Records from 1994 to 2026. Most recent: inspection, 16 April 2026.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 April 2026
Resolved
Vessels on a coastwise route must have interconnected fire detection; the smoke detector in the passenger accommodation space is not functioning properly.
46 CFR 181.405
Action required: 10 - Deficiency Rectified
Resolved 16 April 2026
Resolution: Two smoke detectors were replaced prior to the completion of the inspection.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 16 April 2026
Resolved
Each vessel must have a first aid kit with the proper contents IAW ISO 18813; the existing kit is missing some items and other items are expired.
Action required: 10 - Deficiency Rectified
Resolved 16 April 2026
Resolution: Missing and expired contents were replaced prior to the completion of the inspection.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 16 April 2026
Resolved
The vessel must be equipped with an alcohol testing device; the alcohol swabs are expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2026
Resolved 1 May 2026
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 9 June 2025
Resolved
Each life float shall have a waterlight attached around the body of the life float by a 3/8 inch lanyard, resistant to deterioration from ultraviolet light, and at least 18 feet in length. The lights were not attached to the floats as required.
(46 CFR 180.175)
Action required: 10 - Deficiency Rectified
Resolved 9 June 2025
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 9 June 2025
Resolved
The life float painter must be attached to the painter connection or around the body of the device. The painter was not properly attached as required.
(46 CFR 180.137)
Action required: 10 - Deficiency Rectified
Resolved 9 June 2025
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 9 June 2025
Resolved
An interconnected detection and alarm system must consist of multiple-station smoke detectors listed by an NRTL, or independent laboratory as meeting UL 217. The detectors were not operational due to missing batteries.
Action required: 10 - Deficiency Rectified
Resolved 9 June 2025
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 9 June 2025
Resolved
A vessel on a limited coastwise route must carry six hand red flare distress signals and six hand orange smoke distress signals; hand red flare distress signal may be substituted for the hand orange smoke distress signals. The vessel is missing (4) distress signals.
(46 CFR 180.68)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 June 2025
Resolution: Received objective evidence in the form of an invoice.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 June 2025
Resolved
The vessel must provide a minimum of (9) child size life jackets or such greater number as necessary to provide a life jacket for each person that is smaller than the lower size limit of the adult life jacket. The vessel does not have the required number of child life jackets and is restricted to the carriage of (4) children.
(46 CFR 180.71)
Action required: 705 - Other - as specified
Resolved 10 June 2025
Resolution: Received objective evidence in the form of an invoice.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 June 2025
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the Inland Navigation Rules. The mast head light is not operational, the vessel is restricted to day time operations.
(46 CFR 183.420)
Action required: 705 - Other - as specified
Resolved 28 July 2025
Resolution: New wire run installed.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 9 June 2025
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) (ISO 18813) or a kit with equivalent contents and instructions. The existing kit does not have the proper inventory and some items are expired.
(46 CFR 184.710)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2025
Resolved 10 June 2025
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 June 2025
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. The vessel is missing (1) light and the other light does not work.
(46 CFR 183.430)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2025
Resolved 21 July 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 June 2025
Resolved
Flexible hose must be fabricated with an inner tube and a cover of synthetic rubber or other suitable material reinforced with wire braid. The fuel return hose going to the fuel oil cooler on the starboard main engine is deteriorated and the outer cover is compromised.
(46 CFR 182.720)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2025
Resolved 21 July 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 9 June 2025
Resolved
A hatch cover must have securing devices; and be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. The hatch cover to the lazarette does not have a securing devise.
(46 CFR 179.360)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 June 2025
Resolved 21 July 2025
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 June 2025
Resolved
When operating a vessel on a body of water where the discharge of untreated sewage is prohibited by the Environmental Protection Agency the operator must secure each Type III device in a manner which prevents discharge of untreated sewage. Acceptable methods of securing the device include—(1) Closing the seacock and removing the handle;(2) Padlocking the seacock in the closed position;(3) Using a non-releasable wire-tie to hold the seacock in the closed position; or(4) Locking the door to the space enclosing the toilets with a padlock or door handle key lock. The sewage tank seacock was found to be unlocked and open.
