Records from 1996 to 2001. Most recent: inspection, 6 June 2001.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR ELECTRICAL CONDUIT PIPE FOR CARGO LIGHTING BETWEEN HOLDS 7 AND 8. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR FRACTURE ON #6 CARGO HOLD HATCH COAMING, STARBOARD SIDE, FORWARD BRACKET. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR #5 HOLD VENT, VENT IS FROZEN OPEN AND HOLED/WASTED AT DECK. PROVIDECLASS REPORT AUTHORIZING MAIN DECK DOUBLER IN WAY OF VENT CONNECTION. PRIOR TO DEPARTURE. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Construction/Loadline
Issued 6 June 2001
No resolution recorded
REPAIR WASTED GASKET CHANNELS ON VARIOUS CARGO HATCHES. TO THE SATISFACTION OF CLASS, WITHIN 30 DAYS. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 6 July 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR #1 CARGO HOLD HATCH COAMING, FRACTURED STARBOARD SIDE FORWARD. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Fire Fighting
Issued 6 June 2001
Resolved
PROVIDE ACCEPTABLE FIREFIGHTING TENDING LINE BELT THAT FITS AT WAIST LEVEL.PRIOR TO DEPARTURE. SOLAS 74 CH 1/11 SOLAS 74 III/19
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Fire Fighting
Issued 6 June 2001
No resolution recorded
UPDATE FIRE CONTROL PLANS WITH REQUIRED IMO SYMBOLS. WITHIN 30 DAYS. SOLAS 74 AMENDED II-2/2
Condition: Unknown
Due 6 July 2001 — due date passed with no resolution recorded
Fire Fighting
Issued 6 June 2001
Resolved
CONDUCT PROPER FIRE DRILL. TO THE SATISFACTION OF COAST GUARD, PRIOR TO DEPARTURE. SOLAS 74 AMENDED XI/4
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Lifesaving
Issued 6 June 2001
Resolved
REPAIR EMERGENCY EMBARKATION LIGHTS FOR LIFEBOAT DECK. PRIOR TO DEPARTURE.SOLAS 74 CH1/11 SOLAS 74 III/19
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Accommodation/Occupational Safety
Issued 6 June 2001
Resolved
REMOVE INSECTICIDES FROM HOSPITAL AND STORE IN APPROPRIATE AREA. PRIOR TO DEPARTURE. ILO 147
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Lifesaving
Issued 6 June 2001
No resolution recorded
POST PLACARDS THROUGHOUT ACCOMODATION FOR DIRECTIONS TO LIFEBOATS. WITHIN 30 DAY.
Condition: Unknown
Due 6 July 2001 — due date passed with no resolution recorded
Accommodation/Occupational Safety
Issued 6 June 2001
Resolved
PROVIDE EMERGENCY DOOR RELEASE FOR GALLEY FREEZER. PRIOR TO DEPARTURE. ILO 147
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Fire Fighting
Issued 6 June 2001
Resolved
REMOVE STRING HOLDING FIRE EXTINGUISHER IN PAINT LOCKER AND PROVIDE APPROPRIATE HOLDING BRACKET. WITHIN 30 DAYS. SOLAS 74 AMENDED II-1/21
Condition: Unknown
Due 6 July 2001
Resolved 22 June 2001
Engineering
Issued 6 June 2001
No resolution recorded
INSTALL PUMP SHAFT GUARDS ON ALL SERVICE PUMPS ABOVE THE DECK PLATES IN THEENGINE ROOM. WITHIN 30 DAYS. SOLAS 74 AMENDED II-1/26 ILO 147
Condition: Unknown
Due 6 July 2001 — due date passed with no resolution recorded
Documentation
Issued 6 June 2001
Resolved
COMPANY HAS FAILED TO IMPLEMEMT A SAFETY MANAGEMENT SYSTEM ONBOARD THE VESSEL. CONDUCT EXTERNAL ISM AUDIT WITHIN 72 HOURS WITH CLASS AND COAST GUARD.
