MAURY USCG vessel records Sign in
← All vessels

AO 42

AO 42 is a 1942 tank barge. The Coast Guard has recorded 18 inspections since 1985, most recently in September 1990, along with 19 deficiencies.

Records from 1985 to 1990. Most recent: inspection, 20 September 1990.

Built
1942
Last inspected
20 September 1990
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

Flag
UNITED STATES
—
Maury page id
psix-40586

Inspections, by type

…with no type recorded8
Years with a record 6 calendar years (1985–1990)
The 18 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 36 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Documentation record

Tonnage as PSIX records it603 - Regulatory (Subpart C or D), Gross Ton
603 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 18

20 September 1990 Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 450774
14 March 1990 Re-Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1232049
6 March 1990 Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 535266
10 July 1989 Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 513873
4 April 1989 Deficiency Check · Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1193806
25 August 1988 Administrative
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1345935
6 July 1988 Examination of Repairs · Damage Survey
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1342334
25 March 1988 COI Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 992874
29 October 1987 Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 538616
6 August 1987 Re-Inspection · Drydock Extension
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1336946
24 April 1987 Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 502906
11 December 1986 Damage Survey · Examination of Repairs
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1331950
21 August 1986 Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 499453
7 August 1986 Deficiency Check
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 998572
30 July 1986 COI Inspection
Physical examination · MSO CINCINNATI · Activity 996575
12 July 1986 Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 501885
28 January 1986 Re-Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1306105
3 March 1985 Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 491083

Deficiency record · 19

Construction/Loadline
Issued 6 July 1988 Resolved
MAKE PERMANENT REPAIRS TO 2' X 2' DOUBLER PLATE IN WAY OF #1 PORT CARGO TANK BILGE KNUCKLE 27' AFT OF FWD DRAFT MARKS PRIOR TO LOADING CARGO BUT NOT LATER THAN 06 SEP 88.
Condition: Unknown
Due 6 July 1988
Resolved 6 July 1988
Construction/Loadline
Issued 30 July 1986 Resolved
AT THE NEXT VESSEL DRYDOCKING OR GAS FREE PERIOD MAKE REPAIRS AS NECESSARY TO THE STARBOARD AFT TIMBERHEAD, ASSOCIATED DECK PLATE, AND STRENGTH MEM- BERS.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Deck/Cargo
Issued 30 July 1986 Resolved
PROVIDE CONTAINMENT DRIP PANS THAT CONSTRUCTED IN ACCORDANCE WITH THE VESSELS ON BOARD OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Unknown
Issued 30 July 1986 Resolved
REPAIR OR REPLACE TO MAKE OPERABLE ALL RELIEF VALVES ON THE STEAM PIPING SYSTEM.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Construction/Loadline
Issued 30 July 1986 Resolved
PROVIDE A NEW GASKET FOR THE ACCESS OPENING TO THE NO. 5 CARGO TANK. THIS ITEM IS TO BE COMPLETED PRIOR TO LOADING THE NEXT VESSEL CARGO OR BY THE DATE OF COMPLIANCE, WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Deck/Cargo
Issued 30 July 1986 Resolved
REPLACE THE INTERNALS FOR THE P/V VALVES ON THE NOS. 3 AND 6 CARGO TANKS. THIS ITEM IS TO BE COMPLETED PRIOR TO LOADING THE NEXT VESSEL CARGO OR THE DATE OF COMPLIANCE, WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Deck/Cargo
Issued 30 July 1986 Resolved
CLEAN OR REPLACE THE FLAME SCREEN ON THE NO. 1 CARGO TANK P/V VALVE. THIS ITEM IS TO BE COMPLETED PRIOR TO OFFLOADING THE ONBOARD CARGO.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Construction/Loadline
Issued 30 July 1986 Resolved
PRESENT THE VESSEL FOR A CREDIT DRYDOCK EXAMINATION OR PROVIDE EVIDENCE OF SUFFICIENT FRESHWATER SERVICE.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Construction/Loadline
Issued 30 July 1986 Resolved
PRESENT THE VESSEL FOR INSPECTION OF THE SIDE PLATE PRIOR TO LOADING THE NEXT VESSEL CARGO OR BY THE DATE OF COMPLIANCE, WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Deck/Cargo
Issued 30 July 1986 Resolved
REPAIR THE HYDRAULIC LEAK ON THE STARTING SYSTEM FOR THE CARGO PUMP ENGINE.THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE CARGO PUMP ENGINE.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Construction/Loadline
Issued 30 July 1986 Resolved
REPAINT VESSEL NAME AND DRAFT MARKINGS.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Unknown
Issued 30 July 1986 Resolved
CLEAN OIL AND ABSORBTION MATERIAL FROM THE DECK IN WAY OF THE NOS. 1 AND 2 CARGO TANKS AND INBOARD OF THE CARGO PUMP ENGINE. THIS ITEM IS TO BE COM- PLETED PRIOR TO LOADING THE NEXT VESSEL CARGO OR THE DATE OF COMPLIANCE, WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Documentation
Issued 30 July 1986 Resolved
PROVIDE ONBOARD THE VESSEL A ONE-LINE DIAGRAM TO COMPLETE THE OIL TRANSFER PROCEDURES. THIS ITEM IS TO BE COMPLETED PRIOR TO LOADING THE NEXT VESSEL CARGO.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Deck/Cargo
Issued 30 July 1986 Resolved
TEST THE CARGO PIPING AT 1.5 TIMES THE MAWP OR PROVIDE EVIDENCE OF A TEST BEING CONDUCTED WITHIN THE LAST YEAR.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Deck/Cargo
Issued 30 July 1986 Resolved
PROVE THE PROPER OPERATION OF THE RELIEF VALVE ON THE CARGO PUMP OR PROVIDEEVIDENCE THAT THE RELIEF VALVE HAS BEEN TESTED IN THE PAST YEAR.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Construction/Loadline
Issued 30 July 1986 Resolved
REPLACE THE GASKET ON THE ULLAGE OPENING FOR THE STERN VOID.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Construction/Loadline
Issued 30 July 1986 Resolved
REMOVE ALL EXCESS WATER FROM THE BOW AND STERN COMPARTMENTS. THIS ITEM IS TO BE COMPLETED PRIOR TO DEPARTING THE PORT OF CINCINNATI.
Condition: Unknown
Due 30 July 1986
Resolved 30 July 1986
Construction/Loadline
Issued 28 January 1986 Resolved
MAKE PERMANENT REPAIRS TO THE TWO FRACTURES (6",10") IN THE BASE OF THE FORWARD PART OF THE STBD STERN TIMBERHEAD AT THE NEXT GAS FREE PERIOD BUT NLT 31AUG86.
Condition: Unknown
Due 28 January 1986
Resolved 28 January 1986
Construction/Loadline
Issued 28 January 1986 Resolved
MAKE PERMANENT REPAIRS TO THE 3" DECK FRACTURE ON THE OUTBOARD SIDE OF THE PORT BOW TIMBERHEAD AT THE NEXT GAS FREE PERIOD BUT NLT 31AUG86.
Condition: Unknown
Due 28 January 1986
Resolved 28 January 1986

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.