(33 CFR 159.7)
Action required: 10 - Deficiency Rectified
Resolved 9 June 2025
09 - Working and Living Conditions › 092 - Working Conditions › Personal equipment
Issued 13 May 2024
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew; vessel’s analgesic medication is expired.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2024
Resolved 2 July 2024
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 13 May 2024
Resolved
Vessel’s alcohol test strips are expired.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2024
Resolved 2 July 2024
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 13 May 2024
Resolved
Vessel must have onboard updated Tide Tables for the are of operation; tide table is not onboard.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2024
Resolved 2 July 2024
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 27 February 2024
Resolved
REMOVE AFT DECK IWO LAZARETTE FOR INSPECTION OF STRINGERS BEFORE REPLACEMENT IN KIND.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 March 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 July 2023
Resolved
An adult life jacket must be provided for each person carried on board a vessel; Vessel is limited to the carriage of 83 Adult passengers until 17 Adult life jackets are replaced.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 August 2023
Resolved 25 July 2023
Resolution: Owner purchased 17 new PFD's and p[laced onboard
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 7 July 2023
Resolved
Each survival craft onboard a vessel must be in good working order; vessel's 04 life floats are in need of reconditioning during next drydock in Feb 24.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2024
Resolved 2 July 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 July 2023
Resolved
All engine exhaust pipes must be water cooled; vessel's port engine exhaust was leaking water into lazarette due to loose hose clamps.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 7 July 2023
Resolved 7 July 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 May 2022
Resolved
Each ring lifeboat on a vessel must be approved IAW 160.050; vessel’s life ring has deteriorated retro tape.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 10 June 2022
Resolution: Retro was renewed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 May 2022
Resolved
Fuses must be of the cartridge type only and listed by UL; Two blade type fuses were noted under the console in the pilot house.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 10 June 2022
Resolution: Replaced fuses w/ catridge type
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 10 May 2022
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operations; visual alarm is not operational in pilot house
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 10 June 2022
Resolution: Audible and visual alarms verified
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 May 2022
Resolved
A vessel must have navigation lights that are in compliance w/ the International and Inland Navigations Rules; vessel’s anchor light is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 10 June 2022
Resolution: Nav lights are operational
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 10 May 2022
Resolved
Each vessel must be equipped w/ at least two portable lights; vessel does not have portable lights in pilot house or ER as required.
Condition: Unknown
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 10 June 2022
Resolution: Flashlights were procured and added to pilot house and ER
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 May 2022
Resolved
A life jacket must be provided for all persons onboard; vessel is restricted to the carriage of 84 adult pax.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2022
Resolved 10 June 2022
Resolution: Lifejackets were procured and placed onboard
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 April 2021
Resolved
An adult lifejacket must be provided for each person carried on board a vessel; 05 lifejackets were noted in disrepair. Vessel's pax count will be reduced to 80 adults until lifejackets are replaced.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 May 2021
Resolved 26 April 2021
Resolution: Received email w/ photographs of new lifejackets.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 29 July 2020
Resolved
Each vessel that operates on the high seas must have an
EPIRB installed to automatically float free and operate;
the existing EPIRB is not operational and was
transmitting signal at the time of inspection.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 30 July 2020
Resolved 30 July 2020
Resolution: Company replaced EPIRB w/ new unit. ID number is 2DCC9FF658FFBFF
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 July 2020
Resolved
An adult life jacket must be provided for each person carried on board a vessel; Vessel had 29 Life jackets in a non-serviceable condition. Vessel is restricted to 65
total persons.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2020
Resolved 24 August 2020
Resolution: Company Purchased new lifejackets to replace old ones
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 July 2020
Resolved
Each life jacket carried on a vessel on a coastwise
route must have a light attached; a number of lights
were not operational.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2020
Resolved 24 August 2020
Resolution: Company purchased new lifejacket lights
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 29 July 2020
Resolved
Each life float and buoyant apparatus must be stowed as required under this section; The strength of the float-free link and the strength of the painter under §180.175(f)(3)(ii) must be determined by the combined capacity of the group of life floats and buoyant apparatus; Vessel's Float Free links are not rated for the two sets of 22 person life floats installed.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2020
Resolved 24 August 2020
Resolution: Company purchased and insatalled new weak links
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 29 July 2020
Resolved
The name of the vessel and capacity must be marked or painted in clearly legible letter and numbers on each
life float; the existing marking are faded.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2020
Resolved 24 August 2020
Resolution: Vessel's name was stenciled on lifefloats
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 29 July 2020
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions; instructions were not available.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 August 2020
Resolved 24 August 2020
Resolution: Master printed and mounted instructions
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 24 July 2020
Resolved
An inspection for renewal of a COI is conducted to determine if the vessel is in satisfactory condition, fit for the service intended, and complies with the applicable regulations; the port rudder tube base plate is cracked where it is mounted to the hull allowing the ingress of water.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 July 2020
Resolution: Both rudder port assemblies were replaced and operational test was conducted sat.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 24 July 2020
Resolved
All vessels must have navigations light in compliance with the Inland Navigation Rules; the vessels side lights are not operational.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 July 2020
Resolution: All Navigation Lights were tested sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 24 July 2020
Resolved
Each vessel subject to the Communications Act must have an inspection of the radio installation by an FCC Technician and have issued a FCC Safety Radio Certificate; the existing certificate is expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 August 2020
Resolution: Vessel has onboard proper certificates
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 February 2020
Resolved
The pipe nipple from the sea valve to the flex hose for the generator cooling water is wasted. Replace nipple.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 August 2020
Resolution: Generator is no longer in use and valve is closed.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 17 February 2020
Resolved
The metallic flashing for the boundary between the machinery and accommodation space is corroded. Replace with acceptable metal.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 August 2020
Resolution: Metal has been renewed
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 May 2019
Resolved
4 child and 7 adult lifejackets were taken out of service due to unserviceability, passenger count reduced to 90 adults and 6 children.
