Records from 2016 to 2026. Most recent: inspection, 12 March 2026.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 November 2024
Resolved
Vessel must complete Drydock Exam and Internal Structural Exam prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 January 2025
Resolution: Vessel completed satisfactory DD & ISE to satisfaction of local MSU STT OCMI.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 18 June 2024
Resolved
Provide 02 additional hand red flare distress signals so there are a total of 06 on board.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2024
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 18 June 2024
Resolved
Due to high winds, vessel unable to get underway for propulsion, sail, and steering tests as well as emergency drills. Conduct underway tests and drills.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 June 2024
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 June 2024
Resolved
Fire pump rattles and makes a loud grinding noise when engaged. Service the pump's bearings or replace pump to prevent potential pump failure.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 June 2024
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 18 June 2024
Resolved
Provide a visual indicator for the starboard engine room bilge high level alarm.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 June 2024
Resolved
Install a positive shutoff valve at the hull penetration of the port and starboard aft automatic submersible bilge pump discharge.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 June 2024
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 18 June 2024
Resolved
Abandon ship, man overboard, and fire fighting drills must be conducted and logged at least once every 3 months. Conduct and log drills.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 June 2024
Resolved
Starboard aft bilge pump was not operational. Vessel mechanic cleaned and tightened wire connections and tested sat.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 June 2024
Resolved
Seal the cable run in the starboard engine room aft bulkhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 June 2024
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 11 April 2023
Resolved
Due to high winds, vessel unable to get underway for propulsion, sail, and steering tests as well as emergency drills. Conduct underway tests and drills within 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 April 2023
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 October 2022
Resolved
The starboard backstay chainplate has a stress fracture in the upper load bearing area. Replace chainplate in kind.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 October 2022
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 October 2022
Resolved
Conduct post Mast Inspection sea trials.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 October 2022
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 27 April 2022
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Install guards in front of or covering the rotating machinery on the port and starboard engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 29 July 2022
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 27 April 2022
Resolved
Provide a battery powered bullhorn.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 May 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 12 August 2021
Resolved
Make the port lazarette hatch watertight prior to August 26, 2021.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 August 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 9 August 2021
Resolved
Your vessel must undergo an annual inspection with the 3 months before or after each anniversary date. Vessel is overdue for annual inspection. Anniversary date is 14APR.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 April 2020
Resolved
Submit electrical drawings to the Coast Guard at [email withheld] for newly installed 12volt power source under operating station for vital systems (note vessel name and Official Number). Include Manufacture specifications for battery bank, switches, over current protection, battery charger, wire run length, wire size, wire type and connection to house panel if applicable. Following approval, Coast Guard will re-attend Vessel to certify proper installation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 May 2020
Resolution: plan submitted and installed per 183.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 14 April 2020
Resolved
Make collision bulkhead on STBD side watertight (penetration for electrical wire).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 May 2020
Resolution: Penetration sealed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 April 2020
Resolved
Replace retro-reflective tape (SOLAS) on 36 Adult and 06 Child PFDS, tape was found wasted and no longer reflective.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 May 2020
Resolution: New SOLAS tape applied
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 April 2020
Resolved
Provide 02 portable lights for vessel, 01 shall be stored at operating station and 01 shall be in the vicinity/access of the machinery space.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 May 2020
Resolution: Flash lights provided
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 April 2020
Resolved
Repair/replace set screws in furling foil on jibstay, screws were missing on bottom foil.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 May 2020
Resolution: Screws replaced.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 24 October 2019
Resolved
Repair soft spot locations identified (upper platform, on forward deck in front of storage/benches, vertical section under port window next to mast. all areas of cross member attachments with the exception of the aft one on the port side, and all other self identified locations), submit repair proposal to include material type (Glass type, weight, and resin). Area must be properly prepped and ground down to good glass prior to carrying out repairs.
Action required: 705 - Other - as specified
Resolved 14 November 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 24 October 2019
Resolved
Seal inboard hull penetrations into the engine room for a watertight in the watertight envelope.
Action required: 705 - Other - as specified
Resolved 10 December 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 October 2019
Resolved
Seal penetrations into the engine rooms for a vapor tight seal (from aft compartment and where hose penetrates the deck above.
Action required: 705 - Other - as specified
Resolved 10 December 2019
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 24 October 2019
Resolved
Provide drawings of new items to attached to deck (i.e. bar) with weight difference to local [name withheld] installed new deck and seating measurements will need to be completed by local OCMI for passenger count.
Action required: 705 - Other - as specified
Resolved 14 November 2019
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 October 2019
Resolved
Vessels rudder post found with crevice corrosion near rudder and minor crevice corrosion found on upper portion before sleeve. Rudder post will be removed for re-inspection NLT 24 APRIL 2020. Local Marine Inspectors will evaluate the condition for any changes.
