Records from 2000 to 2020. Most recent: inspection, 8 January 2020.
Inspection history · 69
8 January 2020
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6885099
20 December 2019
COI Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6875940
20 November 2019
Drydock Extension · Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6872143
8 October 2019
Re-Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6830680
12 September 2019
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6809954
17 June 2019
Administrative Inspection · Re-Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6716277
2 April 2019
Deficiency Check · Re-Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6654351
3 December 2018
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6598162
29 November 2018
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6589436
15 May 2017
Periodic Inspection · Administrative Inspection · Deficiency Check · Examination of Repairs · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6146241
27 October 2016
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6034543
25 October 2016
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6029092
1 July 2016
Internal Structural Exam · In-Service Inspection · Drydock Exam · Examination of Repairs · Administrative Inspection · COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5959784
30 December 2008
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3389702
26 August 2008
Damage Survey · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3312178
5 August 2008
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3303289
26 July 2008
Damage Survey
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3282315
26 July 2008
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3283051
25 July 2008
Deficiency Check · Re-Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3268706
3 July 2008
Deficiency Check · Damage Survey
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3255914
31 May 2008
Examination of Repairs · Damage Survey
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3221792
28 May 2008
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3222556
26 May 2008
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3218981
18 April 2008
COI Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3135646
14 February 2008
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3147477
31 October 2007
Damage Survey · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3090457
26 July 2007
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3009123
17 July 2007
Examination of Repairs · Deficiency Check · Damage Survey
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2998674
12 July 2007
Re-Inspection · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2991437
27 April 2007
COI Inspection · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2888837
26 September 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2787285
31 March 2006
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2626436
4 November 2005
Re-Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2522849
1 October 2005
Deficiency Check · Damage Survey
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2503880
8 September 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2487395
2 September 2005
Administrative Inspection · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2487371
5 August 2005
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2467348
22 July 2005
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2434745
10 May 2005
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2354645
8 April 2005
Internal Structural Exam · COI Inspection · Hull Examination · Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2204081
8 April 2005
MTSA Verification
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2424169
7 January 2005
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2270744
16 January 2003
Administrative Inspection
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1728141
20 December 2002
Administrative Inspection
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1721612
25 February 2002
Administrative Inspection
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1488974
12 December 2001
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1077377
28 September 2001
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1459746
11 September 2001
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1379563
29 June 2001
Deficiency Check · Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1410614
16 May 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 161821
11 May 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1436565
5 May 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 505678
2 April 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 51568
31 March 2001
Deficiency Check · COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1459671
28 March 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 90848
27 March 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 731134
8 March 2001
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 212948
24 January 2001
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1061115
23 October 2000
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1054682
17 October 2000
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 823448
15 September 2000
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1056183
1 September 2000
Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1384543
22 August 2000
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 122859
18 August 2000
Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1384540
12 August 2000
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 492726
26 May 2000
Initial Certification · Hull Examination · Initial Construction-Excluding Oversight
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1464909
17 May 2000
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 536518
29 April 2000
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 505278
5 January 2000
Initial Construction-Excluding Oversight
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1438967
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 8 January 2020
No resolution recorded
03 Holes in hull near the main deck Above waterline approx 2" each Port side. 01 tear in hull near main deck above waterline approx 4" long stbd side bow area
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 January 2020 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 January 2020
No resolution recorded
extensive pitting stbd side bow below waterline , Large areas of bottom plate were coverd in scale/rust/salt buildup in engine room spaces prevented adequate inspection of the inside hull
Action required: 701 - Prior to carriage of passengers/cargo
07 - Fire Safety › N/A - No Subsystem › Crew alarm
Issued 20 December 2019
Resolved
Fault found on detection panel on bridge
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 December 2019
Resolution: Service Detection Panel Sat
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 20 December 2019
Resolved
Ansul system for galley out of service last service Nov 18
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 December 2019
Resolution: Serviced Ansul Sysytem
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 December 2019
Resolved
portable fire ext found out of service date last service Nov 2018
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 December 2019
Resolution: Serviced Portable Ext
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 27 June 2019
Resolved
Fire panel on bridge was in fault & did not sound the G/A alarm throughout the vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 July 2019
Resolution: tested system found sat
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 3 April 2019
Resolved
Illuminated exit signs are required. Several doorway exit signs were not illuminated.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 April 2019
Resolved 17 April 2019
Resolution: Exit sign bulbs were renewed. Walked the vessel, all working.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 3 April 2019
Resolved
Each space used by passengers must be fitted with lighting that provides for a safe habitable and working environment. Several interior passageway lights have burnt bulbs. Replace bulbs and ensure lighting works.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 April 2019
Resolved 17 April 2019
Resolution: Lighting bulbs were renewed. Walked the vessel, all working.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 April 2019
Resolved
The certificate of inspection shall be displayed under glass in a conspicuous place where observation by the passengers is likely. The certificate of inspection is not on board the vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 April 2019
Resolution: COI was onboard and posted.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 21 December 2018
Resolved
The fire alarm panel in the pilothouse does not trigger an alarm throughout the vessel; the general alarm in the pilothouse requires manual operation. Provide a plan for the pilothouse to be continually manned between 2200 and 0600 each night in the event of fire.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 December 2018
Resolution: Lockheed Martin provided a "Rapid Response Plan," demonstrating that a person has been contracted to man the pilothouse between the hours of 2200 and 0600 each day.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 December 2018
Resolved
The manhole covers for Ballast Tank 2 and the Forepeak Void were found to be missing bolts. Properly secure the covers.
