Records from 2016 to 2017. Most recent: inspection, 10 May 2017.
Inspection history · 4
10 May 2017
Ballast Water Examination · COC-CHEM & TVE Annual · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6141806
20 April 2017
ISPS II Exam · Joint Vessel Security Verification (Massena only) · Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 6132916
4 April 2017
Deficiency Check · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6113021
11 May 2016
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5869928
Operations/Management › Ballast Water Managment › Ballast Water Discharge
Issued 10 May 2017
No resolution recorded
9900 - Other (not clearly hazardous) - Must employ one of the following ballast water methods listed in 33 CFR 151.2035. The vessel's implementation date, iaw table 33 CFR 151.2035(b) has expired.The vessel is prohibited from discharging ballast water in U.S. waters unless such ballast was received from a U.S. public water system. 33 CFR 151.2025 c
Condition: Invalid
Action required: 705 - Other - as specified
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 10 May 2017
No resolution recorded
1999 - Other (MARPOL Annex II) - the list of authorites or persons to be contacted in the event of a noxious liquid substance pollution incident. Vessel did not have the most up to date contact list. MARPOL Annex II/17.2.2 c
Condition: Invalid
Action required: 705 - Other - as specified
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 11 May 2016
Resolved
1830 - PSCO observed in the cargo control room that 1 high level alarm (8S) and 3 overfill alarms (3C, 8S, and Slop Tank) were improperly alarming. 46 CFR 39.2007(a). Prior to loading cargo requiring high level overfill devices.
Action required: 705 - Other - as specified
Due 11 May 2016
Resolved 7 June 2016
Resolution: Received class report from DNV-GL rectifying deficiency.
Documentation › Certificates/Documents › IOPP Certificate
Issued 11 May 2016
Resolved
0150 - PSCO observed that the IOPP listed the vessel's oily water separator content meter as meeting resolution A.393(X). The actual onboard oil content meter meets the requirements of resolution MEPC.107(49). MARPOL I/7.1. 16a.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 7 June 2016
Resolution: Received class report from DNV-GL rectifying deficiency.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 11 May 2016
Resolved
1705 - PSCO observed on the vessel's monthly inventory checks that the SMPEP's spill equipment inventory list and its minimum equipment requirements were not being met and that the prescribed inventory template as shown in the SMPEP was not being used to conduct the monthly inventory checks. MARPOL I/37.3. 16a.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 7 June 2016
Resolution: Received class report from DNV-GL rectifying deficiency.
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 11 May 2016
Resolved
1830 - PSCO observed that both the "High-level Alarm" and "TANK OVERFILL ALARM" legends were painted with red letters and gray backgrounds. 46 CFR 39.2007. 16c.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 12 May 2016
Resolution: Received proper documentation from vessel's captain stating that this deficiency has been rectified. The proper documentation was a photograph showing that the "High-level Alarm" and "TANK OVERFILL ALARM" legends were properly painted.
Deck/Cargo › Cargo Stowage › General
Issued 11 May 2016
Resolved
1999 - PSCO observed multiple sample bottles falling onto the deck upon opening the door. MARPOL I/31.1. 16.a.
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 7 June 2016
Resolution: Received class report from DNV-GL rectifying deficiency.
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 11 May 2016
Resolved
1720 - PSCO observed that the vessel's ODME was not functioning as per the manufacturer's instructions. Crew was unable to demonstrate testing of the ODME. MARPOL I/31.3. 50a.
Action required: 705 - Other - as specified
Due 10 June 2016
Resolved 7 June 2016
Resolution: Received class report from DNV-GL rectifying deficiency.