Action required: 705 - Other - as specified
Resolved 31 May 2019
Resolution: The required number of serviceable lifejackets have been placed onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 16 May 2019
Resolved
The port upper lifefloat sea painter eye is dry rotted. Place a 3/8" UV resistant line around the body of float and reattach painter line.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 July 2019
Resolution: Deficiency properly corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 May 2019
Resolved
Where clamps are permitted for flexible hose they shall not rely on spring tension. Replace spring tension clips on generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 31 May 2019
Resolution: Clamps have been properly replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 16 May 2019
Resolved
Batteries for float lights must be changed annually IAW manufacturers instructions. The 4 float light batteries have not been changed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 31 May 2019
Resolution: All batteries have been replaced and dated.
Communications › Radio Communications › Radiotelephone Transceiver (2-4 MHz)
Issued 2 May 2018
Resolved
Prove proper operation or replace SSB radio. As an alternative a equivalence from the FCC for a sat phone can be obtained.
Vessel restricted to 20 miles
Action required: 705 - Other - as specified
Resolved 11 July 2018
Resolution: Owner has elected to reduce route to Coastwise
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 2 May 2018
Resolved
Replace 10 adult and 3 child type I PFD's. PFD's are no longer serviceable. Ensure vsl name is marked on replacement and light attached.
Passenger count reduced to 87 adults and 7 children.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: New lifejackets placed on the vessel, all jackets properly marked with lights.
Communications › Radio Communications › EPIRB
Issued 2 May 2018
Resolved
Replace hydrostatic release on EPIRB.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: New hydrostatic release installed.
Lifesaving › Lifefloat › Painter
Issued 2 May 2018
Resolved
Reweld guide rings for both life float paiter coils.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: Both painter coils were replaced new to include new line.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 May 2018
Resolved
Replace items in first aid kit as indicated on provided inventory.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: First aid kit brought up to required standard.
Electrical › Electric Supply System (service) › Battery Installation
Issued 2 May 2018
Resolved
Replace wing nuts on boattery under console with standard nuts.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: Wing nuts removed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 May 2018
Resolved
Replace speaker wire under console that is being used as power wire. Use UL marine cable.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: Wire replaced with UL boat cable.
Engineering › Fuel Oil Service System › Filter
Issued 2 May 2018
Resolved
Remove plastic petcock on generator fuel filter. Install plug, 1/4 turn valve, or approved petcock.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: Plastic petcock removed and metalic plug in place.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 May 2018
Resolved
Properly terminate dead end wires on engine room.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 14 May 2018
Resolution: Wires have been removed at the source.
Engineering › Lubricating Oil Service System › Hose
Issued 2 May 2018
Resolved
Provide documentation for newly replaced petroleum hose in engine room. Hose must meet SAE J-1942.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 11 July 2018
Resolution: Documentation provided that shows hose is SAE J1942
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 2 May 2018
Resolved
Renew Certificate of Documentation.
Action required: 705 - Other - as specified
Due 9 May 2018
Resolved 2 May 2018
Resolution: POC contacted NVDC and verified that COD has been renewed. Electronic copy sent to O/O.
Electrical › Electric Supply System (service) › Cable
Issued 23 February 2017
Resolved
Properly terminate four dead end wires under the bridge console.
Due 9 March 2017
Resolved 17 March 2017
Electrical › Electric Supply System (service) › Battery Conductor
Issued 23 February 2017
Resolved
Remove excess conductors from the battery and install a bus bar.
Due 9 March 2017
Resolved 17 March 2017
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 February 2017
Resolved
Replace the port and stbd navigation lights due to faded lenses.
Due 9 March 2017
Resolved 17 March 2017
Lifesaving › Lifefloat › Lifeline
Issued 23 February 2017
Resolved
Replace the life line on the top port life float due to deterioration.
Due 9 March 2017
Resolved 17 March 2017
Lifesaving › Lifefloat › Painter
Issued 23 February 2017
Resolved
Replace the painter on the bottom port life float due to deterioration.
Due 9 March 2017
Resolved 17 March 2017
Lifesaving › Lifefloat › Platform
Issued 23 February 2017
Resolved
Replace the platform retaining line on the top stbd life float due to deterioration.
Due 9 March 2017
Resolved 17 March 2017
Navigation › Piloting/Steering › Notices to Navigation
Issued 19 April 2016
Resolved
Provide the vessel with the Notice to Mariners.
Due 2 May 2016
Resolved 2 May 2016
Navigation › Piloting/Steering › Marine Charts
Issued 19 April 2016
Resolved
Provide the vessel with a current chart.
Due 2 May 2016
Resolved 2 May 2016
Electrical › Lighting (service) › Lighting Fixture
Issued 19 April 2016
Resolved
Replace the missing globe on the light fixture in the lazarette.