UPDATE 12/26/2018: Ballast Tank 2 cover is properly secured. Forepeak Void only secured by a few bolts. As the vessel will be remaining dockside, the due dated was changed from prior to carriage of passengers to 14 days.
UPDATE 2/5/19: Due date changed to 2/5 to allow for delay due to gov't shutdown.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2018
Resolved 5 February 2019
Resolution: All tank tops where secure
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 21 December 2018
Resolved
Provide a copy of the vessels Fire & Safety Plan at the gangway for fire department use.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 December 2018
Resolution: A copy of the plan has been posted in the gangway watch shack.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 21 December 2018
Resolved
The automatic fire doors to the Great River Lounge on the 2 Deck did not close properly upon activation of the fire detection system. Prove proper closure of the fire doors.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 December 2018
Resolution: The fire doors closed satisfactorily during op test.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 21 December 2018
Resolved
The fire alarm panel in the pilothouse has an active fault. Repair/replace and prove proper operation of the fire alarm panel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2019
Resolved 3 April 2019
Resolution: Fire detection system was serviced. No faults showing on panel.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 21 December 2018
Resolved
The vent fan controller on the forward bulkhead of the Laundry Room was found to be broken. Repair or replace controller to eliminate hazard to passengers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2019
Resolved 26 December 2018
Resolution: The openings in the controller have been closed off to prevent passenger injury.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 21 December 2018
Resolved
The EXIT sign near the forward stairway on the 4 Deck was hanging from the overhead by its power cord. Properly mount the EXIT sign.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2019
Resolved 26 December 2018
Resolution: The exit sign has been replaced and is properly mounted.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 December 2018
Resolved
The self-igniting light on the lifebuoy stationed on the 3rd deck, port quarter, was found to be inoperable. Prove proper operation of the light.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 21 December 2018
Resolution: Light op test sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 December 2018
Resolved
The clean oil tank in the engine room was found to have a damaged flame screen on the vent. Repair or replace the flame screen. The dirty oil tank was found to have an open pipe on the top of the tank. Provide means to secure the open pipe.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 21 December 2018
Resolution: Flame screen replaced; open pipe capped.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 19 December 2018
Resolved
The electrical outlet for the small washer/dryer unit in the laundry room was found to be unsupported. Properly secure the outlet.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 21 December 2018
Resolution: Outlet properly mounted.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 19 December 2018
Resolved
Provide updated muster list and emergency instructions.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 21 December 2018
Resolution: Not applicable for vessel's intended service as C-ROD.
Engineering › Diesel Engine (auxiliary) › Pump, Positive Displacement
Issued 21 November 2017
No resolution recorded
Repair or replace the raw water pump on the STBD generator to eliminate leaks.
Prior to placing the vessel back into service.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2018 — due date passed with no resolution recorded
Communications › Alarms/Indicators › High Water Alarm
Issued 20 November 2017
No resolution recorded
Replace High Temp. shutdown sensors of both generators and make ready for testing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2018 — due date passed with no resolution recorded
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 20 November 2017
No resolution recorded
Prepare the following items on the generators for testing: Load Testing, Reverse Power Relay, High Temp Shutdowns, automation testing of the EDG.
