Records from 2016 to 2025. Most recent: inspection, 30 May 2025.
Documentation record
Registered dimensions (L × B × D)44.3 ft × 15.8 ft × 7.4 ft
Registered tonnagegross 34 / net 27
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMUNSON MFG INC · EDMONDS WA, UNITED STATES · built 1994
Hull materialAluminum
PropulsionDiesel Outdrive
Hull shapeShip
Hull configurationMonohull
Hailing portYELLOWSTONE PARK, WY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 16 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it34 - Simplified, Gross Ton
27 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
30 May 2025
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8106650
31 May 2024
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7929918
2 June 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7684677
3 June 2022
Annual Inspection · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7412313
6 July 2021
Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7247229
9 April 2021
Hull Examination · COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7171881
8 October 2020
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7073907
23 July 2020
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7014036
7 June 2019
DAPI Audit · Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6690456
5 June 2018
Administrative Inspection · DAPI Audit · MARPOL Annex VI Survey · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6429927
9 June 2017
DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6143010
9 June 2016
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5902240
17 May 2016
Administrative Inspection · Deficiency Check · Annual Inspection · MARPOL Annex VI Survey · DAPI Audit
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5879480
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 3 June 2022
Resolved
A space containing propulsion machinery must be equipped with a fire detection system. The fire detection panel was found to have no power and has not been maintained IAW the manufactures maintenance manual. Prove proper operation of the panel prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 July 2022
Resolution: The deficiency was cleared to the satisfaction of an USCG Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 June 2022
Resolved
Propulsion machinery must be capable of operating at constant marine load. 2 of 3 propulsion engines are inoperable due to electronic issues. Prove proper operations prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2022
Resolution: The deficiency was cleared to the satisfaction of an USCG Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 3 June 2022
Resolved
Found fracture in weld located port side near deck of window. Provide repair proposal and make repairs to the satisfaction of an USCG Marine Inspector.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2022
Resolved 18 July 2022
Resolution: The deficiency was cleared to the satisfaction of an USCG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 June 2022
Resolved
The owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment. Inspection found the fixed fire suppression system bottle vale installed preventing the system to function properly if the remote pull station was used to initiate system discharge. Prove the system is in operational status in accordance with the manufactures instruction manual prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2022
Resolution: The deficiency was cleared to the satisfaction of an USCG Marine Inspector.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 6 July 2021
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency.Repair hull fractures in center bilge compartment.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 July 2021
Resolution: Upon further inspection there were three fractures found. Received series of emails containing photographic evidence of repairs. Received email from Marina Manager [name withheld] attesting to satisfactory condition and repairs as witnessed by [name withheld].
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 June 2021
Resolved
Prior to carrying passengers for hire ensure all required maintenance, including hydrostatic testing of compressed gas cylinder is completed for installed fixed fire fighting system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2021
Resolution: Received servicing reports showing all necesary details.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 June 2019
Resolved
Prior to operating the vessel with passengers, ensure all the portable fire extinguishers are properly serviced.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 June 2019
Resolved
Ensue the bottom louver on the stbd side vent, closes shut all the way.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 July 2019
Resolved 28 June 2019
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 7 June 2019
Resolved
Prove proper operation of the rudder angle indicator.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 August 2019
Resolved 2 August 2019
Resolution: Replaced
Engineering › Bilge Water Management System › Hose
Issued 5 June 2018
Resolved
Replace the leaking bilge pump discharged hose.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2018
Resolved 11 June 2018
Resolution: Hose replaced
Fire Fighting › Ventilation Systems › Operating Controls
Issued 9 June 2017
Resolved
Post operating procedures for the port stern, manual, vent closure.
Due 9 July 2017
Resolved 20 June 2017
Engineering › Freshwater System (jacketwater cooling) › Fitting
Issued 9 June 2017
Resolved
Repair the small leak in the stbd MDE raw water pump.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 July 2017
Resolved 20 June 2017
Resolution: Fitting replaced
Fire Fighting › Fixed Halon Fire Extinguishing System › Quantity of Halon
Issued 1 June 2016
Resolved
Prior to carrying passengers, ensure the installed fire system is serviced. It was tested by us and is operational.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 10 June 2016
Resolution: Serviced
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 1 June 2016
Resolved
Prior to carrying passengers, ensure proper operation of the center engine, "fuel alarm".
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 10 June 2016
Resolution: Injectors replaced and test driven
Documentation › Certificates/Documents › Certificate of Inspection
Issued 1 June 2016
Resolved
Prior to carrying passengers, ensure the original COI is posted (copy installed until a new COI can be signed by the command).
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 June 2016
Resolved 10 June 2016
Resolution: A new COI has been routed for command signature, A copy has been installed until a new COI can be signed by the command.
Fire Fighting › Remote Fuel Shutoff › General
Issued 1 June 2016
Resolved
Properly lube the fuel shut-off valve pull cable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2016
Resolved 10 June 2016
Engineering › Freshwater System (jacketwater cooling) › Pump
Issued 1 June 2016
Resolved
Repair the small leak in the stbd MDE raw water pump.
Due 13 June 2016
Resolved 10 June 2016
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 1 June 2016
Resolved
Prove proper operation of the Engine Control Unit, (ECU) using the approved loss of propulsion procedure.
Due 13 June 2016
Resolved 10 June 2016
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 1 June 2016
Resolved
Provide proof of current MOB and fire drills.
Condition: Improper/Lack of Maintenance
Due 13 June 2016
Resolved 10 June 2016
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 1 June 2016
Resolved
Replace the one condemned adult PFD or revise (reduce by one) the PDF storage count
Condition: Improper/Lack of Maintenance
Due 13 June 2016
Resolved 10 June 2016