MAURY USCG vessel records
← All vessels

THREE RIVERS QUEEN

THREE RIVERS QUEEN is a 1994 passenger vessel (inspected). The Coast Guard has recorded 27 inspections since 2016, most recently in July 2026, along with 39 deficiencies and 10 casualty investigations between 2001 and 2024.

Records from 2001 to 2026. Most recent: inspection, 7 July 2026.

Built
1994
Last inspected
7 July 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 7 July 2026
…with no type recorded5
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDI3440
404862
Flag
UNITED STATES
Maury page id
psix-404862

Documentation record

Registered dimensions (L × B × D)87.7 ft × 30.0 ft × 7.2 ft
Registered tonnagegross 96 / net 65
ITC dimensions (L × B × D)87.7 ft × 30.0 ft × 7.2 ft
ITC tonnagegross 271 / net 81
BuilderFREEPORT SHIPBUILDING · FREEPORT, FL, UNITED STATES · built 1994
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPITTSBURGH, PA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 May 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it271 - Convention (Subpart B), Gross Ton
96 - Regulatory (Subpart C or D), Gross Ton
81 - Convention (Subpart B), Net Ton
65 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 27

7 July 2026 Annual Inspection · MSP Additional Oversight - Risk Assessment
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8405402
12 May 2025 Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 8133315
15 June 2024 Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7935552
15 June 2024 Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7944244
10 June 2024 Deficiency Check · Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7931548
31 May 2024 Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7926274
31 May 2024 Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7926356
11 March 2024 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7876068
8 December 2023 Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7836419
8 December 2023 Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7845218
20 October 2023 In-Service Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7812694
18 April 2023 Administrative Inspection · COI Inspection · In-Service Inspection · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7658591
17 May 2022 Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7453121
26 April 2022 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7418922
8 February 2022 Damage Survey
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7392691
8 June 2021 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7219227
17 November 2020 Administrative Inspection
Administrative · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7096915
26 May 2020 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6972911
7 November 2019 In-Service Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6852286
16 July 2019 Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6820617
14 July 2019 Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6818882
4 April 2019 Administrative Inspection · Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6663763
19 February 2019 Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6636122
11 April 2018 COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6389447
17 March 2017 Examination of Repairs · Special Drydock
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6109437
18 October 2016 In-Service Inspection
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 6027043
4 May 2016 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 5870270