Condition: Improper/Lack of Maintenance
Due 21 January 2018 — due date passed with no resolution recorded
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 15 May 2017
No resolution recorded
Prepare Fuel Shutoff Valves for testing.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 January 2018 — due date passed with no resolution recorded
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 27 October 2016
Resolved
Received repoat of sewage overflow on main deck aft of dining room and hold deck aft. Prior to carrying passengers provide a report addressing the cause of the sewage system failure. Complete satisfactory repairs of the MSD system, and any modifications to the approved system must be sent to MSC for approval and installed to the satisfaction of the attending Marine Inspector.
Due 27 October 2016
Resolved 21 December 2018
Resolution: MSD system satisfactorily inspected and tested.
Operations/Management › Drills/Instruction › Fire
Issued 27 October 2016
Resolved
Prior to carrying passengers, you must conduct fire and safety drills. To the satisfaction of the attending Marine Inspector.
Due 27 October 2016
Resolved 19 December 2018
Resolution: No longer applicable due to nature of vessel's operation.
Engineering › Thrusters › Motor
Issued 25 October 2016
Resolved
Port Z drive motor is locked up not allowing maneuverability. Repair or replace to the satisfaction of the attending CG Marine Inspector prior to next voyage.
Action required: 705 - Other - as specified
Due 24 November 2016
Resolved 27 October 2016
Resolution: Motor was replaced with a new one.
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 21 October 2016
No resolution recorded
Submit the Design Verification Failure mode Analysis and the Periodic Safety Test procedures to the USCG Marine Safety Center for approval. This item will be satisfied upon completion of the approval process with the Marine Safety Center and Verification of procedures to the satisfaction of the attending Marine inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Due 21 October 2016 — due date passed with no resolution recorded
Engineering › Diesel Engine (propulsion-reduction gear) › Piston
Issued 29 August 2008
Resolved
Prove proper operation of the port main diesel engine after completing all repairs required after recent piston/bearing failure. Vessel is to supply a service and repair report to be furnished by Cummins NW reps attesting the restored capabilities of this engine. Ref: 46 CFR 58.05
Condition: Unknown
Due 29 September 2008
Resolved 29 August 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Cylinder Liner
Issued 26 July 2008
Resolved
Make permanent repairs to Port Z-Drive primer mover engine (Cummins), due to identified cracked cylinder liners. In clearing this requirement, provide a copy of the Cummins Technician’s service report along with a statement from the chief engineer and master stating that the engine has been repaired and has been found suitable for a return to service. 46 CFR 58.05
Condition: Unknown
Due 26 August 2008
Resolved 5 August 2008
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 25 July 2008
Resolved
Conduct necessary repairs and troubleshooting to correct passenger elevator HIGH OIL TEMPERATURE failures. Provide service report for same from recognized elevator service rechnician.
Action required: 705 - Other - as specified
Due 8 August 2008
Resolved 31 July 2008
Resolution: RCVD report.
Engineering › Diesel Engine (propulsion-direct drive) › Bearing
Issued 3 July 2008
Resolved
Columbia Queen had excessive vibration on one or both of the main shafts. Vessel is underway en-route Rainier Or to discharge passengers for day excursion. Fred Devine will conduct diving survey in Rainier this afternoon. Issued 835 allowing completion of voyage to Rainier, passengers may remain aboard dockside. Damage report and repair proposal must be submitted to the CG prior to further operati
Due 3 August 2008
Resolved 7 July 2008
Resolution: Vessel moored to Rainer on 3 July 08; divers conducted underwater inspection; no fouling or damage to the propeller, shafts or rudders was found. OCMI issued subsequent 835 for vessel to complete intended voyage.