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR WASTED/ MISSING ACCESS TRUNK HATCH HINGE PINS OF CARGO HOLD #2. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR FRACTURE IN #5 CARGO HOLD HATCH COAMING BRACKET, PORT SIDE FORWARD. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Fire Fighting
Issued 6 June 2001
Resolved
REPAIR HOLE IN FIRE MAIN PIPE BETWEEN HOLDS 3 AND 4. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 II-2/21
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR FRACTURE IN #4 CARGO HATCH COAMING BRACKET, STARBOARD SIDE FORWARD. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Construction/Loadline
Issued 6 June 2001
Resolved
REPAIR WASTED/ HOLED AREA IN #6 CARGO HOLD HATCH COVER, PORT SIDE. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
CARGO HOLD #6 VENT HOOD FROZEN OPEN. REPAIR TO SATISFACTION OF CLASS, PRIOR TO DEPARTURE. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR FRACTURE IN #3 CARGO HOLD HATCH COAMING BRACKET, STARBOARD SIDE FORWARD. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR #3 HOLD VENT, WASTED AND HOLED AT DECK CONNECTION. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR #2 HOLD HATCH COAMING BRACKET, FRACTURE ON STARBOARD SIDE FORWARD. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Electrical
Issued 6 June 2001
Resolved
REPAIR VARIOUS CARGO DECK LIGHT ELECTRICAL JUNCTION BOX MOUNTS.(HANGING FROM WIRE) TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 7/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Construction/Loadline
Issued 6 June 2001
Resolved
REPAIR INOPERATIVE VENT MOTOR FOR FOREPEAK VENT FAN. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR HYDRAULIC OIL LEAK FROM CARGO HATCH CONTROLS BETWEEN #4 AND #5 CARGOHOLDS.(PLASTIC BAG CATCHING OIL) TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR LEAKING HYDRAULIC HOSE ON #8 CARGO HOLD AFT SECURING MECHANISM. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Fire Fighting
Issued 6 June 2001
Resolved
REPAIR WASTED/ HOLED FIRE MAIN PIPE TO CLEANING GUN BETWEEN CARGO HOLDS 8 AND 9. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH II- 2/21
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Construction/Loadline
Issued 6 June 2001
Resolved
REPAIR WASTED FILL PIPE FOR CYLINDER OIL HOLDING TANK, AFT MAIN DECK. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. SOLAS 74 CH 1/11
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Fire Fighting
Issued 6 June 2001
Resolved
UPDATE STARBOARD GANGWAY FIRE CONTROL PLAN WITH CURRENT NAME OF SHIP. WITHIN 30 DAYS. SOLAS 74 AMENDED II-2/2
Condition: Unknown
Due 6 July 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
No resolution recorded
REPAIR WASTED WINCH DRUM STARBOARD DAVIT. TO THE SATISFACTION OF CLASS, WITHIN 30 DAYS. SOLAS 74 III 19.2
Condition: Unknown
Due 6 July 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR WASTED/ HOLED VENT HOOD FOR #1 CARGO HOLD. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Deck/Cargo
Issued 6 June 2001
Resolved
REPAIR WASTED #4 CARGO HOLD HATCH VENT, MAKE WATERTIGHT. TO THE SATISFACTION OF CLASS, PRIOR TO DEPARTURE. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 7 June 2001
Resolved 22 June 2001
Construction/Loadline
Issued 6 June 2001
Resolved
REPAIR VARIOUS WASTED PIPE PASS-OVERS AND CATWALKS. TO THE SATISFACTION OFCLASS, WITHIN 30 DAYS. ILLC 66 ANNEX 1/15
Condition: Unknown
Due 6 July 2001
Resolved 22 June 2001
Fire Fighting
Issued 12 August 1997
Resolved
#2 FIRE AND BILGE PUMP INOPERATIVE. VESSEL IS REQUIRED TO HAVE CLASS SOCIETY INSPECT AND DELIVER REPORT TO USCG PRIOR TO DEPARTURE.
Condition: Unknown
Due 12 August 1997
Resolved 12 August 1997
Lifesaving
Issued 12 August 1997
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 12 August 1997
Resolved 12 August 1997
Fire Fighting
Issued 12 August 1997
Resolved
FIRE MAIN ON FORWARD DECK LEAKING. VESSEL IS REQUIRED TO REPAIR LEAK PRIORTO DEPARTURE.
Condition: Unknown
Due 12 August 1997
Resolved 12 August 1997