Due 2 May 2016
Resolved 2 May 2016
Communications › Radio Communications › VHF Radiotelephone
Issued 19 April 2016
Resolved
Bring the vessel into compliance with the FCC regulations regarding the requirement for a Class "A" DSC capable VHF radio or apply the an exemption through the FCC as discussed.
Due 19 October 2016
Resolved 23 February 2017
Resolution: VHF radio tested for DSC capability.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 March 2014
Resolved
Repair broken hand rail on bow pulpit
Action required: 705 - Other - as specified
Due 10 April 2014
Resolved 19 March 2014
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 March 2014
Resolved
Secure passenger access to bow pulpit with chain
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 March 2014
Engineering › Fuel Oil Service System › Piping
Issued 17 March 2014
Resolved
Prove proper operation of port main fuel return piping system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 March 2014
Engineering › Steering Gear System › Piping
Issued 17 March 2014
Resolved
Prove proper operation of capstan hydraulic system
Action required: 705 - Other - as specified
Due 10 April 2014
Resolved 19 March 2014
Construction/Loadline › Hull › Weld
Issued 19 March 2010
Resolved
Several welds in the bow pulpit railing area needed to be redone.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 1 April 2010
Resolution: all welds were fixed
Construction/Loadline › Hull › Weld
Issued 19 March 2010
Resolved
Several bolt holes in the forward bulkhead need to be filled in from the inside.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 1 April 2010
Resolution: All holes were filled and glassed over
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 19 March 2010
Resolved
There was rotten wood located in the anchor locker that needs to be replaced.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 1 April 2010
Resolution: rotten wood was replaced
Electrical › Electric Supply System (service) › Cable
Issued 19 March 2010
Resolved
Some dead end wiring was located in the forward hold area that needs to removed or placed in a junction box.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 1 April 2010
Resolution: electric cables taken out
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 19 March 2010
Resolved
The cutless bearing on the starboard shaft needs to be replaced.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 20 March 2010
Resolution: [name withheld] preformed a deficiencies check and found that the cutless bearing had been replaced and was in working order.
Construction/Loadline › Hull › Bracket
Issued 19 March 2010
Resolved
Rotten wood located in the lazarette area that needs to be replaced.
Action required: 705 - Other - as specified
Due 2 April 2010
Resolved 1 April 2010
Resolution: Replaced rotten wood
Lifesaving › Hand Flares › Not on Board
Issued 19 May 2008
Resolved
Missing three orange day flares and two night flares.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2008
Resolved 19 May 2008
Resolution: Sighted receipt for flares.
Lifesaving › Buoyant Apparatus › Serviceable
Issued 19 May 2008
Resolved
Repair cracks in #1 life float
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2008
Resolved 19 May 2008
Resolution: Sighted repairs to #1 life float coating.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 19 May 2008
Resolved
Place two adulat PFD's onboard, until new PFD's are onbaord reduce passenger capacity by two persons.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2008
Resolved 19 May 2008
Resolution: Sighted receipt for new PFD''s.
Lifesaving › Lifefloat › Serviceable
Issued 19 May 2008
Resolved
Replace battery on float light for #4 life float.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2008
Resolved 19 May 2008
Resolution: Sighted receipt for battery.
Lifesaving › Lifefloat › Pendant
Issued 8 June 2007
Resolved
Replace dry-rotted pendants on #1,3,4 marked lifefloats.
Condition: Improper/Lack of Maintenance
Due 12 July 2007
Resolved 3 July 2007
Resolution: All pendants replaced on #1,3,4 lifefloats.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 8 June 2007
Resolved
Replace expired 07 lights on adult lifejackets.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 July 2007
Resolved 3 July 2007
Resolution: 07 SOLAS approved battery operated lights attached on marked lifejackets.
Lifesaving › Lifefloat › Serviceable
Issued 8 June 2007
Resolved
Repair surface cracks on lifefloats marked #1 and #4.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 July 2007
Resolved 3 July 2007
Resolution: Observed satisfactory repairs on #1 and #4 lifefloats.
Fire Fighting › Fire Hoses › Connections
Issued 8 June 2007
Resolved
Provide corrosion resistant connections and nozzles on both fire hoses.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 July 2007
Resolved 3 July 2007
Resolution: Two brass 3/4 in. connections and nozzles installed and tested.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 8 June 2007
Resolved
Make permanent repairs to removable handrails on both port and stbd sides.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 July 2007
Resolved 3 July 2007
Resolution: Observed permanent repairs on port and stbd removable handrails.
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 8 March 2007
Resolved
Prove proper operation of port side life raft strobe light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 March 2007
Resolution: Replaced bulb.
Construction/Loadline › Hull › Hull Plating
Issued 8 March 2007
Resolved
Ensure sufficient repair of port side hull crack.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 March 2007
Resolution: Repaired crack.