Engineering › Thrusters › Shaft
Issued 18 April 2008
Resolved
Prove proper operation of the port wing station's bow thruster shaft tachometer. 46 CFR 62
Condition: Unknown
Due 15 August 2008
Resolved 21 October 2016
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 18 April 2008
Resolved
Have sensing elements for the P&S SSDG High Exhaust Temp Alarms, on main Monitoring ans Alarm Panel, calibrated to set temp recommended by Cummins. Upon reinstallation, have each alarm tested to satisfaction of vessel's chief engineer. A signed affidavit by the chief engineer documenting the sat operation of the alarm, along with a cert verifying set temp will clear this requirement. 46 CFR 62
Due 2 June 2008
Resolved 26 May 2008
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 18 April 2008
Resolved
Prove proper operation of the OWS and the overboard content meter. Vessel cannot discharge overboard any water processed through this system until this has been completed. 33 CFR 155.380
Condition: Unknown
Due 18 May 2008
Resolved 22 April 2008
Engineering › Fuel Oil Service System › Hose
Issued 18 April 2008
Resolved
Verify ID of all cloth-jacketed hoses installed on SSDG diesel engines, MDE's, Z-drive engines & Bow thruster prime mover are SAE J1942 listed & properly installed (possible fire sleeves req). Note: There are hoses marked "air brake" used in coolant sys that are not SAE J1942 listed & will require replacement. Some hoses are Aeroquip FC300 which req. fire sleeve to meet SAE J1942. 46 CFR 56.60
Due 18 May 2008
Resolved 25 July 2008
Resolution: Hoses renewed and or covered with fire sleave.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 18 April 2008
Resolved
Update fire safety plan to reflect current arrangement of equipment and materials. During the 2008 COI inspection, discrepancies were found including missing vent dampers and smoke/heat detector heads for fire alarm system. The current FSP should be audited by ship's crew for accuracy before submitting for clearing this requirement. 46 CFR 78.45
Due 18 June 2008
Resolved 25 July 2008
Communications › Internal Communications System › Engine Order Telegraph System
Issued 18 April 2008
Resolved
Prove proper operation of the EOT "loss of power" alarms for the main engine EOT's and the audible alarm silencing via acknowledge buttons. 46 CFR 113.35
Due 18 May 2008
Resolved 25 July 2008
Engineering › Thrusters › Shaft
Issued 18 April 2008
Resolved
Prove proper operation of the bow thruster tachometers at all locations (this differs from HO01 issued this date as HO01 refers to a tach that needed to be replaced and this requirement is to address all others being out of calibration). 46 CFR 113.37
Due 15 August 2008
Resolved 21 October 2016
Engineering › Thrusters › Shaft
Issued 18 April 2008
Resolved
Prove proper operation of the Schottel Z-drive Synchronous Mode operation to the satisfaction of the attending Marine Inspector. 46 CFR 113.37
Due 1 June 2008
Resolved 25 July 2008
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 18 April 2008
Resolved
Clear all disconnect faults in the fire detection panel on the bridge. Currently there are two disconnects on the display.
Due 18 May 2008
Resolved 25 July 2008
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 18 April 2008
Resolved
The smoke detectors in the galley cooler and ice cream room display improperly on the fire detection panel. Prove proper operation of these detection indicators as indicated on the fire control plan.
Due 18 May 2008
Resolved 25 July 2008
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (electric)
Issued 31 October 2007
Resolved
As per phone conversation 10/30/07 Remove starter from z-drive and install on stbd main engine. Proceed from Clarkston down bound to Stevenson. Prior to leaving Stevenson renew starter. Provide this office with service order showing starter was renewed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2007
Resolved 1 November 2007
Resolution: Received service report.
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 17 July 2007
Resolved
Proceed to Sacajawea State Park and conduct troubleshooting/repairs to the stbd ship's service diesel generator. Provide tech report prior to movement of the vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 July 2007
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 12 July 2007
Resolved
Repair and demonstrate proper operation of passenger elevator.
Due 26 July 2007
Resolved 26 July 2007
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 12 July 2007
Resolved
Repair and demonstrate operation of door closer on door from the aft athwartship passageway to officer staterooms; starboard side main deck.
Due 26 July 2007
Resolved 26 July 2007
Construction/Loadline › Structures › End Bulkhead
Issued 12 July 2007
Resolved
Replace bulkhead structural insulation, aft bulkhead, port side, bow thruster room.
Due 26 July 2007
Resolved 26 July 2007
Stability › Watertight Integrity › General
Issued 12 July 2007
Resolved
Repair and demonstrate proper operation of the deck threshold for watertight door #2.
Due 26 July 2007
Resolved 26 July 2007
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 12 July 2007
Resolved
Provide one-line diagram and make electrical modifications in purser's office to provide receptacles for all installed electrical appliances.
Due 18 May 2008
Resolved 21 October 2016
Communications › Public Address System › Announcing Station
Issued 27 April 2007
Resolved
Re-mark the two talk-back stations on port and stbd side of main deck bow. 46 CFR 113.30
Due 27 May 2007
Resolved 31 May 2007
Accommodation/Occupational Safety › Potable Water System › General
Issued 27 April 2007
Resolved
Mark re-designated goose-neck vents for new potable water tanks on port and stbd fwd main deck. 46 CFR 71.25-40
Due 27 May 2007
Resolved 31 May 2007
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 27 April 2007
Resolved
Prove proper operation of low aux air pressure alarm (# 16 on main alarm panel). 46 CFR 62
Due 27 May 2007
Resolved 31 May 2007
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 27 April 2007
Resolved
Prove proper operation of stbd main propulsion shaft tachs at all locations. Currently, the stbd main shaft tachs hunt between 0 and 100 rpm's when engine is running in de-clutched mode. 46 CFR 113.37-5
Due 27 May 2007
Resolved 31 May 2007
Electrical › Lighting (emergency) › Lighting Fixture
Issued 27 April 2007
Resolved
Provide a complete list/diagram of all emergency lights installed throughout the vessel to facilitate and document the testing required by 46 CFR 78.17-45.
