Records from 2011 to 2026. Most recent: inspection, 12 February 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 12 February 2026
Resolved
At each initial inspection for certification of a vessel the owner or operator shall have the vessel ready for inspection all machinery essential to the routine operation of the vessel. MI observed broken cables to pull vent dampers closed on 2 of 4 engine room intakes. Repair.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2026
Resolution: MI received video evidence of the def correction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 February 2026
Resolved
At each initial inspection for certification of a vessel the owner or operator shall have the vessel ready for inspection all machinery essential to the routine operation of the vessel. MI found both MDE emergency fuel shut off valves not completely closing when activated. Readjust/Repair.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 February 2026
Resolution: MI received video evidence of the def correction.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 12 February 2026
Resolved
At each inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of lifesaving equipment and systems. MI observed drills not being properly logged.
Action required: 10 - Deficiency Rectified
Resolved 12 February 2026
Resolution: Vessel rep recorded drills completed during COI inspection while MIs on board.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 12 February 2026
Resolved
A vessel must be fitted with a FCC type accepted general marine radar system. MI observed crew unable to operate. Train crew how to use and repair if required.
*Route limited to Lakes, Bays, Sounds until corrected.
Action required: 705 - Other - as specified
Resolved 8 April 2026
Resolution: Vessel rep requested route reduction. Route reduced to LBS. No longer required to have a radar.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 February 2026
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018 as specified by IMO Resolution A.658(16) (incorporated by reference; see 46 CFR 175.600). MI found 23 adult life jackets with unserviceable retro reflective tape. Reduce pax to 56.
Action required: 705 - Other - as specified
Resolved 25 February 2026
Resolution: MI attended vessel and inspected all life jackets onboard. At time of inspection no defs were identified.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 February 2026
Resolved
Each life jacket must be marked with Type I retroreflective material approved in 46 CFR 164.018 as specified by IMO Resolution A.658(16) (incorporated by reference; see 46 CFR 175.600). MI found 01 child life jackets with unserviceable retro reflective tape. *Reduce child capacity to 9.
Action required: 705 - Other - as specified
Resolved 25 February 2026
Resolution: MI attended vessel and inspected all life jackets onboard. At time of inspection no defs were identified.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 February 2026
Resolved
Life ring SOLAS tape retro reflective Each ring life buoy must be marked with Type II retroreflective material (SOLAS Retroreflective Tape). Vessels ring life buoy was found with unserviceable retroreflective tape.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2026
Resolved 25 February 2026
Resolution: MI attended vessel and inspected life ring. At time of inspection no defs were identified.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 February 2026
Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted. MI observed 2x types of life jackets but only one type had a posted placard. Procure and post.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2026
Resolved 25 February 2026
Resolution: MI attended vessel and inspected all life jacket instructions onboard. At time of inspection no defs were identified.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 12 February 2026
Resolved
Each survival craft must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway. MI observed weak link lanyard set up to where it would not function. Run correctly. *Route reduced to Lakes, Bays, Sounds until corrected.
Action required: 705 - Other - as specified
Resolved 16 March 2026
Resolution: Vessel rep submitted picture evidence of lanyard corrected. MI reviewed and no defs identified.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 12 February 2026
Resolved
The discharge ends of vent pipes shall be fitted with removable flame screens or flame arresters. MI observed no vent screen on stbd side tank vent. Install. 46CFR182.20-35
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 2 March 2026
Resolution: Vessel POC submitted pictures of new screen. MI reviewed with no defs identified.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 12 February 2026
Resolved
On a vessel that on which the number of passengers permitted on upper decks is limited by stability criteria, the maximum number of passengers allowed on an upper deck must be indicated. MI observed incorrect labeling per stability letter. Correct.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2026
Resolved 25 February 2026
Resolution: MI attended vessel and inspected correct labeling. At time of inspection no defs were identified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 February 2026
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/ or originating in electrical equipment, and reasonably safe from electrical shock of personnel. Vessel was found with multiple dead end wires and corroded battery terminals on stbd side battery. Remove/repair wires. Clean/Repair terminals. 46 CFR 183.01-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2026
Resolved 25 February 2026
Resolution: MI attended vessel and inspected battery terminals and deadend wires. At time of inspection no defs were identified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 February 2026
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/ or originating in electrical equipment, and reasonably safe from electrical shock of personnel. MI observed incorrect breaker labeling on fwd 12vdc panel for 'tower lights'. Correct. 46 CFR 183.01-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2026
Resolved 25 February 2026
Resolution: MI attended vessel and inspected tower lights breaker labeling. At time of inspection no defs were identified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 February 2026
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment, and reasonably safe from electrical shock of personnel. MI observed bad 120v outlet, overhead. Repair. 46 CFR 183.01-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2026
Resolved 25 February 2026
Resolution: MI attended vessel and inspected new outlet. At time of inspection no defs were identified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 February 2026
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/ or originating in electrical equipment, and reasonably safe from electrical shock of personnel. Vessel was found with two damaged 12 volt DC breakers in aft 12vdc panel, Port and Stbd main. Replace. 46 CFR 183.01-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2026
Resolved 16 March 2026
Resolution: Vessel rep submitted picture evidence of new DC breakers installed. MI reviewed and no defs identified.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 12 February 2026
Resolved
Each vessel must be equipped with at least two operable portable battery lights. MI observed one portable light found onboard. Purchase and install.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2026
Resolved 25 February 2026
Resolution: MI attended vessel and inspected all portable lights. At time of inspection no defs were identified.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 12 February 2026
Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radio-beacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47CFR80. MI found vessel's radio to not have the GPS tied into the radio for the DSC function. Tie in so radio shows GPS coordinates.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 March 2026
Resolved 30 March 2026
Resolution: Vessel rep supplied evidence of new radio. MI reviewed, no defs identified.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 February 2026
Resolved
The intent of this part is to ensure that the scantlings and material arrangements of each vessel are such as to provide for safe operation in accordance with the terms of its certificate of inspection. Passengers are not allowed on the upper deck or forward of the helm due to damaged railings and a support column supporting the upper deck.