Engineering › Shafting/Propeller Arrangements › Thrust Shaft
Issued 8 March 2007
Resolved
Provide locking nut for steering ram shaft eye bolt.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 March 2007
Resolution: Installed locking nut.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 27 April 2006
Resolved
Four lights on PFD's not working. Lights wre replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 June 2006
Resolved 1 May 2006
Resolution: Lights were replaced.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 27 April 2006
Resolved
Two lifejackets not marked with vessel name.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 June 2006
Resolved 1 May 2006
Resolution: Crew labeled lifejackets.
Engineering › Bilge Water Management System › Pump
Issued 27 April 2006
Resolved
Wiring for bilge pump in engine room installed with but connectors and not in junction box.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 June 2006
Resolved 31 May 2006
Lifesaving › Lifebuoys › Immediately Available
Issued 27 April 2006
Resolved
Missing retro tape and lines were dry rotted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 June 2006
Resolved 31 May 2006
Operations/Management › Equipment Service/Testing
Issued 7 April 2004
Resolved
SHOW PROOF OF EPIRB REGISTRATION WITH NOAA. LEGACY COMPONENT DESC: EPIRB
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 May 2004
Resolved 7 April 2004
Resolution: REC''D FAX FM NOAA SHOWING PROPER REGISTRATION AND STATING NEW DECAL ON IT''S WAY TO THE OWNER.
Documentation › Certificates/Documents
Issued 27 August 2003
Resolved
Provide and post FCC Radio Safety Telephony Certificate. LEGACY COMPONENT DESC: FCC SSL
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Documentation › Certificates/Documents
Issued 27 August 2003
Resolved
Provide and post Stability Letter. LEGACY COMPONENT DESC: Stability Letter
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Operations/Management › Lifesaving
Issued 27 August 2003
Resolved
Provide CPR cards. LEGACY COMPONENT DESC: CPR card
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Documentation › Certificates/Documents
Issued 27 August 2003
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Documentation › Logs/Records › Garbage Recordkeeping
Issued 27 August 2003
Resolved
Provide waste management plan.
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Operations/Management › Drills/Instruction › Fire
Issued 27 August 2003
Resolved
Show proof of logged training and drills.
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Documentation › Logs/Records › Logbook (official)
Issued 27 August 2003
Resolved
Provide bridge log.
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Navigation › Piloting/Steering › Coast Guard Light List
Issued 27 August 2003
Resolved
Provide light list and coast pilot.
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Lifesaving › Hand Flares › Quantity
Issued 27 August 2003
Resolved
Provide 1 red and 1 orange flare.
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Lifesaving › Lifejacket/PFD (General)
Issued 27 August 2003
Resolved
Provide and post PFD donning placard. LEGACY COMPONENT DESC: donning placard
Due 10 September 2003
Resolved 10 September 2003
Electrical › Electric Supply System (service) › Cable
Issued 27 August 2003
Resolved
Properly wire or remove range hood.
Condition: Placed in Improper Service
Due 10 September 2003
Resolved 10 September 2003
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 27 August 2003
Resolved
Provide CG approved first aid kit.
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Fire Fighting › Nozzles › Number
Issued 27 August 2003
Resolved
Provide metal nozzle for fire hose.
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Engineering › Bilge Water Management System › Pump
Issued 27 August 2003
Resolved
Prove proper operation of all bilge pumps and suction lines.
Condition: Placed in Improper Service
Due 10 September 2003
Resolved 10 September 2003
Electrical › Lighting (service)
Issued 27 August 2003
Resolved
Renew missing/broken globes serving light fixtures below deck in compts 2 and 5. LEGACY COMPONENT DESC: globes
Condition: Unknown
Due 10 September 2003
Resolved 10 September 2003
Engineering › Thrusters › Gland
Issued 27 August 2003
Resolved
Tighten packing gland nut on stbd rudder shaft.
Condition: Improper/Lack of Maintenance
Due 10 September 2003
Resolved 10 September 2003
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 27 August 2003
Resolved
Renew fuel tank vent hose and screen.
Condition: Improper/Lack of Maintenance
Due 10 September 2003
Resolved 10 September 2003
Deck/Cargo › Mooring/Anchoring
Issued 27 August 2003
Resolved
Prove proper operation of windlass. LEGACY COMPONENT DESC: Winch
Condition: Improper/Lack of Maintenance
Due 10 September 2003
Resolved 27 October 2003
Construction/Loadline › Structures
Issued 22 July 2003
Resolved
Make permanent repairs to cracked FRP on forward side of pilothouse in way of seating. LEGACY COMPONENT DESC: Superstructure
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 August 2003
Resolved 10 September 2003
Personnel › Certificates/Documents/Licenses
Issued 14 August 2002
Resolved
Renew operator's license prior to carrying passengers for hire.
Action required: 705 - Other - as specified
Due 21 August 2002
Resolved 21 August 2002
Engineering › Bilge Water Management System
Issued 14 August 2002
Resolved
Repair float switch for automatic bilge pump in #2 void.
Action required: 705 - Other - as specified
Due 21 August 2002
Resolved 21 August 2002
Engineering › Bilge Water Management System
Issued 14 August 2002
Resolved
Repair float switch and high level bilge alarm in lazarette.