Due 27 May 2007
Resolved 31 May 2007
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 27 April 2007
Resolved
Re-mark all emergency light fixtures currently without the proper markings (red "e"). Some have had marking tags removed, some have been painted over. 46 CFR 78.47-33
Condition: Improper Installation
Due 27 May 2007
Resolved 31 May 2007
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 27 April 2007
Resolved
Have at least half of the deck lights installed above the main deck aft in way of the transom (emergency egress route, location of emergency gear locker, access to steering compartment). 46 CFR 112.43-7
Condition: Improper Installation
Due 27 May 2007
Resolved 31 May 2007
Communications › Alarms/Indicators › Propeller Direction Indicator
Issued 27 April 2007
Resolved
Prove proper operation of the EOT "loss of power" alarms for the z-drive eot's and the audible alarm silencing via acknowledge buttons. 46 CFR 113.35
Due 27 May 2007
Resolved 31 May 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 27 April 2007
Resolved
Submit for Coast Guard approval, a plan for the installation of a new fixed CO2 system for the bow thruster space. The new system must meet Coast Guard and system manufacturer's design requirements. To be completed no later than 27MAY07. 46 CFR 76.05-20
Condition: Improper Installation
Due 27 May 2007
Resolved 12 July 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 27 April 2007
Resolved
Install new CG approved CO2 system in the bow thruster space (ref: item HO09 issued this date) to the satisfaction of an attending CG marine inspector. Until this item is cleared, the terms listed in USCG Sector Portland ltr 16711/COLUMBIA QUEEN dated 27APR07 will be followed when vessel is carrying passenger on board. 46 CFR 76.05-20
Condition: Improper Installation
Due 1 April 2008
Resolved 18 April 2008
Accommodation/Occupational Safety › Washroom/Toilet › Washbasin
Issued 27 April 2007
Resolved
Reconnect the drain pipe for the hand washing sink located on the fwd bulkhead in the galley. 46 CFR 71.25-40
Condition: Improper/Lack of Maintenance
Due 27 May 2007
Resolved 31 May 2007
Electrical › Electrical Distribution System (service) › Cable
Issued 27 April 2007
Resolved
Reconnect the stuffing tube connector on the Hobart food mixer (stand-up) in galley. 46 CFR 111.81
Condition: Improper/Lack of Maintenance
Due 27 May 2007
Resolved 31 May 2007
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 27 April 2007
Resolved
Replace the missing splash cover on electrical outlet in galley, port side, in way of Cospolich reach in refrigerator. To be completed no later than 27MAY07. 46 CFR 111.81
Condition: Improper/Lack of Maintenance
Due 27 May 2007
Resolved 31 May 2007
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 27 April 2007
Resolved
Submit a non-tank vessel response plan for CG approval in accordance with USCG NVIC 01-05
Due 30 June 2007
Resolved 12 July 2007
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 27 April 2007
Resolved
Clear all faults in fire detection system panel on the bridge. 46 CFR 76.05-1
Due 30 June 2007
Resolved 12 July 2007
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 27 April 2007
Resolved
Have vessel name's hull marking and vessel name on Certificate of Documentation match. 46 CFR 67.123
Due 30 June 2007
Resolved 12 July 2007
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 27 April 2007
Resolved
Have Design Verification, Failure Mode Effect Analysis, and Periodic Safety Test Procedures submitted to the USCG Marine Safety Center for approval. This item will be satisfied upon complete approval by the MSC and satisfactory testing in presence of attending CG marine inspector. 46 CFR 61.40
Due 18 April 2009
Resolved 21 October 2016
Resolution: 835 cleared and written again with new dates for completion and to have more current deficiency not one that is 8 years old.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 27 April 2007
Resolved
Provide sound level test report for manned engineering spaces and crew accommodations (on main deck aft). With this report, include proposal for odifications/remedies for excessive noise levels identified by testing. Sound level survey report to be submitted by recognized testing organization/company. 46 CFR 58.01-50
Due 18 October 2008
Resolved 21 October 2016
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 29 September 2005
Resolved
Prove proper operation of Schottel Z-Drive bridge wing controls (P&S) to satisfaction of attending marine insp. Vsl must provide copy of svc rpt, issued by auth. Schottel svc rep., indicating mat'l condition found that led to recent malfunctions & identify corrective actions taken. Ref: 46 CFR 62.25 Vsl is prohibited from using brdg wing controls for Schottel Z-Drives until corrected.
