Records in 2001. Most recent: operational control imposed, 15 June 2001.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Lifesaving
Issued 15 June 2001
Resolved
PORT LIFEBOAT FORWARD LIMIT SWTICH DOES NOT WORK. REPAIR BY 18 JUNE 2001.
Condition: Unknown
Due 21 June 2001
Resolved 21 June 2001
Construction/Loadline
Issued 15 June 2001
No resolution recorded
STEEL INSERT IN HULL 5 METERS FORWARD IF PLIMSOL MARK PORTSIDE. PROVIDE CLASS REPORT ATTESTING TO INTEGRITY OF REPAIR BY 15 JULY 2001.
Condition: Unknown
Due 15 July 2001 — due date passed with no resolution recorded
Engineering
Issued 15 June 2001
No resolution recorded
M/E #7 CYLINDER HAS COOLING WATER LEAK ON CYLINDER HEAD BY WAY OF TURBOCHARGER. REPAIR TO SATISFACTION OF CLASS BY 15 JULY 2001.
Condition: Unknown
Due 15 July 2001 — due date passed with no resolution recorded
Lifesaving
Issued 15 June 2001
Resolved
STBD LIFEBOAT WILL NOT LOWER. PROVE PROPER OPERATION TO SATISFACTION OF CLASS PRIOR TO DEPARTURE.
Condition: Unknown
Due 16 June 2001
Resolved 16 June 2001
Engineering
Issued 15 June 2001
No resolution recorded
ALL PIPE LAGGING AROUND F/O PURIFIERS, F/O TRANSFER PUMPS, AND M/E FUEL LINES SOAKED AND COVERED WITH FUEL. CLEAN AND/OR REPLACE BY NEXT U.S. PORT.
Condition: Unknown
Due 1 August 2001 — due date passed with no resolution recorded
Engineering
Issued 15 June 2001
No resolution recorded
M/E HAS EXCESSIVE FUEL AND OIL ON IT. CLEAN ALL FUEL AND OIL FROM M/E PRIORTO NEXT U.S. PORT.
Condition: Unknown
Due 1 August 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 15 June 2001
No resolution recorded
STBD SIDE CARGO COMPRESSOR HAS CARGO LEAKS. REPAIR ALL LEAKS TO SATISFACTION OF CLASS BY NEXT U.S. PORT.
Condition: Unknown
Due 1 August 2001 — due date passed with no resolution recorded
Electrical
Issued 15 June 2001
No resolution recorded
NUMEROUS CARGO DECK LIGHTING FIXTURES FILLED WITH WATER. REPAIR ALL LIGHT FIXTURES BY 15 JULY 2001.
Condition: Unknown
Due 15 July 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 15 June 2001
No resolution recorded
BOTH ANCHOR WINDLASS BRAKE LININGS SEVERELY WASTED. REPLACE/REPAIR TO SATISFACTION OF CLASS BY NEXT U.S. PORT.
Condition: Unknown
Due 1 August 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 15 June 2001
No resolution recorded
BOTH CARGO DECK TANKS HAVE ONE RELIEF VALVE WITH BROKEN SAFETY WIRES. PROVIDE PROOF OF TESTING AND NEW WIRES INSTALLED BY NEXT U.S. PORT.
Condition: Unknown
Due 1 August 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 15 June 2001
No resolution recorded
GAUGE BOXES BY WAY OF STBD MANIFOLD WASTED AND BROKEN. REPAIR BY 15 JULY 2001.
Condition: Unknown
Due 15 July 2001 — due date passed with no resolution recorded
Deck/Cargo
Issued 15 June 2001
No resolution recorded
CARGO GAS DETECTION ALARM PANEL WILL NOT RESET ON BRIDGE. PROVE PROPER OPERATION TO SATISFACTION OF CLASS BY NEXT U.S. PORT.
Condition: Unknown
Due 1 August 2001 — due date passed with no resolution recorded