Action required: 705 - Other - as specified
Resolved 12 February 2026
Resolution: MI attended vessel and inspected repair. Allsat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 January 2026
Resolved
Repairs to the hull, machinery, or equipment that affect the safety of the vessel must not be made without approval of the cognizant [name withheld] found vessel undergoing repairs not overseen by the Coast Guard. All repairs shall be overseen by the Coast Guard prior to the carrying of passengers.
46CFR176.700
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 February 2026
Resolution: MI Attended vessel U/W to inspect resilts of repair. All sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 April 2025
Resolved
For fixed-gas fire extinguishing systems, the owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. MI found the system out of its service compliance date. Have annual servicing completed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2025
Resolution: Vessel POC emailed satisfactory proof of fire servicing completion and videos of the engine override test.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 17 April 2025
Resolved
Repairs or alterations to the equipment that affect the safety must not be made without the approval of the cognizant OCMI, except during an emergency. MI fund life ring and life floats with unauthorized repairs. Submit repair plan with 2 weeks.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 April 2025
Resolution: Vessel POC reached out to manufacturer who stated 5200 and a water based paint was acceptable repair. MI saw life ring and life floats repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 17 April 2025
Resolved
An adult life jacket must be provided for each person carried on board a vessel. MI found 9 life jackets that needed SOLAS tape and 14 that needed to be replaced. Complete replacements/repair within 14 days
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 April 2025
Resolution: Vessel POC reached out to manufacturer who stated 5200 and a water based paint was acceptable repair. MI saw repaired life jackets and new solas tape on the applicable life jackets.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 April 2025
Resolved
A power driven fire pump shall be installed on each mechanically propelled “S” that is permitted to carry more than 49 passengers. The fire pumps where inoperable. Passenger count is limited to 49 passengers.
Action required: 705 - Other - as specified
Resolved 16 June 2025
Resolution: MI attended vessel and observed port and starboard fire pump operated with no defs identified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 April 2025
Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). The stbd installed bilge system was found inoperative. Repair within 2 weeks.
46 CFR 182.25-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2025
Resolved 16 June 2025
Resolution: MI attended vessel and observed port and starboard bilge system operated with no defs identified.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 17 April 2025
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 2 1/2 gallon buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. Vessel will install fire buckets prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2025
Resolution: Vessel POC supplied satisfactory evidence of new fire buckets. MI reviewed with no deficiencies identified.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 17 April 2025
Resolved
On a vessel of at least 26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. MI found the high level alarms in the port forward space and the stbd laz spaces OOC. Repair or replace within 02 days.
Action required: 705 - Other - as specified
Resolved 9 May 2025
Resolution: Vessel rep supplied satisfactory evidence of new working bilge alarm. MI reviewed and no defs identified.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 April 2025
Resolved
The owner, managing operator must conduct the following inspections and tests. Portable extinguishers must be inspected and maintained in accordance with NFPA 10. Vessel had no logged fire extinguisher maintenance. Complete and log maintenance.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 April 2025
Resolution: Vessel POC showed new fire extinguisher maintenance log to MI that showed maintenance recorded.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 17 April 2025
Resolved
The master of the vessel shall ensure that Each EPIRB is tested monthly. The EPIRB test required shall be logged. No EPIRB testing logs where found onboard.