Condition: Unknown
Due 1 November 2005
Resolved 1 October 2005
Electrical › Electrical Distribution System (service) › Cable
Issued 22 July 2005
Resolved
Remove or end injunction box, dead ended cable on distribution panel in back porch pantry.
Due 2 August 2005
Resolved 5 August 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 22 July 2005
Resolved
Replace lamp fixture where missing in back porch pantry.
Due 2 August 2005
Resolved 5 August 2005
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 22 July 2005
Resolved
Seal fiberglass insulation or remove food in back porch pantry.
Due 2 August 2005
Resolved 5 August 2005
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 22 July 2005
Resolved
Remove paint from oxygen locker.
Due 2 August 2005
Resolved 5 August 2005
Communications › Internal Communications System › Sound-powered Telephone
Issued 22 July 2005
Resolved
Demonstrate operation of phone next to elevator on the 03 deck.
Due 2 August 2005
Resolved 5 August 2005
Communications › Internal Communications System › Sound-powered Telephone
Issued 22 July 2005
Resolved
Demonstrate operation of elevator call system.
Due 2 August 2005
Resolved 2 September 2005
Resolution: Tested call system in both elevators, ops check good.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 22 July 2005
Resolved
Remove hasp from fwd. galley door on port side.
Due 2 August 2005
Resolved 5 August 2005
Electrical › Electrical Distribution System (service) › Panelboard
Issued 22 July 2005
Resolved
Install blanks where missing Panel # 5-P229 in electrical room.
Due 2 August 2005
Resolved 5 August 2005
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 22 July 2005
Resolved
Renew latch for Panel #12-224 in electrical room.
Due 2 August 2005
Resolved 5 August 2005
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 22 July 2005
Resolved
Demonstrate operation of fire screen door, port side stair tower main deck.
Due 2 August 2005
Resolved 5 August 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 22 July 2005
Resolved
Make permanent repairs to water leak in laundry aft bulkhead, stbd. side next to exit sign. Do not relag piping untill repair is inspected by CG inspector.
Due 2 August 2005
Resolved 5 August 2005
Communications › Visual Communication › Warning Sign (gangway)
Issued 22 July 2005
Resolved
Renew exit sign stbd. side fwd out of crew qtrs.
Due 2 August 2005
Resolved 5 August 2005
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 22 July 2005
Resolved
Remove flammables, paints & aerosols from emergency gear locker.
Due 2 August 2005
Resolved 5 August 2005
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 11 April 2005
Resolved
Install approved structural insulation to the exposed underdeck beams in the dry stores room.
Due 8 May 2005
Resolved 16 May 2005
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 8 April 2005
Resolved
Provide Design Verification and Periodic Safety Testing Procedures, all approved by the Coast Guard Marine Safety Center, per 46 CFR 62.20, and carry out all tests to the satisfaction of the attending Coast Guard marine inspector. Ref: 46 CFR 61.40
Due 8 April 2006
Resolved 27 April 2007
Resolution: Cleared and re-issued.
Stability › Watertight Integrity › General
Issued 8 April 2005
Resolved
Renew the gasket in the quick acting water tight door located between the main engine room and the forward A/C machinery room (due to excessive gap in joint). Until this is corrected, the joint gap is to be filled with a suitable flexible compound, rated for high temp. application.
Due 22 April 2005
Resolved 25 April 2005
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 8 April 2005
Resolved
Demonstrate the proper operation of the installed Oily Water Separator to the satisfaction of the attending CG marine inspector. This equipment shall not be operated until this requirement has been cleared. It is recognized that this equipment had been installed voluntarily and is not req. to be on board per current U.S. regs. 33CFR151.10
Due 8 April 2006
Resolved 27 April 2007
Lifesaving › Launching Appliances › Davit
Issued 8 April 2005
Resolved
Submit a detailed plan & sketch of desired modification to the rescue boat davit limit switch. 46CFR199.153(k).
Due 22 April 2005
Resolved 25 April 2005
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 8 April 2005
Resolved
Update fire control plan to reflect current arrangements and to include smoke detectors on the plan. 46CFR78.45-1
Due 8 June 2005
Resolved 20 May 2005
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 8 April 2005
Resolved
Prove that the deck between the grand stair tower and the dry stores space meets A-60 boundary. 46CFR72.05-10(g).
