING TO THE COAT ROOM HALL WAY.
Lifesaving
Issued 12 April 1995
Resolved
REPLACE STBD RESCUE BOAT WITH ONE SUITABLE FOR CONDUCTING RESCUE OPERATIONSWITH A CREW OF 2 PERSONNEL.
Fire Fighting
Issued 12 April 1995
Resolved
REPLACE PORTABLE FIRE EXTINGUISHER IN STBD RESCUE BOAT AND RELOCATE TO MOREACCESSIBLE LOCATION.
Accommodation/Occupational Safety
Issued 12 April 1995
Resolved
REPLACE INSECT SCREEN FOR POTABLE WATER TANK VENT WITH ONE OF SUITABLE SCREEN SIZE.
Electrical
Issued 12 April 1995
Resolved
REPLACE PLASTIC WIRE TIES IN 4TH DECK CREW LOCKER.
Electrical
Issued 12 April 1995
Resolved
PROVIDE THREE (3) SUITABLE EMERGENCY LIGHTS; ONE (1) EACH IN THE COAT ROOM,COAT ROOM HALL WAY AND THE STBD PONTOON.
Fire Fighting
Issued 12 April 1995
Resolved
CONDUCT ANNUAL SERVICING OF FIRE AND SMOKE DETECTION SYSTEM AND PROVIDE CG WITH COPY OF SERVICING REPORT.
Fire Fighting
Issued 12 April 1995
Resolved
CONDUCT ANNUAL SERVICING OF FIXED FIRE FIGHTING SYSTEMS (3 HALON; 1 ANSEL) AND PROVIDE CG WITH COPY OF SERVICING REPORTS.
Fire Fighting
Issued 12 April 1995
Resolved
CONDUCT ANNUAL SERVICING OF PORTABLE FIRE EXTINGUISHERS AND PROVIDE CG WITHCOPY OF SERVICING REPORTS.
Electrical
Issued 12 April 1995
Resolved
REPLACE STARTING BATTERIES FOR EMERG GENERATOR DUE TO CORRODED CELL CAPS AND EXCESSIVE MOISTURE.
Lifesaving
Issued 12 April 1995
Resolved
REPLACE/REPAIR BROKEN GUSSET LINES ON RING BUOYS.
Electrical
Issued 12 April 1995
Resolved
REPLACE MISSING ELECTRICAL OUTLET COVERS THROUGHOUT VESSEL.
Electrical
Issued 12 April 1995
Resolved
PERMANENTLY MOUNT AND HARD WIRE ALL SURGE PROTECTIONS DEVICES IN USE THROUGHT VESSEL.
Lifesaving
Issued 12 April 1995
Resolved
PROPERLY SECURE COILS OF FIBER OPTIC CABLE THROUGHOUT VESSEL.
Engineering
Issued 25 January 1995
Resolved
DOUBLE CLAMP ALL RUBBER HOSE INSTALLATIONS ON THE BOW THRUSTER ENGINE TO PREVENT LOSS DUE TO VIBRATION.
Fire Fighting
Issued 25 January 1995
Resolved
REPAIR/REPLACE LATCHING MECHANISM FOR FIRE BOUNDARY DOOR LEADING INTO EMPLOYEE STAIR TOWER FROM THE HOLD DECK.
Lifesaving
Issued 25 January 1995
Resolved
POST SIGNS INDICATING THE STORAGE OF ADDITIONAL FIRE FIGHTING EQUIPMENT AS PER THE FIRE SAFETY PLAN.
Lifesaving
Issued 25 January 1995
Resolved
PROVIDE COVERS FOR RESCUE BOATS TO PREVENT SNOW/ICE/RAIN FROM RENDERING BOATS INOPERABLE OR UNUSABLE.
Fire Fighting
Issued 25 January 1995
Resolved
ADD OR REPLACE FIRE STOP MATERIAL TO ALL OUTLETS FROM THE PIPING RUN FOR THE BEVERAGE SERVICE TUBES.
Lifesaving
Issued 25 January 1995
Resolved
DEVELOP EMERGENCY EVACUATION PLAN FOR DOCKSIDE OPERATION & PROVIDE TRAININGTO REQUIRED PERSONNEL AS PER WATCH, QUARTER & STATION BILL.
Lifesaving
Issued 19 October 1994
Resolved
PROVIDE DETAILS DIRECTION AT REMOTE PUMP STATION (LOCATED AT TOP OF STAIRS LEADING TO CREW BREAK ROOM) FOR WATERTIGHT DOORS.
Accommodation/Occupational Safety
Issued 10 August 1994
Resolved
PROVIDE SERVICE LTR FOR ELEVATORS, AND PROVE ELEVATOR WILL RETURN TO MAIN DECK IF POWER IS LOST.
Lifesaving
Issued 10 August 1994
Resolved
INSTALL SIGNS ON VESSEL TO DIRECT PASSENGERS TO THE LIFEBOATS.
Electrical
Issued 10 August 1994
Resolved
LABEL 'E' LIGHTS IN THE CASHIER SPACES AND IN ALL HEADS.