Test and log.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 April 2025
Resolution: Vessel POC supplied proof of new EPIRB log. MI reviewed and no deficiencies were identified.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 3 June 2024
Resolved
Stbd void #2, 12" crack in collision bulkhead. Repair prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 10 June 2024
Resolution: Crack was found to be in a filler material and not structural. All sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 3 June 2024
Resolved
Port and stbd void #2 flush mounded hatches are waisted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 31 July 2024
Resolution: MI inspected new hatch instalations. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 January 2024
Resolved
At least one ring life buoy must be fitted with a lifeline. Each lifeline on a ring life buoy must have a lifeline of at least 60 feet in length. Lifeline onboard was 40’ long’.
46 CFR 180.70(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 13 February 2024
Resolution: MI visited vessel and inspected cleared deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 30 January 2024
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. MI found Life Float life line attachments where damaged. Repair proposal requested.
46 CFR 180.175 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 13 February 2024
Resolution: MI visited vessel and inspected cleared deficiency.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 30 January 2024
Resolved
The service of each ship station must at all times be under the ultimate control of the master, who must require that each operator or such station comply with the Radio Regulations in force and that the ship station is used in accordance with those regulations. Vessel was not in compliance with the FCC Station License, FCC Operators Permit, or FCC Safety Radio Certificate.
46 CFR 80.114 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2024
Resolved 26 February 2024
Resolution: MI visited vessel and inspected cleared deficiency.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 30 January 2024
Resolved
Up-to-date charts and nautical publications of large enough scale to make safe navigation possible as appropriate for the intended voyage, must be carried onboard vessels. MI found outdated charts for intended voyages.
46 CFR 184.420 (a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 26 February 2024
Resolution: MI visited vessel and inspected cleared deficiency.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 30 January 2024
Resolved
The intent of this part is to ensure that the scantlings, materials, fastenings, workmanship in arrangement of each vessel are such as to provide for safe operation in accordance with the terms of its certificate of inspection. MI found the six hatch gaskets unserviceable.
46 CFR 177.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 28 February 2024
Resolution: POC sent photo of hatch gasket repair.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 30 January 2024
Resolved
Employers are responsible for all the actions of their officials, representatives, and agents in carrying out the requirements of this part. Vessel representatives did not understand their responsibilities for the DAPI program or furnish proof of compliance during inspection. The supervisor did not receive a 1 hour training.
46 CFR 16.203 (a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 13 February 2024
Resolution: MI visited vessel and inspected cleared deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 January 2024
Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/ or originating in electrical equipment, and reasonably safe from electrical shock of personnel. Vessel was found with an ungrounded wire on the stbd MDE and a lose bonding wire in the stbd lazarette.
46 CFR 183.05-30 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 February 2024
Resolved 13 February 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 June 2023
Resolved
A power driven fire pump shall be installed on each mechanically propelled “S” that is permitted to carry more than 49 passengers. Thee port fire pump was inoperable. Passenger count is limited to 49 passengers.
46 CFR 181.10-1 (a)
Action required: 705 - Other - as specified
Resolved 18 July 2023
Resolution: MI witnessed operation of fire pump. All sat
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 28 June 2023
Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Hydrostatic release was expired past the manufacturer’s date. Vessels rout restricted to no more than 3 miles from shore.
46 CFR 185.740 (b)
Action required: 705 - Other - as specified
Resolved 8 July 2023
Resolution: Vessel installed new hydrostatic release. POC sent photos to MI.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 28 June 2023
Resolved
At least once every three months the emergency drills shall be conducted. No drill logs kept for the previous six months. Conduct drills in the presence of a marine inspector.
46 CFR 185.420 (b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 June 2023
Resolution: Drills conducted in the presence of a MI.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 28 June 2023
Resolved
A vessel on a limited coastwise route must carry six approved hand red distress signals and six approved hand orange smoke distress signals or approved configuration of distress signals. Vessel had 3 red distress signals and 3 hand orange smoke distress signals. Reduce route to Lakes, Bays and Sounds.
46 CFR 180.68
Action required: 705 - Other - as specified
Resolved 30 June 2023
Resolution: New flares where brought onboard.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 28 June 2023
Resolved
The intent of this part is to ensure that the scantlings, materials, fastenings, workmanship in arrangement of each vessel are such as to provide for safe operation in accordance with the terms of its certificate of inspection. MI found the six hatch gaskets unserviceable.
46 CFR 177.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2023
Resolved 30 June 2023
Resolution: New gaskets where installed onboard.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 28 June 2023
Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. High level alarms visual indicator was extinguished from the port lazarette space.
46 CFR 185.530 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2023
Resolved 18 July 2023
Resolution: Vessel installed visiual indicator.
01 - Certificates & Documentation › 013 - Documents › Conformance Test Report
Issued 28 June 2023
Resolved
No marine employer shall engage or employ any individual to serve as a crew member unless the individual passes a chemical test for dangerous drugs for that employer. Vessels crew and captain where not enrolled in the company’s DAPI program. Vessel to only use crew that is current within the DAPI program.