Due 22 April 2005
Resolved 11 April 2005
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Electrical › Electric Generation Source (service) › Switch
Issued 8 April 2005
Resolved
Install fireman override switch in all passenger elevators. 46CFR112.15-5(b).
Due 22 April 2005
Resolved 16 May 2005
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 8 April 2005
Resolved
Remove the "fault" indication on the smoke detection panel on bridge.
Due 8 April 2006
Resolved 27 April 2007
Resolution: Cleared and re-issued this date.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 8 April 2005
Resolved
Install fixed fire extinguishing system in the flammable locker located in the laundry room. 46CFR76.05.
Due 22 April 2005
Resolved 25 April 2005
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 8 April 2005
Resolved
Install "door coordinator" that will allow double doors (fire screen doors) to close in proper order regardless of what order they are closed for double doors located at the Purser's Lounge and main deck forward of stair tower. 46CFR72.05-25(b)(7)(i).
Due 29 July 2005
Resolved 25 April 2005
Communications › Internal Communications System › Voice Tube
Issued 8 April 2005
Resolved
Make "911" function of the internal phone system work properly. Complete prior to sailing.
Due 8 April 2005
Resolved 8 April 2005
Resolution: Received signed statement from Master via fax.
Construction/Loadline › Hull › Weld
Issued 25 February 2002
Resolved
Weld ballast tank boundaries in accordance with ABS rules for inland vessels or re-admeasure vessel without ballast tank exemptions. Interior tank boundaries are skip welded. LEGACY COMPONENT DESC: Weld
Condition: Design Flaw
Due 1 July 2003
Resolved 8 April 2005
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 February 2002
Resolved
Provide noise level test report for manned engineering spaces and crew accommodations main deck aft. Submit proposal for modifications to remedy excessive noise discovered as a result of test report. Survey conducted 10-11 Sep 01 in the presence of a CG inspector; report/proposal never provided.
Condition: Design Flaw
Due 8 April 2006
Resolved 27 April 2007
Resolution: Cleared and re-issued this date.
Fire Fighting › Fire Hydrants › Location/Position
Issued 28 September 2001
Resolved
Relocate fire station #38 (located in the Z-drive space) to a suitable location that allows access from deck. Consult [name withheld] prior to commencing work. New location must be approved, certified welders must be used and non-destructive testing must be witnessed.
Condition: Unknown
Due 1 July 2003
Resolved 8 April 2005
Construction/Loadline › Hull › Hull Plating
Issued 28 September 2001
Resolved
Have the following voids/tanks certified for entry: (all ballast tanks, voids, and cofferdams located aft of #1 ballast tank and forward of the chiller room (fwd machinery space).
Condition: Unknown
Due 1 July 2003
Resolved 8 April 2005
Engineering
Issued 29 June 2001
Resolved
MAKE PORT Z-DRIVE SHAFT/FOUNDATIONS AVAILABLE FOR FINAL WELD INSPECTION (POST-BRACKET MOD.) BY AN ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 July 2001
Resolved 16 July 2001
Engineering
Issued 29 June 2001
Resolved
PROVIDE FINAL SUMMARY REPORT ON REPAIRS/MODS TO BOTH Z-DRIVE SHAFTS. TO INCLUDE: 1) SKETCH OF FWD AND AFT BRACKET MODS; 2) BEFORE AND AFTER VIBRATION READINGS; AND 3) FINAL SHAFT ALIGNMENT READINGS. SUBMIT REPORT TO MSO PORTLAND, OR INSPECTION OFFICE.
Condition: Unknown
Due 7 August 2001
Resolved 7 August 2001
Engineering
Issued 29 June 2001
Resolved
COMPLETE MOD. TO FWD LINE SHAFT BEARINGS (FOUNDATIONS) FOR P&S Z-DRIVES.
Condition: Unknown
Due 16 July 2001
Resolved 16 July 2001
Construction/Loadline
Issued 29 June 2001
Resolved
REPAIR PORT EXTERIOR DOOR (FWD PORT GALLEY). DOOR CASING DAMAGED AND LATCHIS MISSING.
Condition: Unknown
Due 16 July 2001
Resolved 16 July 2001
Accommodation/Occupational Safety
Issued 29 June 2001
Resolved
PROVE PROPER OPERATION OF INTERNAL COMS TELEPHONE AT 3RD DECK ELEVATOR.