Action required: 705 - Other - as specified
Resolved 18 November 2019
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 16 May 2019
Resolved
Valid COD must be kept on board at all times.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2019
Resolution: Copy provided
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 May 2019
Resolved
Replace 01 adult PFDs, vessel is restricted to carrying 68 total persons.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
Resolution: New Adult PFD onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 16 May 2019
Resolved
Provide metallic positive shutoff valves at hull penetration for all installed submersible bilge pumps.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 May 2019
Resolution: Metallic valves installed at hull.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2019
Resolved
Provide over-current protection device to all wires connected directly to battery terminal within 72 inches of wire run to battery terminal. STBD Battery
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
Resolution: Inline fuse installed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 May 2019
Resolved
All connections to battery terminals shall be made with permanent type connectors, wing nuts are not permanent type. STBD Battery.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
Resolution: Wingnuts removed.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 16 May 2019
Resolved
Provide hatch for securing Engine Room door on STBD side, and close bulkhead penetrations on portside to prevent vapors from entering accommodation space (Head).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
Resolution: Completed
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 16 May 2019
Resolved
Provide light cover on light fixture in STBD forward compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
Resolution: Cover installed.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 16 May 2019
Resolved
Cracks discovered on STBD lower shroud chain plate, make connection point available for re-inspection and to conduct NDT (Dye pen) in the presence of attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
Resolution: NDT conducted, additonal 835 issued.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 May 2019
Resolved
Remove STBD collision bulkhead panel for forward compartment inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 May 2019
Resolution: Cover removed, inspected with no deficiencies.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 May 2019
Resolved
Multiple hairline cracks are visible in both Port and STBD stainless steel shroud chain plates, NDT (Dye pen) was conducted in the presence of attending [name withheld] confirmed cracks were not superficial or just surface cracks. Aluminum cross-member connection point for jib-stay was found to be fatigued and elongated an estimated 1/4inch. Provide plan for repair/replace for all lower standing rigging chain-plates and connection points.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 June 2019
Resolution: Additional CG835 issued.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 16 May 2019
Resolved
Provide adequate ventilation for batteries, batteries currently installed in port and STBD lazarette producing unsafe levels of LEL due to charging and lack of ventilation for hydrogen gas.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 May 2019
Resolution: Batteries relocated to E/R
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 May 2019
Resolved
Provide access to attending Marine inspector to visually inspect fastener penetrations when chain plates are removed. Replacement of port and STBD chain plates shall be visually inspected after installation. Retain old fasteners for examination.
*Prior to credit drydock
Action required: 705 - Other - as specified
Resolved 26 June 2019
Resolution: Added special note to vessel, must be completed prior to recieving credit drydock.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 May 2019
Resolved
Provide access to attending Marine inspector to visually inspect and measure Aluminum cross-member connection point for jib-stay by removing the clevis pen from the toggle prior to any repair or fabrication.
*Prior to credit Drydock
Action required: 705 - Other - as specified
Resolved 26 June 2019
Resolution: Added special note to vessel, must be completed prior to recieving credit drydock.
Lifesaving › Buoyant Apparatus › Serviceable
Issued 8 May 2018
Resolved
Replace/renew port Buoyant Apparatus. BA is not in good serviceable condition, lifeline attachment points degrading.
Action required: 705 - Other - as specified
Due 8 August 2018
Resolved 17 August 2018
Resolution: New 22 person life float on board.
Navigation › Piloting/Steering › Magnetic Compass
Issued 8 May 2018
Resolved
Repair/replace light on magnetic compass.
Action required: 705 - Other - as specified
Due 8 June 2018
Resolved 8 June 2018
Resolution: Light on compass is operational.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 8 May 2018
Resolved
Post emergency instructions.
Action required: 705 - Other - as specified
Due 8 June 2018
Resolved 8 June 2018
Resolution: Instructions posted.
Engineering › Steering Gear System › Cable
Issued 8 February 2018
Resolved
Repair steering gear assembly prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 March 2018
Resolution: Steering gear assembly repaired.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 8 February 2018
Resolved
Repair cracked welds on passenger embarkation/disembarkation ladder.
Action required: 705 - Other - as specified
Due 8 March 2018
Resolved 1 March 2018
Resolution: Cracked welds repaired.
Communications › Radio Communications › VHF Radiotelephone
Issued 14 April 2017
Resolved
Provide GPS input for VHF radio.
Action required: 705 - Other - as specified
Due 14 May 2017
Resolved 19 May 2017
Resolution: GPS integrated into VHF radio.
Fire Fighting › Fixed Gas Fire Extinguishing System › Tanks
Issued 14 April 2017
Resolved
Replace fixed gas fire system tanks for both port and starboard installations. Manufacture dates are 1994.
Action required: 705 - Other - as specified
Due 28 April 2017
Resolved 28 April 2017
Resolution: New fixed fire system tanks were installed, verified coverage of area to be the same as previous installation (200ft3). Conducted operational test of both systems.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 14 April 2017
Resolved
Provide plans to OCMI to install 4" rail courses on vessel.
Action required: 705 - Other - as specified
Due 14 May 2017
Resolved 19 May 2017
Resolution: Deck rail courses installed at 4" intervals.
Engineering › Steering Gear System › Rudder
Issued 28 November 2016
Resolved
Starboard rudder broken off.
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 November 2016
Resolved 9 December 2016
Resolution: Rudder Replaced
Engineering › Steering Gear System › Rudder
Issued 28 November 2016
Resolved
Rudder stop on port side has broken off.
Action required: 705 - Other - as specified
Due 28 December 2016
Resolved 9 December 2016
Resolution: rudder stop replaced.
Documentation › Certificates/Documents › FCC SSL
Issued 12 April 2016
Resolved
Provide valid FCC SSL.
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 12 April 2016
Resolution: Vessel retrieved valid FCC SSL from office.
Lifesaving › Lifejacket/PFD (Type I) › Marking
Issued 12 April 2016
Resolved
Provide a donning placard for each type of lifejacket on board.
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 12 April 2016
Resolution: Vessel printed and posted a donning placard for each type of lifejacket on board.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Valve
Issued 25 January 2016
Resolved
Engine cooling intake valve would not close completely, required to be fixed or replaced prior to DD credit.
Action required: 705 - Other - as specified
Due 8 March 2016
Resolved 22 February 2016
Resolution: Valve repaired.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 25 January 2016
Resolved
Provide new shaft, propeller, and bearings for inspection prior to drydock credit.
Action required: 705 - Other - as specified
Due 10 March 2016
Resolved 22 February 2016
Resolution: Witnessed installation of new shaft, bearings, propeller.