Electrical
Issued 10 August 1994
Resolved
REPAIR 'E' LIGHT IN THE STBD SEWAGE ROOM
Construction/Loadline
Issued 10 August 1994
Resolved
REPAIR WATER TIGHT DOORS TO ENSURE MANUAL PUMPS (REMOTE AND LOCAL) FUNCTIONPROPERLY.
Electrical
Issued 10 August 1994
Resolved
INSTALL A NON-CONDUCTIVE RAIL TO THE MAIN BOARD IN THE GENERATOR ROOM.
Fire Fighting
Issued 13 May 1994
Resolved
REMOVE CARPET FROM UNDER FLOOR FIRE STOPS (FLOOR BARS) FOR ALL FIRE DOORS.
Lifesaving
Issued 13 May 1994
Resolved
REMOVE HYDRO RELEASES FOR INFLATABLE LIFERAFTS AND INSTALL FLOAT FREE DEVICES.
Documentation
Issued 13 May 1994
Resolved
AMEND FIRE SAFETY PLAN TO REFLECT CURRENT LIFESAVING AND FIREFIGHTING EQUIPMENT.
Fire Fighting
Issued 13 May 1994
Resolved
LABEL FIRE EXTINGUISHER STATIONS.
Documentation
Issued 13 May 1994
Resolved
AMEND EMERGENCY ACTION PLAN AND SUBMIT TO [name withheld], MO.
Electrical
Issued 13 May 1994
Resolved
PROVIDE ALL PANEL BOXES WITH CIRCUIT DIRECTORIES.
Documentation
Issued 13 May 1994
Resolved
OBTAIN CORRECTED CERTIFICATE OF DOCUMENTATION.
Fire Fighting
Issued 13 May 1994
Resolved
PROVIDE PLACARD FOR CO2 ALARM IN EMERGENCY GENERATOR SPACE.
Construction/Loadline
Issued 13 May 1994
Resolved
REMOVE PAINT FROM ENGINEROOM WTD KNIFE-EDGES.
Lifesaving
Issued 13 May 1994
Resolved
PLACARD GENERAL ALARM IN AFT STEERING PUMP COMPARTMENT.
Engineering
Issued 13 May 1994
Resolved
LABEL FUEL SHUT-OFF VALVES WITH DIRECTION ARROWS.
Fire Fighting
Issued 13 May 1994
Resolved
RELOCATE CO2 WARNING PLACARD TO VICINITY OF EXIT IN BOW THRUSTER ROOM.
Electrical
Issued 13 May 1994
Resolved
PROVIDE RUBBER MAT FOR BACK OF MAIN SWITCHBOARD.
Navigation
Issued 13 May 1994
Resolved
PROVIDE CHARTS & PUBS, INLAND NAVIGATION RULES AND CFRs.
Fire Fighting
Issued 13 May 1994
Resolved
PROVIDE SPANNER WRENCHES FOR ALL FIRE HOSE STATIONS.
Fire Fighting
Issued 23 April 1994
Resolved
PROPERLY CONFORM TO THE REQUIREMENTS CONTAINED IN 46 CFR 76.10-5 AND 76.10-10 FOR FIREMAINS, HYDRANTS, AND HOSES FOR VESSELS WITH GROSS TONNAGE IN EXCESS OF 1500 TONS.
Documentation
Issued 23 April 1994
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, POST ON BOARD THE VESSEL THE STABILITYLETTER ISSUED BY THE USCG MARINE SAFETY CENTER.
Accommodation/Occupational Safety
Issued 23 April 1994
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, INSTALL THE CENTER RAILINGS FOR ALL INCLINED STAIRWAYS IN EXCESS OF 66 INCHES IN WIDTH.
Accommodation/Occupational Safety
Issued 23 April 1994
Resolved
RENEW THE BROKEN PORT REAR WINDOW IN THE PILOT HOUSE.
Accommodation/Occupational Safety
Issued 23 April 1994
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, INSTALL THE ATRIUM PERIPHERY RAILINGS.
Accommodation/Occupational Safety
Issued 23 April 1994
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, INSTALL AND PROVE OPERATIONAL THE FREIGHT AND PASSENGER ELEVATOR TELEHPONES.
Fire Fighting
Issued 23 April 1994
Resolved
PRIOR TO THE CARRIAGE OF PASSENGERS, COMPLY WITH ANY REVIEW COMMENTS FROM THE USCG MARINE SAFETY CENTER FOR THE RESUBMITTED R. CARTER & ASSOC. DWGS_x001C_ FP1 - FP3, SPRINKLER SYSTEM.
Casualty record · 6
15 November 2003Routine · role: Involved in a Marine Casualty · 1 injured · activity 1950754
26 November 2004Routine · role: Involved in a Marine Casualty · activity 2301327
8 August 2011Routine · role: Involved in a Marine Casualty · activity 4110551
25 March 2013Routine · role: Involved in a Marine Casualty · activity 4605249
28 March 2013Routine · role: Involved in a Marine Casualty · activity 4561725
29 July 2013Routine · role: Involved in a Marine Casualty · activity 4736427
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.