Condition: Unknown
Due 16 July 2001
Resolved 16 July 2001
Fire Fighting
Issued 31 March 2001
Resolved
Prove proper operation of the fire main pressure gage in the pilot house.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Accommodation/Occupational Safety
Issued 31 March 2001
Resolved
Provide documentation of noise level survey to be taken in all machinery spaces per 46 CFR 58.01-50. Survey should include readings taken in all possible machinery configurations.
Condition: Unknown
Due 31 March 2001
Resolved 31 March 2001
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 31 March 2001
Resolved
submit proposal to this office to bring construction of the port and stbd fwd fuel into full compliance with ABS Rules for Inland Steel Vessels._x001C_ (non-continuous welds on the under side of the tank.
Condition: Unknown
Due 1 July 2003
Resolved 8 April 2005
Resolution: Added Special Note and entry on Routes and Conditions to document that the two tanks are decomissioned for the long term.
Fire Fighting
Issued 31 March 2001
Resolved
provide correct detector heads and prove operation of detectors in hold deck freezer, ice cream freezer and cooler. Until this item is completed hourly rounds shall be made of these spaces and the results logged in the deck log.
Condition: Unknown
Due 16 July 2001
Resolved 16 July 2001
Construction/Loadline › Structures › Door
Issued 31 March 2001
Resolved
Provide CG approved plans for the complete installation of the two sliding wtd in the machinery spaces.
Condition: Unknown
Due 8 April 2006
Resolved 27 April 2007
Resolution: Vessel removed sliding water tight door components were removed. Vessel no longer wants the two sliding water tight doors installed in way of the main machinery spaces.
Construction/Loadline
Issued 31 March 2001
Resolved
Back gouge all weld installed in conjunction with with installation of the sliding wtd in the fwd bulkhead in the main engine room.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 31 March 2001
Resolved
Provide copies of welder certs and welding procedures for all welding/welders involved with current welding installations and repairs.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Construction/Loadline
Issued 31 March 2001
Resolved
Repair and prove operation of the WTD #2 from crews passage to laundry.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Engineering
Issued 31 March 2001
Resolved
Prove proper operation of the high exhaust temp. alarm for the starboard ssdg.
Condition: Unknown
Due 13 April 2001
Resolved 13 April 2001
Electrical
Issued 1 September 2000
Resolved
Install blank covers in electrical dist. panels in laundry room. (4-P229 & P404)
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Engineering
Issued 1 September 2000
Resolved
Install cage over daytank sightglass in bow thruster space.
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Construction/Loadline
Issued 1 September 2000
Resolved
Have excess water pumped out of bow thruster space and both engine rooms.
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Accommodation/Occupational Safety
Issued 1 September 2000
Resolved
Fabricate and install a guard at the outboard side of mid-level landing (large opening) in the fwd port crew stair well.
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Lifesaving
Issued 1 September 2000
Resolved
permanently mount file cabinet in dyrstores space.
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Construction/Loadline
Issued 1 September 2000
Resolved
Make permanent repairs to water tight bulkhead (fr 75) port side (1/4 inch dia. holes/4 ea.).
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Construction/Loadline
Issued 1 September 2000
Resolved
Complete fire stop installation in bulkhead #57 above stbd sewage tank IWO sideshell.
Condition: Unknown
Due 1 September 2000
Resolved 1 September 2000
Fire Fighting
Issued 18 August 2000
Resolved
Repair fire door on cabin deck between purser's office and atrium. Door does not close completely.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Construction/Loadline
Issued 18 August 2000
Resolved
Make tanks available for weld inspection. Fuel tanks do not need to be madeready. Voids and ballast tanks must be made ready.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Accommodation/Occupational Safety
Issued 18 August 2000
Resolved
Clean galley, remove all standing water, make ready for inspection. No foodto be served until galley is cleaned.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Electrical
Issued 18 August 2000
Resolved
Blank off hole in distribution panel EP205 in emergency generator space.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Accommodation/Occupational Safety
Issued 18 August 2000
Resolved
Properly connect all wires in engineroom PA/GA systems which are connected with wire nuts.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Accommodation/Occupational Safety
Issued 18 August 2000
Resolved
Properly secure all loose gear in engineering spaces.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Electrical
Issued 18 August 2000
Resolved
Label all power panel directories IAW 46CFR111.40.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000
Electrical
Issued 18 August 2000
Resolved
Install danger warning on main switchboard.
Condition: Unknown
Due 12 September 2000
Resolved 12 September 2000