Deficiency record · 39

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 July 2026 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery,. . . including the following: Operational test and inspection of engine control mechanisms including primary and alternate means of starting machinery. During inspection, vessel's starboard main diesel engine (MDE)could not be started from the pilothouse. Vessel staff determined a faulty solenoid was the issue, it was replaced during the inspection, and engine could once again be started from the pilothouse.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 7 July 2026
Resolved 7 July 2026
Resolution: Solenoid was replaced during inspection.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 7 July 2026 Resolved
If a vessel is not equipped with a single source of power for emergency lighting, it must have individual battery powered lights which have sufficient capacity for a minimum of 2hrs of continuous operation. Battery for emergency light in second deck fire stairwell failed to power light for more than a few seconds. Replace battery in emergency light.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 July 2026
Resolved 8 July 2026
Resolution: Vessel's mechanic sent video of properly functioning E-light.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 June 2024 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Port shaft separated at the coupling immediately forward of the shaft seal allowing shaft to slide back and water ingress. Affect temporary repairs to mitigate potential water ingress via shaft seal and prepare corrective action/repair plan to correct and mitigate potential for recurrence. Notify attending marine inspector for attendance of plan development @ [phone withheld].
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 15 June 2024
Resolved 18 June 2024
Resolution: Shaft reinstalled in coupling. Installed Castle nut retainer. Operational test SAT.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 10 June 2024 Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck. Emergency lighting located above COI not working. Repair/replace light.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2024
Resolved 18 July 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 June 2024 Resolved
The owner, managing operator, or a qualified servicing facility as applicable shall conduct the following inspections and tests:(1) For portable fire extinguishers, the inspections, maintenance procedures and hydrostatic pressure tests required by Chapter 4 of NFPA 10, with the frequency specified by NFPA 10. Fire extinguisher on main deck missing inspection label, tamper seal missing, and crew has not weighed extinguisher. Complete maintenance in accordance with NFPA 10. -Check at least the following items: (a) Location in designated place (b) No obstruction to access or visibility (c) Operating instructions on nameplate legible and facing outward (d) Safety seals/tamper indicators not broken or missing (e) Fullness determined by weighing or "hefting" (f) Examination for obvious physical damage, corrosion, leakage or clogged nozzle (g) Pressure gauge reading in operational range (i) HMIS label in place
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2024
Resolved 18 July 2024
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 10 June 2024 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. Eyewash in first aid kit expired. Replace eyewash with new.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2024
Resolved 18 July 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 June 2024 Resolved
At least one ring buoy must be fitted with a floating waterlight, unless the vessel is limited to daytime operation, in that case no floating waterlight is required. Floating water light on stern inoperable. Repair as required.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2024
Resolved 18 July 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 May 2024 Resolved
46 CFR 182.05-1 (OLD T): Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements. The port shaft of the vessel came uncoupled. Repair port shaft.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2024
Resolved 1 June 2024
Resolution: Bolt was replaced and an additional bolt was added for redundancy to prevent recurrence.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 December 2023 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Approximate 4" crack found in fore peak space in vicinity of keel. Vessel not allowed passengers until repairs are made. Affect repairs IAW NVIC 7-68. While in transit to shipyard: -Conduct hourly rounds of space -Maintain dewatering pump in vicinity of space -Notify MSU Pittsburgh duty Marine Inspector upon departure from current location, arrival at shipyard, and of any change in vessel condition at [phone withheld].
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 15 December 2023
Resolution: Replaced 20" x 30" hull plating IAW NVIC 7-68. Weld test conducted utilizing dye penetrant method. Test SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 April 2023 Resolved
Grab line. The grab line shall be 3/8-inch diameter polyethylene, polypropylene, or other suitable buoyant type synthetic material having a minimum breaking strength of 1,350 pounds. Life buoy grab line aft of pilothouse wasted from environmental exposure. Repair/replace as required.
Action required: 10 - Deficiency Rectified
Due 18 May 2023
Resolved 10 May 2023
Resolution: Replaced life buoy with new stock.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 April 2023 Resolved
If your vessel's Certificate of Inspection is renewed less often than annually, the marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, twice every 5 years. No more than 3 years may elapse between any check and its immediate predecessor. No documentation available for calliope air compressor relief valve testing. Test/replace as required.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 May 2023
Resolved 10 May 2023
Resolution: Replaced calliope relief valve.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 18 April 2023 Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, flooding, heavy weather, or man overboard conditions. Missing from pilot house. Replace as required.
Action required: 10 - Deficiency Rectified
Due 18 May 2023
Resolved 19 April 2023
Resolution: Emergency instructions posted in pilothouse as required.
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 18 April 2023 Resolved
A station bill must be posted by the master on a vessel of more than 19.8 meters (65 feet) in length having: (1) Overnight accommodations for more than 49 passengers; or (2) A Certificate of Inspection requiring more than four crew members at any one time, including the master. Station bill missing from pilothouse. Replace as required.
Action required: 10 - Deficiency Rectified
Due 18 May 2023
Resolved 19 April 2023
Resolution: Station bill posted in pilothouse as required.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 8 February 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. A 1/2" hole was found on the bottom of the hull outboard of the stuffing box of the shaft log. Prior to carrying passengers, dry dock vessel and make ready for Coast Guard inspection to determine extent of hull damages.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 February 2022
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 February 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. A 1/2" hole was found on the bottom of the hull outboard of the stuffing box of the shaft log. Inspection completed showing no further damage. Crop out and renew to original condition a section no less than 18" x 18" IAW NVIC 07-68. Complete NDT of repairs in the presence of CG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2022