46 CFR 16.210 (a)
Action required: 705 - Other - as specified
Resolved 30 June 2023
Resolution: MI reviewed DAPI and found all crew and captain current.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 June 2023
Resolved
The fixed power bilge pump shall be self priming. The port installed bilge system was found inoperative. All port submersible pumps must be operational for the vessel to operate.
46 CFR 182.25-5 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2023
Resolved 18 July 2023
Resolution: MI observed installed bilge pump evacuate water from all port side spaces.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 June 2023
Resolved
If a grounded distribution system is provided, there must be only one connection to ground. Vessel has an open ground on the 120 volt ships supply diesel generator electrical system in all outlets. Vessel is to keep generator secured until MI approves repair.
46 CFR 183.376
Action required: 705 - Other - as specified
Resolved 18 July 2023
Resolution: MI witnessed proper operational testing of the SSDG 120 V receptacles.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 June 2023
Resolved
If a grounded distribution system is provided, there must be only one connection to ground. Vessel has an open ground on the 120 Volt ships supply shore power electrical system in the forward outlet. Vessel is to keep generator secured until MI approves repair.
46 CFR 183.376
Action required: 705 - Other - as specified
Resolved 18 July 2023
Resolution: MI witnessed proper operational testing of the shore power 120 V receptacles.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 June 2023
Resolved
Propulsion machinery shall be suitable in type and design. Coolant expansion tanks on both MDE's are missing.
46 CFR 182.05-1 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2023
Resolved 18 July 2023
Resolution: MI observed newly installed coolant expansion bottles on both MDEs.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 June 2018
Resolved
Anchor light is not fuctioning. Prior to anchoring at night, fix anchor light so that it is fully fuctional.
Action required: 705 - Other - as specified
Resolved 1 June 2018
Resolution: Prior to anchoring at night, fix anchor light so that it is fully fuctional.
Engineering › Steering Gear System › Linkage
Issued 1 June 2018
Resolved
crew/nut on port steering linkage arm is upside-down,
place screw/nut on bottom of linkage assembly so that it will not fall out easily.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 June 2018
Engineering › Fuel Oil Service System › Piping
Issued 1 June 2018
Resolved
Fuel shut-off valves are located in the same compartment as the fuel tanks.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 July 2018
Resolution: relocated remote handles
Documentation › Markings/Placards › Hull Identification Number (HIN)
Issued 31 May 2017
Resolved
miising name of vsl on port and starboard hull
Condition: Damaged By Earlier Event
Due 14 June 2017
Resolved 14 June 2017
Resolution: Replaced name of vsl on both sides
Lifesaving › Lifefloat › Paddle
Issued 31 May 2017
Resolved
Oars not lashed to life float and vessel name is missing
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 1 June 2017
Resolution: lashed oars and stincled name
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 31 May 2017
Resolved
exshaust needs to be supported in starboard steering compartmenr
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 June 2017
Resolved 14 June 2017
Resolution: replaced strap with a metal one
Fire Fighting › Miscellaneous Items › B Class Division Penetrations
Issued 31 May 2017
Resolved
penetrations from engine room to steering gear space where wet exshaust penetrates bulkhead need to be sealed
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 1 June 2017
Resolution: used expanding foam to seal openings
Engineering › Fuel Oil Service System › Hose
Issued 31 May 2017
Resolved
clamp on fuel fill was loose
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 1 June 2017
Resolution: tigthned
Fire Fighting › Miscellaneous Items › B Class Division Penetrations
Issued 31 May 2017
Resolved
stuffing for thru penetrations
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 1 June 2017
Resolution: intalled spray foam
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 31 May 2017
Resolved
guards for belts on both port and starboard mde lever for fire pump is next to belts
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 14 June 2017
Resolved 14 June 2017
Resolution: replaced engine guards
Engineering › Steering Gear System › Pin
Issued 31 May 2017
Resolved
missing nuts on steering
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 1 June 2017
Resolution: replaced and tightned steering hardware
Engineering › Bilge Water Management System › Interface Detector
Issued 31 May 2017
Resolved
repair/replace high water alarms
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 1 June 2017
Resolution: replaced and tested bilge pumps
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 31 May 2017
Resolved
loose deck railing starboard aft
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 June 2017
Resolved 7 June 2017
Resolution: replaced bolts to railing
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 31 May 2017
Resolved
removed 27 life jackets
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 14 June 2017
Resolution: replaced and marked life jackets
Engineering › Bilge Water Management System › Pump
Issued 31 May 2017
Resolved
repair/replace bilge pumps
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2017
Resolved 1 June 2017
Resolution: rplaced and tested pumps
Operations/Management › Equipment Service/Testing › EPIRB
Issued 31 May 2017
Resolved
removed, vsl is not able to operate past three miles from shore
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 June 2017
Resolved 21 June 2017
Resolution: received conformation of updated eprib registration