Action required: 705 - Other - as specified
Due 21 August 2002
Resolved 21 August 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 14 August 2002
Resolved
Reinstall guards on main and auxiliary engines.
Action required: 705 - Other - as specified
Due 21 August 2002
Resolved 21 August 2002
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 14 August 2002
Resolved
Weigh fixed halon fire fighting extinguishing system for engine room.
Action required: 705 - Other - as specified
Due 21 August 2002
Resolved 21 August 2002
Engineering
Issued 17 May 2001
Resolved
Provide machinery guards around port and starboard shafts where exposed.
Condition: Unknown
Due 17 May 2001
Resolved 17 May 2001
Construction/Loadline
Issued 17 May 2001
Resolved
Prove proper operation of bilge high water alarm in tank room.
Condition: Unknown
Due 25 May 2001
Resolved 27 June 2001
Lifesaving
Issued 17 May 2001
Resolved
Provide an additional weak link for life floats so that no more than four (4) will be attached to each individual weak link.
Condition: Unknown
Due 25 May 2001
Resolved 27 June 2001
Navigation
Issued 17 May 2001
Resolved
Provide a recently calculated magnetic compass deviation table.
Condition: Unknown
Due 1 June 2001
Resolved 17 May 2001
Construction/Loadline
Issued 25 April 2001
Resolved
PRIOR TO CARRYING PASSENGERS, properly install bilge high level water alarmin after lazarette.
Condition: Unknown
Due 25 April 2001
Resolved 25 April 2001
Lifesaving
Issued 25 April 2001
Resolved
Vessel restricted to carry 50 persons until additional life saving survivalcraft is installed.
Condition: Unknown
Due 25 April 2001
Resolved 25 April 2001
Construction/Loadline
Issued 10 May 2000
Resolved
Make permanent repair to the lazarette bilge alarm vice temporary installation.
Condition: Unknown
Due 10 May 2000
Resolved 10 May 2000
Lifesaving
Issued 10 May 2000
Resolved
Remove all non-operational water lights from life jackets or prove proper operation of all water lights.
Condition: Unknown
Due 10 May 2000
Resolved 10 May 2000
Documentation
Issued 10 May 2000
Resolved
Provide documentation that the company has all employees responsible for passenger safety are enrolled in the random chemical testing program as required by 46CFR part 16.
Condition: Unknown
Due 10 May 2000
Resolved 10 May 2000
Engineering
Issued 4 May 2000
Resolved
INSTALL PROPER CONNECTION FOR FLEXIBLE FUEL LINES FOR GENERATOR
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Electrical
Issued 4 May 2000
Resolved
PROVIDE CONDUIT FOR FEEDER CABLE TO DISCONNECT SWITCH.
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Engineering
Issued 4 May 2000
Resolved
REPAIR LUBE OIL LEAKS TO EXCHANGER FOR STBD MAIN ENGINE TRANSMISSION
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Electrical
Issued 4 May 2000
Resolved
PROVIDE DRIP SHIELD FOR AC DISCONNECT SWITCH.
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Construction/Loadline
Issued 4 May 2000
Resolved
INSTALL HIGH LEVEL BILGE ALARMS IN ENGINE ROOM AND LAZARETTE
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Documentation
Issued 4 May 2000
Resolved
PROVIDE DOCUMENTATION FOR DRUG TESTING PROGRAM
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Fire Fighting
Issued 4 May 2000
Resolved
PROVIDE DOCUMENTATION FOR SERVICING OF FIXED HALON FIRE SYSTEM.
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Construction/Loadline
Issued 4 May 2000
Resolved
SECURE HIGH LEVEL BILGE PUMP FLOAT SWITCH IN LAZERETTE.
Condition: Unknown
Due 11 May 2000
Resolved 16 May 2000
Documentation
Issued 7 May 1999
Resolved
PROVIDE CURRENT/VALID CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 12 May 1999
Resolved 12 May 1999
Electrical
Issued 7 May 1999
Resolved
REPAIR WIRING TO HALOGEN LIGHTS ON 2ND DECK.
Condition: Unknown
Due 12 May 1999
Resolved 12 May 1999
Construction/Loadline
Issued 7 May 1999
Resolved
INSTALL RETAINING CHAINS TO 3 WATER TIGHT HATCH COVERS.
Condition: Unknown
Due 12 May 1999
Resolved 12 May 1999
Lifesaving
Issued 7 May 1999
Resolved
SECURE BILGE HIGH LEVEL ALARM IN AFTER LAZARETTE.
Condition: Unknown
Due 12 May 1999
Resolved 12 May 1999
Electrical
Issued 7 May 1999
Resolved
REPLACE GLASS GLOBE IN LIGHTING FIXTURE, STBD SIDE, AFT, MAIN DECK.
Condition: Unknown
Due 12 May 1999
Resolved 12 May 1999
Fire Fighting
Issued 13 May 1998
Resolved
ALL PORTABLE FIRE EXTINGUISHERS TO BE CERTIFIED AS SERVICEABLE.