Resolution: Cropped out and replaced IAW NVIC 07-68
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 June 2021 Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Electrical distribution panel in engine room missing breaker/blank and is open to accidental personnel contact. Install breaker or blank to prevent accidental contact to energized parts of distribution panel.
Action required: 10 - Deficiency Rectified
Resolved 30 June 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 June 2021 Resolved
Rugs and carpets are not permitted in machinery spaces. Rug found at engine room entrance. Remove from machinery as required.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 30 June 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 June 2021 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Highly flammable aerosol containers are being stored in the engine room, remove as required.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 30 June 2021
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 May 2019 Resolved
The 40-B:C portable fire extinguisher located in the 2nd deck concession area installed in wrong bracket. Provide approved bracket for extinguisher type.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2019
Resolved 22 May 2019
Resolution: Wrong bracket replaced with approved bracket.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 May 2019 Resolved
Several portable fire extinguishers located throughout vessel have loose mounting brackets as they attach to stuctures/mounting surfaces including the brackets cylinder capture devices. Make all loose fire extinguisher brackets that attach to structures and mounting surfaces tight and make tight all bracket cylinder capture devices.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2019
Resolved 22 May 2019
Resolution: Fire extinguisher brackets properly secured.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 May 2019 Resolved
Severe internal bottom hull plating wastage noted along both sides of the CVK in Void #1 - biler Space. Provide internal hull thickness readings in affected area as identified by the attending CG MI and submit a proposal to mitigate and arrest any further corrosion.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 June 2019
Resolved 22 May 2019
Resolution: Mitigation plan acceptable. Crop and renew scheduled for next haul-out.
Engineering › Pressure Vessel › Relief Valve
Issued 11 April 2018 Resolved
Repair leaking valve in hot water heating system boiler. Prior to operating boiler.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 April 2018
Resolved 20 April 2018
Resolution: Valve replaced
Lifesaving › Lifebuoys › Serviceable
Issued 11 April 2018 Resolved
Replace deteriorated grab line on stbd side lifebuoy.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: Replaced lifebuoy
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 11 April 2018 Resolved
Replace deteriorated waterlight lanyard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: Replaced lanyard
Lifesaving › Lifebuoys › Serviceable
Issued 11 April 2018 Resolved
Replace deteriorated grab line on 2nd deck lifebuoy.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: Replaced lifebuoy
Engineering › Steam System (auxiliary) › Piping
Issued 11 April 2018 Resolved
Properly plug holes in both hot water boiler exhaust pipes.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: Plugged thermocouple holes
Engineering › Steam System (auxiliary) › Lagging/Insulation
Issued 11 April 2018 Resolved
Properly install exhaust pipe lagging on both boilers to cover piping completely.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: lagging installed
Engineering › Steam System (auxiliary) › Valve, Relief
Issued 11 April 2018 Resolved
Test safety relief valves on both hot water heating boilers boilers.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 April 2018
Resolution: relief valve replaced in kind
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 April 2018 Resolved
Properly secure all overhead wiring runs as identified by the attending CG MI.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2018
Resolved 20 April 2018
Resolution: secured wire runs
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1.1-Documentation Routine Vessel Inspection
Issued 11 April 2018 Resolved
Provide proof of annual VGP compliance verification.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: VGP compliant
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 11 April 2018 Resolved
Proove proper operation oof fwd mast head and stern lights.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: Nav light operational
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 11 April 2018 Resolved
Provide proper/approved fire extinguisher bracket for BI located in pilothouse.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: bracket installed
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 11 April 2018 Resolved
Update Fire Control Pln to reflect equipment installed on vessel
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2018
Resolved 20 April 2018
Resolution: fire control plan updated.
Communications › Alarms/Indicators › Bilge Alarm
Issued 4 May 2016 Resolved
Make permanent repairs to high water float alarms in Engine Room, Forepeak, and Beverage Space. Floats had come off the mounts.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2016
Resolved 6 May 2016
Construction/Loadline › Structures › Transverse Bulkhead
Issued 4 May 2016 Resolved
Cable penetrations through watertight bulkheads required to be sealed in rudder room and beverage spcece.
Condition: Improper Installation
Due 20 May 2016
Resolved 6 May 2016
Engineering › Fuel Oil Service System › Valve
Issued 4 May 2016 Resolved
Repair fuel shut off valve to port boiler to enable complete closing of the valve from remote shutdown.
Condition: Improper Installation
Due 20 May 2016
Resolved 6 May 2016
Electrical › Electrical Distribution System (service) › Junction Box
Issued 4 May 2016 Resolved
Provide permanant cover over junction box located behind port boiler.
Condition: Improper Installation
Due 20 May 2016
Resolved 6 May 2016
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 4 May 2016 Resolved
Repair lettering on port bow deck life ring.
Condition: Improper/Lack of Maintenance
Due 20 May 2016
Resolved 6 May 2016
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Drum Pressure Gage Shut-off
Issued 4 May 2016 Resolved
Prior to seasonal service conduct required boiler tests and inspections to the satisfaciton of the CG Marine Inspector
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 October 2016
Resolved 18 October 2016

Casualty record · 10

14 December 2001Routine · role: Involved in a Marine Casualty · activity 1478263
14 December 2001Routine · role: Involved in a Marine Casualty · activity 1478263
7 May 2002Routine · role: Involved in a Marine Casualty · activity 1704869
22 July 2006Routine · role: Involved in a Marine Casualty · activity 2748066
15 May 2015Routine · role: Involved in a Marine Casualty · activity 5199951
14 July 2019Routine · role: Involved in a Marine Casualty · activity 6818882
16 July 2019Routine · role: Involved in a Marine Casualty · activity 6820617
8 December 2023Routine · role: Involved in a Marine Casualty · activity 7845218
31 May 2024Routine · role: Involved in a Marine Casualty · activity 7926274
15 June 2024Routine · role: Involved in a Marine Casualty · activity 7944244
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 3

PECONIC RIVER QUEEN (2001–2002), TUNICA QUEEN (2001), ARKANSAS QUEEN (2006). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.