Condition: Unknown
Due 13 May 1998
Resolved 14 May 1998
Engineering
Issued 13 May 1998
Resolved
RENEW FLAME SCREEN ON FUEL TANK VENT.
Condition: Unknown
Due 13 May 1998
Resolved 14 May 1998
Accommodation/Occupational Safety
Issued 13 May 1998
Resolved
LABEL UPPER DECK ACCESS POINT WITH LIMITED PASSENGER COUNT PER STABILITY TEST DATA.
Condition: Unknown
Due 13 May 1998
Resolved 14 May 1998
Lifesaving
Issued 13 May 1998
Resolved
EPIRB MOUNT TO BE REPLACED WITH PROPER HYDROSTATIC RELEASE AND EXPIRATION DATE.
Condition: Unknown
Due 13 May 1998
Resolved 14 May 1998
Fire Fighting
Issued 25 April 1997
Resolved
Properly service the fixed fire fighting system in the machinery space.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Lifesaving
Issued 25 April 1997
Resolved
Properly repair the two life float waterlights.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Lifesaving
Issued 25 April 1997
Resolved
Properly repair the starboard life float waterlight bracket.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Fire Fighting
Issued 25 April 1997
Resolved
Provide bronze or similiar material fire hose nozzle.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 25 April 1997
Resolved
Attach the leashes to the forepeak and lazarette hatches.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Lifesaving
Issued 25 April 1997
Resolved
Properly repair the EPIRB bracket.
Condition: Unknown
Due 14 May 1997
Resolved 14 May 1997
Electrical
Issued 25 April 1997
Resolved
Provide guard for the generator salt water pump.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Lifesaving
Issued 25 April 1997
Resolved
Provide two additional adult lifejackets. The vessel is restricted to 98 total persons.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Construction/Loadline
Issued 25 April 1997
Resolved
Permanently label each valve on the bilge manifold.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Engineering
Issued 25 April 1997
Resolved
Properly install the flame cups on the main engine fuel filters.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Navigation
Issued 25 April 1997
Resolved
Prove operation of the single side band radio (SSB).
Condition: Unknown
Due 2 May 1997
Resolved 28 April 1997
Navigation
Issued 25 April 1997
Resolved
Prove operation of the ships horn.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Lifesaving
Issued 25 April 1997
Resolved
Properly place the vessel name on the life float paddles.
Condition: Unknown
Due 25 April 1997
Resolved 25 April 1997
Navigation
Issued 6 May 1996
Resolved
CORRECT UPTODATE ALL CHARTS.
Condition: Unknown
Due 15 July 1996
Resolved 19 September 1996
Lifesaving
Issued 6 May 1996
Resolved
APPLY REFLECTIVE TAPE TO RING BUOYS.
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Navigation
Issued 6 May 1996
Resolved
PROVIDE CURRENT LIGHTLIST, TIDE/CURRENT TABLES, COAST PILOT AND RULES OF THE ROAD.
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Documentation
Issued 6 May 1996
Resolved
PROVIDE COPY OF MIS REPORT_x001C_ _x001C_ _x001C_ X
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Accommodation/Occupational Safety
Issued 6 May 1996
Resolved
POST WASTE MANAGEMENT PLAN.
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Documentation
Issued 6 May 1996
Resolved
CONDUCT PREEMPLOYMENT TESTING AND PROVE ENROLLMENT IN RANDOM PROGRAM.
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Documentation
Issued 6 May 1996
Resolved
DISPLAY AND DISTRIBUTE EMPLOYER POLICY AND HOTLINE NUMBERS.
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Accommodation/Occupational Safety
Issued 6 May 1996
Resolved
PROVIDE WASTE MANAGEMENT LOG.
Condition: Unknown
Due 15 July 1996
Resolved 19 September 1996
Navigation
Issued 6 May 1996
Resolved
LABEL FLARE CONTAINER "DISTRESS SIGNALS"
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Fire Fighting
Issued 6 May 1996
Resolved
SERVICE FIXED HALON SYSTEM.
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Lifesaving
Issued 6 May 1996
Resolved
POST LIFEJACKET INSTRUCTIONS.
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Navigation
Issued 6 May 1996
Resolved
POST FCC RADIO CHECKLIST_x001C_
Condition: Unknown
Due 15 July 1996
Resolved 19 September 1996
Documentation
Issued 6 May 1996
Resolved
PROVIDE LIST OF EMPLOYEES AND DATES OF EMPLOYMENT. 46/16.210
Condition: Unknown
Due 15 July 1996
Resolved 19 September 1996
Documentation
Issued 6 May 1996
Resolved
CONDUCT 60 MINUTE EAP TRAINING_x001C_
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Documentation
Issued 6 May 1996
Resolved
POST COMPANY DRUG PROGRAM
Condition: Unknown
Due 3 July 1996
Resolved 3 July 1996
Construction/Loadline
Issued 1 May 1996
Resolved
PROPERLY LABEL THE VESSEL WITH THE CORRECT OFFICIAL NUMBER IN ACCORDANCE WITH 46 CFR 185.602(b) AND 46 CFR 67.15-1. TO BE COMPLETED TO THE SATISFACTION TO THE ATTENDING MARINE INSPECTOR BUT NO LATER THAN NEXT INSPECTION.
Condition: Unknown
Due 1 May 1996
Resolved 1 May 1996
Engineering
Issued 26 April 1995
Resolved
REPLACE RACOR FUEL FILTER FLAME SHIELDS FOR BOTH MDE'S AND GENERATOR SET.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Lifesaving
Issued 26 April 1995
Resolved
REPLACE LATCH HOOKS FOR LIFEJACKET BIN COVERS.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Electrical
Issued 26 April 1995
Resolved
REPLACE BATTERY BOX COVERS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Fire Fighting
Issued 26 April 1995
Resolved
PROVIDE BRONZE NOZZLE FOR FIRE HOSE.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Construction/Loadline
Issued 26 April 1995
Resolved
PROPERLY LABEL BILGE MANIFOLD.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Construction/Loadline
Issued 26 April 1995
Resolved
CLEAN BILGE STRAINER IN TANKROOM.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Lifesaving
Issued 26 April 1995
Resolved
PROPERLY STOW B/A SEA PAINTER.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Documentation
Issued 26 April 1995
Resolved
PROVIDE GARBAGE LOG.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Fire Fighting
Issued 26 April 1995
Resolved
CLEAN UP RUSTED PORTABLE EXTINGUISHER BRACKETS IN MAIN CABIN AREA.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Engineering
Issued 26 April 1995
Resolved
PROVIDE MACHINERY GUARD FOR STABOARD ENGINE BELT AND PULLY AT FORWARD END OF ENGINE.
Condition: Unknown
Due 15 May 1995
Resolved 6 June 1995
Engineering
Issued 26 April 1995
Resolved
PROVIDE FLAME SCREEN FOR FUEL VENT.
Condition: Unknown
Due 15 May 1995
Resolved 6 June 1995
Navigation
Issued 26 April 1995
Resolved
REPAIR PORT RUNNING LIGHT._x001C_
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Lifesaving
Issued 26 April 1995
Resolved
REPLACE WATERLIGHT BATTERY.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Accommodation/Occupational Safety
Issued 26 April 1995
Resolved
LABEL UPPER DECK WITH MAXIMUM PASSENGERS ALLOWED ON UPPER DECK.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Electrical
Issued 26 April 1995
Resolved
PROVIDE METALIC SUPPORTS FOR WIRE BUNDLE CENTERLINE OF ENGINEROOM OVERHEAD.
Condition: Unknown
Due 27 April 1995
Resolved 27 April 1995
Documentation
Issued 26 April 1995
Resolved
PROVIDE EVIDENCE OF COMPLIANCE WITH DRUG TESTING REQUIREMENTS OF 46 CFR 16.
Condition: Unknown
Due 15 May 1995
Resolved 6 June 1995
Electrical
Issued 21 April 1994
Resolved
REPAIR D.C. VOLT METER IN PILOT HOUSE_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Fire Fighting
Issued 21 April 1994
Resolved
PROPERLY WIRE HALON DISCHARGE/ENGINE/GENERATOR SHUTDOWN SYSTEM_x001C_ _x001C_ TO BE COMPLETED PRIOR TO THE CARRIAGE OF PASSENGERS_x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Lifesaving
Issued 21 April 1994
Resolved
STENCIL PFD STOWAGE IAW 46 CFR 185.30-10_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Documentation
Issued 21 April 1994
Resolved
PROVIDE DRUG TESTING POLICY_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Lifesaving
Issued 21 April 1994
Resolved
PROVIDE 60' LINE FOR RING BUOY IAW 46 CFR 180.30-10(a)_x001C_ _x001C_ TO BE COMPLETED PRIOR TO THE CARRIAGE OF PASSSENGERS
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Lifesaving
Issued 21 April 1994
Resolved
PROPERLY MOUNT WEAK LINK IAW 46 CFR 180.20-1(a)_x001C_ _x001C_ TO BE CORRECTED PRIOR TO THE CARRIAGE OF PASSENGERS_x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Lifesaving
Issued 21 April 1994
Resolved
PROVIDE PADDLES FOR LIFE FLOATS IAW 46 CFR 180.15-1(a)_x001C_ _x001C_ TO BE COMPLETED PRIOR TO THE CARRIAGE OF PASSENGERS_x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Documentation
Issued 21 April 1994
Resolved
PROVIDE FCC SAFETY CERTIFICATE AND STATION LICENCE_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Documentation
Issued 21 April 1994
Resolved
PROVIDE VESSEL DOCUMENT_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994
Documentation
Issued 21 April 1994
Resolved
PROVIDE WASTE MANAGEMENT PLAN_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 21 April 1994
Resolved 21 April 1994